Section 100, The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996
The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 (27 of 1996) - Section 100
Text of section 100
100. Mixing and pouring of concrete:-The employer shall ensure at a
construction site of a building or other construction work that—
(a) the concrete mixture does not contain any material which may
unduly affect the setting of such concrete, weaken such concrete
or corrode steel used with such concrete;
(b) when dry ingredients of concrete are being mixed in confined
spaces such as silos—
(i) the dust shall be exhausted at the time of such mixing;
and
(ii) in case the dust cannot be exhausted, as specified in
sub-clause (i), the building workers shall wear
respirators at the time of such mixing;
(c) when concrete is being tipped from buckets, building workers
are kept out of the range of any kickbacks of such buckets;
(d) loads are not dumped or placed on setting concrete.
Previous and next
Questions people ask
Is section 100 of the Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 still in force?
No repeal of the Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 is recorded.