Rule 58, Rajasthan Factories Rules,1951: (1) Definition]
Rajasthan Factories Rules,1951 - Rule 58
Text of rule 58
(1) Definition]
[58. (1) Definition]. - In this rule:—
(a) "Design pressure" means the maximum pressure that a pressure vessel or plaint is
designed to withstand safely when operating normally:
(b) "Maximum permissible working pressure" is the maximum pressure at which a
pressure vessel or plant is permitted to be operated or used under this rule and is
determined by the technical requirement of the process:
(c) "Plant" means a system of piping that is connected to a pressure vessel and is used
to contain a gas, vapour or liquid under pressure greater than the atmospheric
pressure, and includes the pressure vessel:
------------------------------------------------------------------------------------------------------------------
@. Substituted vide Notification No. F1(112)L&E/76 dated 24.3.1979; Rajasthan Gazette
Part IV-Ga(1). dated 26.4.1979
(d) "Pressure Vessel" means @[fired and] an unfired vessel that may be used for
containing, storing, distributing, transferring, distilling, processing or otherwise
handling any gas, vapour or liquid under pressure greater than the atmospheric
pressure and includes any pipeline fitting or other equipment attached thereto or used
in connection therewith: and
(e) "Competent person" means a person who is, in the opinion of the Chief Inspector,
capable by virtue of his qualifications, training and experience, of conducting a
thorough examination and pressure tests, as required, on a pressure vessel or plant,
and of making a full report on its condition.
(2) Exceptions.— Nothing in this rule shall apply to:—
(a) #[x x x]
(b) Vessels made of ferrous materials having an internal operating pressure not
exceeding 1 kg/cm:
(c) Steam boilers, steam and feed pipes and their fittings coming under the purview of
Indian Boilers Act, 1923 (V of 1923):
(d) #[x x x]
(e) Vessels in which internal pressure is due solely to the static head of liquid;
(f) Vessels with a nominal water capacity not exceeding 500 litres connected in a water
pumping system containing air that is compressed to serve as a custion;
(g) Vessels for nuclear energy application; and
(h) #[x x x]
(i) Working cylinders of steam engines or prime movers, feed pumps and steam traps:
turbine casings; compressor cylinders; steam separators or dryers; steam strainers;
steam de-super heaters: oil separators; air receivers for fire sprinkler installations: air
receivers of monotype machine provided the maximum working pressure of the air
receiver does not exceed 1.33 kg. /cm2 and the capacity 85 liters; air receivers of
electrical circuit breakers: air receivers of electrical relays, air vessels on pumps, pipe
coils accessories of instruments and appliances, such as cylinders and piston
assemblies used for operating relays and interlocking type of guards; vessels with
liquids subjected to static head only; and hydraulically operating cylinders other than
any cylinder communicating with an air loaded accumulator.
(3) Design and construction.— Every pressure vessel or plant used in a factory—
(a) shall be properly designed on sound engineering practice;
(b) shall be of good construction, sound material, adequate strength and free from any
patent defects: and
(c) shall be properly maintained in a safe condition provided that the pressure vessel or
plant in respect of the design and construction of which there is an Indian standard or
a standard of the country of manufacture or any other law or regulation in force, shall
be designed and constructed in accordance with said standard, law or regulation, as
the case may be, and a certificate thereof shall be obtained from the manufacturer or
from the competent person which shall be kept and produced on demand by an
Inspector.
---------------------------------------------------------------------------------------------------------------------
@. Added vide Notification No. F.4(3) Shram/86 dated 27.7.1987; published in Rajasthan
Gazette Extraordinary, Part IV-Ga, dated 29.7.87
#. Deleted vide Notification No. F.4(3) Shram/86 dated 27.7.1987; published in Rajasthan
Gazette Extraordinary, Part IV-Ga, dated 29.7.87
(4) Safety devices.— Every pressure vessel shall be fitted with—
(a) a suitable safety valve or other effective pressure relieving device of adequate
capacity to ensure that the maximum permissible working pressure of the pressure
vessel shall not be exceeded. It shall be set to operate at pressure not exceeding the
maximum permissible working pressure and when more than one protective device is
provided, only one of the devices need be set to operate at the maximum permissible
working pressure and the additional device shall be set to discharge at a pressure not
more than 5 per cent in excess of the maximum permissible working pressure;
(b) a suitable pressure guage with a dial range not less than 1.5 times the maximum
permissible working pressure, easily visible and designed to show at all times the
correct internal pressure and marked with a prominent red mark at the maximum
permissible working pressure of the pressure vessel;
(c) a suitable nipple and globe valve connected for the exclusive purpose of attaching a
test pressure guage for checking the accuracy of the pressure guage referred to in
clause (b) of this sub-rule;
(d) a suitable stop valve or valves by which the pressure vessel may be isolated from
other pressure vessels or plant or source of supply of pressure. Such a stop valve or
valves shall be located as close to the pressure vessel as possible and shall be easily
accessible; and
(e) a suitable drain cock or valve at the lowest part of the pressure vessel for the
discharge of the liquid or other substances, that may collect in the pressure vessel:
Provided that it shall be sufficient for the purpose of this sub-rule if the safety valve or
pressure releasing device: the pressure guage and the stop valve are mounted on a pipe
line immediately adjacent to the pressure vessel and where there is a range of two or more
similar pressure vessels served by the same pressure lead, only one set of such mounting
need be fitted on the pressure lead immediately adjacent to the range of pressure vessels,
provided they cannot be isolated.
