LawGrids logoLAWGRIDS.ORG

Regulation 872, Indian Boiler Regulations, 1950.: Drainage

Indian Boiler Regulations, 1950. - Regulation 872

Text of regulation 872

Drainage

872. Drainage.—(a) In the oase of st^am mains, attention should bo paid to the adequate provision of drainage points in the form of drain pookots. Drainage points oonneotod to steam traps, shall bo provided wherovor water can collect under •work- ing conditions. Hand drains shall be provided at all points at which water oan collect in any portion of tho steam main, by valve leakage or othor means, when ehut down, or when warming up prior to use. (b) Where practicable a suitable gradiont shall be jirovided in the pipe work to onsure the passage of oondensed water in the direction of flow of steam towards the drainago point. (c) It is recommonded that a by-paBs should be fitted at each steam trap. (d) Where tho volume of water deposited is likoly to be of serious proportions, separators Bhould bo installed. Each separator shall be furnished With a steam trap which shall be connected to it by means of a three-Way cock one end of which is- oonneoted to a manually operated drain. 373. Freedom Srom rust and other foreign matter.—All pipes, valves and fittings shall be thoroughly cleaned as far as possiblo of rust and other foreign matter bofore erection and pipe linos shall be blown through with steam or air before being put into aorvioe. -730- THE GAZETTE OF INDIA EXTBAOftDINABY [PAJII^H 374. Test Pressures.—(a) Each completed pipo and fitting shall be tested by hydraulic pressure at the Manufacturer's works to twice the maximum permissible working prossure. I t is inadvisablo to submit a completed steam pipe installation to any hydraulic test. (b) Pipes and fittings with flanges for steam pressures exceeding 100 lbs. per sq. in. shall be tosted with blank flanges bolted or elampod on. All other pipos, if straight may be tested botween the hoads of an ordinary hydraulio pipe testing machine. (c) Speoial arrangements shall bo made, according to circumstances, for testing bends and other fittings where not flanged. CHAPTER IX REGULATIONS FOR THE REGISTRATION AND INSPECTION OF BOILERS 376. *The prooadure to be followed in connection with applications for the registration of a boiler and with examinations of boilers under the Act shall be regu- lated in aocordanoo with the provisions of this Chapter read with the relevant Sections of the Act. 376. Preparation lor Inspection.—(a) At every examination of a boiler for the grant or renewal of a certificate, the boiler shall be empty and thoroughly clean in all its parts. Except as provided for in nob-regulation (/) all doors of manholes, hand- holes and sightholes and oloaning pljg4 and all caps in the headers and mud drums of water-tube boilers, all firebars, bearers, fiont plates, bridge plates, firebridges, brick arches, oil fuel burners and mechanical stoVer fittings shall be iemoved. All valves and couks comprising the boiler mounting shall bo opened up and taken apart and the valves or cocks ground, when necessary, beforo the Inspector's visit. (b) Provision shall, if required by tho Inspector, be niarl<> for the removal of lagging or brick-woik or other concealing part and for. tho drilling of platea, and for verifying the pressure gauge and safety valve dimensions and weights. (c) All smoke tubes, exterior of water tubes, smoke boxea, and external flues shall be swept clean. (d) Provision shall be marlo for the cfifeotivo disconnection of all steam and hot water communication with any other boiler under steam as piescribed in Chapter X of these .Regulations, This shall be effected either by tho removal of a length of pipe from tho steam and foed piping or by the insortion of substantial blank flanges. Where blank flanges aio employed, thoy shall be inserted between Hie flange of tho chest and tho pipe attached to it. (e) No blank flange shall be inserted between a safety valve ohest t,nd the boiler. (/) At alternative annual inspections and subjoct to a minimum of throo bottom rows or all tubes subjeot to the first pass of heat hoing oponed up for insp<v 'ion, the Inspector may at his discretion relax the preparation for infection called for under (a) abovo in favour of boilers having an ovaporative capacity of 200,000 lbs. per hour and over, and fed with water troated to the satisfaction of tho Inspeotor. 377. Hydraulic test ol boilers tor registration.—Every boiler shall be hydrau- lically tested in the presence of an Inspeotor or Inspecting Officer. • N O T E . — I n a o o o r d a n o e w i t h s o o t i o n s 7 a n d 8 o f t h e A o t I n s p e c t o r s o r e r e q u i r e d t o measure and examine boilers for registration, to examine boilers for renewal oertiflostes, to determine subjeot to tho approval of the Chief Inspeotor, the pressure ab whion thoy may bo allowed to work, to grant certificate therefor and generally to convey to the owners suoh •orders us the Chief Inspector may i^sue. Bm. $3 TH|!,OABBT?*B OF INDIA EXTKAOKDlttAiu,,. 378. Preparation lor hydraulic tests.—(a) The chests of all mountings subject to steam pressure shall bo in place and shut liaht or blank flanged. (6) Tho aafefy valves RIIOTIM invariably be rnnio^od and tho ehobt opening blank flansiod. (c) The attachment for the Inspector's? pressure gauge and tbo nipple for con- necting the Inij i'<'tov'n tost immi; hose Khali be in order, (d) All doors slhill be proneily johited and tightened up. Tho boiler shall bo completely filled with water, care being taken to allow all air to escape and, if pos- sible, u priliTvinary test not exceeding tho working pressure of the boiler shall bo taken before the Inspector's visit, to test the tightness of the joints. (e) When a boiler is hydraulically tested for the first time, it Rhall be entirely cleared of lagging or brickwork ; nt subsequent tests the lagging or brickwork, or portions thereof, shall be removed if required by the Inspector. 