Regulation 2, Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010.: Connection of Small Generators (not below 1MW to Distribution Systems

Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010. - Regulation 2

Text of regulation 2

Connection of Small Generators (not below 1MW to Distribution Systems

2. Connection of Small Generators (not below 1MW to Distribution Systems:- Bus bars may be provided at the Generating station. All generating units shall inject the output into the bus bars via the synchronizing breaker. The isolator between the synchronizing breaker and the bus bars is the boundary between the Generator and the Distribution Licensee. The current transformers for the metering shall be connected near the synchronizing breaker. The voltage transformers (including the standby set) of the metering shall be connected to the bus-bars. However, the small generators based on non-conventional source of energy will be allowed for the connection with Distribution System/ Transmission System as feasible and decided by the Commission on case to case basis. 3. EHT/HT Consumers: The supply voltage may be 220kV, 132kV, 66kV, 33 kV, 22 kV or 11 kV or voltage as agreed by the Distribution Licensee. The substations shall be owned by the Users. The boundary shall be the feeder entry in the premises of the Users or when so provided it shall be the busbar between breakers of the Distribution Licensee and the EHT/ HT Consumers. 4. Low voltage and Medium Voltage Consumers: The incoming terminal of the cut out circuit breaker installed by the Consumer is the boundary of low voltage and medium voltage Consumers. The metering shall be provided before a fuse unit / circuit breaker of the Consumer. The metering equipment shall be provided at the entry point of Consumer Premises in a safe location, preferably at the entry of the Premises or in a common passage on ground floor for easy access for the purpose of meter reading, maintenance, repairs, inspection, etc. The metering equipment shall be provided inside a box sealed by the Distribution Licensee and the User/Consumer shall not disturb the seal metering equipment and shall take reasonable care for protecting the meter and equipment. 18 | P a g e 4.5 PROCEDURE FOR APPLICATIONS FOR CONNECTIONS TO THE SYSTEM: Any User seeking use of Distribution System may submit an application for connection to the Licensee as per the procedures and formats prescribed under JERC (Electricity Supply Code) Regulations 2010 or in a format specially developed by Licensees for specific users. Prospective large customers may enclose information as per Annexure – 1. 4.6 ACCEPTANCE OR REJECTION OF APPLICATION FOR CONNECTION: The acceptance or rejection of Consumer’s application for supply connection shall be as per JERC (Electricity Supply Code) Regulations, 2010. 4.7 CONNECTION AGREEMENTS: A connection Agreement of Consumer shall be as per JERC (Electricity Supply Code) Regulations, 2010. Chapter – 5 OPERATION CODE 5.1 OBJECTIVES: 1. This Chapter contains the procedures and practices to be followed for a safe and efficient operation of the Distribution System by the Distribution Licensee and by the Users of the Distribution System of their electrical plant and lines which are connected to the Distribution Licensee’s system. This shall also apply to any electrical interface between two Distribution Licensee’s for a safe and efficient operation of interface. 2. The following aspects of operation are covered in this section: (a) Demand Estimation (b) Outage Planning (c) Contingency Planning (d) Demand Side Management and Load Shedding (e) Interface with Small Generating Plant including CPPs (f) Communication 19 | P a g e (g) Monitoring and Control of voltage, frequency and power factor. (h) Safety Co-ordination. (i) Maintenance and testing (j) Tools and spares (k) Training 5.2 DEMAND ESTIMATION: 1. The Distribution Licensee shall estimate his hourly and daily Demand for his Area of Supply on the basis of relevant load curves drawn on day ahead basis subject to modifications depending upon the communication received from any specific User or caused by any contingency. This may be given to SLDC as may be required. 2. For this purpose, the concerned major Users identified by the Distribution Licensee shall furnish the required data pertaining to their demands of their installation to him. 5.3 OUTAGE PLANNING: 1. The Distribution Licensee shall furnish his proposed outage programs to the SLDC on a month ahead basis. 2. The outage program shall contain identification of lines and equipment of the Distribution System proposed by Licensee. 3. The outage plan proposed by the Licensee shall come into effect only after the SLDC releases the finally agreed outage plan. 4. However at the time the line or equipment is taken out of service, the Distribution Licensee shall intimate the Transmission Licensee to facilitate in accommodating their maintenance work, if possible, even though the same is not already included in the approved plan. 5. The above procedure shall not apply under the following circumstances: a) ‘Emergency situations’ to save plant and machinery; b) In case of the unforeseen emergency situations requiring isolation of lines or equipment to save human life, c) Where disconnection is to be effected on any User installation due to breach of Agreement. In this case the SLDC shall be informed wherever the load to the extent of 1 MW or more is affected. 