(5) Pressure reducing devices:
(a) every pressure vessel which is designed for a working pressure less than the
pressure at the source of supply, or less than the pressure which can be obtained in
the pipe connecting the pressure vessel with any other source of supply, shall be
fitting with a suitable pressure reducing valve or other suitable automatic device to
prevent the maximum permissible working pressure of the pressure vessel being
exceeded;
(b) To further protect the pressure vessel in the event of failure of the reducing valve or
device, at least one safety valve having a capacity sufficient to release all the steam,
vapour or gas without undue pressure rise as determined by the pressure at the
source of supply and the size of the pipe connecting the source of supply shall be
fitted on the low pressure side of the reducing valve.
(6) Pressure Vessel or plant being taken into use:
(a) No new pressure vessel or plant shall be taken into use in a factory after coming into
force of this rule unless it has been hydrostatically tested by a competent person at a
pressure at least 1.3 time the design pressure, and no pressure vessel or plant which
has been previously used or has remained isolated or idle for a period exceeding 2
months or which has undergone alterations or repairs shall be taken into use in a
factory unless it has been thoroughly examined by a competent person externally and
internally, if practicable and has been hydrostatically tested by the competent person
at a pressure which shall be 1.5 times the maximum permissible working pressure,
provided, however, that the pressure vessel or plant which is so designed and
constructed that it cannot be safely filled with water or liquid or is used in service even
some traces of water cannot be tolerated, shall be pneumatically tested at a pressure
not less than the design pressure or the maximum permissible working pressure as
the case may be:
Provided further that the pressure vessel or plant which is linked with glass shall be
tested hydrostatically or pneumatically as required at a pressure not less than the
design pressure or maximum permissible working pressure as the case may be.
Design pressure shall be not less than the maximum permissible working pressure
and shall be taken into account the possible fluctuations of pressure during actual
operation.
(b) No pressure vessel or plant shall be used in a factory unless there has been
obtained from the maker of the pressure vessel or plant or from the competent person
a certificate specifying the design pressure or maximum permissible working pressure
thereof, and stating the nature of tests to which the pressure vessel or plant and its
fittings (if any) have been subjected, and every pressure vessel or plant so used in a
factory shall be marked so as to enable it to be identified as to be the pressure vessel
or plant to which the certificate relates and the certificate shall be kept available for
perusal by the Inspector.
(c) No pressure vessel or plant shall be permitted to be operated or used at a pressure
higher than its design pressure or maximum permissible working pressure as shown
in the certificate.
(7) In service test and examinations.— Every pressure vessel or plant in service shall be
thoroughly examined by a competent person—
(a) externally, once in every period of six months;
(b) internally, once in every period of twelve months;
If by reason of the construction of a pressure vessel or plant, a thorough internal
examination is not possible this examination may be replaced by a hydrostatic test which
shall be carried out once in every period of two years:
Provided that for a pressure vessel or plant in continuous process which cannot be
frequently opened, the period of internal examination may be extended to four years;
(c) hydrostatically tested once in every period of four years: and
(d) The hydrostatic pressure to be carried out for the purpose of this rule shall be 1.25
times the design pressure or 1.5 times the maximum permissible working pressure
whichever is less:
Provided that in respect of a pressure vessel or plant with thin walls, such as ceasing
cylinder made of copper or any other nonferrous metal, periodic hydrostatic test may be
dispensed with subject to the condition that the requirements laid down in sub- rule (8) are
fulfilled:
Provided further that when it is impracticable to carry out thorough external examination of
any pressure vessel or plant every six months as required in clause (a) of this sub-rule, or if
owing to its construction and use a pressure vessel or plant cannot be hydrostatically tested
as required in clauses (b) and (c) of this sub-rule, a thorough external examination of the
pressure vessel or plant shall be carried out at least once in every period of two years, and
at least once in every period of four years a thorough systematic non-destructive test like
ultrasonic test for metal thickness or other defects of all parts, the failure of which might lead
to eventual rupture of the pressure vessel or plant shall be carried out.