379. Procedure of hydraulic tests,- (a) Rubi< ot to the provisions of sub-regula- tion (e) of Regulation 381 every boiler hhnll be liydraulically tested in the presence of an Inspector to not loss than 1wioc the approved working pressure, when suoh working piossure docs not exceed 100 lbs. por square inch; when the approved work- ing pressure in above 100 lbs. per square inch, the hydraulic tested pressure shall bo 1̂ times the woiking pressure plus 50 lbs. per square inch. (6) The boiler shall satisfactorily withstand such pressure without appreciable leakage or undue defleotion or distortion of its parts for at least ten consecutive minutes. If the test is not satisfactory, the working pressure allowable by calcula- tion shall be suitably reduced, unless the owner desires to make such alterations as will enable the boiler to withstand satisfactorily the hydraulic test; in which case the boiler "shall again be examined, after tho alterations have been made, the pressure recalculated, if necessary, and the boiler tested to tho satisfaction of tho Inspector. (c) *Ai t ho first hydraulic tost of a boiler prior to the issue of an original certi- ficate deflection measurements shall be made before, during and after test of each furnace length, fire-box and flat end or othei plates. (d) After the application of tho hydraulic test tho Inspector Rhall carefully exa- mine the boiler inside and outside and satiRfy himself that it has satisfactorily with- stood the test. (c) In any case in which tho saf0 working pressure to be allowed for a boiler cannot, owint; to peculiar construction of any of its parts, bo determined by calcu- lation in the ordinary way, the Inspector shall, under tho direotion of the Chief Inspector, subject the boiler to hydraulic test foi the purpose of delerminiiu>; the fitness of Mich parts. The amount of the tost pressure to be applied in such a case shall not exceed the Lost prossu'e prescribed for the least working pressure found by calculation for other parts of 1be boiler or ihe intended working pressure, whichever is less. (/) Should any pait of the boiler show undue deflection or indication of perma- nent set during tho progress of the test, tho pressure shall be released immediately auoh indication^ are observed. The working pressure for the part shall bo 40 per cent, of the tost pressure applied when the point of permanent set was reached. This proceduv' ,hall apply 1o any boilor at any tost. (g) Hvdi'Riilie tests of boilers at subsequent examinations shall, except when tho Inspector oxpre-Hy jequires otherwise, bo made after tho inspection. The test pressure to be applied to bcilers at ^uch subsequent examinations shall be from one and a quarter to one and n half times tho working prcssuie of tho boiler. • N O T E . - T h o s e d e f l e r t i o n m e m r a r e m f n t f s h o u l d b e e n t e r e d i n t h e M e m o r a n d u m o f Inspection BooL bofore its stifomjSHion to tho Chief Inspector. • , t 2 * . j , G A Z E T T E O F I N D I A E X T R A O R D I N A B Y [ P A B T t l (h) When the internal construction of size of a boiler does not permit of the Inspector getting inside it or of examining closely all its parts, he shall see it tested by hydraulic pressure to one and a half times the working pressure at each inspoo- tion for the grant or renewal of a certificate. (i) Water tube, locomotive type and all tubular boilors shall bo hydriuilioally tested at each inspection for the grant or renewal of a certificate, unless such test is waived under tho orders of the Chief Inspector. (j) The Inspeotor may, if he considers it necessary, apply a hydraulic test to any boiler at any inspection. (k) Except in the cane of small, portablo and vehicular boilors which do not require re-orection or building in brickwork, tho hydraulic test of all boilers shall be conducted only after tho erection of the boiler in situ and all boilors shall after re- -eroctton in a position different from that in which they were last examined bo hy- draulioally tested. (/) A hydraulio test shall also bo takon before granting an increased pressure certificate and after repairing a boiler, unless the Chief Inspector authorizes the Inspector to waive such test. (m) When carrying out hydraulio test, Inspectors shall use pressure gauges euppliod by the Chief Inspector. 380. *Steam tests.—(a) Every newly registered boiler and every other boiler of -which the working pressure has been altered shall, before the issue of an original or renewal certificate for such boiler, be tested under steam to the satisfaction of the Inspector. (6) At the time of test the safety valves shall be left free and capable of being adjusted to the approved -working pressure. (c) After adjustment of the valves to the correct blowing pressure the boiler shall be tried under full steam and firing with the feed water shut off and the stop valve closed, during whioh time the Inspector shall note the accumulation of pres- sure and other details of the test as well as the loading and adjustment of the safety valves. In the oase of water tube boilers, or boilers fitted with superheaters, the feed water connection and stop valve need not be shut off, and if the total safety valve area and lift are found to be adequate, the requirements of this olause may be assumed to have been satisfied if the valves are so adjusted that each blows at the approved pressure. (d) On completion of the safety valve test the Inspootor shall satisfy himself that the water gauges are in working order and that the feed