Regulation 22, The Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011: Operation and Maintenance (O&M) Expenses
The Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011 - Regulation 22
Text of regulation 22
Operation and Maintenance (O&M) Expenses
[22. Operation and Maintenance (O&M) Expenses.-(1) Operation and Maintenance
(O&M) expenses shall comprise of the following:-
1
Subs. vide Not No. HPERC/F (5)(3)(1)(Gen.) dated 1
st
Nov., 2013 published in the R H.P.
dated 4
th
November, 2013 at p. 4599-4606. Before its substitution it stood as under:
“(2) The rate of return on equity shall be computed by grossing up the base rate with the normal tax rate for the year 2010-
11 applicable to the concerned generating company:
Provided that return on equity with respect to the actual tax rate applicable to the generating company in line with
the provisions of the relevant Finance Acts of the respective year during the tariff period shall be trued up separately for each
year of the tariff period along with the tariff petition filed for the next tariff period.”
2
Subs. for “33.22%” vide Not No. HPERC/F (5)(3)(1) (Gen.) dated 1
st
Nov., 2013 published in
the R H.P. dated 4
th
November, 2013 at p. 4599-4608.
3
Substituted vide Not. No. HPERC/F(5)(3)(1)(Gen) dated 1
st
November, 2013 published in the
Rajpatra Himachal Pradesh dated 4
th
November, 2013 at p. 4599-4606 and before its substitution it stood as
under:
“22. Operation and Maintenance (O&M) Expenses
(1) Operation and Maintenance (O&M) expenses shall comprise of the following:-
(a) salaries, wages, pension contribution and other employee costs;
(b) administrative and general costs;
(c) repairs and maintenance; and
(d) other miscellaneous expenses including insurance costs, statutory levies and taxes (except corporate income tax).
(2) Operation and maintenance expenses, for the existing generating stations which have been in operation for 3 years
or more in the base year of 2010-11, shall be derived on the basis of actual operation and maintenance expenses for the years 2007-
08 to 2009-10, based on the audited balance sheets, excluding abnormal operation and maintenance expenses, if any, after prudence
check by the Commission
(3) The normalised operation and maintenance expenses after prudence check, for the years 2007-08 to 2009-10, shall
be escalated @ 8.32% to arrive at the normalized operation and maintenance expenses at the 2009-10 price level respectively and
then averaged to arrive at normalised average operation and maintenance expenses for the 2007-08 to 2009-10 at 2009-10 price
level. The average normalized operation and maintenance expenses for year 2009-10 shall be escalated by 8.32% to arrive at the
normalized operation and maintenance of base year 2010-11. The normalized operation and maintenance expenses or the actual
operation and maintenance expenses for the base year 2010-11, whichever is lower shall be escalated at the rate of 8.32% to arrive at
the operation and maintenance expenses for year 2011-12.
(4) The operation and maintenance expenses for the year 2011-12 shall be escalated further at the rate of 8.32% per
annum to arrive at permissible operation and maintenance expenses for the subsequent years of the control period.
(5) In case of the hydro generating stations, which have not been in commercial operation for a period of three years
as on 1.4.2011, operation and maintenance expenses shall be fixed at 2% of the original project cost (excluding cost of
rehabilitation and resettlement works) and shall be escalated at the rate of 8.32% per annum from the subsequent year to arrive at
operation and maintenance expenses for the base year 2010-11. The base operation and maintenance expenses shall be further
escalated at the rate of 8.32% per annum to arrive at permissible operation and maintenance expenses for the respective year of the
tariff period.
(6) In case of the hydro generating stations declared under commercial operation on or after 1.4.2011,
operation and maintenance expenses shall be fixed at 2% of the original project cost (excluding cost of rehabilitation and
resettlement works) and shall be subject to annual escalation of 8.32% per annum for the subsequent years.
Compendium of HPERC Regulations, March 2021 19
(a) salaries, wages, pension contribution and other employee costs;
(b) administrative and general costs;
(c) repairs and maintenance; and
(d) other miscellaneous expenses including insurance costs, statutory levies and
taxes (except corporate income tax).
1
[(2) Operation and maintenance expenses, for the existing generating stations
which have been in operation for 5 years or more as on 31st March, 2018, shall be derived
on the basis of actual operation and maintenance expenses for the years 2013-14 to 2017-
18, based on the audited balance sheets, excluding abnormal operation and maintenance
expenses, if any, after prudence check by the Commission.
(3) In case of hydro generating stations, which have been in commercial operation
for less than 5 years as on 31st March, 2018, the Operation and maintenance expenses shall
be fixed at 2% of the original project cost, excluding cost of rehabilitation and resettlement
works, and shall be escalated in accordance with the escalation principles specified in sub-
regulation (6).
