Section 100, The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996

The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 (27 of 1996) - Section 100

Text of section 100

100. Mixing and pouring of concrete:-The employer shall ensure at a construction site of a building or other construction work that— (a) the concrete mixture does not contain any material which may unduly affect the setting of such concrete, weaken such concrete or corrode steel used with such concrete; (b) when dry ingredients of concrete are being mixed in confined spaces such as silos— (i) the dust shall be exhausted at the time of such mixing; and (ii) in case the dust cannot be exhausted, as specified in sub-clause (i), the building workers shall wear respirators at the time of such mixing; (c) when concrete is being tipped from buckets, building workers are kept out of the range of any kickbacks of such buckets; (d) loads are not dumped or placed on setting concrete.

Previous and next

All sections of The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996

Questions people ask

Is section 100 of the Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 still in force?

No repeal of the Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 is recorded.