apparatus is capable of supplying the boiler with sufficient water. (e) Where the State Government does not require a person-in-charge of a boiler to hold a certificate of competency, the Inspector may when he thinks fit satisfy himself by questioning or by practical test whether the person-in-charge of the boiler understands the use and purpose of the water gauges, the pressure gauge, the safety valves, the feed -water-supply and blowdown. •NOTE—A steam test is primarily intended for the purpose of ascertaining by antual test whether the safety valves are sufficient to relieve the boiler effeotivoly of excess steam and whether they operate at the time when the maximum working pressure ifl reached. Inspectors should always send to tho owner due notice of the date fixed for the steam test. On completion of tho teHt the Inspector should enter all details in the Memorandum of ••Inspection Book. Slid. 8] THE GAZETTE OF INDIA liXTBAOBDINARt ?38 (f) When witnessing safety valve tests, Inspectors shall use the standard pres- sure gauges supplied bv the Chief Inspector unless the boilor pressure gauge has, •ince the time of inspection been tested and found correct with an authorized testing machine. (g) No steam gauge shall be used without u syphon filled with water between it and the boiler. (A) When the accumulation of pressure at a steam test exoeeds ten per cent, of the maximum working pressure, the area of the safety valves shall be considered insufficient, and a certificate shall be refused until the safety valve area is inoreas- ed. (») An Inspeotor may, when visiting a factory for any purpose, verify the cor- rectness of the safety valves and pressure gauge of any boiler under steam by com- parison with his standard pressure gauge. 381. Procedure lor registration.— (a) On recoipt of an application for registration under section 7(1) of the Aot, the Inspector shall, when the boiler has been properly prepared for examination, proceed to measure in complete detail all its parts, asoer- tain the working pressure allowed by the Regulations by making a series of calcula- tions of the strongth of the various parts, such calculations being based on his mea- surement and if he is satisfied with the correctness of the maker's certificate, on the dimensions and other particulars relating to the material and construction as stated therein [vide Section 14(1) (c) of the Aot and Regulation 4]. In making his calcula- tions he shall after examination of the material, take due account of the workman- ship and details of the construction of eaoh part. In his examination the Inspeotor may, if he deems necessary, bore the plates or other parts to asoertam their thiokness and in mak'ng his calculations he shall be guided by the requirements of Chapters IV and V of these Regulations. (6) If no formulae or co-efficient applicable to any part is contained in Chapter TV or V of the Regulations, the Chief Inspeotor shall in his discretion determine the fitness of suoh part. (c) The strength of the weakest part so calculated or determined, subject to any discretionary power exercised by the Chief Inspeotor, shall determine the per- missible working pressure of the boiler. After inspecting the boiler and ascertaining by the prescribed calculations the maximum pressure at whioh the boiler may be worked, the Inspector shall hydraulioally test and steam-test it in accordanoo with requirements of Regulations 379 and 380 and may issue a provisional order under Section 9 of the Aot in Form V. (d) The Inspector shall enter the above particulars and dimensions of the boiler and calculations of strength of the various parts, together with details of the hy- drauh'o and of the steam tests, in a "Memorandum of Inspection" Book (vids Re- gulation 386) whioh, together with all the maker's papers for the boiler, shall be submitted to the Chief Inspector with the Inspector's report under sub-section (3) of Section 7 of the Aot in Form I. (e) Where a certificate in Form II and a memorandum of inspection book in Form I are furnished by an Inspecting Authority in accordance with sub-regulation (o) of Regulation 4, the Inspeotor shall, on receipt of an application for registration under Section 7 (1) of tho Aot, proceed to make such examination and measurement of the boiler as will satisfy him that the boiler is tho one certified by the Inspecting Authority and that it has sustained no damage in transit for which purpose he may, if he oonsiders it necessary, subject the boiler to hydraulic test in accordance with Regulation 379. The Inspector shall, if he is satisfied with the condition of the boiler, accept th« particulars *nd approved working pressure entered in Form T by th? Inspecting 73* THE GAZETTE OF INDIA EXTEAOBMNABY' [PART U Authority as if they had been ascertained and entered by himself and shall issue a provisional order to enable the boiler to be worked. He shall make such entries in respect of his examination of the boiler in the Memorandum of Inspection Book as may be required and shall submit the book and Inspecting Authority's certificate and drawing of the boiler with his report to the Chief Inspector as prescribed under sub-regulation (d). 382. ""Engraving of registry number.—(a) The registry number of overy boiler shall, within a period of one month after the registration thereof, bo cut in the front plate thereof in suoh position as shall bo pointed out by the Inspector. The devict for each state shall bo distinguished by tho following letters :— Ajmor . • . . . . A w j a i n . . . . . . B h o p a l B i h a r . . . . . . . . B i l a f i p u r . • • . . . . B o m b a y . . . . . . C o o r g . • . . . . D o l h i . . . H i m a o h a l P r a d f w h . . . . . . K a t c h . . . I f u d h y a P r a d e s h . . M n d r t u i . . . . . . . . M o n i p u r . . . . . . O r i s s a . . • . . . . P u n j a b ( I n d i a ) . . . . . . . T r i p u r j i . . . . . . . U t t a r P r a d a a h V u i d h y a P r a d e s h . . . . . W e a t B e r u r n l • • . . . . A . J . A. B . P . L . B . T i . B . I . B . Y . C. D. H . P . K . U . M . P . M. M . A . 