Charges for long term and medium term open access in transmission
27. Charges for long term and medium term open access in transmission.- (1) The
long term and medium term open access customers shall pay the transmission charges,
operating charges, unscheduled inter-change charges and reactive energy charges as the
Commission may, in exercise of its powers under sections 61, 62, 86 and other provisions
of the Act, determine from time to time.
(2) Transmission and operating charges.- The transmission and operating charges
payable by a long-term and medium-term customer for use of the transmission system shall
be determined in accordance with the Himachal Pradesh Electricity Regulatory Commission
(Terms and Conditions for Determination of Transmission Tariff) Regulations, 2007 and
shall be based on the prevailing costs, prices and methodology of sharing of transmission
charges specified by the Commission. However, no upfront fee or charges shall be levied by
the utility on open access customers and all costs in relation to the transmission shall be
subsumed in the transmission charges.
(3) Unscheduled Inter-change (UI) Charges.- (a) Scheduling of all transactions pursuant
to grant of long-term open access and medium-term open access shall be carried out on day-
ahead basis in accordance with the Grid Code .
(b) Based on net metering on the periphery of each intra-State entity, composite
accounts for Unscheduled Interchanges shall be issued for each intra-State
entity on a weekly cycle.
(c) Any mismatch between the scheduled and the actual drawl at drawl points
and scheduled and the actual injection at injection points for the intra-State
entities shall be determined by the State Load Despatch Centre and covered
in the intra-State Unscheduled Interchanges accounting scheme.
1
Sub- regulation (3) added vide Not. No. HPERC/ 418 dated 7
th
December, 2012 published
in the R H.P. dated 10
th
December, 2012 at p. 5409-5415.
Compendium of HPERC Regulations, March 2021 15
(d) The Unscheduled Interchanges rates for intra-State entity shall be 105% (for
over-drawls or under generation) and 95% (for under-drawls or over
generation) of the inter-State Unscheduled Interchanges rates.
(4) Reactive energy charges .- The reactive energy drawls, injections and the payment,
receipt of the reactive energy charges by the open access customers shall be in accordance
with the relevant provisions of the Grid Code.
Previous and next
Questions people ask
Is regulation 27 of the Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term Intra-State Open Access and Related Matters) Regulations, 2010 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term Intra-State Open Access and Related Matters) Regulations, 2010 is recorded.