Rule 134B, Rajasthan Land Revenue (Allotment of Land for setting up of Power Plant based on Renewable Energy Sources) Rules, 2007: Allotment of land for setting up of Wind Monitoring Station
Rajasthan Land Revenue (Allotment of Land for setting up of Power Plant based on Renewable Energy Sources) Rules, 2007 - Rule 134B
Text of rule 134B
Allotment of land for setting up of Wind Monitoring Station
134B. Allotment of land for setting up of Wind Monitoring Station.- (1) Notwithstanding
anything contained in these rules, the Developer may apply for allotment of Government
land in Form “AAA” to the R.R E.C. for establishment of wind monitoring station to
carry out wind resources assessment studies. After receiving application, the R.R.R.C.
may send it to the Collector with its recommendation.
14[(2) The Collector may, on recommendation of the R.R.E.C., allot Government land
upto 100mx100m for setting up of wind monitoring station on temporary basis to
10a Added by Notification no. F9(90)Rev.6/2021/139, dated-24-08-2022.
10b Added by Notification no. F9(90)Rev.6/2021/139, dated-24-08-2022.
10c Added by Notification no. F9(90)Rev.6/2021/139, dated-24-08-2022.
10d Added by Notification no. F11(14)Rev.6/2025/35, dated-01-12-2025.
11 Inserted by Notification no. F6(2)Rev.6/2001/14, dated-01-07-13
12 Substituted by Notification no. F6(28)Rev.6/2014/part/4, dated-22-02-17.
13 Inserted by Notification no. F6(2)Rev.6/2001/14, dated-01-07-13
14 Substituted by Notification no. F6(28)Rev.6/2014/part/4, dated-22-02-17.
14a Added by Notification no. F9(90)Rev.6/2021/139, dated-24-08-2022.
the Developer for maximum period of three years on payment of market value of
land assessed on the basis of rates recommended by DLC.]
(3) After completion of wind resources assessment studies or 3 years from the date of
temporary allotment of land, whichever is earlier, the wind monitoring station shall be
dismantled at the cost of Developer and land shall be revert back to the State Government
free from all encumbrances.]
14a4C. Allotment of land for setting up of Renewable Energy based EV Charging
Stations.- (1) Any person, who desires to establish Renewable Energy based EV Charging
Station, may apply for allotment of Government Land electronically through official
website of the RREC in the Form and manner as provided therein. The RREC shall, along
with its recommendation including area required for establishment of such Charging
Station, forward the application to the District Collector. The District Collector may, on
recommendation of the RREC, allot Government land for setting up of Renewable Energy
based EV Charging Station.
(2) Land for Renewable Energy based EV Charging Station shall be initially allotted on
lease hold basis for a period of thirty years from the date of allotment, which may be
renewed for a period of ten years.
(3) Premium shall be equal to the fifty percent of the market price of the land calculated
on the basis of the rates recommended by the DLC for the commercial purpose.
(4) Annual rent shall be charged at the rate of five percent per annum of the premium as
specified in sub-rule (3) for two years from the date of allotment which shall be enhanced
thereafter for every year at the rate of five percent per annum of annual of the previous
years.
(5) The allottee of land shall execute a lease deed in form ‘B’ within forty five days from
the date of allotment order. The lease shall be subject to the terms and conditions
provided in the lease deed and these rules.
Provided that the said period of forty five days may be extended by the District
Collector, if the District Collector is satisfied about the reasons on account of which the
lease deed could not be executed within the period specified above.
5.Land not available for allotment:- The following land shall not be allotted under
these rules:-
(a) Land prohibited under section 16 of the Rajasthan Tenancy Act, 1955
(Rajasthan Act No. 3 of 1955),
(b) Land situated in catchment area of any tank, river, Nala, Nadi.
(c) Land reserved for allotment under any specific rules.
(d) Land falling under urbanisable limit or peripheral belt as provided under
section 90-B of the Rajasthan Land Revenue Act, 1956 (Act No. 16 of 1956),
(e) For polluting plants land within radius of 1.5 km and land within radius of 0.5
km for non-polluting plants from outer limits of inhabitance (abadi) of a
revenue village. In special circumstances after recording reasons for the same
the State Government may relax this condition only for non-polluting plants.
(f) Land failing within National Capital Region, or
(g) Land falling within the boundary limits of any Railway Line or any other road
maintained by Central or State Government or Local authority as specified in
the guidelines given by the Indian Road Congress from time to time.
(h) 15[Land falling within the limit of 2 km. of both the sides from the middle
point of Jaisalmer to Sam Road.]
