THE BOILERS ACT, 1923 (ACT V OF 1923)
Notice for Examination of Boiler under sections 7 and 8
(Rule 34)
No. of 20
STEAM BOILER INSPECTION OFFICE
Dated the 2010
To
Gentlemen/Sir,
In reply to your application, dated you are hereby
informed that Boiler Registry No. at the above named premises will be
thoroughly examined/hydraulically tested by the Deputy Director on the
To enable the examination to be made, you are bound—
(a) to afford to the Deputy Director all reasonable facilities for the
examination and all such information as may reasonably be required
of you;
(b) to have the boiler properly prepared and ready for examination in the
prescribed manner; and
(c) in the case of an application for the registration of a boiler, to provide
such drawings, specifications, certificates and other particulars as
may be prescribed.
Voucher No. in acknowledgement of Bank/Treasury Receipt No.
For Rs. Accompanies.
Director of Steam Boilers,
Maharashtra State
(See reverse for preparation required)
The Maharashtra Boiler Rules, 1962 29
REVERSE OF FORM B
PREPARATION FOR EXAMINATION
See Chapter IX of the Regulations
(Regulation 376)
(A) Preparation for inspection
At every examination of a boiler for the grant of renewal of a certificate,
the boiler shall be empty and thoroughly clean in all its parts. All doors of
manholes, handholes and sightholes and cleaning plugs and all caps in the
headers and mud drums of water tube boilers, all firebars, bearers, front
plates, bridge plates fire bridges brick arches, oil fuel burners and mechanical
stoker fittings shall be removed. All valves and cocks comprising the boiler
mounting shall be opened up and taken a part and the valves or cocks
ground, when necessary, before the Deputy Director’s visit.
Provision shall, if required by the Deputy Director, be made for the
removal of lagging or brickwork or other concealing part and for the drilling
of plates and for verifying the pressure gauge and safety valve dimensions
and weights. All smoke tubes, exterior of water tubes, smoke boxes and
external flues shall be swept clean.
Provisions shall be made for the effective disconnection of all steam and
hot water communication with any other boiler under steam, as prescribed
in Chapter X of the Regulations. This shall be effected either by the removal
of a length of pipe from the steam and feed piping or by the insertion or
substantial blank flanges. Where blank flanges are employed, they shall be
inserted between the flange of the chest and the pipe attached to it. No blank
flange shall be inserted between a safety valve chest and the boiler.
In the case of forced flow and forced circulation types of boilers,
provision shall be made for checking that proper circulation is maintained
through all sections of the circuit by the flow of water.
___________________________________________________
Note – These provisions to effective disconnection shall extend to every case
wherein a person is sent or with the absent of the owner or person-in –
charge goes into boiler for any purpose
(See Part III of the Regulation)
(Regulation 378)
(B) Preparation for hydraulic test
The chest of all mountings subject to steam pressure shall be in place an shut
tight or black-flaged. The safety valves shall either be jammed down or
removed and the chest opening blank-flaged. The attachment * for the
The Maharashtra Boiler Rules, 1962 30
Deputy Directors pressure gauge and nipple + for connecting the Deputy
Directors test pump house shall be in order. All doors shall be properly
jointed and tightened up. The boiler shall be completely filled with water,
care being taken to allow all air to escape and, if possible, a preliminary test
not exceeding the working pressure of the boiler be taken before the
Inspector’s visit to test the rightness of the joints. When a boiler is
hydraulically tested for the first time, it shall be entirely cleared of lagging or
brickworks; at subsequent tests the lagging or brickwork or portions thereof,
shall be removed if required by the Dy. Director.
________________________________________________________________________________________
*Tapped 19 mm Whiteworth bolt and nut thread.
*Tapped 22 mm Whiteworth bolt and nut thread.
Preparation now required (A), (B)
________________________________________________________________________________________
Note:- The last certificate for the boiler should be shown to the Dy.
Director
________________________________________________________________________________________
The Maharashtra Boiler Rules, 1962 31