Regulation 2, Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010.: Connection of Small Generators (not below 1MW to Distribution Systems
Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010. - Regulation 2
Text of regulation 2
Connection of Small Generators (not below 1MW to Distribution Systems
2. Connection of Small Generators (not below 1MW to Distribution Systems:- Bus
bars may be provided at the Generating station. All generating units shall inject the
output into the bus bars via the synchronizing breaker. The isolator between the
synchronizing breaker and the bus bars is the boundary between the Generator and
the Distribution Licensee. The current transformers for the metering shall be
connected near the synchronizing breaker. The voltage transformers (including the
standby set) of the metering shall be connected to the bus-bars. However, the small
generators based on non-conventional source of energy will be allowed for the
connection with Distribution System/ Transmission System as feasible and decided
by the Commission on case to case basis.
3. EHT/HT Consumers: The supply voltage may be 220kV, 132kV, 66kV, 33 kV, 22
kV or 11 kV or voltage as agreed by the Distribution Licensee. The substations
shall be owned by the Users. The boundary shall be the feeder entry in the
premises of the Users or when so provided it shall be the busbar between breakers
of the Distribution Licensee and the EHT/ HT Consumers.
4. Low voltage and Medium Voltage Consumers: The incoming terminal of the cut
out circuit breaker installed by the Consumer is the boundary of low voltage and
medium voltage Consumers. The metering shall be provided before a fuse unit /
circuit breaker of the Consumer. The metering equipment shall be provided at the
entry point of Consumer Premises in a safe location, preferably at the entry of the
Premises or in a common passage on ground floor for easy access for the purpose
of meter reading, maintenance, repairs, inspection, etc. The metering equipment
shall be provided inside a box sealed by the Distribution Licensee and the
User/Consumer shall not disturb the seal metering equipment and shall take
reasonable care for protecting the meter and equipment.
18 | P a g e
4.5 PROCEDURE FOR APPLICATIONS FOR CONNECTIONS TO THE
SYSTEM:
Any User seeking use of Distribution System may submit an application for
connection to the Licensee as per the procedures and formats prescribed under JERC
(Electricity Supply Code) Regulations 2010 or in a format specially developed by
Licensees for specific users. Prospective large customers may
enclose information as per Annexure – 1.
4.6 ACCEPTANCE OR REJECTION OF APPLICATION FOR
CONNECTION:
The acceptance or rejection of Consumer’s application for supply connection shall be
as per JERC (Electricity Supply Code) Regulations, 2010.
4.7 CONNECTION AGREEMENTS:
A connection Agreement of Consumer shall be as per JERC (Electricity Supply
Code) Regulations, 2010.
Chapter – 5
OPERATION CODE
5.1 OBJECTIVES:
1. This Chapter contains the procedures and practices to be followed for a safe and
efficient operation of the Distribution System by the Distribution Licensee and by
the Users of the Distribution System of their electrical plant and lines which are
connected to the Distribution Licensee’s system. This shall also apply to any
electrical interface between two Distribution Licensee’s for a safe and efficient
operation of interface.
2. The following aspects of operation are covered in this section:
(a) Demand Estimation
(b) Outage Planning
(c) Contingency Planning
(d) Demand Side Management and Load Shedding
(e) Interface with Small Generating Plant including CPPs
(f) Communication
19 | P a g e
(g) Monitoring and Control of voltage, frequency and power factor.
(h) Safety Co-ordination.
(i) Maintenance and testing
(j) Tools and spares
(k) Training
5.2 DEMAND ESTIMATION:
1. The Distribution Licensee shall estimate his hourly and daily Demand for his Area
of Supply on the basis of relevant load curves drawn on day ahead basis subject to
modifications depending upon the communication received from any specific User
or caused by any contingency. This may be given to SLDC as may be required.
2. For this purpose, the concerned major Users identified by the Distribution Licensee
shall furnish the required data pertaining to their demands of their installation to
him.
5.3 OUTAGE PLANNING:
1. The Distribution Licensee shall furnish his proposed outage programs to the SLDC
on a month ahead basis.
2. The outage program shall contain identification of lines and equipment of the
Distribution System proposed by Licensee.
3. The outage plan proposed by the Licensee shall come into effect only after the
SLDC releases the finally agreed outage plan.
4. However at the time the line or equipment is taken out of service, the Distribution
Licensee shall intimate the Transmission Licensee to facilitate in accommodating
their maintenance work, if possible, even though the same is not already included
in the approved plan.