0 . P . I . T.TC. U.P- v.e. W.B.L The distinguishing letters shall b« en^rnved above a number and separated there- from by a horizontal lino two and si half inches in length. The letters and figure? shall be one inch in height and of suitable breadth, provided that in tho ease of small boilers the letters and tf<£uies-of the dovic* may, in the discretion of tho Chief Inspec- tor, be reduced to 3/8" in height. The wholo shall be enclosed in a rectangle, the upper and lower aides of which shall bo th-oe inches opart and ono quarter inoh clear of the top of tho let/tern and the boHoru of tho figures respectively as indicated below :— B.Y. 1 2 3 4 I The side lines shall boat equal distance clour from the figures. The engraving shall not be lew than 1/04th inch in depth. (6) Tho engravirg shall be complete and ready for verification within thirty dayri of the fi.-t inspection of the boiler. (c) Boilers having ryqintry device, differing from thoso proscribed herein shall have 3uch devices obliterated, alteied or cut anew in conformity with those pres- cribed above. The original numbers of sucli boilers shall be rctpined in tho new dovico. A number onoe allotted to a boiler shall not be used again for another boiler, •NOTE.—EntfruvmK blips Lor tracing tho devices in the boilor will b<-> supplied by the CliioJ iiHp'ictor ; tina slip HlioLild be ptwted on tlio part of the boilor pointoil out by the Inspector. 383. Measurement of heating surface.—(a) For the purpose of regulating the area of the safety valves and the amount of registration and inspection foes the " heating surface " of a boiler shall bo the total surface ot all plates and tubes exposed to heat on one side and in contact with water on the other measured on the water side or the lire side, whiohever is largor. (6) For Lancashire and Cornish boilers the total heating surface shall include the wetted surface of the furnaces between the end plates, the fire surfaoo of cross tubes where fitted, and the part of the external shell below the side flue covers. In estimating the areas furnaoes shall bo considered as plain cylinders ; the area of their wetted surface shall be taken a3 their mean external circumference X the length of the boiler between end plates. For the shell the width of that part of the eireum- foronoo bolow the flue covers shall be takon as = 2 D, and this width X the longth betwoon end plates shall bo taken as tha aroa of shell heating surface. The part of th-) surface of the buck-end plate exposed to h»at shall bo omitted from the cal- culation. Example.—Tho formula far the total heating surfaoo of a Lancashire boiler having plain furnaces without cross tubes is as follows :— H.H. in square feet =2L (:-M4d+D). L is the length of the boiler between end plates in feet, d is the mean external diameter of the furnaces in feet and D is the internal diameter of the largest belt of shell in feet. (c) For steam and water drums of water tube boilers the heating surface of the •drum shall bo takon as half the external mean cLrcum.for.enoe multiplied by the clear length of drum between the outer briok walls or oentres of oross boxen, as the case may bo. The heating surfaoc of the tubes shall be taken as tho external surface of the tubes between tho tube plates or headers. The heating surface of the headers shall be omitted from the calculation. Integral economise™ shall be deemed as component heating surface. (d) For marine boilers of the fire.tube type the heating surface shall inolude the wetted surfaoo of the furnaces between the tube plates (considered in the same way as for Lancashire boilers), the Vetted surfaoo of the combustion ohambers (lostt tho aroa of tho tube holes) and the wetted surface of the tubes between tubo platea. The parts of tho front tube plate exposed to h^at shall be omitted from the calcula- tion. (e) For locomotive type boilers the heating surface shall include the wetted surface of the fire-box above the foundation ring (less the area of the tube holes and the fire-hole and ring) and tho wetted surface of the tubes between tube plates. Tho smoke box tube plate shall be omittod from the calculation. (/) For vertical boilers of ordinary type tho heating surface shall inolude the wetted surfaoo of the fire-box above the foundation ring (less tho area of fire-hole •and ring and tube holos, if any) and the surfacs of any cross or other tubes and uptake below tho lowest water level shown in the gauge glass. (g) For any other heatingjsurfaee not provided for in the foregoing instructions the same general procodure shall bo observed. (h) No deduction shall be made for stays, etc., in calculating the heating sur- face. 384. Boiler rating.—Tho boiler rating shall be the number of square feet (to the nearest whole figure) in the heating surface of tho boiler as determined under Regulation 383. 385. Registration fee.—The fee required to aooompany anj application under subsection (1) of section 7 of the Ac'f shall be;J>"i KB. F o r B o i l o r " R u t i n g n o t e x c e e d i n g J 0 0 . . . . . . 