28. (Functions of Regional Load Despatch Centre): --- (1) The Regional
Load Despatch Centre shall be the apex body to ensure integrated operation of
the power system in the concerned region.
(2) The Regional Load Despatch Centre shall comply with such principles,
guidelines and methodologies in respect of the wheeling and optimum
scheduling and despatch of electricity as the Central Commission may specify in
the Grid Code.
(3) The Regional Load Despatch Centre shall -
(a) be responsible for optimum scheduling and despatch of electricity
within the region, in accordance with the contracts entered into
with the licensees or the generating companies operating in the
region;
(b) monitor grid operations;
(c) keep accounts of quantity of electricity transmitted through the
regional grid;
(d) exercise supervision and control over the inter-State transmission
system; and
(e) be responsible for carrying out real time operations for grid
control and despatch of electricity within the region through
secure and economic operation of the regional grid in accordance
with the Grid Standards and the Grid Code.
(4) The Regional Load Despatch Centre may levy and collect such fee and
charges from the generating companies or licensees engaged in inter-State
transmission of electricity as may be specified by the Central Commission.
Section
Previous and next
Questions people ask
Is section 28 of Electricity Act, 2003 still in force?
No repeal of Electricity Act, 2003 is recorded.