5. The above procedure shall not apply under the following circumstances:
a) ‘Emergency situations’ to save plant and machinery;
b) In case of the unforeseen emergency situations requiring isolation of lines or
equipment to save human life,
c) Where disconnection is to be effected on any User installation due to breach of
Agreement. In this case the SLDC shall be informed wherever the load to the
extent of 1 MW or more is affected.
20 | P a g e
6. Planned outages of Power System for the duration as specified in Standard of
Performance for Licensee for maintenance purposes shall be intimated to the public
through media including publishing in at least two largely circulated Newspapers
(one in English and one in local language) of that area, two days in advance.
5.4 CONTINGENCY PLANNING:
1. A contingency situation may arise in the event of a total or partial blackout in the
Transmission System. A contingency may also arise on a part of the Distribution
System due to local breakdowns in the Distribution System itself. It may also arise
due to a breakdown in the Apparatus of the Transmission Licensee at the point of
interconnection.
2. Transmission System Failure:
a) In case of a total blackout at any point in the Area of Supply of Distribution
Licensee, the Distribution Licensee shall follow the black start procedures
framed by the Transmission Utility (STU)/SLDC.
b) The Distribution Licensee shall sectionalize the Distribution System into
discrete blocks of demand. The Licensee shall advise and co-operate with the
SLDC for the amount of MW load likely to be picked up on switching each
demand block.
c) The Distribution Licensee shall prepare a schedule of essential and non-
essential loads in order of priority at each connection to be picked up during
the restoration process.
d) The Distribution Licensee shall ensure and maintain the load generation
balance under the direction of the SLDC.
e) The Distribution Licensee shall maintain direct communication links with the
SLDC.
f) The Distribution Licensee shall furnish the names and designations of the
person(s) with their telephone numbers and stations, authorized to deal with
contingency operations, to the SLDC, who shall co-ordinate for restoration
process as per State/ Central Grid Code/ Regulations as the case may be.
3. Distribution System Failure:
a) Interruptions to power supply in any part of the Distribution System lasting for
the period as specified in JERC (Standard of Performance) Regulations 2009
for Licensee due to breakdown in any part of the Distribution System may be
termed as a Distribution System Failure.
21 | P a g e
b) The Distribution Licensee shall evolve a restoration process for such a
Distribution System Failure.
4. Failure of the Apparatus of the Transmission Licensee:
a) The Distribution Licensee shall immediately contact the authorized person at
the substation of the Transmission Licensee, and assess the probable period of
restoration and the probable restriction of load drawl from the affected
substation.
b) The Distribution Licensee shall affect the demand management plan
accordingly.
5.5 DEMAND MANAGEMENT AND LOAD SHEDDING:
1. Temporary Load Shedding may be resorted to for maintaining the load generation
balance as instructed by the SLDC. This may also be necessary due to loss of any
circuit or equipment or any other operational contingency.
2. The Distribution Licensee shall estimate loads that may be shed in discrete blocks
at each Connection Point / Interface Point or in overall Area of Supply in
consultation with the Users supplied through independent circuits as required. Such
Users shall co-operate with the Licensee in this regard. The Distribution Licensee
shall work out the sequence of load shedding operations and the detailed procedure
shall be furnished to the person’s in-charge of substations concerned where such
load shedding has to be carried out. In case of automatic load shedding through
under frequency relays, the circuits and the amount of load to be interrupted with
corresponding relay settings shall be co-ordinated with the SLDC and persons in
charge of the substations of the Distribution Licensee as necessary.
3. If the duration of unplanned load shedding to any part of the Distribution System
exceeds 60 minutes, the affected Consumers having contract demand of 1MW and
above may be suitably intimated. The essential services such as public hospital,
public water works, sewage works, etc. shall be intimated over the telephone
wherever possible.
5.6 INTERFACES WITH SMALL GENERATING UNITS INCLUDING CPPS
If the Distribution Licensee has an interface with any generating unit including
CPP and an Agreement for this purpose exists, the Distribution Licensee and the
concerned owner of the generating unit shall abide by the following provisions in
addition to the provisions contained in this Code as applicable to all the Users:
a) The owner shall provide suitable protection at the interface to protect his
system from any damage due to normal and abnormal conditions in the
Distribution System.
22 | P a g e
b) In case of induction generator, the owner shall take adequate precautions to
limit the system disturbances, when the induction generator is synchronized in
consent with the Distribution Licensee. Induction generators shall be installed
with adequate capacitors to compensate the reactive power drawl. Also
whenever the power factor is found very low during starting period and causes
voltage dip in the Licensee’s system the Licensee may advise the owner to
install capacitors and the owner shall comply. Failure to comply entails
penalty and/or disconnection from the system as per provision of rules and
Acts.
c) The owner shall comply with the provisions of the (State / Central) Grid Code
/ Regulations as the case may be.
