LawGrids logoLAWGRIDS.ORG

Form E, Mineral conservation and Development Rules, 1988: FORM-E

Mineral conservation and Development Rules, 1988 - Form E

Text of form E

FORM-E

FORM-E (Notice of commencement of stoping) [See rule 26(2)] MINE CODE__________ To ___________________________________ 1. The Controller General, IMPORTANT Indian Bureau of Mines, Notice in this Form shall be sent at least sixty Nagpur - 440 001 days before the commencement of stoping operations to the concerned authority. *2. The Controller of Mines, __________________________________ Indian Bureau of Mines, PIN_________ *3. The Regional Controller of Mines Indian Bureau of Mines, PIN __________ 4. State Government concerned. 1. (a) Name of mine ____________________________________________ (b) Section/pit number** ____________________________________________ (c) Mineral/minerals worked ____________________________________________ 2. Name and address of (a) Owner _________________________________________________________ (b) Agent _________________________________________________________ (c) Manager _________________________________________________________ (d) Mining Engineer/Geologist employed under rule 42 _________________________________________________________ 3. Date of expiry of lease: ___________________________________ 4. Date on which it is proposed to commence stoping ___________________________________ 5. Extent of development in the mine: ___________________________________ (a) Number of shafts/inclines/and its width/depth/length: ___________________________________ (b) Maximum depth and development ___________________________________ __________________________________________________________________________________________ * This should be sent to the Controller of Mines/Regional Controller of Mines in whose territorial jurisdiction the area/mine falls as notified from time to time by the Controller General, Indian Bureau of Mines, under rule 62 of the Mineral Conservation and Development Rules, 1988. ** This is applicable in cases where the main mine is divided into more than one district/section/pit. 57 (c) Number of levels with their extent ____________________________________ (d) Total meterage of development ___________________________________ (e) Total number of blocks developed including the total tonnage and grade (excluding blocks already stoped out and already permitted for stoping) __________________________________ 6. Details of the blocks applied for stoping (a) Number and size of each block, their levels tonnage and grade _________________________________ (b) Method of stoping to be adopted - (i) A description of the method with appropriate drawings to illustrate the stope preparation sequence of operation and extraction __________________________________ (ii)Rate of stoping contemplated in each block (monthly) ___________________________________ (iii)Estimated recovery from each block ____________________________________ (iv) Estimated dilution ____________________________________ (v) Estimated tonnage and grade of ore to be extracted _____________________________________ 7. Is this a first application for stoping for this mine? If not, the following details may be furnished. (i) Date of previous application(s) for stoping: ____________________________________ (ii) Date and reference of permission or refusal by this department (mention blocks and their levels) ___________________________________ (iii) Have all the blocks for which stoping permission was granted, been stoped out? If not, mention the specific blocks that are remaining to be stoped out, indicating the state of stoping operations therein: _________________________________ 8. Rate of development and programme of forming additional stope blocks simultaneously with the proposed stoping. __________________________________ 9. List of enclosures ___________________________________ Place: Signature Date: Name in full: Designation: Owner/Agent/ Mining Engineer/Manager _____________________________________________________________________________________________ Note: Information in respect of items 5 and 6 (a) should be accompanied by (i) underground composite plan, (ii) longitudinal section, (iii) geological/assay plan of the levels at which stoping is proposed including one level above and below, and (iv) transverse sections at reasonable intervals for the portion covered under (iii) above. 58 1

Previous and next

All provisions of Mineral conservation and Development Rules, 1988

Questions people ask

Is form E of Mineral conservation and Development Rules, 1988 still in force?

No repeal of Mineral conservation and Development Rules, 1988 is recorded.