20 | P a g e 6. Planned outages of Power System for the duration as specified in Standard of Performance for Licensee for maintenance purposes shall be intimated to the public through media including publishing in at least two largely circulated Newspapers (one in English and one in local language) of that area, two days in advance. 5.4 CONTINGENCY PLANNING: 1. A contingency situation may arise in the event of a total or partial blackout in the Transmission System. A contingency may also arise on a part of the Distribution System due to local breakdowns in the Distribution System itself. It may also arise due to a breakdown in the Apparatus of the Transmission Licensee at the point of interconnection. 2. Transmission System Failure: a) In case of a total blackout at any point in the Area of Supply of Distribution Licensee, the Distribution Licensee shall follow the black start procedures framed by the Transmission Utility (STU)/SLDC. b) The Distribution Licensee shall sectionalize the Distribution System into discrete blocks of demand. The Licensee shall advise and co-operate with the SLDC for the amount of MW load likely to be picked up on switching each demand block. c) The Distribution Licensee shall prepare a schedule of essential and non- essential loads in order of priority at each connection to be picked up during the restoration process. d) The Distribution Licensee shall ensure and maintain the load generation balance under the direction of the SLDC. e) The Distribution Licensee shall maintain direct communication links with the SLDC. f) The Distribution Licensee shall furnish the names and designations of the person(s) with their telephone numbers and stations, authorized to deal with contingency operations, to the SLDC, who shall co-ordinate for restoration process as per State/ Central Grid Code/ Regulations as the case may be. 3. Distribution System Failure: a) Interruptions to power supply in any part of the Distribution System lasting for the period as specified in JERC (Standard of Performance) Regulations 2009 for Licensee due to breakdown in any part of the Distribution System may be termed as a Distribution System Failure. 21 | P a g e b) The Distribution Licensee shall evolve a restoration process for such a Distribution System Failure. 4. Failure of the Apparatus of the Transmission Licensee: a) The Distribution Licensee shall immediately contact the authorized person at the substation of the Transmission Licensee, and assess the probable period of restoration and the probable restriction of load drawl from the affected substation. b) The Distribution Licensee shall affect the demand management plan accordingly. 5.5 DEMAND MANAGEMENT AND LOAD SHEDDING: 1. Temporary Load Shedding may be resorted to for maintaining the load generation balance as instructed by the SLDC. This may also be necessary due to loss of any circuit or equipment or any other operational contingency. 2. The Distribution Licensee shall estimate loads that may be shed in discrete blocks at each Connection Point / Interface Point or in overall Area of Supply in consultation with the Users supplied through independent circuits as required. Such Users shall co-operate with the Licensee in this regard. The Distribution Licensee shall work out the sequence of load shedding operations and the detailed procedure shall be furnished to the person’s in-charge of substations concerned where such load shedding has to be carried out. In case of automatic load shedding through under frequency relays, the circuits and the amount of load to be interrupted with corresponding relay settings shall be co-ordinated with the SLDC and persons in charge of the substations of the Distribution Licensee as necessary. 3. If the duration of unplanned load shedding to any part of the Distribution System exceeds 60 minutes, the affected Consumers having contract demand of 1MW and above may be suitably intimated. The essential services such as public hospital, public water works, sewage works, etc. shall be intimated over the telephone wherever possible. 5.6 INTERFACES WITH SMALL GENERATING UNITS INCLUDING CPPS If the Distribution Licensee has an interface with any generating unit including CPP and an Agreement for this purpose exists, the Distribution Licensee and the concerned owner of the generating unit shall abide by the following provisions in addition to the provisions contained in this Code as applicable to all the Users: a) The owner shall provide suitable protection at the interface to protect his system from any damage due to normal and abnormal conditions in the Distribution System. 22 | P a g e b) In case of induction generator, the owner shall take adequate precautions to limit the system disturbances, when the induction generator is synchronized in consent with the Distribution Licensee. Induction generators shall be installed with adequate capacitors to compensate the reactive power drawl. Also whenever the power factor is found very low during starting period and causes voltage dip in the Licensee’s system the Licensee may advise the owner to install capacitors and the owner shall comply. Failure to comply entails penalty and/or disconnection from the system as per provision of rules and Acts. c) The owner shall comply with the provisions of the (State / Central) Grid Code / Regulations as the case may be. 5.7 COMMUNICATION: Reliable communication links viz telephone, fax, teleprinter, etc. shall be established for exchange of data, information and operating instructions between the Licensee, Consumer with a demand of 1 MW and above and the SLDC. Each constituent shall ensure installation and maintenance of proper communication infrastructure at his end. 5.8 MONITORING AND CONTROL OF VOLTAGE, FREQUENCY AND POWER FACTOR: 1. The Distribution Licensee shall monitor the voltage, frequency and power factors in the Distribution System at different points at peak and off-peak hours and take reasonable measures for improvement of the same in co-ordination with the Users with demand of 1 MW and above, and the Transmission Licensee. 