Regulation 16, The Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Wheeling Tariff and Retail Supply Tariff) Regulations, 2011: Transmission and Load Despatch Charges
The Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Wheeling Tariff and Retail Supply Tariff) Regulations, 2011 - Regulation 16
Text of regulation 16
Transmission and Load Despatch Charges
16. Transmission and Load Despatch Charges.- The distribution licensee shall be
allowed to recover net transmission and load despatch charges payable to the transmission
licensees (Central Transmission Utility, State Transmission Utility etc.) and System
Operators (Regional Load Despatch Centre, State Load Despatch Centre etc.) for access to
and use of the inter-State transmission system, intra-State transmission system and availing
load despatch services assuming maximum normative rebate available from each source
for payment of bills through letter of credit on presentation of bills in accordance with the
tariffs approved, from time to time, by the Appropriate Commission.
Previous and next
Questions people ask
Is regulation 16 of the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Wheeling Tariff and Retail Supply Tariff) Regulations, 2011 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Wheeling Tariff and Retail Supply Tariff) Regulations, 2011 is recorded.