The main areas, which require a careful network planning, and analysis are

1. The main areas, which require a careful network planning, and analysis are:- (a) Network extension planning – newly built networks or extension of already existing network or configuration of the existing network to meet the changed load or feeder situation or operational exigency; (b) Network component design; and (c) Providing solutions for operational problems like low voltage and short circuit withstand capability, power swings and protection selectivity errors. 2. Networks are generally extended over several stages. The operational conditions are then simulated for this future load forecast. This step will facilitate the fulfilling of all the operational conditions after Commissioning of the new extension stage. A careful network analysis provides the decision aids for selecting the most reliable and cost effective solution from among several configurations. To dimension the individual components like transformer, cables and switchgear and to provide an optimal solution for the total system, an extensive analysis of the network is often necessary. 3. The System Planning Wing,- (a) examines the operational behaviour of electrical systems both in normal operation and under fault condition, (b) proposes remedial measures, if the operational conditions do not conform to the requirements for quality supply, (c) promotes the development of components by examining operational conditions and equipment requirements, (d) advises in system configuration, system structuring and component design questions, and (e) plans the extension of already existing systems as well as the new construction of supply systems within the framework of the total system. 4. Intensive sessions are required to be held to clarify the task situation and it may be processed in direct contact with the customer also the distribution network are cost intensive and hence they require long term planning. The location and nature of the connected loads on the quality and reliability of the power requirement determine the structure of the distribution network. 5. The system planning is also necessary in the cases that include (a) network modernization and upgrading; (b) changes in operational and protection philosophy or neutral grounding. Compendium of HPERC Regulations, March 2021 39 6. The tasks, problems and activities related to network expansion planning, component design and operational problems are brought out as follows. Sl. No. Description Tasks and problems Activities 1 Expansion planning Load increase New transformer, sub-stations Integration of peripheral networks Cable relaying Modernization of sub-stations Network coupling Power station extension High voltage level Network documentation Geographic Information System/ Global Positioning System/Network calculations for load flow and short-circuit. Dynamic network Calculations. 2 Component design Circuit-breaker stress Cable cross section Transformer size Neutral earthing resistor Stability Fault analysis Relay coordination studies 3 Operational problems Sub-station faults Voltage quality Harmonics Earthing problems Motor starting Power swings Frequency of occurrence of faults Fault tripping Overloads Over voltages Under Voltage Harmonics analysis Harmonics filter design Earthing measurement Network configuration Sub-station design Economic analysis Relay selection Handling of neutral point Insulation coordination

Previous and next

All provisions of The Himachal Pradesh Electricity Distribution Code, 2009

Questions people ask

Is regulation 1 of the Himachal Pradesh Electricity Distribution Code, 2009 still in force?

No repeal of the Himachal Pradesh Electricity Distribution Code, 2009 is recorded.