Form B, THE UTTAR PRADESH BOILER RULES,1969: FORM B
THE UTTAR PRADESH BOILER RULES,1969 - Form B
Text of form B
FORM B
FORM B
INDIAN BOILERS ACT, 1923
(Act V of 1923)
Notice for Examination of Boiler under
section 8
BOILER INSPECTORATE
no .
To
Messrs __________________
Dated Kanpur, _19
HYDRAULIC TEST/OPEN
DESPECTION/STEAM TEST
In reply to your application, dated__ ______________ you
are hereby informed that Boiler Register no. _______________ at
the abovenamed premises will be thoroughly
examined/
hydraulically tested by , the Government Inspector
on the
BOILER TO BE PREPARED AS AT A, B, C.
To enable the examination to be made you are
required to—
(a) afford to the Inspector
all reasonable fticilitiet for such
examination and all such
information as may
reasonably be required by him ;
(b) arrange that the boiler
is properly prepared for
examination in the prescribed
manner,
provide in the case of boiler about to be
registered such dra w ing s
spec i f i ca t io ns a nd cer t i f i ca te s a s
ma y
be prescribed
(c) arrange to have the person in
charge of the boiler
present at the time of inspection.
2. You may continue to use the boiler provided
it is ready
for inspection on the abovementioned
date.
3. Voucher no. ____________________________________________________________________________________________________________ in acknowledgment of bank/treasury
receipt no. ------------------
--------------------------------------------------
---------------for Rs.--------------------
accompanies.
Please make provision for verifying the
dimensions of and
weights on safety valves, vide
Regulation 376 (b.)
Encl. : One.
HeadClerk
For Chief Inspector of Boilers,
Uttar Pradesh.
PREPARATION FOR EXAMINATION
(See CHAPTER IX OF THE REGULATIONS)
A Preparation for thorough Inspection
At every inspection of boiler for the grant or renewal of a
cetificate the boiler shall be empty and thoroughly clean in all
its parts. All doors of manholes, handholes and sightholes and
cleaning plugs and all caps in the headers and mud drums of
water-tube boilers all firebars bearers, frontplates, bridge-
plates fire-bridges, bridge arches, oil Mel burners and
mechanical stoker fitting shall be removed. All valves and
cocks comprising the boiler mountings must be opened up
and taken apart and the valves or cocks ground where
necessary before the Inspector's visit
Provisions should be made for the removal of lagging or
brickwork or other concealing part and for the drilling of plates
if required by the Inspector and for verifying the pressure
gauge and safety valve dimensions and weights. All smoke
tubes, smoke boxes and external flues must be swept clean.
Provisions must be made for the effective disconnection
of all steam and hot water communication with any other
boiler under steam. This must be effected either by the
removal of a length of pipe from the steam, feed and below
down piping or by the insertion of substantial blank flanges.
Where blank flanges are employed they must be inserted
between the flange of chest and pipe attached to it No blank
flange shall be inserted between a safety valve chest and the
boiler.
Note These provisions as to effective disconnection shall extended to
every case wherein a person is sent or with the assent of the owner for
person
in charge goes into a boiler for any purpose.
B Preparation for hydraulic Test
The chest of a l l mounting s subject to st ea m pressure
should be in place and shut tight or blank-flanged. The safety
valves should ei ther be ja mmed dow n or removed and the
chest opening blank-f langed. The attachment tapped 3 /4."
Witworth bol t and nut thread for the Inspector's pressure
g aug e a nd t he s o c ket t a ppe d 7 /8 " . Wi tw ort h bol t and nut
thread for connecting the Inspector's test pump hole shall be
in order. All doors shall be properly jointed and tightened up.
The boiler shall be completely f il led with water, care being
taken to allow all air to escape and, if possible, a preliminary
test not exceeding the working pressure of the boiler shall be
taken before the Inspector's visit to test the tightness of the
joints. When a boiler is hydraulically tested for the first time, it
shall be entirely cleared of lagging or brickwork, at subsequent
t e s t t h e l a g g i n g o r b r i c k w o r k o r p o r t i o n t h e r e o f s h a l l
b e
removed if required by the Inspector.
C-Preparation for Steam Test
A t t h e t i m e o f I n s p e c t o r ' s v i s i t , t h e b o i l e r s h o u l d b e
working under steam and the safety valves shall be left free
a n d c a p a b l e o f b e i n g a d j u s t e d t o t h e a p p r o v e d
w o r k i n g
pressure.
Preparation now required (A) (B) (C)
In the case of forced flow and forced circulation types of
bo i l e r s , pr o v i s i o n s ha l l be ma d e f o r c he c ki ng t h a t pr o p e r
circulation is maintained through all sections of the circuit by
flow of water.
N o t e — T h e l a s t c e r t i f i c a t e f o r t h e b o i l e r s h o u l d b e
s h o w n t o t h e
Inspector.