2. The Distribution Licensee shall take power factor improvement measures at strategic points in the Distribution System by carrying out system studies and installing the required reactive compensation equipment. 3. The voltage in the Distribution System may vary depending upon the available generation, system demand, and the configuration of Transmission and Distribution Systems at any time. Under normal operating conditions the Licensee shall exercise proper voltage management in the Distribution System beyond the point of connection with the Transmission System to maintain voltage at all levels according to the quality of supply mentioned in the Distribution System Planning and Security Standard as mentioned under Attachment –1 of this code. The capacitors, wherever available in the Grid substations shall be operated to maintain reactive compensation to be within acceptable limits of power factor of at least 0.9 keeping the bus voltage in view. 4. Users having loads with high harmonic content, low Power Factor and fluctuations shall install appropriate correction equipment. 23 | P a g e 5. The Distribution Licensee shall abide by the instructions issued by the SLDC from time to time on load management for maintaining the frequency of supply within the specified limits. 5.9 SAFETY CO-ORDINATION 1. The Distribution Licensee and the Users and any other Distribution Licensee having common electrical interface with the Licensee shall designate suitable persons to be responsible for safety co-ordination. These persons shall be referred to as Control Persons. Their designations and telephone numbers shall be exchanged between all the concerned persons. Any change in the list shall be notified promptly to all the concerned. 2. The Distribution Licensee and such Users shall prepare safety manuals incorporating all the safety precautions to be taken for each component of the Distribution System. All the safety rules and precautions shall be observed when work is to be carried out on any line or apparatus, switchgear or circuits in any part of the Distribution System or in any part of the User System. The safety manuals thus prepared shall be issued to all the control persons and such Users for compliance. 3. There shall be co-ordination between persons of the Distribution Licensee and the Users, between persons of two Distribution Licensees having electrical interfaces, for carrying out the work on any apparatus or lines etc., belonging to either party at the point of interconnection. 4. The provisions of the (State / Central) Grid Code / Regulation (as the case may be) shall be followed at Connection Points/ Interface Points in co-ordination with the Transmission Licensee. 5. The disconnecting device(s) at each electrical interface, which shall be capable of effectively disconnecting the system of the Distribution Licensee and the other Users, and the grounding devices of the respective systems at the control boundary shall be identified and marked by the Licensee and the respective Users. These shall be maintained in good condition at all times. To prevent inadvertent switching operations by unauthorized persons, such disconnecting devices shall be provided with interlocks. 6. Wherever any Consumer has installed an emergency power supply system, either an electronic system with storage batteries or with generators, the arrangement shall be such that the same cannot be operated without clearly isolating the system from the supply mains. The responsibility of making the required arrangement for isolation from supply mains shall be of the User and this shall be part of the electrical layout submitted to Electrical Inspector for his approval. The possibility of a feedback from these devices to the Distribution System from any of the conductors, including the neutral conductor shall be clearly ruled out. 24 | P a g e 7. The appropriate Control Person at the electrical interface shall issue written permission to his counterpart for carrying out the work on any apparatus, switchgear or lines beyond the electrical interface. Such permissions shall be termed as "Permit to Work" (PTW). The format for PTW shall be standardized by the Distribution Licensee and shall be used by all concerned. 8. The Distribution Licensee in consultation with the concerned User shall frame checklist of operations to be carried out and the procedures for safety coordination for each electrical interface, before issue and return of PTWs. Such procedures and checklists shall be issued to all the concerned by the Licensee for implementation. 5.10 MAINTENANCE AND TESTING 1. The Distribution Licensee shall prepare maintenance schedules for lines and equipment to meet the level of maintenance as required in the "Distribution System under Power System Management and Operating Standard" and "Distribution System under Power System Safety Standard ". 