15 Added by Notification no. F6(2)Rev.6/2001/pt/25, dated-04-10-13.
6 Assessment of premium and Annual Lease Rent:- (1) The lease rent payable
on the land allotted for setting up of 15a[Renewable Energy Power Plant/RE Park]
shall be paid annually.
15a [(2) Annual lease rent shall be charged at the rate of 7.5 percent per annum of the
premium spemium specified in sub-rule (3) or reserve lease rent, whichever is higher
and it shall be enchanced every year by ten percent of the annual lease rent of previous
year.
(2A) Reserve lease rent for the year 2025-2026 shall be Rs 30,000/- per hectare per
annum and for subsequent years it shall be enhanced every year by five percent of the
reserve lease rent of previous year.]
]
15b[(3) Premium of land allotted for Renewable Energy Power Plant/RE Park
shall be equal to two times the market value of land determined on the basis of
rate recommended by the DLC for the agricultural land. After 30 years, if the
lease is renewed for a further period of 10 years, the premium shall be equal to
two times of the market value of land, determined on the basis of rate
recommended by the DLC for the agricultural land, at the time of renewal.]
(4) The Power Producer or Developer shall be liable to pay annual rent and
premium for the whole of the allotted land irrespective of the fact that he has
utilized only a part or portion of the land for erecting structures and installing
machines for the generation of electricity from the 15a[Renewable Energy Power
Plant/RE Park.]
7. 15a[Setting up of Renewable Energy Power Plant:- (1) A Renewable Energy
Power Plant/RE Park shall be set up within a period of two years from the date
of allotment of land:
Provided that the State Government on being satisfied with the grounds
mentioned in application made by developer/producer seeking extention of time
upto a maximum period of two years after the payment of following amount
which shall be deposited in Government account under head Land Revenue
Account (0029):-
(i) 20% of Land Security Amount for the extention of first year; and
(ii) 30% of Land Security Amount for the extention of second year;
Provided that a power Plant based on biomass shall be set up within a period of
four years from the date of allotment
(2) If the land is not used within the stipulated period or time extended by the
State Government as per provisions of Sub- rule (1), the land shall revert back to
the State Government free all encumbrances and all the payment made shall be
forefeited.]
8. Restriction on use of land for any other purposes:- The land allotted under
these rules shall be used strictly for the purposes of setting- up of 15a[Renewable
Energy Power Plant/RE Park]. The Power Producer shall neither use, nor allow
the land to be used for any other purpose and shall not make any constructions
on the said land other than that which is required for the setting, operation and
maintenance of the Renewable Energy Power Plant /RE Park and evacuation of
the energy generated thereof:
16[Provided that any part of land, which remained un-utilized after setting
up of Renewable Energy Power Plant/RE Park for which it was alloted, may be
utilized by the Power Producer/ Developer for setting up of other kind of
Renewable Energy Power Plants/RE Park with the prior permission of the
Government in the Revenue Department on recommendation of R.R.E.C.]
9. Restriction on sub-lease of land: - (1) No power producer except Developer
may be allowed to sub-lease the part of leased land. Developer may sub-lease the
land to the Investor subject to the provisions of these rules.
17[(2) Where the Developer desire to sub-lease any of the area or part of the area
allotted to him and his interest in the leased area for the purpose of generating
the wind energy or solar energy, he may be allowed to do so by the Collector on
18[recommendation of R.R.E.C. and on payment of fifty percent of prevailing
market value of land after deducting premium charged under sub-rule (3) of rule
6]. The transferee shall pay fifty percent additional lease rent annually:
26a(Provided that where the land allotted to a developer for development of
project having capacity of 4000 MW or more, no additional charge shall be levied
if such allottee transfer his interest in land allotted to him by way of sub-lease in
favour of its subsidiary or group company.)
(3) Whenever any leased area is sub-divided as a consequence of sub-lease under
sub-rule (2), all terms and conditions of lease as applicable to the lease shall also
be applicable to the sub-lease except lease rent. The Sub-lessee in the sub-lease
period may assign his interest to any financial institution for the purpose of
15a Inserted by Notification No F.9(26) Rev-6/2024/16 dated 12-09-25.
15b Added by by Notification no. F9(26)Rev.6/2024/07, dated-17-03-25
16 Added by by Notification no. F6(28)Rev.6/2014/part/4, dated-22-02-17.
17 Substituted by Notification no. F6(28)Rev.6/14/part/06, dated-31.10.14.
18 Substituted by Notification no. F6(28)Rev.6/14/15, dated-11.02.16.
26a Added by Notification no. F.11(2)Rev.6/2021/152 dated-27.12.2021.
taking loan for establishing or developing 19[Wind Farms, Wind Power Plant,
Solar Parks and Solar Power Plant], such assignment shall be subject to first
charge of the Government.
