Rule 2A, Rajasthan Land Revenue (Allotment of Land for setting up of Power Plant based on Renewable Energy Sources) Rules, 2007: Maximum area to be allotted

Rajasthan Land Revenue (Allotment of Land for setting up of Power Plant based on Renewable Energy Sources) Rules, 2007 - Rule 2A

Text of rule 2A

Maximum area to be allotted

10[2A. Maximum area to be allotted.- For setting up of renewable energy power plant, the maximum area to be allotted shall be as under:- S. No. Nature of power plant Maximum area to be allotted 1. Wind Farm/Wind Power Project 2.50 Hectare per MW 5a Substitited by Notification no. F9(90)Rev.6/2021/139, dated-24-08-2022. 5b Inserted by Notification No F.9(26) Rev-6/2024/16 dated 26-07-24. 6 Inserted by Notification dated 01-07-13. 7 Inserted by Notification no. F6(28)Rev.6/201401/9, dated-04-08-14. 8 Substituted by Notification dated 01-07-13. 9 Added by Notification dated 01-07-13. 10 Added by Notification dated 01-07-13 & Substituted by Notification no. F6(28)Rev.6/2014/part/4, dated-22- 02-17 & again substituted by notification dated 18-01-21 and again again substituted by notification dated 26.07.2024 2. Solar Power Plant using- (i) Solar Photo Voltaic (SPV) on Crystalline Technology (ii) Solar Photo Voltaic (SPV) on Crystalline Technology with tracker (iii) Solar Photo Voltaic (SPV) on thin film/Amorphous Technology with or without tracker (iv) Solar Thermal [Concentrate Solar Power (CSP)] Parabolic Trough/Tower/ other technology with and without storage 2.0 Hectare per MW 2.5 Hectare per MW 2.5 Hectare per MW 2.25 Hectare per MW (a) upto Plant Load Factor (PLF) of 21% 3.0 Hectare per MW. (b) for every 1%increase in Plant Load Factor (PLF), 0.15 Hectare per MW additional land shall be alloted . 3. 4. 10d[5. Biomass Power Plant Wind Solar Hybrid Power Plant using,- (i) Solar Photo Voltaic (SPV) on Crystalline Technology (ii) Solar Photo Voltaic (SPV) on Crystalline Technology with tracker (iii) Solar Photo Voltaic (SPV) on thin film/Amorphous Technology with or without tracker (i) Compressed Bio Gas Plant (ii) Bio Coal Plant (iii) Bio-Ethanol Plant 2.5 Hectare per MW 2.50 Hectare per MW 2.50 Hectare per MW 3.00 Hectare per MW for 1MTPD capacity 1 acre for plant and 2.5 acre for feedstock storage and for other capacity, in proportionate to this criteria for 100 MTPD capacity 2 acre and for other capacity, in proportionate to this criteria for 100 kilo litre capacity 1.5 acre and for other capacity, in proportionate to this criteria.] Provided that in case of requirement of extra land beyond above maximum limit, not more than 10% of the maximum limit variation may be allowed for allotment on recommendation by the RREC on the basis of technical grounds, as per Grid Code Government Rules, Guidelines, Land locations and Layout etc.] 3 Application for allotment: - (1) The Power Producer shall select appropriate site of land available in the area where [the Renewable Energy Power Plant/RE Park] is proposed to be set up. (2) The application for allotment of Government land for setting up Renewable Energy Power Plant/RE Park shall be submitted by the Power Producer to the Rajasthan Renewable Energy Corporation. (3) Deleted by Notification Dated 22.2.2017. (4) The application shall be proposed and recommended by the RREC to the District Collector, if the applicant fulfils all the requirements for allotment of land as per the Policy for promoting generation of electricity through non- conventional energy sources declared by the Energy Department, Government of Rajasthan, from time to time. (5) If the Collector after considering the application is satisfied that the proposals are complete in all respects, he shall send the application with his comments to the State Government. 4 Period of allotment and terms and conditions of lease:- (1) After receiving the proposal from the District Collector under sub- rule (5) of rule 3, allotment of land for setting up of Renewable Energy Power Plant/RE Park may be made by the State Government. (2) Land for Renewable Energy Power Plant /RE Park shall be initially allotted on lease hold basis for a period of 30 years from the date of allotment. The lease may be renewed for a further period of 10 years: 10c (Provided further that in case of Repowering of the existing Wind power Project, lease period of land may be extended, on recommendation of the RREC for the useful life of the project i.e. upto 25 years form the date of Repowering but is shall not be more than 20 years after the expiry of existing lease period in any case.) (3) On the expiry of lease period the land allotted under these rules shall revert back free from all encumbrances to the State Government. (4) The lease shall abide by all the terms and conditions prescribed in the lease Deed. (5) Energy Power Producer shall abide by all the terms and conditions of allotment and directions issued by the State Government and R.R.E.C. from time to time. (6) The Lease holder shall have limited rights in the land allotted to him for the purpose of setting up Renewable Energy Power Plant/RE Park. (7) The Lease-holder in the lease period, may assign his interest to any financial institution for the purposes of taking loan for establishing or developing the Renewable Energy Power Plant/RE Park, such assignment shall be subject to first charge of the Government.

Previous and next

All provisions of Rajasthan Land Revenue (Allotment of Land for setting up of Power Plant based on Renewable Energy Sources) Rules, 2007

Questions people ask

Is rule 2A of Rajasthan Land Revenue (Allotment of Land for setting up of Power Plant based on Renewable Energy Sources) Rules, 2007 still in force?

No repeal of Rajasthan Land Revenue (Allotment of Land for setting up of Power Plant based on Renewable Energy Sources) Rules, 2007 is recorded.