UTTAR PRADESH BOILER
INSPECTION DEPARTMENT
FORM C'
T. R. FILED
NO, _____________________________________ Dated _______________ 19 .
*Boiler Registry no.
___________________________________ Certifi
cate no __________________________
APPLICATION FOR THE REGISTRATION, INSPECTION OF
TRANSFER OF BOILER UNDER THE INDIAN
BOILERS ACT (ACT NO. V OF 1923) (INDIAN BOILERS
ACT)
Dimensioned drawing and certificates of test, vide
Regulation 4 should be sent along with an application
for the registration of boiler.
fBoiler Treasury
recipt
Registry Descrip- Boiler Name Where Date on Date ' Ten days '
Descrip- Name No. and Amount Remarks
no. • don rating of situated• which desired notice is don of of date depo-
engraved (see owner or nearest the for needed, work Treasury of sited
on boiler reverse) company railway certificate inspection, if not -
carried on receipt
station expires if any how rnany
and daYs
distance notice
is needed
1 2 3 4 5 6 7 10 11 12ta,These entries will be made by Boiler Inspector's office. 1•Separaterm should be used for each boiler.
r
k
In case of the boiler transferred from other State into this State,
the following particulars to be given In addition to the above
(i) Name and Mil address of ______________
person or firm from whom the ___________________
boiler has been purchased.
(ii) ________________________________ N
ame and fUll address of ____________________
owner to whom last certificate
was granted:
(iii) The certificate or pro-
visional order now in force
under which the boiler was
being worked. _____________________________________
_ hereby apply, to the Chief Inspector of Boilers, Uttar
Pradesh, Kanpur, for the Registration/Inspection/Transfer of
ownership (cross out which does not apply) and the grant of a
certificate for the abovementioned boilers, for which the
requisite fee has been deposited into the Government
Treasury and treasury chalan enclosed herewith.
Dated at ________________
This ___________________ day of _______________ 18
Signature of Owner or Agent.
SCALE OF FEES
1- Fees for registration of boilers are charged as per
Regulation 385 of the Indian Boiler Regulations, 1960.
2. Fees for the inspection of boilers are charged as per
table given below :
For boilers rating not exceeding 120.00
10 square metres.
For Boiler rating exceeding 10 160.00
square metres but not exceeding 30 square
metres.
For Boiler rating exceeding 30 180.00
square metres but not exceeding 50 square
metres.
For Boiler rating exceeding 50 • -
0
20.00
square metres but not exceeding 70 square
metres.
For Boiler rating exceeding 70 260.00
square metres but not exceeding 90 square
metres.
For Boiler rating exceeding 90 300.00
square metres but not exceeding 110 square
metres.
For Boiler rating exceeding 110 340.00
square metres but not exceeding 200 square
metres.
For Boiler rating exceeding 200 380.00
square metres but not exceeding 400 square
metres.
For Boiler rating exceeding 400 440.00
square metres but not exceeding 600 square
metres.
For Boiler rating exceeding 600 480.00
a
d
e
s
h
.
800 square
840.00
1,000 square
640.00
1,200 square
720.00
1,400 square
840.00
1,600 square
900.00
1,800 square
1,000.00
2,000 square
1,080.00
2,200 square
1,200.00
2,400 square
1,260.00
square metres but not 'exceeding metres.
For Boiler rating exceeding 800 square metres but
not exceeding metres.
For Boiler rating exceeding 1,000 square metres but not exceeding
metres.
For Boller rating exceeding 1,200 square metres but not exceeding
metres.
For Boiler rating exceeding 1,400 square metres but not exceeding
metres.
For Boiler rating exceeding 1,600 square metres but not exceeding
metres.
For Boiler rating exceeding 1,800 square metres but not exceeding
metres.
For Boiler rating exceeding 2,000 square metres but not exceeding
metres.
For Boiler rating exceeding 2,200 square metres but not exceeding
metres.
For Boiler rating exceeding 2,400 square metres but not exceeding
metres.
For Boiler rating exceeding 2,600 square metres but not exceeding
metres.
For Boiler rating exceeding 2,800 square metres but not exceeding
metres.
Above8,000 square metres or every 200 square metres or part thereof an additional fee of
Rs. 40.00 shall be charged. :
Provided that when any owner is willing to accept any renewed certificate for less than
twelve months in order to approximate the date of annual inspection to the date on which
other boilers in the locality are inspected, a certificate for such period less than twelve
months as may be necessary for such approximation of dates may be granted at the
reduced fee to be calculated at one-twelfth of the ordinary fee for each Mil month, portion of a
month not being reckoned.
(ii) Fees for inspection of Steam Pipes—Fee for the 'lupe:10bn of steam pipes made
after structural alterations, additions or renewals and not at the time of annual inspection Shall
be re. 140.00.