2. Regular testing of all the equipments, such as transformers, switchgear, protective relays etc., should be carried out as recommended by the manufacturers and the relevant code of practices issued by the Bureau of Indian Standards and CBIP. These shall be carried out at the prescribed intervals and the test results shall be recorded in the maintenance registers. Wherever the test results indicate a decline in the insulation resistance and/or deterioration of the equipment, preventive maintenance shall be carried out to ensure serviceability, safety and efficiency. 3. The Distribution Licensee shall maintain well trained hot-line personnel, and all the required tools in good condition, and conduct the maintenance work by using hot-line technique, wherever possible, to reduce the period of interruption. 4. The Users shall maintain their Apparatus and Power Lines at all times conforming to I.E. Rules 1956 which are in force for time being and will be replaced by new rules made under Electricity Act, 2003 and shall be suitable for being connected to the Distribution System in a safe and reliable manner. 5.11 TOOLS AND SPARES 1. The Distribution Licensee shall ensure availability of proper tools and tackles at all work places for carrying out the maintenance. The tools and tackles shall be checked from time to time and their serviceability shall be ensured. 2. The Distribution Licensee shall maintain an inventory of spares required for maintenance and replacement purposes at suitable locations according to a clear policy to be laid down by the Licensee. 5.12 TRAINING The Distribution Licensee shall make appropriate arrangements for imparting training to his workmen and supervisory staff, incorporating up-to-date techniques of Distribution System design, construction and maintenance, safety, consumer services etc. He shall frame a suitable syllabus for this purpose. 25 | P a g e Chapter – 6 METERING AND PROTECTION CODE 6.1 OBJECTIVES: The Chapter specifies the procedure for metering in Distribution System with respect to operational metering as well as tariff and commercial metering. This section also specifies the general guidelines for protection of Distribution system. Provided that the regulations on Installation and Operation of Meters made by Central Electricity Authority, if any, shall prevail over provisions 7.2 to 7.4 of this Distribution Code. 6.2 OPERATIONAL METERING: The minimum requirement of operational metering at Distribution System substations shall be as follows: (a) Grid substation  66 / 33 kV bus voltage  33 / 22 / 11 kV bus voltage  66 / 33 / 22 / 11 kV incoming / outgoing current in each phase and each circuit  Power transformer primary and secondary currents in each phase of every transformer.  HT outgoing feeder current in each phase for each feeder.  Power factor in each HT feeder.  Load survey meters having memory duration of at least 45 days for all the incoming and outgoing feeders.  Facility to record energy in MWH and frequency at interval of 15 minutes at point of connection with Transmission Licensee. (b) User’s System with Demand of 1 MW and above  Voltage  Current  Load  Power Factor  Energy 6.3 TARIFF AND COMMERCIAL METERING: 1. Tariff metering shall be provided at each point of interconnection between the Distribution and Transmission Systems in accordance with the Central / State Grid Code as the case may be and the Transmission Services Agreement thereof. 26 | P a g e 2. Tariff metering shall be provided at the Connection Points/ Interface Points between the User’s system and the Distribution System and shall be governed by the provision in the Distribution Services Agreement. 3. All the meters, instrument transformers (CT/PT), metering cubicles and testing procedures shall conform to the relevant Indian Standard Specification and relevant provision made under the Electricity Act, 2003. 4. The CT/PT deployed for metering of energy supplied to the Consumers shall be of class 0.2 accuracy. However, in case of rating of instrument transformers in service, which are of 0.5 class, which may continue to be used. These shall also conform to relevant IEC or IS specifications. On failure, the same shall be replaced by suitable CT/PT of 0.2 class accuracy after exhausting the CT/PT of 0.5 class accuracy (as available in their inventory). It is desirable that the Distribution Licensee shall purchase new CT/PT of 0.2 class accuracy. 5. The open access consumer, Generating company, Distribution licensee and traders shall provide Meters, as may be specified by the Commission for such consumer based on voltage, point and period of supply and tariff category (as also incorporated in JERC (State Grid Code) Regulations 2010). 6.4 MEASUREMENT OF ENERGY IMPORT/ EXPORT: 1. The Distribution Licensees shall install the following meters for all of their sub- transmission lines connecting the generating stations, and substations for the measurement of energy import/export from each Connection Point/ Interface Point, energy generated in generating units and energy consumed in power stations and substations: (a) Active energy import. (b) Active energy export. (c) Reactive energy import. (d) Reactive energy export. Each metering point associated with the determination of energy exported or imported, between the Generating Companies, Transmission Licensees and Distribution Licensees shall be provided with both main and check meters. The minimum standard of accuracy of these meters shall be of accuracy class 0.2. These meters shall conform to the relevant IEC or IS specifications. However, the Distribution Licensee shall continue to use the available meters, until not exhausted in their inventory. However, the meter purchased after implementation of this code, the Distribution Licensee shall purchase the meter of 0.2 class accuracy. 