LawGrids logoLAWGRIDS.ORG

Form B, THE UTTAR PRADESH BOILER RULES,1969: FORM B

THE UTTAR PRADESH BOILER RULES,1969 - Form B

Text of form B

FORM B

FORM B INDIAN BOILERS ACT, 1923 (Act V of 1923) Notice for Examination of Boiler under section 8 BOILER INSPECTORATE no . To Messrs __________________ Dated Kanpur, _19 HYDRAULIC TEST/OPEN DESPECTION/STEAM TEST In reply to your application, dated__ ______________ you are hereby informed that Boiler Register no. _______________ at the abovenamed premises will be thoroughly examined/ hydraulically tested by , the Government Inspector on the BOILER TO BE PREPARED AS AT A, B, C. To enable the examination to be made you are required to— (a) afford to the Inspector all reasonable fticilitiet for such examination and all such information as may reasonably be required by him ; (b) arrange that the boiler is properly prepared for examination in the prescribed manner, provide in the case of boiler about to be registered such dra w ing s spec i f i ca t io ns a nd cer t i f i ca te s a s ma y be prescribed (c) arrange to have the person in charge of the boiler present at the time of inspection. 2. You may continue to use the boiler provided it is ready for inspection on the abovementioned date. 3. Voucher no. ____________________________________________________________________________________________________________ in acknowledgment of bank/treasury receipt no. ------------------ -------------------------------------------------- ---------------for Rs.-------------------- accompanies. Please make provision for verifying the dimensions of and weights on safety valves, vide Regulation 376 (b.) Encl. : One. HeadClerk For Chief Inspector of Boilers, Uttar Pradesh. PREPARATION FOR EXAMINATION (See CHAPTER IX OF THE REGULATIONS) A Preparation for thorough Inspection At every inspection of boiler for the grant or renewal of a cetificate the boiler shall be empty and thoroughly clean in all its parts. All doors of manholes, handholes and sightholes and cleaning plugs and all caps in the headers and mud drums of water-tube boilers all firebars bearers, frontplates, bridge- plates fire-bridges, bridge arches, oil Mel burners and mechanical stoker fitting shall be removed. All valves and cocks comprising the boiler mountings must be opened up and taken apart and the valves or cocks ground where necessary before the Inspector's visit Provisions should be made for the removal of lagging or brickwork or other concealing part and for the drilling of plates if required by the Inspector and for verifying the pressure gauge and safety valve dimensions and weights. All smoke tubes, smoke boxes and external flues must be swept clean. Provisions must be made for the effective disconnection of all steam and hot water communication with any other boiler under steam. This must be effected either by the removal of a length of pipe from the steam, feed and below down piping or by the insertion of substantial blank flanges. Where blank flanges are employed they must be inserted between the flange of chest and pipe attached to it No blank flange shall be inserted between a safety valve chest and the boiler. Note These provisions as to effective disconnection shall extended to every case wherein a person is sent or with the assent of the owner for person in charge goes into a boiler for any purpose. B Preparation for hydraulic Test The chest of a l l mounting s subject to st ea m pressure should be in place and shut tight or blank-flanged. The safety valves should ei ther be ja mmed dow n or removed and the chest opening blank-f langed. The attachment tapped 3 /4." Witworth bol t and nut thread for the Inspector's pressure g aug e a nd t he s o c ket t a ppe d 7 /8 " . Wi tw ort h bol t and nut thread for connecting the Inspector's test pump hole shall be in order. All doors shall be properly jointed and tightened up. The boiler shall be completely f il led with water, care being taken to allow all air to escape and, if possible, a preliminary test not exceeding the working pressure of the boiler shall be taken before the Inspector's visit to test the tightness of the joints. When a boiler is hydraulically tested for the first time, it shall be entirely cleared of lagging or brickwork, at subsequent t e s t t h e l a g g i n g o r b r i c k w o r k o r p o r t i o n t h e r e o f s h a l l b e removed if required by the Inspector. C-Preparation for Steam Test A t t h e t i m e o f I n s p e c t o r ' s v i s i t , t h e b o i l e r s h o u l d b e working under steam and the safety valves shall be left free a n d c a p a b l e o f b e i n g a d j u s t e d t o t h e a p p r o v e d w o r k i n g pressure. Preparation now required (A) (B) (C) In the case of forced flow and forced circulation types of bo i l e r s , pr o v i s i o n s ha l l be ma d e f o r c he c ki ng t h a