4 0 E ' o r B o i l e r R a t i n g H x e w o d i n g 1 0 0 b u t n o t t p c e e o d i n g 3 0 0 . . . C O For Boilor Rating oxct)»ding 300 but not etrooding A00 For Boiler RnMiip; exceeding 500 but not oxceeding 700 1'or Boilor Hating oxueeding 700 but not oxcaeding W00 FOJT Holier Rating exceeding 000 but not oucoeoding 1,100 . T<\>r Boiler llutinx oxceedmg 1,100 but not oxceeduig 2,000 For Boiler "Rating acdiduifi 2,000 but not oxeoodinK 4,000 For Boiler Kating exceeding 4,000 but not excooding 6,000 For Boiler Rating exceodtng 6,000 but not oxcooding 8,000 For Boilor Rating e^teerting 8,000 but not excooding 10,000 For Boiler Rating exceeding 10,000 . . . . . Ks, (10 70 80 00 100 120 140 100 ISO 200 Provided that the Chief Inspector may direct that no fees shall be payable in respeot of a fresh application made in pursuance of sub-section (2) of Section 14 of the Act.. 388. *Memorandum oi Inspection Book.—(a) A Memorandum of Inspection Book shall be picpared for each boiler in Form. 1. In thin book the Inspector shall enter in ink all particulars and dimensions of Hie boiler with the calculations for the various parts in deta.il, particulars of hydraulic test and steam tost and his inspection notes. (6) At subsequent inspections Inspectors shall enter the dates of the inspeo- tjons, hydraulic, tests and steam tests, when such are made with their notes there- ' on. (c) Inspectors should also enter in the Memorandum of Inspection Book the general condition of the boiler and of rcpaii.s, to what extent boilers have been cleared of brick work, etc., a report of all casual visits, visits for inspection of repairs, for inspection of main steum pipes, and reports on accidents, etc., in this way the Memorandum of Inspection Book will piovide a useful ierord of the boiler's history for the information and guidanoo of Inspectors at subsequent inspec- tions. (</) On submission of the Memorandum Book to the Chief Inspector ho will in the ease of newly registered boileis, check all particular.s and calculations and approve of tho w irking pressure that is to bo permitted. In the case of old boilers, tne Chief Inspector' will examine Ihe Inspector's notes of inspection and proposals made for repair.s or reduction of pressure. A pressure once approved for the boiler should not be altered without the written authority of the Chief Inspector. 387. Registration Book.—(a) A Registration Book or copy of Memorandum of Inspection Book containing all the particulars required for iogistraiion shall be maintained in tho office of the Chief Inspector m Form I and any orders passed by him regarding the boiler shall be entered in the Registration Book under his initials. (b) Tho Chief Inspector should also seo that the notes of subsequent inspections entered, in the Memorandum of Inspection Book are copied in the Registration Book. 388. Transfer oi Memorandum oi Inspection Beck and RegJstiatitn Ecck.— On a boiler pausing from one State to another, tho Memorandum of Ins- pection Book and tho Registration Book shall, on the request of the Chief Inspeci or of the State to which the boiler haw been transferred, be forwarded to that officer who shall take over their custody and maintain them as hereinbefore pre- scribed. 389. tQrant Oi certificate.—(a) A certificate for the use of a boiler shall be- granted in Foim VI. In the certificate shall be entered the maximum pressure at which the boiler shall be worked, the load to be placed on the safety valves or tho • N O T B . — T h o M e i D o r o n d u m o f T n s p e o t i o n B o o k s h o u l d a l w a y s b e k e p t c l e f t n a n d u p t o dale- Inspection BookR, except when actually required by thfi Inspector, should be filod in the ofriro of the Chief Inspect or. t NOTE —The Lmpeotor'a remark should be us brief aq possible. , U J x. < v i.£K J.1.CJ UJI, I J N J J I A Jl lAlftAOJilU^^]. fx thickness of washers Or ferrules required as safeguard against overloading, the data and pressure of the last hydraulic tost of tho boiler and, when applicable, of 1 he main steam pipes prescribed. 390. Procedure for inspection of installed boilers.—(a) General Instructions.— I t in essential to have every part of a boiler, that is accessible, open and properly prepared for examination, internally and externally. All boilers havo openings through which an examination may be made and vhieh for operation are closed ; all such parts shall be opened whether for access to water am faces, or hunter surfaces. TYi cooling a boiler down for inspection or repairs, the waler should not be wilhdrawn until the setting is sufficiently cooled to avoid damage to tho boiler and when possible allowed to cool down naturally. It is not n^cessflry, in order to comply with ordinary prudence, to remove insulation material, masonry, or fixed parts of tho boiler, unless defects or deterioration, peouliar U> eeitain types or inaccessible parts of boilers are suspected and where there IM moisture or vapour showing Ihrough the covering, the coveting should be removed at once and a com- plete investigation made. Particular attention should be paid to the external parts of boilers in the way of seating blocks, especially when the situation is damp. Saddle tanks and engine fittings of locomotive lype boilers should be removed to facilitate the inspection of the parts underneath at the first inspection, and at any reasonable period afterwards if (he Inspector cannot otherwise satisfy himself as to tho condition of those parts. Water walls, shall be bared at least once in every 24 month,-*. Upon sufficient visible evidence or suspii ion due to age or other causes, every effort shall bo made to discover the true condition, even to the removal of insulating material, masonry or fixed parts of a boilei, Sometimes drilling or cutting away of parts is justifiable and necessary to positively determine thin condition. Tho Inspector should, whenever the sizo permits, go inside it and make sv thorough inspection of all its internal parts. Before doing so, he should of course, satisfy himself that proper provision has been made for disconnecting