(4) In case of sub-lease, following conditions shall also be applicable; namely:-
i. The Lessee can make sub-lease only after taking prior permission of the
Collector 20[on the recommendation of RREC].
ii. The sub-lessee shall be liable to make payment of charges specified under
these rules;
iii. The sub-lease shall be permissible only for the purposes for which the land
was leased out to the Lessees;
iv. Sub- lease period shall not exceed the remaining period, of the original or
renewed lease period, as the case may be;
v. The terms and conditions applicable to lessee shall mutatis mutandis apply to
all sub-lessees;
vi. The rights and liabilities between the Developer (Lessee) and Investor (Sub-
Lessee) shall be determined among themselves and those shall not be
binding on the State Government.
vii. The State Government shall not be liable for any dispute arising between the
lessee and sub-lessee.
viii. Any other conditions which may be specified by the State Government, from
time to time; and
ix. 21 [Sub-lessee may 22 [] transfer his interest in the sub-lease to another
investor, subject to prior approval of R.R.E.C. On such transfer the sub-
lessee deposit fifty percent of the prevailing market value of land in
Government account after deducting the price charged by the lessee under
sub-rule (2). The transferee shall pay fifty percent additional lease rent.]
10. Lease Deed: - (1) The allottee of land shall execute a lease deed in form ‘B’
appended to these rules within 45 days from the date of allotment order:
23[Provided that the said period of 45 days may further be extended by the
State Government if the State Government is satisfied about the reasons on account
of which the lease deed could not be executed within the prescribed period.]
(2) The lease shall be subject to the terms and conditions provided in the lease
deed.
19 Substituted by Notification no. F6(28)Rev.6/14/part/06, dated-31.10.14.
20 Substituted by Notification no. F6(2)Rev.6/2001/14, dated-01-07-13
21 Substituted by Notification no. F6(28)Rev.6/14/15, dated-11.02.16.
22 The word ‘only once’ deleted by Notification no. F6(28)Rev.6/2014/part/4, dated-22-02-17.
23 Substituted by Notification no. F6(2)Rev.6/2001/14, dated-01-07-13
11. Consequences of breach of terms and conditions by the Lessee or sub-
lessee:- (1) The power producer shall initiate activities on the allotted land only
after the execution of the lease deed. The allotment of land shall be liable to be
cancelled if power project does not start commercial operation within the time
prescribed in rule 7.
(2) If and when the Lessee or Sub-Lessee makes any default or contravenes any
of the terms and conditions of allotment of land as set forth in the Lease Deed or
any of the provisions of Rajasthan Land Revenue Act, 1956 (Act 15 of 1956) and
these rules or any of the provisions contained in any law relating to generation of
electricity, the lease shall come to an end and the land shall revert back to the
State Government.
(3) The lease holder shall have to remove all structures and installations from the
land at his own cost and upon his failure to do so, the Collector shall have power
to do so and dispose off the same and recover the expenses of so doing from the
Developer or Investor or both.
(4) The amount received from disposal of Articles shall first of all be adjusted
towards the dues, if any, standing expenses incurred for removal of structures/
machineries and those incurred on disposal of these articles and any residue sum
shall be remitted to the Developer/ Investor.
12. Power producer to adhere to the Policy of the State Government:- (1) Subject
to the provisions of these rules, Power Producer shall adhere to the “Policy for
promoting Generation of Electricity 24[from Renewable] Energy Sources” as may be
declared by the State Government from time to time.
(2) Without prejudice to the generality of provisions contained in sub-rule (1).
i. When the orders of allotment are issued, the lease deed shall be signed by
the Collector. Only after Security Money is deposited by the Power
Producer with the RREC as per the provisions of said Policy and premium
as per these rules.
ii. Where lease deed is not executed in prescribed time the allotment
shall automatically be cancelled.
iii. The Power Producer shall follow the time frame for completion of
project and running the same.
25[12A. Allotment of Land to R.R.E.C. or Rajasthan Solar Park Development
Company Limited.- Land may be allotted to the R.R.E.C. or Rajasthan Solar Park
Development Company Limited for setting up and developing Solar Park, on the
following terms and conditions, namely:-
24 Substituted by Notification no. F6(2)Rev.6/2001/14, dated-01-07-13
25Inserted by Notification no. F6(28)Rev.6/201401/9, dated-04-08-14
(i) The land shall be allotted on lease hold basis for a period of 99 years.
