Charges for long term and medium term open access in distribution
28. Charges for long term and medium term open access in distribution.- (1) The
long term and medium term open access customers shall pay the wheeling charges,
surcharge, additional surcharge, unscheduled inter-change charges and reactive energy
charges as the Commission may, in exercise of its powers under sections 61, 62, 86 and
other provisions of the Act, determine from time to time
(2) Wheeling Charges.- The wheeling charges for use of the intra-State distribution
system shall be recovered from the long-term open access customers and the medium-term
open access customers in accordance with the Himachal Pradesh Electricity Regulatory
Commission (Terms and Conditions for Determination of Wheeling Tariff and Retail Supply
Tariff) Regulations, 2007.
(3) Surcharge.- In addition to the wheeling charges, the long-term and medium- term
open access customer, other than the captive generating customer, availing open access in
distribution, shall pay the cross subsidy surcharge specified by the Commission in the
Himachal Pradesh Electricity Regulatory Commission (Cross Subsidy Surcharge, Additional
Surcharge and Phasing of Cross Subsidy) Regulations, 2006.
(4) Additional surcharge.- The long-term and medium-term open access customer
shall also pay to the distribution licensee an additional surcharge to meet the fixed cost of
such distribution licensee arising out of his obligation to supply as provided under sub-
section (4) of section 42 of the Act; and such additional surcharge shall be as specified by
the Commission in the Himachal Pradesh Electricity Regulatory Commission (Cross
Subsidy Surcharge, Additional Surcharge and Phasing of Cross Subsidy) Regulations, 2006.
(5) Unscheduled Inter-change (UI) Charges.- (a) Scheduling of all transactions
pursuant to grant of long-term open access and medium-term open access shall be carried
out on day-ahead basis in accordance with the Grid Code and the Himachal Pradesh
Electricity Distribution Code, 2009 .
(b) Based on net metering on the periphery of each intra-State entity, composite accounts for
Unscheduled Interchanges shall be issued for each intra-State entity on a weekly cycle.
(c) Any mismatch between the scheduled and the actual drawal at drawal points and
scheduled and the actual injection at injection points for the intra-State entities shall be
determined by the State Load Despatch Centre and covered in the intra-State Unscheduled
Interchanges accounting scheme.
(d) The Unscheduled Interchanges rates for intra-State entity shall be 105% (for over-drawls
or under generation) and 95% (for under-drawls or over generation) of the inter-State
Unscheduled Interchanges rates.
(6) Reactive energy charges.- The reactive energy drawls, injections and the
payment, receipt of the reactive energy charges by the open access customers shall be in
accordance with the relevant provisions of the Grid Code.
16 Compendium of HPERC Regulations, March 2021
Previous and next
Questions people ask
Is regulation 28 of the Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term Intra-State Open Access and Related Matters) Regulations, 2010 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term Intra-State Open Access and Related Matters) Regulations, 2010 is recorded.