5.7 COMMUNICATION:
Reliable communication links viz telephone, fax, teleprinter, etc. shall be
established for exchange of data, information and operating instructions between
the Licensee, Consumer with a demand of 1 MW and above and the SLDC. Each
constituent shall ensure installation and maintenance of proper communication
infrastructure at his end.
5.8 MONITORING AND CONTROL OF VOLTAGE, FREQUENCY AND
POWER FACTOR:
1. The Distribution Licensee shall monitor the voltage, frequency and power factors
in the Distribution System at different points at peak and off-peak hours and take
reasonable measures for improvement of the same in co-ordination with the Users
with demand of 1 MW and above, and the Transmission Licensee.
2. The Distribution Licensee shall take power factor improvement measures at
strategic points in the Distribution System by carrying out system studies and
installing the required reactive compensation equipment.
3. The voltage in the Distribution System may vary depending upon the available
generation, system demand, and the configuration of Transmission and Distribution
Systems at any time. Under normal operating conditions the Licensee shall
exercise proper voltage management in the Distribution System beyond the point
of connection with the Transmission System to maintain voltage at all levels
according to the quality of supply mentioned in the Distribution System Planning
and Security Standard as mentioned under Attachment –1 of this code. The
capacitors, wherever available in the Grid substations shall be operated to maintain
reactive compensation to be within acceptable limits of power factor of at least 0.9
keeping the bus voltage in view.
4. Users having loads with high harmonic content, low Power Factor and fluctuations
shall install appropriate correction equipment.
23 | P a g e
5. The Distribution Licensee shall abide by the instructions issued by the SLDC from
time to time on load management for maintaining the frequency of supply within
the specified limits.
5.9 SAFETY CO-ORDINATION
1. The Distribution Licensee and the Users and any other Distribution Licensee
having common electrical interface with the Licensee shall designate suitable
persons to be responsible for safety co-ordination. These persons shall be referred
to as Control Persons. Their designations and telephone numbers shall be
exchanged between all the concerned persons. Any change in the list shall be
notified promptly to all the concerned.
2. The Distribution Licensee and such Users shall prepare safety manuals
incorporating all the safety precautions to be taken for each component of the
Distribution System. All the safety rules and precautions shall be observed when
work is to be carried out on any line or apparatus, switchgear or circuits in any part
of the Distribution System or in any part of the User System. The safety manuals
thus prepared shall be issued to all the control persons and such Users for
compliance.
3. There shall be co-ordination between persons of the Distribution Licensee and the
Users, between persons of two Distribution Licensees having electrical interfaces,
for carrying out the work on any apparatus or lines etc., belonging to either party at
the point of interconnection.
4. The provisions of the (State / Central) Grid Code / Regulation (as the case may be)
shall be followed at Connection Points/ Interface Points in co-ordination with the
Transmission Licensee.
5. The disconnecting device(s) at each electrical interface, which shall be capable of
effectively disconnecting the system of the Distribution Licensee and the other
Users, and the grounding devices of the respective systems at the control boundary
shall be identified and marked by the Licensee and the respective Users. These
shall be maintained in good condition at all times. To prevent inadvertent switching
operations by unauthorized persons, such disconnecting devices shall be provided
with interlocks.
6. Wherever any Consumer has installed an emergency power supply system, either
an electronic system with storage batteries or with generators, the arrangement
shall be such that the same cannot be operated without clearly isolating the system
from the supply mains. The responsibility of making the required arrangement for
isolation from supply mains shall be of the User and this shall be part of the
electrical layout submitted to Electrical Inspector for his approval. The possibility
of a feedback from these devices to the Distribution System from any of the
conductors, including the neutral conductor shall be clearly ruled out.
24 | P a g e
7. The appropriate Control Person at the electrical interface shall issue written
permission to his counterpart for carrying out the work on any apparatus,
switchgear or lines beyond the electrical interface. Such permissions shall be
termed as "Permit to Work" (PTW). The format for PTW shall be standardized by
the Distribution Licensee and shall be used by all concerned.
8. The Distribution Licensee in consultation with the concerned User shall frame
checklist of operations to be carried out and the procedures for safety coordination
for each electrical interface, before issue and return of PTWs. Such procedures and
checklists shall be issued to all the concerned by the Licensee for implementation.
5.10 MAINTENANCE AND TESTING
1. The Distribution Licensee shall prepare maintenance schedules for lines and
equipment to meet the level of maintenance as required in the "Distribution System
under Power System Management and Operating Standard" and "Distribution
System under Power System Safety Standard ".