(ii) The premium to be charged for the allotment of government land for setting
up and developing Solar Park shall be as specified in sub rule (3) of rule 6 of
these rules;
(iii) Lease rent shall be payable at the rate as specified in sub-rule (2) of rule 6 of
these rules;
(iv) The R.R.E.C. or Rajasthan Solar Park Development Company Limited, may
sub-lease the leased land or part thereof for setting up and developing Solar
Park for solar plant/ solar power plant/ solar PV power plant/solar thermal
power plant/ solar farm purposes;
(v) The R.R.E.C. or Rajasthan Solar Park Development Company Limited, may
levy and recover such lease rent and other charges as may determined by it,
in respect of the lands sub- leased by it;
(vi) The periods of the sub-leases shall be determined by the R.R.E.C. or Rajasthan
Solar Park Development Company Limited , but such period shall not exceed
30 years, in all, in any case;
(vii) The shall revert to the Government free of all encumbrances and without
payment of any compensation in case the R.R.E.C. or Rajasthan Solar Park
Development Company Limited or any of it’s sub-lessees use it for any
purpose other than solar plant/ solar power plant/ solar PV power
plant/solar thermal power plant, including essential welfare and supporting
services or commit breach of any other condition of the lease or sub-lease;
and
(viii) The sub-lessee of the R.R.E.C. or Rajasthan Solar Park Development Company
Limited shall continue to be governed by all others terms conditions
prescribed in these rules and any other analogous rules that may be
promulgated or orders that may be issued, in this behalf by the State
Government.]
13. Repeal and Savings: - (1) The Rajasthan Land Revenue (Allotment of Land for
Setting up of wind Farm) Rules, 2006 are hereby repealed.
(2) On and from the date of commencement of these rules, the Land for
establishment of Renewable Energy Power Plant shall be allotted under these rules.
(3) All Lands allotted for establishment of Renewable Energy Power Plant and lease
deeds executed in favour of any Power Producer under and in accordance with the
administrative decisions or rules so repealed shall except in the matters which are
repugnant or inconsistent to these rules, be deemed to have been allotted and
executed under and in accordance with the provisions of these rules. 12
26FORM-A
(see rule 3)
APPLICATION FORM FOR ALLOTMENT OF
GOVERNMENT LAND FOR SETTING UP OF RENEWABLE
ENERGY POWER PLANT/RE Park
I. COMPANY DETAILS
1. Name of the applicant / organization :
2. State whether the applicant /
organization is a :
(a) Company registered under Indian
companies Act 1956; :
(b) Co-operative Society; :
(c) Any other corporate entity :
3. Address:
(i) Office :
a- Telephone No. :
b- Fax No. :
c- Email Address. :
(ii) Name and address of the
authorized person :
(a) Name :
(b) address :
(c) Telephone No. :
(d) Fax No.
(e) Email Address. : :
4. In case of any other corporate entity,
give details of partners/directors/owners :
5. whether income tax assesses, if yes,
please state the year up to which
assessment made (copies of
assessment for last three years to
be enclosed). :
6. If answer to 5 is No, State whether
the promoter is an assessee. :
7. income tax permanent A/c No.
8. Present activity/business carried on
by the applicant / organization :
9. Give details of the turnover of over of
the organization in last three years
(copies of the profit and loss account
and Balance Sheet /Annual Report to
26 Deleted by Notification no. F6(28)Rev.6/2014/part/4, dated-22-02-17.
be enclosed). :
10. Do you propose to set up the plant
in the name of existing company or SPV or
propose some sister concern. :
II. PROPOSED POWER PROJECT
1. a) Proposed Gross Capacity (MW) :
b) Auxiliary Consumption (MW) :
c) Net capacity (MW) :
d) Plant Load Factor (PLF)% :
e) net expected power generation per annum:
………………………………lacs kWh
2. a) Location of proposed site with details. :
b) Land details of the power plant site:- :
i) Name of village :
ii) Khasra Nos. :
iii) Area of land from each Khasra No.:
iv) Land map with clear markings of
land required for the project :
v) is it Government land or private land :
3. Nearest Railway Station :
4. Name of the manufacturer with address for
supply, installation and commissioning of the
power generation system, if identified. :
5. Financing Arrangement:- :
(a) Own funds (promoters) :
(b) IREDA/PFC/REC/Financial Institution/
Commercial Banks,
(c) Equity, :
(d) Other. :
6. Time frame and pert chart for major activities:-
(i) Acquisition of land :
(ii) signing of PPA, :
(iii)Expected financial closure, :
(iv) Date of commissioning/synchronization:
(v) Proposed Commercial operation Date
(COD) :
7. Power Plant proposed to be set up for:- :
(a) Captive use :
(b) Sale to RVPN/DISCOM on approved rate:
(c) Third party sale at mutually agreeable
rates on payment of approved wheeling
charges to RVPN. :
(d) Sale of DISCOM under REC mechanism
(e) Under solar mission (please
specify the name of scheme
under which the power proposed
to be set up)
(f) Any other (please specify)
8. Please tick the Non Conventional
Source of Energy on which the
project is proposed to be based
(a) Biomass
(b) SPV/SPV- Wind Hybrid/Solar Thermal
(c) Wind
(d) Mini-Small Hydel
(e) Biogas
:
III. DETAILS OF PROPOSED POWER PROJECTS
(a) for Biomass based power plants:
(i) Biomass proposed to be used : Name and type of Biomass
(i.e. Rice husk, mustard stalk (1)
wood chips, saw dust, coconut (2)
shell, groundnut husk, wood
waste, Prosopis-Juliflora
fire wood industrial waste
of paper mills plywood
industry etc.
