Rule 25, The Rajasthan Boilers Rules,1954: Procedure at inspections : Internal inspection
The Rajasthan Boilers Rules,1954 - Rule 25
Text of rule 25
Procedure at inspections : Internal inspection
25. Procedure at inspections : Internal inspection. - Detailed instructions
for the inspection of boilers are contained in Chapter IX of the regulations.
The following general procedure at inspection should be observed.-
At a thorough inspection of a boiler the Inspector should, where the size
and construction of the boiler permit, go inside it and make a thorough
inspection of all its internal parts. But before doing so he should satisfy
himself that proper provision has been made for disconnection from any other
boiler under steam.
Should he find that proper provision for disconnection has not been
made or that the boiler has not been properly cleaned or that it is
unreasonably hot he should decline to proceed with the inspection and should
report the facts to the Chief Inspector for order under Section 14 (2) of the
Act.
When a boiler is of such a size or its construction is such that the
inspector cannot go inside it there must be sufficient sight holes or hand holes
provided to enable him to see the principal internal parts. If any important part
of a boiler is so constructed that the inspector cannot examine it he should
report the fact to the Chief Inspector for orders.