Fee payable fbr inspection made by an Inspector otherwise than on tour i. e. out of
tour month las prescribed this •rule shall be the above amount and halting charge of Rs. 80.00
per-day plus travelling expenses which will vary according to the distance from kanpur to
the nearest railway station of the boiler site and will be as under :—
Kilometres from Kanpur
Rs.
1 to 100 km 100.00
Any additional 50 km. or a part thereof 50.00
ABSTRACT OF UTTAR PRADESH BOILER RULES,
1968
Rule 3—All fees and costs payable under the Act or Regulations or Rules
framed thereunder shall be deposited into a Government Treasury or the State
Bank of India. Fess above Rupees one hundered for Government boilers may
be acjjusted by Book Debit.
An application- to which the Treasury receipt is affixed shall be deemed to be
accompanied by the preicribed fee.
NOTE—kplications for Inspection of boilers should be sent on Form accompanied with a Treasury Receipt( for
the prescribed fee and should reach the oMoe of the Chief Inspector of Boilers, Uttar Pradesh, Kanpur as
stipulated below
(i) Inspection of Boilers during the tour month
First day of the month, preceding the month assigned In the tour programme given in Rule 13 (11)
forsinspection of boilers in that particular district.
(II) inspection of Boilers in the month other then tour month :
Thirty days before the date of expiry of certificate or provisional order. (W) Inspection of the
Boilers in Kanpur District:
•
Fist day of the month, preceding the month in which the certificate expires.
Rule (iii). In case the owner desires not to wort his boiler after the expiry of the period
mentioned in the certificate granted to him, he shall intimate the fact to the Chief inspector of
Boilers, Uttar Pradesh, Kanpur beams the said date, awing which he will be halite to pay at the
subsequent
Inspection the fees prescribed under the rules phis the fee for the uncertified period
(cilloulated from the date of expiry of lard cerldficate to the date of intimation), note
withstanding that the boiler had remained out of commission during the uncertified
period. In case the ownership is changed the new owner shall be liable to pay at the •
subsequent Inspection, the fee prescribed under the rules plus the tee for the uncertified
period, along with the application for inspection of the boiler.
Rule-13 Notes—(i).The following tour programme shall be observed until varied
by order of the State Government, published in the official Casette, and in any other way that
may be considered desirable
Tour Programme
Month
January Lucknow and Sonbhadra.
FebruarySultanpur, Pratapgarh, Unnao, Mirzapur,
Rae avail and Kanpur (Dehat).
March Jhansi, Hamirpur, Jalaun, Ghazipur and
Lalltpur.
AprilVaranasi, Azamgarh, Faizabad, Farrukha-
bad, Mathura, Mau.
MayEtowah, Fatehpur, Jaunpur, and Morada-
bad.
June Gonda, Bahralch, Basta, Bljnore, Badaun.
Aligarh and Sidharthnagar.
July Saharanpur, BaraBanktMeerut, Hardol,
Sitapur, Ghaziabad and Haridwar. August Bulandshahr, Etah,
Agra, Shahjahanpur,
Rampur and Flrozabad.
SeptemberGorakhpur, Deoria, BaIlia, Mahn;Igarg and
MaInpuri.
October Banda, &veiny, Pfiibhit, Kheri and
Muzaftlimagar
NovemberAllahabad, Hain' Tal, Almora and Plthora-
garb.
December Delve Dun, Garhwal, Tehri
Charnoli and Uttar Kasha:
(ii) Inspections in Kanpur Nagar are carried out during the whole year.
(Ill) Special concessions are made In case of ja) Boller belonging to the military which shall be
Inspected In the month of January, February, November and December.
(b) Stigar Factory Boilers for. which the tour month will be from June to October. The
owner shall communicate in witting to the chief Inspector of Boilers Uttar Pradesh Kanpur,
his selection of the months out of tour months Mentioned above in which he desires to get
his boilers inspected every year. The month so selected will be taken as the tour month in
his case.
ABSTRACT OF REGULATION 4 OF THE INDIAN
BOILER REGULATIONS, 1980
Application for Registration of boilers should be accompanied by a Treasury Receipt of B.
T. Bill of requisite amount together with (a) Form II—Inspecting Authority's Certificate ; (b) Form
III—Constructor's Certificate of rnanufitcture and test ; (c) Form IV—Steel Maker's Certificate ; (d)
Scaled drawings in detail ; (e) Form HI-A—Certificate of manullicture and test of Steam pipes; (f)Form
HI-Et—Certificate of manufacture and test of tubes ; and (g)Form
of valves and fittings.
Previous and next
Questions people ask
Is form B of THE UTTAR PRADESH BOILER RULES,1969 still in force?
No repeal of the UTTAR PRADESH BOILER RULES,1969 is recorded.