(ii) Name of technology :
(Pyrolysis, gasification, Incineration/
Palletisation/Briquetting, through
gas/Steam turbine, duel fuel
engine/gas engine route or
combination thereof/ Bagasse/
Biomass Cogeneration)
(iii) Required quantity of biomass
:………………………………….MT per year
(iv) Available quantity of Biomass :
…………………………………MT per year
(a) from own sources : …………………………….
MT per year
(b) from other sources :
………………………………..MT per year
(v) Calorific value of proposed :
……………………………….kcal/kg
biomass to be used
(vi) Cost of biomass to be used : Rs.
………………………………..per tone
(vii) Is the biomass available for 20
years? : Yes/
No……………………………….
(b) Solar Photovoltaic Power Plant (SPV)/SPV- Wind Hybrid/Solar Thermal
(a) Solar Photovoltaic Power Plant (SPV)
(i) Name of Solar Technology proposed
(ii) No. of Solar Modules proposed :
(iii) capacity of PCU :
(iv) Battery bank proposed : Yes/No
(v) if yes, its capacity
(vi) Duration and time of day during :
which supply of power is
proposed
(b) SPV- Wind Hybrid
(i) No. of Solar Modules proposed :
(ii) capacity of PCU :
(iii) Battery bank proposed : Yes/No
(iv) if yes, its capacity
(v) Duration and time of day during :
which supply of power is
proposed
(c) Solar Thermal
(i) Name of Solar Technology proposed
(ii) With storage/without storage
(iii) If, storage total hours of storage
(iv) Requirement of water (Cusec)
(v) Duration and time of day during :
which supply of power is
proposed
(d) Wind Farms:-
(i) Total capacity of the proposed :
Wind Farm, along with micro
siting plan as per C-WET
guidelines. Type test approval
and Power Curve of WEG
proposed should also be
enclosed.
(ii) No. of wind Energy generators :
(with capacities) proposed to be
installed along with individual
capacity of generators
(Technical Parameters of WEG
should be indicated).
(iii) Location at which Wind Farm is :
proposed along with category of
Land I.e. Revenue/ Forest,
Khasra wise area and Jama bandi :
map (the minimum
generation at the given
location shall be minimum
20% on the basis of power
curve of WEG proposed).
(iv) Wind assessment, Feasibility :
report, DPR of proposed site is
enclosed (Applications not
accompanied with feasibility report
will not be entertained) Feasibility
report should include site
details, wind assessment data,
Basis/Source of Wind Data
estimated generation
on the basis of power curve of
WEG proposed and cash flow
analysis including profitability
statement, assumptions made
etc.
(v) Please furnish the details of :
previous experience in the field
of wind power generation and
or manufacturing of WEGs or
experience in generation of grid
quality power.
(e) Hydel Power Plant:
(i) Capacity of proposed Mini/MIcro & :
Estimated annual generation. :
(ii) Design head & discharge :
(iii) No. of turbines & their capacity :
(iv) Type of turbine :
(v) Generation voltage :
(vi) Location of proposed plant: :
(a) Dam/ Canal/River :
(b) Village :
(c) District :
(vii) Whether feasibility report of :
proposed site is enclosed
(without feasibility report
applicable will not be
entertained). Format is
enclosed
(f) Biogas Plants :
(i) Type of fuel used :
(i.e. cattle dung/digested
slurry/Kitchen waste/Agro
waste etc.)
(ii) Required quantity of bio-fuel :…….. ……. MT
per year
(iii) Available quantity of bio-fuel
(a) From Own Source :……………… . MT
per year
(b) From Other Source :…………………….. MT per
year
(iv) Cost of bio-fuel to be used :…………………………Rs./
MT
(v) Is the bio-fuel available for 10 years
:………………………..Yes/No
IV. ELECTRICAL DETAILS
1. Transmission of Power & Evacuation :
plan/interconnection facility for the
proposed plan
2. interfacing scheme proposed :
3. For captive power plant
(i) Present consumption of Electricity :
(a) From Vidyut Vitaran Nigam ;
(b) Captive Generation :
(ii) Connected load of the company :
(iii)HT/LT consumer :
(iv) Nearest sub-station of RVPN/VVN :
and distance from the proposed
power plant.