2. Regular testing of all the equipments, such as transformers, switchgear, protective
relays etc., should be carried out as recommended by the manufacturers and the
relevant code of practices issued by the Bureau of Indian Standards and CBIP.
These shall be carried out at the prescribed intervals and the test results shall be
recorded in the maintenance registers. Wherever the test results indicate a decline
in the insulation resistance and/or deterioration of the equipment, preventive
maintenance shall be carried out to ensure serviceability, safety and efficiency.
3. The Distribution Licensee shall maintain well trained hot-line personnel, and all
the required tools in good condition, and conduct the maintenance work by using
hot-line technique, wherever possible, to reduce the period of interruption.
4. The Users shall maintain their Apparatus and Power Lines at all times conforming
to I.E. Rules 1956 which are in force for time being and will be replaced by new
rules made under Electricity Act, 2003 and shall be suitable for being connected to
the Distribution System in a safe and reliable manner.
5.11 TOOLS AND SPARES
1. The Distribution Licensee shall ensure availability of proper tools and tackles at all
work places for carrying out the maintenance. The tools and tackles shall be
checked from time to time and their serviceability shall be ensured.
2. The Distribution Licensee shall maintain an inventory of spares required for
maintenance and replacement purposes at suitable locations according to a clear
policy to be laid down by the Licensee.
5.12 TRAINING
The Distribution Licensee shall make appropriate arrangements for imparting
training to his workmen and supervisory staff, incorporating up-to-date techniques
of Distribution System design, construction and maintenance, safety, consumer
services etc. He shall frame a suitable syllabus for this purpose.
25 | P a g e
Chapter – 6
METERING AND PROTECTION CODE
6.1 OBJECTIVES:
The Chapter specifies the procedure for metering in Distribution System with
respect to operational metering as well as tariff and commercial metering. This
section also specifies the general guidelines for protection of Distribution system.
Provided that the regulations on Installation and Operation of Meters made by
Central Electricity Authority, if any, shall prevail over provisions 7.2 to 7.4 of this
Distribution Code.
6.2 OPERATIONAL METERING:
The minimum requirement of operational metering at Distribution System
substations shall be as follows:
(a) Grid substation
66 / 33 kV bus voltage
33 / 22 / 11 kV bus voltage
66 / 33 / 22 / 11 kV incoming / outgoing current in each phase and each
circuit
Power transformer primary and secondary currents in each phase of every
transformer.
HT outgoing feeder current in each phase for each feeder.
Power factor in each HT feeder.
Load survey meters having memory duration of at least 45 days for all the
incoming and outgoing feeders.
Facility to record energy in MWH and frequency at interval of 15 minutes at
point of connection with Transmission Licensee.
(b) User’s System with Demand of 1 MW and above
Voltage
Current
Load
Power Factor
Energy
6.3 TARIFF AND COMMERCIAL METERING:
1. Tariff metering shall be provided at each point of interconnection between the
Distribution and Transmission Systems in accordance with the Central / State Grid
Code as the case may be and the Transmission Services Agreement thereof.
26 | P a g e
2. Tariff metering shall be provided at the Connection Points/ Interface Points
between the User’s system and the Distribution System and shall be governed by
the provision in the Distribution Services Agreement.
3. All the meters, instrument transformers (CT/PT), metering cubicles and testing
procedures shall conform to the relevant Indian Standard Specification and relevant
provision made under the Electricity Act, 2003.
4. The CT/PT deployed for metering of energy supplied to the Consumers shall be of
class 0.2 accuracy. However, in case of rating of instrument transformers in
service, which are of 0.5 class, which may continue to be used. These shall also
conform to relevant IEC or IS specifications. On failure, the same shall be replaced
by suitable CT/PT of 0.2 class accuracy after exhausting the CT/PT of 0.5 class
accuracy (as available in their inventory). It is desirable that the Distribution
Licensee shall purchase new CT/PT of 0.2 class accuracy.
5. The open access consumer, Generating company, Distribution licensee and traders
shall provide Meters, as may be specified by the Commission for such consumer
based on voltage, point and period of supply and tariff category (as also
incorporated in JERC (State Grid Code) Regulations 2010).
6.4 MEASUREMENT OF ENERGY IMPORT/ EXPORT:
1. The Distribution Licensees shall install the following meters for all of their sub-
transmission lines connecting the generating stations, and substations for the
measurement of energy import/export from each Connection Point/ Interface Point,
energy generated in generating units and energy consumed in power stations and
substations:
(a) Active energy import.
(b) Active energy export.