t pr o p e r circulation is maintained through all sections of the circuit by flow of water. N o t e — T h e l a s t c e r t i f i c a t e f o r t h e b o i l e r s h o u l d b e s h o w n t o t h e Inspector. UTTAR PRADESH BOILER INSPECTION DEPARTMENT FORM C' T. R. FILED NO, _____________________________________ Dated _______________ 19 . *Boiler Registry no. ___________________________________ Certifi cate no __________________________ APPLICATION FOR THE REGISTRATION, INSPECTION OF TRANSFER OF BOILER UNDER THE INDIAN BOILERS ACT (ACT NO. V OF 1923) (INDIAN BOILERS ACT) Dimensioned drawing and certificates of test, vide Regulation 4 should be sent along with an application for the registration of boiler. fBoiler Treasury recipt Registry Descrip- Boiler Name Where Date on Date ' Ten days ' Descrip- Name No. and Amount Remarks no. • don rating of situated• which desired notice is don of of date depo- engraved (see owner or nearest the for needed, work Treasury of sited on boiler reverse) company railway certificate inspection, if not - carried on receipt station expires if any how rnany and daYs distance notice is needed 1 2 3 4 5 6 7 10 11 12ta,These entries will be made by Boiler Inspector's office. 1•Separaterm should be used for each boiler. r k In case of the boiler transferred from other State into this State, the following particulars to be given In addition to the above (i) Name and Mil address of ______________ person or firm from whom the ___________________ boiler has been purchased. (ii) ________________________________ N ame and fUll address of ____________________ owner to whom last certificate was granted: (iii) The certificate or pro- visional order now in force under which the boiler was being worked. _____________________________________ _ hereby apply, to the Chief Inspector of Boilers, Uttar Pradesh, Kanpur, for the Registration/Inspection/Transfer of ownership (cross out which does not apply) and the grant of a certificate for the abovementioned boilers, for which the requisite fee has been deposited into the Government Treasury and treasury chalan enclosed herewith. Dated at ________________ This ___________________ day of _______________ 18 Signature of Owner or Agent. SCALE OF FEES 1- Fees for registration of boilers are charged as per Regulation 385 of the Indian Boiler Regulations, 1960. 2. Fees for the inspection of boilers are charged as per table given below : For boilers rating not exceeding 120.00 10 square metres. For Boiler rating exceeding 10 160.00 square metres but not exceeding 30 square metres. For Boiler rating exceeding 30 180.00 square metres but not exceeding 50 square metres. For Boiler rating exceeding 50 • - 0 20.00 square metres but not exceeding 70 square metres. For Boiler rating exceeding 70 260.00 square metres but not exceeding 90 square metres. For Boiler rating exceeding 90 300.00 square metres but not exceeding 110 square metres. For Boiler rating exceeding 110 340.00 square metres but not exceeding 200 square metres. For Boiler rating exceeding 200 380.00 square metres but not exceeding 400 square metres. For Boiler rating exceeding 400 440.00 square metres but not exceeding 600 square metres. For Boiler rating exceeding 600 480.00 a d e s h . 800 square 840.00 1,000 square 640.00 1,200 square 720.00 1,400 square 840.00 1,600 square 900.00 1,800 square 1,000.00 2,000 square 1,080.00 2,200 square 1,200.00 2,400 square 1,260.00 square metres but not 'exceeding metres. For Boiler rating exceeding 800 square metres but not exceeding metres. For Boiler rating exceeding 1,000 square metres but not exceeding metres. For Boller rating exceeding 1,200 square metres but not exceeding metres. For Boiler rating exceeding 1,400 square metres but not exceeding metres. For Boiler rating exceeding 1,600 square metres but not exceeding metres. For Boiler rating exceeding 1,800 square metres but not exceeding metres. For Boiler rating exceeding 2,000 square metres but not exceeding metres. For Boiler rating exceeding 2,200 square metres but not exceeding metres. For Boiler rating exceeding 2,400 square metres but not exceeding metres. For Boiler rating exceeding 2,600 square metres but not exceeding metres. For Boiler rating exceeding 2,800 square metres but not exceeding metres. Above8,000 square metres or every 200 square metres or part thereof an additional fee of Rs. 40.00 shall be charged. : Provided that when any owner is willing to accept any renewed certificate for less than twelve months in order to approximate the date of annual inspection to the date on which other boilers in the locality are inspected, a certificate for such period less than twelve months as may be necessary for such approximation of dates may be granted at the reduced fee to be calculated at one-twelfth of the ordinary fee for each Mil month, portion of a month not being