(8) Thin walled pressure vessel or plant:
(a) (i) As far as possible, in respect of every sizing cylinder of which shall be made of
copper sheet or any other non-ferrous material, the Manager shall make available to
the Inspector and the competent person examining such cylinders, information to
show the date on which such cylinder was taken into use for the first time with full
particulars as to the thickness of the shell when so taken into use in the factory.
Information shall also be made available as to the safe working pressure,
recommended by the manufacturers when such cylinder is taken into use for the first
time in the factory.
(ii) If no information as aforesaid in the foregoing sub-rule is available, any other
evidence relevant to show the age of the cylinder shall be submitted by the Manager.
The Chief Inspector shall determine the age of the cylinder on such documentary
evidence or other oral evidence that may be presented to him by Manager or any
other evidence that may be produced by an Inspector, and the age so determined
shall be considered as the age of the cylinder for the purposes of this rule.
(b) (i) The minimum thickness of the shell of a sizing cylinder shall be actually measured as
and when possible.
(ii) If during its working life the shell of a sizing cylinder is at any time punctured
requiring repairs to the cylinder to close the punctured portion, the thickness of the
sheet of the shell near such puncture of opening shall be measured by a competent
person and the record maintained in Form 9.
(c) (i) No sizing cylinder shall be subjected to a working pressure greater than the safe
working pressure recommended by the manufacturers of such cylinder at the time
when such cylinder was first taken into use 11;1 a factory.
(ii) The safe working pressure of a sizing cylinder which has been in use for more than
five years shall be calculated in accordance with the following three methods and the
lowest figure obtained by any of the three methods shall be considered as safe
working pressure of a sizing cylinder:—
(1) The safe working pressure of the sizing cylinder shall be the same proportion
to the original safe working pressure when first taken into use as the minimum
thickness of the shell material as actually measured at any time bears to the
original thickness of the shell material when first taken into use; or
(2) The safe working pressure of a sizing cylinder shall be calculated on the basis
of the minimum thickness actually measured so that the tensile stress in the
shell shall not exceed safe working stress for the material of the shell. If shell is
made of copper, safe working tensile stress shall be taken to be not more than
350 kgms. per square/cm: or
(3) The same working pressure of a sizing cylinder shall be reduced at the rate of
5 per cent of the original working pressure for every year of its use after the first
five years.
(d) No sizing cylinder shall be continued to be used for more than 20 years after it was first
taken into use: provided further that the Chief Inspector of Factories may authorise the use
of sizing cylinders after a period of twenty years up to a further period of not more than five
years if tests are carried out and further details are made available to his satisfaction to
indicate that the cylinder can be used with safety.
(e) An Inspector may by an order in writing direct the Manager to produce within time
specified in such an order a report of examination of a sizing cylinder in Form 9 by a
competent person.
(9) Report by competent person:
(a) If during any examination any doubt arises as to the ability of the pressure vessel or
plant to work safely until the next prescribed examination, the competent person shall
enter in the prescribed register his observations, findings and conclusions with other
relevant remarks with reasons and may authorise the pressure vessel or plant to be
used and kept in operation subject to a lowering of maximum permissible working
pressure or to more frequent or special examination or tests, or subject to both of
these conditions.
(b) A report of the result of every examination or test carried out shall be completed in
the prescribed Form No.9 and shall be signed by the person making the examination
or test, and shall be kept available for perusal by the Inspector at all hours when the
factory or any part thereof is working.
(c) Where the report of any examination under this rule specified any condition for
securing the safe working of any pressure vessel or plant, the pressure vessel or
plant shall not be used unless the specified conditions are fulfilled.
(d) The competent person making report of any examination under this rule, shall within
seven days of the completion of the examination, send to the Inspector a copy of the
report in every case where the maximum permissible working pressure is reduced or
the examination shows that the pressure vessel or plant or any part thereof, cannot
continue to be used with safety unless certain repairs are carried out or unless any
other safety measure is taken.
(10) Application of other law:
(a) The requirements of this rule shall be in addition to and without any prejudice to and
not in derogation of the requirement of any other law in force.
(b) Certificates or reports of any examination or test of any pressure vessel or plant to
which sub-rule (7) to (9) do not apply conducted or required to be conduced under
any other law in force and other relevant record relating to such pressure vessel or
plant, shall be properly maintained as required under the said law and shall be
produced on demand by the Inspector.]
