Regulation 1, The Himachal Pradesh Electricity Distribution Code, 2009: The main areas, which require a careful network planning, and analysis are
The Himachal Pradesh Electricity Distribution Code, 2009 - Regulation 1
Text of regulation 1
The main areas, which require a careful network planning, and analysis are
1. The main areas, which require a careful network planning, and analysis are:-
(a) Network extension planning – newly built networks or extension of already
existing network or configuration of the existing network to meet the changed
load or feeder situation or operational exigency;
(b) Network component design; and
(c) Providing solutions for operational problems like low voltage and short circuit
withstand capability, power swings and protection selectivity errors.
2. Networks are generally extended over several stages. The operational conditions are
then simulated for this future load forecast. This step will facilitate the fulfilling of
all the operational conditions after Commissioning of the new extension stage. A
careful network analysis provides the decision aids for selecting the most reliable and
cost effective solution from among several configurations. To dimension the
individual components like transformer, cables and switchgear and to provide an
optimal solution for the total system, an extensive analysis of the network is often
necessary.
3. The System Planning Wing,-
(a) examines the operational behaviour of electrical systems both in normal
operation and under fault condition,
(b) proposes remedial measures, if the operational conditions do not conform to the
requirements for quality supply,
(c) promotes the development of components by examining operational conditions
and equipment requirements,
(d) advises in system configuration, system structuring and component design
questions, and
(e) plans the extension of already existing systems as well as the new construction
of supply systems within the framework of the total system.
4. Intensive sessions are required to be held to clarify the task situation and it may be
processed in direct contact with the customer also the distribution network are cost
intensive and hence they require long term planning. The location and nature of the
connected loads on the quality and reliability of the power requirement determine the
structure of the distribution network.
5. The system planning is also necessary in the cases that include
(a) network modernization and upgrading;
(b) changes in operational and protection philosophy or neutral grounding.
Compendium of HPERC Regulations, March 2021 39
6. The tasks, problems and activities related to network expansion planning, component
design and operational problems are brought out as follows.
Sl. No. Description Tasks and problems Activities
1 Expansion
planning
Load increase
New transformer, sub-stations
Integration of peripheral
networks
Cable relaying
Modernization of sub-stations
Network coupling
Power station extension
High voltage level
Network documentation
Geographic Information
System/ Global
Positioning
System/Network
calculations for load flow
and short-circuit.
Dynamic network
Calculations.
2 Component
design
Circuit-breaker stress
Cable cross section
Transformer size
Neutral earthing resistor
Stability
Fault analysis
Relay coordination studies
3 Operational
problems
Sub-station faults
Voltage quality
Harmonics
Earthing problems
Motor starting
Power swings
Frequency of occurrence of faults
Fault tripping Overloads
Over voltages
Under Voltage
Harmonics analysis
Harmonics filter design
Earthing measurement
Network configuration
Sub-station design
Economic analysis
Relay selection
Handling of neutral point
Insulation coordination
Previous and next
All provisions of The Himachal Pradesh Electricity Distribution Code, 2009