Form E, Mineral conservation and Development Rules, 1988: FORM-E
Mineral conservation and Development Rules, 1988 - Form E
Text of form E
FORM-E
FORM-E
(Notice of commencement of stoping)
[See rule 26(2)]
MINE CODE__________
To
___________________________________ 1. The Controller General,
IMPORTANT Indian Bureau of Mines,
Notice in this Form shall be sent at least sixty Nagpur - 440 001
days before the commencement of stoping
operations to the concerned authority. *2. The Controller of Mines,
__________________________________ Indian Bureau of Mines,
PIN_________
*3. The Regional Controller of Mines
Indian Bureau of Mines,
PIN __________
4. State Government concerned.
1. (a) Name of mine ____________________________________________
(b) Section/pit number** ____________________________________________
(c) Mineral/minerals worked ____________________________________________
2. Name and address of
(a) Owner _________________________________________________________
(b) Agent _________________________________________________________
(c) Manager _________________________________________________________
(d) Mining Engineer/Geologist
employed under rule 42 _________________________________________________________
3. Date of expiry of lease: ___________________________________
4. Date on which it is proposed to commence stoping ___________________________________
5. Extent of development in the mine: ___________________________________
(a) Number of shafts/inclines/and its
width/depth/length: ___________________________________
(b) Maximum depth and development ___________________________________
__________________________________________________________________________________________
* This should be sent to the Controller of Mines/Regional Controller of Mines in whose territorial
jurisdiction the area/mine falls as notified from time to time by the Controller General, Indian Bureau
of Mines, under rule 62 of the Mineral Conservation and Development Rules, 1988.
** This is applicable in cases where the main mine is divided into more than one district/section/pit.
57
(c) Number of levels with their extent ____________________________________
(d) Total meterage of development ___________________________________
(e) Total number of blocks developed including
the total tonnage and grade (excluding blocks
already stoped out and already permitted for stoping) __________________________________
6. Details of the blocks applied for stoping
(a) Number and size of each block,
their levels tonnage and grade _________________________________
(b) Method of stoping to be adopted -
(i) A description of the method with
appropriate drawings to illustrate the
stope preparation sequence of operation
and extraction __________________________________
(ii)Rate of stoping contemplated
in each block (monthly) ___________________________________
(iii)Estimated recovery from
each block ____________________________________
(iv) Estimated dilution ____________________________________
(v) Estimated tonnage and grade
of ore to be extracted _____________________________________
7. Is this a first application for stoping for this mine?
If not, the following details may be furnished.
(i) Date of previous application(s) for stoping: ____________________________________
(ii) Date and reference of permission or
refusal by this department (mention
blocks and their levels) ___________________________________
(iii) Have all the blocks for which stoping
permission was granted, been stoped out?
If not, mention the specific blocks that are
remaining to be stoped out, indicating the state
of stoping operations therein: _________________________________
8. Rate of development and programme of forming
additional stope blocks simultaneously with the
proposed stoping. __________________________________
9. List of enclosures ___________________________________
Place: Signature
Date: Name in full:
Designation: Owner/Agent/
Mining Engineer/Manager
_____________________________________________________________________________________________
Note: Information in respect of items 5 and 6 (a) should be accompanied by (i) underground composite plan,
(ii) longitudinal section, (iii) geological/assay plan of the levels at which stoping is proposed including one level
above and below, and (iv) transverse sections at reasonable intervals for the portion covered under (iii) above.
58
1
Previous and next
All provisions of Mineral conservation and Development Rules, 1988