(c) Reactive energy import.
(d) Reactive energy export.
Each metering point associated with the determination of energy exported or
imported, between the Generating Companies, Transmission Licensees and
Distribution Licensees shall be provided with both main and check meters. The
minimum standard of accuracy of these meters shall be of accuracy class 0.2.
These meters shall conform to the relevant IEC or IS specifications. However, the
Distribution Licensee shall continue to use the available meters, until not exhausted
in their inventory. However, the meter purchased after implementation of this code,
the Distribution Licensee shall purchase the meter of 0.2 class accuracy.
2. All the instrument transformers used in conjunction with commercial (tariff)
metering shall also be of accuracy class 0.2 and conform to the relevant IEC or IS
specifications. The rating shall be suitable for catering the burdens of lead wires
and metering. However, in case of rating of instrument transformers in service,
27 | P a g e
which are of 0.5 class, which may continue to be used. These shall also conform to
relevant IEC or IS specifications. On failure, the same shall be replaced by suitable
CT/PT of 0.2 class accuracy after exhausting the CT/PT of 0.5 class accuracy (as
available in their inventory). It is desirable that the Distribution Licensee shall
purchase new CT/PT of 0.2 class accuracy.
3. Data collection shall be used to integrate impulses from meters over each
integration period as per agreement, store values, and to transmit the same to the
data collection system of the Distribution Licensee. Data shall be collected from
both the main and check metering schemes.
4. Voltage failure relays shall be provided to initiate alarm on loss of one or more
phases of the voltage supply to the meter.
5. Main and check meters shall be provided at all Connection Points/ Interface Points.
All the meters shall be tested and calibrated according to the guidelines provided in
the relevant IEC/IS specifications at least once a year and also whenever the
difference in readings between the main and check meters exceed 0.5%.
6. Records of these calibrations and tests shall be maintained for reference.
7. The Generating Companies, Transmission Licensees and Distribution Licensees
shall formulate and agree upon a procedure covering summation, collection and
processing of tariff meter readings at various interconnection sites of their area.
Whenever necessary, these procedures can be revised.
8. The ownership, responsibility of maintenance and testing of these meters shall be
as mutually agreed to between the Users and the concerned Licensees.
9. The term ‘Meter’ shall include Current transformers, voltage/potential
transformers, wiring between them and meter box/panel.
6.5 PROTECTION SYSTEM:
1. No item of electrical equipment shall be allowed to remain connected to the system
unless it is covered by the appropriate protection aimed at reliability, selectivity,
speed and sensitivity. The Distribution Licensees shall cooperate with the
Transmission Licensee to ensure correct and appropriate settings of protection to
achieve effective, discriminatory isolation of faulty line/equipment within the time
target clearance specified by the Transmission Licensee.
2. Protection settings shall not be altered, or protection bypassed and/or disconnected
without consultation and agreement of all the affected Users. In case the protection
has been bypassed and/or disconnected by agreement due to any cause, the same
should be rectified and protection restored to normal condition as quickly as
possible. If agreement has not been reached, the electrical equipments shall be
isolated forthwith.
28 | P a g e
3. The settings of protective relays for 33 kV, 22 kV and 11 kV lines shall be such
that a fault in any section does not affect the section between the generating unit
and the faulty section under all conditions. The Transmission Licensee shall notify
the initial settings and any subsequent changes to the Users from time to time.
Routine checks on the performance of the protective relays shall be conducted and
any malfunction shall be noted and corrected as soon as possible. Short circuit
studies required for deciding the relay settings shall be conducted by the Licensee
with the data collected from the Transmission Licensee and the Users.
Representatives of the Generating Companies, Transmission Licensees and
Distribution Licensees shall meet periodically to discuss such malfunctions,
changes in the system configuration, if any, and possible revised settings of relays.
4. The Transmission Licensee shall be responsible for arranging periodical meetings
between the Generating Companies and the Distribution Licensees to discuss
coordination of protection. The Transmission Licensee shall investigate any
malfunction of protection or other unsatisfactory protection issues. The concerned
Licensees shall take prompt action to correct any protection malfunction or other
unsatisfactory protection issue as discussed and agreed to in these periodical
meetings.
5. All generating units and all associated electrical equipment of the Generating
Company connected to the Distribution System shall be protected by adequate
protection, as per CBIP manual, so that the system does not suffer due to any
disturbances originating at the generating unit.
Previous and next
All provisions of Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010.
Questions people ask
Is regulation 2 of Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010. still in force?
No repeal of Joint Electricity Regulatory Commission” (Distribution Code) Regulations, 2010. is recorded.