the boiler from any other boiler under steam. Should he find that proper provision foi disconnection has not been made or that the boiler has not been properly cle ijind or sealed, or that itf unreasonably hot, he should decline to proceed wilb the inspection and should report the facts to the Chief Inspector for orders. When a boiler is of such a size or its construction is such that the Inspector cannot go inside it, there should bo sufficient sightholes or handholcs provided to enable him to see the piincipal internal parts ; if any important part of a boiler is so constructed that the Inspector cannot examine it, he should report the facts to the Chief Inspector for orders. (b) Scale, Oil, etc—Upon entering a boiler, tho Inspector shall examine all surfaces of the exposed metal to observe tho action caused by the use of water, oil scale solvents, or other substances which may have intentionally or unintention- ally gone in with the feedwate*' Any evidence of oil is dangerous and immediat e steps shall be taken to prevent any further entrance of oil into the boiler. Oil or scale in the tubes of water-tube boilers or on plates over the fire of any boiler is particularly had, often causing them to rupture. (o) Corrosion, Grooving.—A given amount of oorrosion along or immediately adjacent to a seam is more serious than a similar amount of oorrosion in the solid plate away from, the seams. Grooving along longitudinal seams is especially sig- nificant as grooving or cracks aro likely to occur when the material is highly stressed. Severe oorrosion is likely ro ooour at points where the circulation of the water i» poor and such places should be examined most carefully for evidences of corrosivo aotion. If the Inspector decides that a boiler in one or more of its parts is no longer ftt for the pressure approved for it, he must without delay report his proposal for re- ducing the pressure to the Chief Inspector and at the same time submit hie calcula- tion for the wasted parts for check and approval of pressure. 738 THE GAZETTiu OF 1JMDIA uXlKAOKDiNAK.. ^ A B T 11 With regard to the pitting and wasting of shell plates* tho Inspeotor should boar in mind that shell plates may become reduoed in thickness to an appreciable •extent and still be stronger than longitudinal seams. All flanging shall be thoroughly inspected and particularly the flanges of cir- cular end plates that are not stayed, Internal grooving in the fillet of such heads and external grooving in the outer surfaces of heads concave to pressure is very common (since there is slight movement in the heads of this oharaoter which produoes this kind of defect. Some types of boilers have what is known as the OG or reversed flange construction in some of then1 parts that may be inaccessible to the eye, but the condition shall be determined by the insertion of a mirror whioh at a proper anglo will reflect back to tho eye the condition of such a place, or any other feasible manner, (d) Stays.—All stays, whether diagonal or through, shall be examined to note that they are in even tension. All fastened onds shall be examined to note whether oraoks exist where the stays are punched or drilled for rivets or bolts and, if not found in proper tension, the inspeotor should reoomroend their proper adjust- ment. (e) Manholes and other Openings.—The manhole and other reinforcing plates, as well as nozzles or other connections flanged or eorewed into a boiler, shall be examined internally as well as externally to see that they are not cracked or de- formed, and wherovor possible observation shall be made from tho inside of the boiler as to tho thoroughness with whioh its pipe connections are marie to the boiler. All openings to external attachments, such as water oolumn connections, open- ings in dry pipes and openings to safety valves, shall be noted to see that they are free from obstructions, (f) Fire? Surfaces—Bulging, Blistering, Leaks.-—-Particular attention shall be given to the plate or tubo surfaoes exposed to the fire. The Inspeotor shall •observe whether any part of the boiler has become deformed during operation by bulging or blistering ; the former is a distortion of the entire thickness of tho plate or tube where it takes place, while the latter is a lamination or separation of the plate due to foreign material being embedded in the ingot before the plate is rolled. If bulges or blisters are of such size as would seriously weaken the plate or tube, and •especially when a loakage is noted coming from those defeots, the boiler shall be dis- continued from service until the defective part or parts have reoeived propor re- pairs. Careful observation shall be mado to detect loakage from any portion of the boiler structures, particularly in the vicinity of seams and tube ends. Fire tubes flometimos blister but rarely collapse ; the Inspector should look through the tubes for such defects and if they are found with a sufficient degree of distortion they ahould be removed. (g) Lap Joints, Fire Cracks.—Lap-joint boilers are apt to crack where the plate8 lap in the, longitudinal or straight seam ; if thero is any evidence of loakage or other distress at this point, it shall be thoroughly investigated and, if necessary rivets removed or the plate slotted in order to determine whether cracks exist in tho seam. Any cracks noted in shell plates are usually dangerous except fire cracks that run from the edge of the plate into the rivet holis of girth seams. A limited number of such fire cruoks is not usually a very serious matter. (h) Testing Staybolts.—The Inspeotor shall test staybolts by tapping one end of each bolt with a hammer and when practicable a hammer or other heavy too] should be held on tho opposite end to make the test more effective. (i) Tabes—Thair Datects etc.