Regulation 34, Indian Boiler Regulations, 1950: Stay and Rivet Bars
Indian Boiler Regulations, 1950 - Regulation 34
Text of regulation 34
Stay and Rivet Bars
34. Stay and Rivet Bars—(a) Process.—To comply with Regulation 33 (a).
(b) Chemical Composition—To comply wilh Regulation 33 (b).
(c) Freedom from Detects.—To comply with Regulation 33(o)
(d) Rolling Margin.—The bars in any part shall not be more than 1% over or
more than 1/2 % under the specified diametci
(e) Tensile Tests.—The tonsile broaking-sttength shall not ho less than 14 tona
per sq. in. with an elongation of noi IOHH than 40% on the Standard Test Pieoe B.
(f) Bend Teats. -To comply wilh Regulation 33(f).
(g) Dump Tests. -Apiece of tod 1 in. long shall be placed on end and hammered
or crushed down cold to a thick nebs of 3/8in. without showing either crack or flaw
on tho circumference of the resulting dine.
(h) Number of Tests.—One bar, from wliioh the required test specimens shall
be taken, shall be solei ted at rnndom from each batch of 50 (or part thereof) bars of
eaoh size from each melt. From each bar selected one tensile test, one cold bend
test, ono hot bend test, and ono dump test shall bo made.