(4) In case of the hydro generating stations declared under commercial operation on
or after 1-4-2018, operation and maintenance expenses shall be fixed at 2% of the original
project cost, excluding cost of rehabilitation and resettlement works, and shall be escalated
in accordance with the escalation principles specified in sub-regulation (6).; and]
(5) Post, determination of base O&M Expenses for the generator/generating
company in sub-regulation (2), the O&M expenses for the n
th
year and also for the year
immediately preceding the control period, shall be approved based on the formula given
below:-
O&Mn = R&Mn + EMPn + A&Gn:
Where –
‘O&Mn’ – Operation and Maintenance expenses for the n
th
year;
‘EMPn’ – Employee Costs for the n
th
year;
‘R&Mn’ – Repair and Maintenance costs for the n
th
year;
‘A&Gn’ – Administrative and General Costs for the n
th
year; and -
‘EMPn’ = [(EMPn-1) x (1+Gn) x (CPIinflation)] + Provision(Emp)
‘A&Gn’ = [(A&Gn-1) x (WPIinflation)] + Provision(A&G)
‘R&Mn’ = K x (GFA n-1 ) x (WPIinflation); and –
(7) Of the O&M expenses so determined based on the above regulations, at least 30% shall be spent
towards repair and maintenance activities.”
1
Sub. vide Not. No. HPERC-F(1)-2/2018 dated 22
nd
November, 2018 published in the R.H.P. 27
th
November, 2018 at p. 6249-6255. Before its substitution it read as under:
“(2) Operation and maintenance expenses, for the existing generating stations which have been in operation for 3 years or
more as on 31 March 2013, shall be derived on the basis of actual operation and maintenance expenses for the years 2010-11 to 2012-13,
based on the audited balance sheets, excluding abnormal operation and maintenance expenses, if any, after prudence check by the
Commission.
(3) In case of hydro generating stations, which have been in commercial operation for less than 3 years as on 31 March 2013,
the Operation and maintenance expenses shall be fixed at 2% of the original project cost, excluding cost of rehabilitation and
resettlement works, and shall be escalated in accordance with the escalation principles specified in sub-regulation (6).
(4) In case of the hydro generating stations declared under commercial operation on or after 1.4.2013, operation and
maintenance expenses shall be fixed at 2% of the original project cost, excluding cost of rehabilitation and resettlement works, and shall
be escalated in accordance with the escalation principles specified in sub-regulation (6).”
20 Compendium of HPERC Regulations, March 2021
EMPn-1 – Employee Cost of the generator for the (n-1)
th
year; (employee cost for the base
year would be adjusted for provisions for expenses beyond the control of the licensee and
one time expected expenses, such as recovery/ adjustment of terminal benefits, implication
of pay revisions, arrears and interim relief);
‘Provision(Emp)’- Provision for expenses beyond control of the Generating company and
expected one-time expenses as specified above;
A&Gn-1 – Administrative and General Costs of the generator/generating company for the
(n-1)
th
year;
Provision(A&G): Cost for initiatives or other one-time expenses as proposed by the
generating company and approved by the Commission after prudence check;
‘K’ is a constant to be specified by the Commission: % Value of K for each year of the
control period shall be determined by the Commission in the MYT Tariff order based on
generator/generating company’s filing, benchmarking of repair and maintenance expenses,
approved repair and maintenance expenses vis-à-vis GFA approved by the Commission in
past and any other factor considered appropriate by the Commission;
CPIinflation – is the average increase in the Consumer Price Index (CPI) for the three years
immediately preceding the base year;
WPIinflation – is the average increase in the Wholesale Price Index (WPI) for the three years
immediately preceding the base year;
GFAn-1 – Gross Fixed Asset of the generator/generating company for the (n-1)
th
year;
Gn is a growth factor for the n
th
year: Value of Gn shall be determined by the Commission
in the MYT tariff order for meeting the additional manpower requirement based on
generator/generating company’s filings, benchmarking, approved cost by the Commission
in past and any other factor that the Commission feels appropriate. The Commission may
also determine the appropriate level of employees and provide a roadmap for
rationalization of employees during the control period:
Provided that repair and maintenance expenses determined shall be utilized towards
repair and maintenance works only.
(6) O&M expenses determined in sub-regulations (3) and (4), shall be escalated for
subsequent years to arrive at the O&M expenses for the control period by applying the
Escalation factor (EFk) for a particular year (K
th
year) which shall be calculated using the
following formula:
EFk = 0.20xWPIInflation + 0.80xCPIInflation
Provided that, out of the O&M expenses so determined based on the above
regulations, at least 30% shall be spent towards repair and maintenance activities:
Provided further that, the impact of pay revision (including arrears) shall be
allowed on actual during the mid-term performance review or at the end of the control
period as per audited /unaudited accounts, subject to prudence check and any other factor
considered appropriate by the Commission.]
Compendium of HPERC Regulations, March 2021 21
1
[(7) The generating company, wherever applicable, shall submit the detail of
sharing of the terminal benefits including pension of its employees as per the Himachal
Pradesh Electricity Regulatory Commission (Terms and Conditions for Sharing of Cost of
Terminal Benefits of Personnel of the erstwhile Himachal Pradesh State Electricity Board
and Successor Entities) Regulations, 2015.]
PART-IV
NORMS OF OPERATION
Previous and next
Questions people ask
Is regulation 22 of the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011 is recorded.