(v) Voltage ratio of the sub-station
V. FINACIAL DETAILS
1. Estimated cost of the project proposed :
2. Cost of power generation per unit : …………….Rs. / kWh
(Please enclose Cash Flow
Chart also)
3. How do you propose to raise the :
required finance for the project
(a) Equity share capital :
(b) Promoters contribution :
(c) Term Loans :
4. Do you envisage any foreign collaboration :
if so please furnish the details
5. details of the application/ processing :
fee remitted: (@Rs 50000/- per MW
which shall be non-refundable. The
service tax shall also be payable
extra as applicable from time to
time.) )
(a) Amount Rs. :
(b) Demand Draft/Cheque No :
(c) Date
(d) Banker’s name and address :
6. Can you help access bilateral grants
/concessional loans from Government of Rajasthan to
provide soft loan for your project
(if yes, give details of the agency
and preliminary terms and conditions)
VI. ANY OTHER RELEVANT INFORMATON
VII. DECLARATION
(i) I/ We certify that all information furnished is true to the best of my /
our knowledge.
(ii) I/ We agree that Government of Rajasthan is the final authority to
allot us the project.
(iii) I/ We shall not have any dispute with Government of
Rajasthan/RREC for non-allotment of the project.
(iv) I/ We agree to sign necessary agreement with Gove. of Rajasthan/
RREC.
(v) I/ We agree to comply with the terms and conditions of Policy for
Promoting Generation of Electricity from Biomass, 2010, Rajasthan
Solar Energy Policy,2011, Policy for Promoting Generation of
Electricity from Wind, 2012, as amended from time to time.
Signature of the authorized Signatory
of the organization with seal
Place:
Date:
VIII. DOCUMENTS ENCLOSED:-
1. A certified copy of the Memorandum & Article of Association of the
Company.
2. Certified copy of the registration certificate.
3. Certified copy of the partnership deed.
4. Certified copy of the Authority conferring powers on the person(s) who
are competent to execute the MOU/the agreement with GoR/RREC/
RVPN/DISCOM/NVVN/IREDA.
5. Pre-feasibility report/Detailed project report.
6. Processing fee in the form of D.D.No…………………………… dated
…………………..payable to the managing Director RREC, at Jaipur for
Rs………………
7 Annual Report, audited balance sheet, audited project and loss account
and Net Worth of the company for last three years and for the current
year un-audited, if available.
8 Certificate from the Chartered Accountant showing the Net Worth of the
company.
27FORM-AA
(see rule 4A)
APPLICATION FORM FOR SUBMITTING PROPOSALS FOR
SETTING UP OF SOLAR MONITORING STATION
I COMPANY DETAILS
1. Name of the applicant / organization :
2. State whether the applicant /
organization is a :
(a) Company registered under Indian
companies Act 1956 :
(b) Co-operative Society :
(c) Any other corporate entity :
3. Address:
(i) Office :
a) Telephone No. :
b) Fax No. :
c) Email Address. :
(ii) Name and address of the
authorized person :
(a)Name :
(b) address :
(c) Telephone No. :
(d) Fax No. :
(e) Email Address :
4. In case of any other corporate entity,
give details of partners/directors/owners :
5. whether income tax assessee, if yes,
please state the year up to which
assessment made (copies of
assessment for last three years to
be enclosed). :
6. If answer to 5 is No, state whether
the promoter is an assessee. :
7. income tax permanent A/c No.
8. Present activity/business carried on
by the applicant / organization
:
II PROPOSED SOLAR MONITORING STATION
1. (a) Location of proposed site with details. :
27 Added by Notification no. F6(2)Rev.6/2001/14, dated-01-07-13
(b) Land details of the power plant site :
(i) Name of village :
(ii) Khasra Nos. :
(iii) Area of land from each Khasra
No. & Jamabandi map:
(iv) Land map with clear markings of
land required for the project :
(v) is it Government. land or Private. land : :
2. Nearest Railway Station :
3. Name of the manufacturer with address for
supply, installation and commissioning of the
monitoring station, if identified.
:
III FINACIAL DETAILS
1. Estimated cost :
2. Details of the application / Processing
fee remitted (non-refundable)
a) Amount Rs.
b) Demand Draft No.
c) Date
IV ANY OTHER RELEVANT INFORMATON
V DECLARATION
(vi) I/ We certify that all information furnished is true to the best of my /
our knowledge.
