Form F-1, Mineral conservation and Development Rules, 1988: [FORM F-1
Mineral conservation and Development Rules, 1988 - Form F-1
Text of form F-1
[FORM F-1
[FORM F-1
For the month of ________20
MONTHLY RETURN
[See rule 45(5) (a) (i)]
(Read the instructions carefully before filling the particulars)
To
(i) The Regional Controller of Mines
Indian Bureau of Mines
_________Region,
PIN:
(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the
Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development rules, 1988)
(ii) The State Government
PART – I
(General and Labour)
1. Details of the Mine:
(a) Registration number allotted by Indian Bureau of Mines (to give registration
number of the mine owner/ agent/ mining engineer/ manager signing the return)
b) Mine Code
c) Name of the Mineral IRON ORE
d) Name of Mine
e) Name(s) of other mineral(s),
if any, produced from the same mine
f) Location of the Mine :
Village
Post Office
Tahsil/Taluk
District
State and PIN Code
Fax no: E-mail:
Phone no:
2. Name and Address(s) of Lessee/Owner (along with fax no. and e-mail):
Name of Person
Street/Village
Post Office
Tahsil/Taluk
District
State and PIN Code
Fax no: E-mail:
Phone No:
3. Details of Rent/ Royalty / Dead Rent paid in the month
(i) Rent paid for the period (Rs.)
(ii) Royalty paid for the period (Rs.)
(iii) Dead Rent paid for the period (in Rs)
4. Details on working of mine:
(i) Number of days the mine worked:
(ii) Reasons for work stoppage in the mine
during the month (due to strike, lockout,
heavy rain, non-availability of labour,
transport bottleneck, lack of demand,
uneconomic operations, etc.) and the number of days of work stoppage for
each reason separately
Reasons No of days
1 Substituted by G.S.R. 75(E), dated 9.2.2011.
59
5. (i) Average Daily Employment and Wages paid:
Work place
Direct Contract Wages (Rs.)
Male Female Male Female Direct Contract
Below ground
Opencast
Above ground
Total
5.(ii) Total number of technical and supervisory staff employed in the mine during the month :___________________
(iii) Total salaries paid to technical and supervisory staff employed in the mine during the month in Rs._________________
PART-II (PRODUCTION, DESPATCHES AND STOCKS)
(Unit of Quantity in Tonnes)
1. Type of ore produced:
(Tick mark, whichever is applicable)
(a) Hematite
(b) Magnetite
2. Production and Stocks of ROM ore at Mine-head
Category Opening stock Production Closing stock
(a) Open Cast workings
(b) Dump workings
3.Grade-wise Production, Despatches ,Stocks and Ex-mine prices of Processed ore:
Grades(% of Fe content)
Opening stock
at mine head
Production
Despatches
from mine
head
Closing
stock at
mine-
head
Ex-mine
price
(Rs./
MT)
i) Lumps:-
(a) Below 55%
(b) 55% to below 58%
(c) 58% to below 60%
(d) 60% to below 62%
(e) 62% to below 65%
(f) 65% and above
ii) Fines:-
(a) Below 55%
(b) 55% to below 58%
(c) 58% to below 60%
(d) 60% to below 62%
(e) 62% to below 65%
(f) 65% and above
iii) Concentrates
4. Details of Deductions used for computation of Sale price (Ex-Mine)(Rs/Tonne)
Deduction claimed Unit ( in Rs/Tonne) Remarks
a) Cost of transportation
(indicate Loading station and Distance from
mine in remarks)
b) Loading and Unloading charges
c) Railway freight ,if applicable
(indicate destination and distance)
d) Port Handling charges/export
duty(indicate name of port)
e) Charges for Sampling and Analysis
f) Rent for the plot at Stocking yard
g) Other charges(specify clearly)
Total (a) to (g)
I I
60
5. Sales/ Despatches effected for Domestic Consumption and for Exports:
Grade Nature of
Despatch
(indicate
whether
1[Sale] or
Captive
consumption or
Export)
For Domestic Consumption For export
Consignee name and
Registration number as
allotted by the Indian
Bureau of Mines to the
buyer ##
Quantity Sale value Country Quantity F.O.B
Value
(Rs.)
## Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer
(to indicate separately if more than one buyer) for the top five despatches in terms of Quantity for the remaining consolidated figure shall be
reported with details of despatches as annexure.
NOTE:- Mine owners are required to substantiate domestic sale value/ FOB value for each grade of ore quoted above with copy of invoices.
6. Give reasons for increase/decrease in production/nil production (of primary or associate mineral), if any, during the month compared
to the previous month.
a)
b)
c)
7. Give reasons for increase/decrease in grade wise ex-mine price (of primary or associate Mineral),if any, during the month compared to
the previous month.
a)
b)
c)
I certify that the information furnished above is correct and complete in all respects.
Place: Signature
Date: Name in full:
Designation: Owner/Agent/Mining Engineer/Manager
1. Inserted by G.S.R. 55(E), dated 17.1.2000
61
Previous and next
All provisions of Mineral conservation and Development Rules, 1988
Questions people ask
Is form F-1 of Mineral conservation and Development Rules, 1988 still in force?
No repeal of Mineral conservation and Development Rules, 1988 is recorded.