2. All the instrument transformers used in conjunction with commercial (tariff) metering shall also be of accuracy class 0.2 and conform to the relevant IEC or IS specifications. The rating shall be suitable for catering the burdens of lead wires and metering. However, in case of rating of instrument transformers in service, 27 | P a g e which are of 0.5 class, which may continue to be used. These shall also conform to relevant IEC or IS specifications. On failure, the same shall be replaced by suitable CT/PT of 0.2 class accuracy after exhausting the CT/PT of 0.5 class accuracy (as available in their inventory). It is desirable that the Distribution Licensee shall purchase new CT/PT of 0.2 class accuracy. 3. Data collection shall be used to integrate impulses from meters over each integration period as per agreement, store values, and to transmit the same to the data collection system of the Distribution Licensee. Data shall be collected from both the main and check metering schemes. 4. Voltage failure relays shall be provided to initiate alarm on loss of one or more phases of the voltage supply to the meter. 5. Main and check meters shall be provided at all Connection Points/ Interface Points. All the meters shall be tested and calibrated according to the guidelines provided in the relevant IEC/IS specifications at least once a year and also whenever the difference in readings between the main and check meters exceed 0.5%. 6. Records of these calibrations and tests shall be maintained for reference. 7. The Generating Companies, Transmission Licensees and Distribution Licensees shall formulate and agree upon a procedure covering summation, collection and processing of tariff meter readings at various interconnection sites of their area. Whenever necessary, these procedures can be revised. 8. The ownership, responsibility of maintenance and testing of these meters shall be as mutually agreed to between the Users and the concerned Licensees. 9. The term ‘Meter’ shall include Current transformers, voltage/potential transformers, wiring between them and meter box/panel. 6.5 PROTECTION SYSTEM: 1. No item of electrical equipment shall be allowed to remain connected to the system unless it is covered by the appropriate protection aimed at reliability, selectivity, speed and sensitivity. The Distribution Licensees shall cooperate with the Transmission Licensee to ensure correct and appropriate settings of protection to achieve effective, discriminatory isolation of faulty line/equipment within the time target clearance specified by the Transmission Licensee. 2. Protection settings shall not be altered, or protection bypassed and/or disconnected without consultation and agreement of all the affected Users. In case the protection has been bypassed and/or disconnected by agreement due to any cause, the same should be rectified and protection restored to normal condition as quickly as possible. If agreement has not been reached, the electrical equipments shall be isolated forthwith. 28 | P a g e 3. The settings of protective relays for 33 kV, 22 kV and 11 kV lines shall be such that a fault in any section does not affect the section between the generating unit and the faulty section under all conditions. The Transmission Licensee shall notify the initial settings and any subsequent changes to the Users from time to time. Routine checks on the performance of the protective relays shall be conducted and any malfunction shall be noted and corrected as soon as possible. Short circuit studies required for deciding the relay settings shall be conducted by the Licensee with the data collected from the Transmission Licensee and the Users. Representatives of the Generating Companies, Transmission Licensees and Distribution Licensees shall meet periodically to discuss such malfunctions, changes in the system configuration, if any, and possible revised settings of relays. 4. The Transmission Licensee shall be responsible for arranging periodical meetings between the Generating Companies and the Distribution Licensees to discuss coordination of protection. The Transmission Licensee shall investigate any malfunction of protection or other unsatisfactory protection issues. The concerned Licensees shall take prompt action to correct any protection malfunction or other unsatisfactory protection issue as discussed and agreed to in these periodical meetings. 5. All generating units and all associated electrical equipment of the Generating Company connected to the Distribution System shall be protected by adequate protection, as per CBIP manual, so that the system does not suffer due to any disturbances originating at the generating unit.

Previous and next

All provisions of Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010.

Questions people ask

Is regulation 2 of Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010. still in force?

No repeal of Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010. is recorded.