reckoned. (ii) Fees for inspection of Steam Pipes—Fee for the 'lupe:10bn of steam pipes made after structural alterations, additions or renewals and not at the time of annual inspection Shall be re. 140.00. Fee payable fbr inspection made by an Inspector otherwise than on tour i. e. out of tour month las prescribed this •rule shall be the above amount and halting charge of Rs. 80.00 per-day plus travelling expenses which will vary according to the distance from kanpur to the nearest railway station of the boiler site and will be as under :— Kilometres from Kanpur Rs. 1 to 100 km 100.00 Any additional 50 km. or a part thereof 50.00 ABSTRACT OF UTTAR PRADESH BOILER RULES, 1968 Rule 3—All fees and costs payable under the Act or Regulations or Rules framed thereunder shall be deposited into a Government Treasury or the State Bank of India. Fess above Rupees one hundered for Government boilers may be acjjusted by Book Debit. An application- to which the Treasury receipt is affixed shall be deemed to be accompanied by the preicribed fee. NOTE—kplications for Inspection of boilers should be sent on Form accompanied with a Treasury Receipt( for the prescribed fee and should reach the oMoe of the Chief Inspector of Boilers, Uttar Pradesh, Kanpur as stipulated below (i) Inspection of Boilers during the tour month First day of the month, preceding the month assigned In the tour programme given in Rule 13 (11) forsinspection of boilers in that particular district. (II) inspection of Boilers in the month other then tour month : Thirty days before the date of expiry of certificate or provisional order. (W) Inspection of the Boilers in Kanpur District: • Fist day of the month, preceding the month in which the certificate expires. Rule (iii). In case the owner desires not to wort his boiler after the expiry of the period mentioned in the certificate granted to him, he shall intimate the fact to the Chief inspector of Boilers, Uttar Pradesh, Kanpur beams the said date, awing which he will be halite to pay at the subsequent Inspection the fees prescribed under the rules phis the fee for the uncertified period (cilloulated from the date of expiry of lard cerldficate to the date of intimation), note withstanding that the boiler had remained out of commission during the uncertified period. In case the ownership is changed the new owner shall be liable to pay at the • subsequent Inspection, the fee prescribed under the rules plus the tee for the uncertified period, along with the application for inspection of the boiler. Rule-13 Notes—(i).The following tour programme shall be observed until varied by order of the State Government, published in the official Casette, and in any other way that may be considered desirable Tour Programme Month January Lucknow and Sonbhadra. FebruarySultanpur, Pratapgarh, Unnao, Mirzapur, Rae avail and Kanpur (Dehat). March Jhansi, Hamirpur, Jalaun, Ghazipur and Lalltpur. AprilVaranasi, Azamgarh, Faizabad, Farrukha- bad, Mathura, Mau. MayEtowah, Fatehpur, Jaunpur, and Morada- bad. June Gonda, Bahralch, Basta, Bljnore, Badaun. Aligarh and Sidharthnagar. July Saharanpur, BaraBanktMeerut, Hardol, Sitapur, Ghaziabad and Haridwar. August Bulandshahr, Etah, Agra, Shahjahanpur, Rampur and Flrozabad. SeptemberGorakhpur, Deoria, BaIlia, Mahn;Igarg and MaInpuri. October Banda, &veiny, Pfiibhit, Kheri and Muzaftlimagar NovemberAllahabad, Hain' Tal, Almora and Plthora- garb. December Delve Dun, Garhwal, Tehri Charnoli and Uttar Kasha: (ii) Inspections in Kanpur Nagar are carried out during the whole year. (Ill) Special concessions are made In case of ja) Boller belonging to the military which shall be Inspected In the month of January, February, November and December. (b) Stigar Factory Boilers for. which the tour month will be from June to October. The owner shall communicate in witting to the chief Inspector of Boilers Uttar Pradesh Kanpur, his selection of the months out of tour months Mentioned above in which he desires to get his boilers inspected every year. The month so selected will be taken as the tour month in his case. ABSTRACT OF REGULATION 4 OF THE INDIAN BOILER REGULATIONS, 1980 Application for Registration of boilers should be accompanied by a Treasury Receipt of B. T. Bill of requisite amount together with (a) Form II—Inspecting Authority's Certificate ; (b) Form III—Constructor's Certificate of rnanufitcture and test ; (c) Form IV—Steel Maker's Certificate ; (d) Scaled drawings in detail ; (e) Form HI-A—Certificate of manullicture and test of Steam pipes; (f)Form HI-Et—Certificate of manufacture and test of tubes ; and (g)Form of valves and fittings.

Previous and next

All provisions of THE UTTAR PRADESH BOILER RULES,1969

Questions people ask

Is form B of THE UTTAR PRADESH BOILER RULES,1969 still in force?

No repeal of the UTTAR PRADESH BOILER RULES,1969 is recorded.