(vii) I/ We agree that Govt. of Rajasthan is the final authority to allot us
the site
(viii) I/ We shall not have any dispute with GoR/RREC for non-allotment of
the site.
(ix) I/ We agree to sign necessary agreement with Government. of
Rajasthan/ RREC.
(x) I/ We agree to comply with the terms and conditions of Rajasthan
Solar Energy Policy,2011.
Signature of the authorized Signatory
of the organization with seal
Place:
Date:
VI DOCUMENTS ENCLOSED:-
1. A certified copy of the Memorandum & Article of Association of the
Company/ Certified copy of the registration certificate/Certified copy
of the partnership deed.
2. Processing fee in the form of D.D.No…………………………… dated
………………….. in favour of RREC, payable at Jaipur for
Rs………………
28FORM-AAA
(see rule 4B)
APPLICATION FORM FOR SUBMITTING PROPOSALS FOR
ESTABLISHMENT OF WIND MONITORING STATION
I COMPANY DETAILS
1. Name of the applicant / organization :
2. State whether the applicant /
organization is a :
(a) Company registered under Indian
companies Act 1956 :
(b) Co-operative Society :
(c) Any other corporate entity :
3. Address:
(i) Office :
a) Telephone No. :
b) Fax No. :
c) Email Address. :
(ii) Name and address of the
authorized person :
(a)Name :
(b) address :
(c) Telephone No. :
(d) Fax No. :
(e) Email Address :
4. In case of any other corporate entity,
give details of partners/directors/owners :
5. whether income tax assesses, if yes,
please state the year up to which
assessment made (copies of
assessment for last three years to
be enclosed). :
6. If answer to 5 is No, state whether
the promoter is an assesses. :
7. income tax permanent A/c No.
8. Present activity/business carried on
by the applicant / organization
:
II PROPOSED WIND MONITORING STATION
1. (a) Location of proposed site with details. :
28 Added by Notification no. F6(2)Rev.6/2001/14, dated-01-07-13
(b) Land details of the power plant/RE Park site :
(i) Name of village :
(ii) Khasra Nos. :
(iii) Area of land from each Khasra
No. & Jamabandi map:
(iv) Land map with clear markings of
land required for the project :
(v) is it Government. land or Private. land :
(vi) Height of the mast :
(vii)Height of the sensors :
(viii) Anemometer & Direction sensor
mounting arrangement :
2. Nearest Railway Station :
3. Name of the manufacturer with address for
supply, installation and commissioning of the
power generation system, if identified.
:
III FINACIAL DETAILS
1. Estimated cost of the wind mast :
2. Details of the application / Processing
fee remitted (Rs. 10,000 per site which shall
be non-refundable. The service tax shall be
payable extra as applicable from time to
time)
d) Amount Rs.
e) demand Draft /cheque No.
f) Date
3. Details of fees to be furnished to C-WET
(Fee, if any, payable to C-WET shall be extra as applicable)
a) Amount Rs.
b) Demand Draft /cheque No.
c) Date
IV ANY OTHER RELEVANT INFORMATON
V DECLARATION
(xi) I/ We certify that all information furnished is true to the best of my /
our knowledge.
(xii) I/ We agree that Govt. of Rajasthan is the final authority to allot us
the site
(xiii) I/ We shall not have any dispute with GoR/RREC for non-allotment of
the site.
(xiv) I/ We agree to sign necessary agreement with Government. of
Rajasthan/ RREC.
(xv) I/ We agree to comply with the terms and conditions of Policy for
promoting Generation of Electricity form Wind, 2012
Signature of the authorized Signatory
of the organization with seal
Place:
Date:
VI DOCUMENTS ENCLOSED:-
1. A certified copy of the Memorandum & Article of Association of the
Company/ Certified copy of the registration certificate/Certified copy
of the partnership deed.
2. Processing fee in the form of D.D. No…………………………… dated
………………….. in favour of RREC, payable at Jaipur for
Rs………………
3. Processing fee in the form of D.D. No…………………………… dated
…………………..payable to the Unit Chief, WRA unit, C-WET,
Chennai through RREC for Rs. …………………….
37Form "B"
(See rule 4C and rule 10)
Lease Deed
This lease deed made on the .........day of............(month) 200...........Between the
.............(hereinafter called the lessee, which expression shall, unless excluded by or
repugnant to the contest includes his hairs, successors, executors, administrators and
assigns) of the first part and the Governor of Rajasthan (hereinafter called the lessor,
which expression shall unless excluded by or repugnant to the context includes his
successors in Office and permitted assigns) through Collector, District.............. of the
second part.