—(i) Tubes in horizontal fire-tube boilers do- teriornte more rapidly at the ends forward the fire, and they should be carefully la] \m\ \\ ith a Yvzht hammer on their outer surface to ascertain whether there has been SEC. 3] THE GAZETTE OF INDIA EXTEAOBDINAEY 730 serious reduction in thickness. The tubes of vertical tubular boilers arc more- susceptible to deterioration at the upper ends when exposed to the products of combustion without water protection. They should be reached fts far as possible either through tho handholes, if any, or inspected at the ends. (ii) The surfaces should be carefully examined to detect bulges or oracks, or any evidonces of defective wolds. Where thoro is a strong draft tho tubes may bo- come thinned by corrosion produced by the impingement of particles of fuel and ash, or the improper use of soot blowers. A leak from a tube frequently causes- serious corrosive action on a number of tubes in its immediute viciniry. (Hi) Where short tubes or nipples are employed in joining drums or headeis, there is a tondonoy for wasto products of tho furnaoo to lodge in the junction points and suoh deposits are likely to cause corrosion if moisture is present. All such places should be thoroughly cleaned and examined, (j) Ligaments between tube holes.—The ligamonts between tube holes in the heads of all types of fire-tube boilers and in shells of water-lube boilers should be examined. If leakage is noted, it may denote a broken ligament. (k) Steam Pockets.—-Steam pockets on fire surfaces are sometimes found irt new or replacement work, and wherever this is possible or likely the Inspector should make observation and, if any are found, recommend the necessary changes. (1) Pipe connections and Fittings.—-The steam and water pipes, including con- nections to the wator column, shall bo examined for leaks, and if any are found it should be determined whether they are the result of excessive strains due to ex- pansion and contraction, or othor causes. The general arrangement of the piping" in regard to the provisions for expansion and drainage, as well as adequate support at the proper poults, shall be carefully noted. The location of the various stop- valvos shall be observed to soe that water will not bo pooketed when the valves am closed and thereby establish cause for water-hammer action. Tho arrangement of connections between individual boilers and the main steam pipes shall be especially noted to see that any change of position of the boiler, due to- netting or other causes, will not produce an undue strain on the piping. It shall be ascertained whether all pipe connections to tho boiler possess tho- proper strength in their fastenings, whether tapped into the boiler, a fitting, or flange riveted to the boiler. The Inspector shall determine whether there is proper provision for the ex- pansion and contraction of such piping, and that there is no undue vibration tending to crystallize the parts subjected to it. This includes all steam and water pipe ; and especial attention should be given to the blowoff pipes with their connections and fittings, because the expansion and contraction duo to rapid ohangos in tem- perature and water-hammer action oreate a great strain upon tho entire blowoff system, whioh is more pronounced when a number of blowoff pipes are joined in one common disoharge. The freedom of the blowoff connection on each boiler shall be tested whenever possible by opening the valve lor a few seconds, at whioh time it can be determined whether there is excessive vibration. Blowoff pipes should be free from external dampness to prevent corrosion. (m) Water column.—The piping to the water oolumnjshall be carefully noted tcv see that thore is no chances of water being pocketed in the piping forming t lie steam connection to the water column. The steam pipe should preferably drain towards the water column. The water-pipe connection to Ihe wator column must drain, toward the boiler. Tho relative position of tho water oolumn to the flro surfaces of the boiler shall' be observed to determine whether tho column is placed in accordance with thai 740 THE GAZETTE OV INDIA EXTRAOEDINABY TPABT II regulations. The attachments shall bo examined to determine their operating condition. (n) Baffling—Water-Tut>3 Boilers.—In wuter-tube boilers, it should be noted, aa far as possible, whether or not the proper baffling is in place. In many typos of boilers tho absonoe of baffling often onuses high temperatures on portions of the boiler structure which are not intended to be exposed to such temperatures, from which a dangerous condition may result. The location of combustion arches with respect to tubo surfaces shall bo carefully noted. These are sometimes arranged so as to cause the flame to impinge on a particular part of a boiler and produces overheating of the material and consequent danger of the rupture of the part. (o) Localization of Heat.—Localization of heat brought about by improper or •defective burner or stoker installation or operation creating a blowpipe effect upon the boiler, shall be condemned. (p) Suspended Boilers—Freedom of Expansion.—Whore boilers are suspended the supports and sotting shall be oarefully examined especially at points where the boiler structure comes near tho setting walla or floor. Often accumulation of ash and soot will bind the boiler structure at such points and produce excessive etrains on tho structure owing to the expansion of tho parts under oporating condi- tions. (q) Safety Valves.