Regulation 8, The Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term Intra-State Open Access and Related Matters) Regulations, 2010: Grant of Connectivity
The Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term Intra-State Open Access and Related Matters) Regulations, 2010 - Regulation 8
Text of regulation 8
Grant of Connectivity
8. Grant of Connectivity.- (1) The application for connectivity shall contain details
such as, proposed geographical location of the applicant, quantum of power to be
interchanged, that is the quantum of power to be injected in the case of a generating station
including a captive generating plant and quantum of power to be drawn in the case of a bulk
consumer, with the intra-State transmission system /distribution system and such other
details as may be laid down by the nodal agency in the detailed procedure :
Provided that where once an application has been filed and thereafter there has been
any material change in the location of the applicant or change in the quantum of power to be
interchanged -
(i) in case of the intra-State transmission system is by more than 5 MW; or
(ii) in case of the distribution system is by more than 1 MW;
the applicant shall make a fresh application, which shall be considered in accordance with
these regulations.
(2) On receipt of the application, the nodal agency shall, in consultation and through
co-ordination with other agencies involved in intra-State transmission/ distribution system to
be used, process the application and carry out, as the case may be, the necessary
interconnection study as specified in the Central Electricity Authority (Technical Standards
for Connectivity to the Grid) Regulations, 2007 or the Himachal Pradesh Electricity
Distribution Code 2009, the Grid Code, 2008.
(3) While granting connectivity, the nodal agency shall specify the name of the sub-
station or pooling station or switchyard where connectivity is to be granted. In case
connectivity is to be granted by looping-in and looping-out of an existing or proposed line,
the nodal agency shall specify the point of connection and name of the line at which
connectivity is to be granted. The nodal agency shall indicate the broad design features of
the dedicated transmission/distribution line and the timeframe for completion of the
dedicated transmission/distribution line.
(4) The applicant and the licensee, as the case may be, shall comply with the
provisions of the Central Electricity Authority (Technical Standards for Connectivity to the
Grid) Regulations, 2007 or the Himachal Pradesh Electricity Distribution Code,2009 and the
Grid Code, 2008.
(5) The applicant or the intra-State transmission licensee or a distribution licensee, as
the case may be, shall sign a connection agreement with the State Transmission Utility or the
intra-State Transmission/distribution licensee owning the sub-station or pooling station or
switchyard or the transmission/distribution line as identified by the nodal agency where
connectivity is being granted:
Provided that in case connectivity to an open access customer is granted to the intra-
State transmission system of an intra-State transmission licensee, other than the State
Transmission Utility, a tripartite agreement as provided in the Central Electricity Authority
(Technical Standards for Connectivity to the Grid) Regulations, 2007 shall be signed
Compendium of HPERC Regulations, March 2021 7
between the applicant, the State Transmission Utility and such intra-State transmission
licensee.
(6) The grant of connectivity shall not entitle an applicant to interchange any power
with the grid unless it obtains long-term open access or medium-term open access or short-
term open access.
(7) A generating station, including captive generating plant, which has been granted
connectivity to the grid, shall be allowed to undertake testing including full load testing by
injecting its infirm power into the grid before being put into commercial operation, even
before availing any type of open access, after obtaining permission of the State Load
Despatch Centre, which shall keep grid security in view while granting such permission. The
tariff of the infirm power from a generating station or a unit thereof, other than those based
on non-conventional energy sources, shall be as determined by the Commission from time to
time.
(8) An applicant may be required by the nodal agency to construct a dedicated
line to the point of connection to enable connectivity to the grid.
CHAPTER - 4
CRITERIA FOR LONG-TERM AND MEDIUM-TERM OPEN ACCESS
Previous and next
Questions people ask
Is regulation 8 of the Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term Intra-State Open Access and Related Matters) Regulations, 2010 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term Intra-State Open Access and Related Matters) Regulations, 2010 is recorded.