Whereas the lessor has agreed to grant and the lessee has agreed to accept a plot of land
measuring .............. hectare situated ............(name of place) and more particularly
described in the schedule hereto (hereinafter called the plot) on lease on the condition
hereinafter appearing:
Now This Indenture Witness As Follows:
1. that the lessor agrees to let the said plot and the lessee has agreed to occupy the
said plot for a period of 30 years on lease for the purpose of setting up Power
Plant/Park based on Renewable Energy Sources/Renewable Energy based EV
Charging station for which the lessee had applied under the provisions of the
Rajasthan Land Revenue (Allotment of Land for Setting up of Power Plant
based on Renewable Energy Sources) Rules, 2007.
2. that the possession of the said plot is hereby delivered\has been delivered to the
lessee on and with effect from....
3. that the lessee hereby convenants with the lessor as under: -
(i) that the lessee shall duly pay the stipulated lease rent of the said plot to the lessor or
his authorized officer on or before the 7th day of each calendar year for which the rent
due at such place as the lessor may from time to time specified.
(ii) the rent as aforesaid excludes all kinds of tax/fee/duty which the Municipal Board,
Panchayat or any Civil Body imposed or may impose during the period of lease in
respect of the said plot the lessee agrees to pay such tax/fee/duty to the authorities
concerned directly.
(iii) the lessee hereby agrees to pay the lessor along with the rent, further sum of Rs
............. as premium in accordance with the provisions of the Rajasthan Land Revenue (
Allotment of Land for Setting-up of Power Plant based on Renewable Energy Sources)
Rules, 2007 and the said sum of premium has already been deposited with lessor.
(iv) the lessee shall set up on the said plot, Power Plant based on Renewable Energy
Source/ Renewable Energy based EV Charging Station for which land has been leased
to him by the lessor within a period of 3 years and provided that the Power Plant based
on bio-mass shall be set up within a period of four years from the that of allotment of
land and in case of his failure to do so, the said plot shall revert to the lessor unless the
stipulated period is extended by the State Government on valid grounds.
(v) the lessee agreed not to construct or build any structures or building on the said plot
of land or on a portion of it, which may have the object of using it as a commercial
undertaking other then for the Power Plant based on Renewable Energy Source/
Renewable Energy based EV Charging Station, for which the said plot has been leased.
(vi) the annual rent shall be Charged at the rate of five percent per annum of the
premium for two years from the date of allotment which shall be enhanced there after
for every year at the rate of five percent per annum of annual rent of the previous years.
(vii) the lessee shall have an option to renew the said lease for a further period of 10
years after expiry of the present term of lease.
(viii) in case any default is made by the leasee in respect of any of the aforesaid terms
and conditions, the lease shall stand determined and the said plot or the land shall
revert to the lessor and lessee shall not be entitled to any compensation for premature
determination of the lease.
Provided that in case the lessee has assigned or mortgaged its leasehold right in favour
of any institution or institutions for the purpose of availing of financial assistance, the
lessor shall before exercising its rights to determine the lease of the said plot give notice
thereof to the assignee or mortgagee, as the as the case may be, and in case default is not
rectified either by the company or by assignee or the mortgagee within a period of 3
months from the date of the receipt of the notice, the said plot or land shall revert to the
lessor.
(ix) The lessee shall have to remove therefrom at his cost, all the buildings and structure
constructed by him thereon. In case of his failure to do so, the lessor shall have a right
to dispose the said structures or buildings in any way he likes and to refund the
proceeds to the lessee after recovering all the sum due to him from the lessee.
(x) the lessee shall abide by all the terms and conditions prescribed in the lease deed and
direction issued by the State Government and R.R.E.C. from time to time.
(xi) the lessee shall adhere to the Renewable Energy Policy issued by the State
Government from time to time.
(xii) the lessee shall abide by all the provisions of the Rajasthan Land Revenue
(Allotment of Land for Setting up of Power Plant based on Renewable Energy Sources)
Rules, 2007, as amended from time to time.
4. The cost and expenses incidental to the preparation and execution and
registration of this lease including stamp duty shall be born and paid by the
lessee.
In witness whereof the parties hereto have set their respective hands on the dates
maintained against their signatures.
For and on behalf of the signature of lesse
Governor of Rajasthan with the name and date
( )
District Collector………
1. Witness
2. Witness
Schedule
Plot of land measuring………
Bounded on the Area
Khasra No. Situated in village……..
Tehsil…….. District………
Previous and next
Questions people ask
Is rule 134B of Rajasthan Land Revenue (Allotment of Land for setting up of Power Plant based on Renewable Energy Sources) Rules, 2007 still in force?
No repeal of Rajasthan Land Revenue (Allotment of Land for setting up of Power Plant based on Renewable Energy Sources) Rules, 2007 is recorded.