@[58A. - (1) For the purpose of this rule, the expression "gas-holder" means a water-sealed
gas-holder which has a storage capacity of not less than 141.5 cubic meters (500 C.ft.).
(2) Every gasholder shall be of adequate material and strength, sound construction and
properly maintained.
--------------------------------------------------------------------------------------------------------------------------
@. Added vide Notification No F. 3(46) L & E/64. dated 28.7.1966; published in Rajasthan
Gazette Part IV-Ga. dated 25.8.66.
(3) Where there is more than one gasholder in the factory, every such gasholder shall be
marked in a conspicuous position with a distinguishing number or letter.
(4) Every gasholder shall be thoroughly examined externally by a competent person at least
once in a period of twelve months.
(5) In the case of gasholder of which any lift has been in use for more than ten years. the
internal state of sheeting shall, within one year of the coming into operation of these rules,
and thereafter at least after every period of four years, be examined by a competent person
by means of electronic or other accurate devices:
Provided that if the Chief Inspector is satisfied that such electronic or other accurate
devices are not available, he may permit the cutting of samples from the crown and the
sides of the holder:
Provided further that if the above inspection raises a doubt, an internal visual
examination shall be made.
(6) All possible steps shall be taken to prevent or minimise ingress of impurities in the
gasholder.
(7) No gasholder shall be repaired or demolished except under the direct supervision of
person who, by his training, experience and knowledge of the necessary precautions
against risks of explosion and of persons being overcome by gas, is competent to supervise
such work.
(8)(a) All sample discs cut under sub-rule (5) above, shall be kept readily available for
inspection.
(b) A permanent register in Form 9-A duly signed by the occupier or manager shall be
maintained giving the following particulars
(i) the serial number of gasholder vide sub-rule (3) above and the particulars of
manufacture i.e. makers name, date of manufacture, capacity, number of lifts,
pressure thrown by holder when full of gas:
(ii) the dates of inspection carried out as required under sub-rules (4) and (5) above
and by whom carried out:
(iii) the method of inspection used:
(iv) date of painting. etc.
(v) nature of repairs and name of person carrying out repairs; and
(vi) remarks.
(c) The results of examinations by a competent person carried out under sub-rules (4) and
(5) shall be entered in Form No. 9-B.
(d) A copy of the report in Form B shall be kept in the said register and both the register
and the report shall be readily available for inspection.]
Rule prescribed under sub-section (2) of section 34
@[59. Excessive weights. — (1) No person, unaided by another person, or mechanical
aid, be required or allowed to lift, put down, carry or move any load of material, article, tools
or appliance exceeding the maximum limit in weight as set out in the following schedule:—
-----------------------------------------------------------------------------------------------------------------------
@. Substituted vide Notification No F3(1)legal/F&B/2001/5584 dated 8.8.2002; published in
Rajasthan Gazette Extraordinary, Part 4(Ga)(1), dated 13.8.2002, p.85(1), w.e.f. 13.8.2002.
[Schedule
Persons Maximum weight of
material, article, tool or
appliance
(a) Adult male 50 Kilograms
(b) Adult female 30 Kilograms
(c) Young person (Male 15-18 years) 30 Kilograms
(d) Young persons(Female 15-18years) 20 Kilograms
(e) Young person (Male 14-15years) 16 Kilograms
(e) Young person (Female 14-15years) 14 Kilograms]
(2) No woman or young person shall engage, in conjunction with others, in lifting, carrying
or moving any material, article, tool or appliance, if the weight thereof exceeds the lowest
weight fixed by the Schedule to sub-rule (1) for any of the person engaged, multiplied by the
number of the persons engaged.
(3) Taking into account all conditions in which the work is to be performed, no worker shall
be required or permitted to engage in the manual transport of load which, by reasons of its
weight, is likely to jeopardize his health or safety.
(4) Wherever reasonably practicable, suitable technical devices shall be used for the
manual transport of loads.
(5) Notwithstanding the fact that workers are engaged in the regular, manual transport of
loads, within the permissible limits as set out in sub-rule (1) they should be subjected to
medical examination prior to regular assignment and periodical examination at an interval of
12 months if the assignment of such jobs, exceeds more than 12 months.
Explanation:— for the purpose of this rule—
(a) the term "manual transport of loads" means any transport in which the weight of the
load is wholly borne by one worker, it covers the lifting and putting down of loads.
(b) the term "regular manual transport of loads" means any activity which is continuously
or principally devoted to the manual transport of loads, or which normally included,
even though intermittently, the manual transport of loads.]
Rule prescribed under section 35