LawGrids logoLAWGRIDS.ORG

Form B, The Maharashtra Boiler Rules, 1962: Form B

The Maharashtra Boiler Rules, 1962 - Form B

Text of form B

Form B

Form B THE BOILERS ACT, 1923 (ACT V OF 1923) Notice for Examination of Boiler under sections 7 and 8 (Rule 34) No. of 20 STEAM BOILER INSPECTION OFFICE Dated the 2010 To Gentlemen/Sir, In reply to your application, dated you are hereby informed that Boiler Registry No. at the above named premises will be thoroughly examined/hydraulically tested by the Deputy Director on the To enable the examination to be made, you are bound— (a) to afford to the Deputy Director all reasonable facilities for the examination and all such information as may reasonably be required of you; (b) to have the boiler properly prepared and ready for examination in the prescribed manner; and (c) in the case of an application for the registration of a boiler, to provide such drawings, specifications, certificates and other particulars as may be prescribed. Voucher No. in acknowledgement of Bank/Treasury Receipt No. For Rs. Accompanies. Director of Steam Boilers, Maharashtra State (See reverse for preparation required) The Maharashtra Boiler Rules, 1962 29 REVERSE OF FORM B PREPARATION FOR EXAMINATION See Chapter IX of the Regulations (Regulation 376) (A) Preparation for inspection At every examination of a boiler for the grant of renewal of a certificate, the boiler shall be empty and thoroughly clean in all its parts. All doors of manholes, handholes and sightholes and cleaning plugs and all caps in the headers and mud drums of water tube boilers, all firebars, bearers, front plates, bridge plates fire bridges brick arches, oil fuel burners and mechanical stoker fittings shall be removed. All valves and cocks comprising the boiler mounting shall be opened up and taken a part and the valves or cocks ground, when necessary, before the Deputy Director’s visit. Provision shall, if required by the Deputy Director, be made for the removal of lagging or brickwork or other concealing part and for the drilling of plates and for verifying the pressure gauge and safety valve dimensions and weights. All smoke tubes, exterior of water tubes, smoke boxes and external flues shall be swept clean. Provisions shall be made for the effective disconnection of all steam and hot water communication with any other boiler under steam, as prescribed in Chapter X of the Regulations. This shall be effected either by the removal of a length of pipe from the steam and feed piping or by the insertion or substantial blank flanges. Where blank flanges are employed, they shall be inserted between the flange of the chest and the pipe attached to it. No blank flange shall be inserted between a safety valve chest and the boiler. In the case of forced flow and forced circulation types of boilers, provision shall be made for checking that proper circulation is maintained through all sections of the circuit by the flow of water. ___________________________________________________ Note – These provisions to effective disconnection shall extend to every case wherein a person is sent or with the absent of the owner or person-in – charge goes into boiler for any purpose (See Part III of the Regulation) (Regulation 378) (B) Preparation for hydraulic test The chest of all mountings subject to steam pressure shall be in place an shut tight or black-flaged. The safety valves shall either be jammed down or removed and the chest opening blank-flaged. The attachment * for the The Maharashtra Boiler Rules, 1962 30 Deputy Directors pressure gauge and nipple + for connecting the Deputy Directors test pump house shall be in order. All doors shall be properly jointed and tightened up. The boiler shall be completely filled with water, care being taken to allow all air to escape and, if possible, a preliminary test not exceeding the working pressure of the boiler be taken before the Inspector’s visit to test the rightness of the joints. When a boiler is hydraulically tested for the first time, it shall be entirely cleared of lagging or brickworks; at subsequent tests the lagging or brickwork or portions thereof, shall be removed if required by the Dy. Director. ________________________________________________________________________________________ *Tapped 19 mm Whiteworth bolt and nut thread. *Tapped 22 mm Whiteworth bolt and nut thread. Preparation now required (A), (B) ________________________________________________________________________________________ Note:- The last certificate for the boiler should be shown to the Dy. Director ________________________________________________________________________________________ The Maharashtra Boiler Rules, 1962 31

Previous and next

All provisions of The Maharashtra Boiler Rules, 1962

Questions people ask

Is form B of the Maharashtra Boiler Rules, 1962 still in force?

No repeal of the Maharashtra Boiler Rules, 1962 is recorded.