—As tho safety valves are the most important attachments on tho boiler, thev shall be inspected with, the utmost caution. There should be no •accumulations of rust, soalo, or other foreign substances located in (he casings so as to interfere with the free operation of the valvos. The setting and freedom of the safety valves should bo tested prefeiably by raising the steam presaure to the blow- ing-otf point, or if this cannot be done, the valvos shall be tested by means of the try levers to ascertain if they are free. Whoro the steam discharged from a safety valve is led through n, pipe the inspector shall determine at the time tho valvt is operating whether 01 not tho drain opening in the discharge pipe is free and in accordances with the Regulations. IP the Inspector dooms it neeensaiy, in order to determine tho freedom of dis- •ohargo from a sufetv valvo, the discharge connections should be removed. Under no circumstances should a stop valve be permitted between a boiler and its safety valvo, (r) Steam Gauges.—The .steam gauges on all boilers shall bo removed and the Inspector shall test them and compare their readings with a standard test gauge. The readings of the steam gauges shall be observed and compared when making an inspection with steam on tho boilor, where several boilers are in service con- nected to a common steam main. Tho location of the steam gauges shall be noted to see whether or not it is opposed to high temperature cither externally, as would be the oase if placed olose to the smoke flue or other highly heated part of the boiler •or setting, or oxposed to heat internally duo to lack of protection of the gauge spring with a proper syphon or trap to pro vent stoatn from ooming in contaot with the flpring. The Inspector shall see that provisions aro made for blowing out the pipe leading to the steam gauge. 391. Circulation of Wasted Shell.—{a) When any part is wasted and the Inspootor is doubtful of its fitno-ts for the pressure, he thai] oause one or more small loles to bo bored and from them ascertain the average thickness of the parts from -which he can satisfy himsolf by calculation in aeoordanoe with the formula applicable to the part. Such gaugings and calculations ho shall ontor in the Memorandum of Inapcot'on Book. •SBO. S] THE GAZETTE OF INDIA EXTRAORDINARY 741 (b) In making calculations for a •wasted part of a boiler shell, e.g.f along the line 'Of seating blocks of a Lancashire boiler, the Inspector shall use the following for- mula:— 2t 'xS W.P. = — Eqn. (96) DxF t'—thickness of -wasted plate, where thinnost. S-= minimum tensile strength of material of shell in lbs. por sq. in. D=internal diameter of shell in inohos. F=»faotor of safety, which shall not be less than 4. 392. Repairs to Boilers.—-(a) Extensive rcapairs such as, fusion woldod or riveted patches to shells, fire boxes and ond plates of boilers and extensive building up of wasted parts of boilers permit tod under these Kogulations, the renewal of furnaeos and end plates, parts of shell, fire boxes, girders otc, shall only bo entrusted to a .Repairer who can satisfy the Chief Inspector regarding the quality of welding and other repair done by his Organisation. Welding (6) The .Repairer shall satisfy the Chief Inspector,— (i) that the elootrio arc or CKy-aoetyleiid welding sets and all other tools and plant in his possession for carrying out ropairs are suitable for the woA undei taken, (ii) that the quality of material used conforms to the specification that are prescribed, (Hi) Hint the Ruporvisoiy and operational staff unployed by him possess tho necessary training and experience for the work undertaken, (if) all welding Operators employod by the Repairer shall be required to pass the tests in regard to vortical, horizontal, overhead and fillot welding prescribed by the Chief Inspeotor, (v) standard of-work should be of high order and comply with all the require- ments and Lost that may be prescribed by the Chief Inspector Riveting and other repairs (c) The Repairer shall satisfy the Chief Inspector,— (i) that ho possesses the necessary equipment and tools and engages trained and experienced workmen and staff for the work undeitaken. (h) standard of work should be of a high order and oomply with all the require- ments and teat that may be proscribed by the Chief Inspector, and all material used Bbn.ll be of boiler quality. Minor repairs. (d) Notwithstanding anything oontained in (a) above, minor repairs as dotennin- ed at the discretion of the Chief Inspector may bo entrusted to any .Repairer. (e) The repairs should be supervised, so far as his other duties permit by the Inspector when the fibrohoxes and smoke tubes of locomotive tubo boilers are with- dra-wn, the opportunity should be taken to inspoet the internal parts -which are other- wise inacoessible to close inspection. (/) Repairs to boilor shells shall be effected either by patching or by removing a strip of worn or damaged plate and inserting the new strip with covering straps over the longitudinal butt ends, the strength of the revetod joints to be not lose than that of the longitudinal joints of the shell. 742 THE GAZETTE OK INDIA EXTBAOEDINABY [PAET II (g) Patches for fire-exposed plates shall be fitted metal to metal without joint of any description. The affeitod part shall bo cut out, leaving tho corners of the hole •well-ro'undod. Patches shall be secured, wherever possible, by properly spaoed rivets with a width of plate at least equal to tho diameter of rivet botween tho edge of the rivet hole and tho edge of tho plate. Whore rivoting is impracticable, tho plale shall be pocured by well fitting countersunk headed screw pins. (h) Tho thickness of a patch plate shall not be less than the original thickness of tho plate winch it is uaod to patch. (i) Bulged or distorted furnaces of circular section may, if the bulgo or distor- tion in not too great, be pressed back to shape-, (j) Circular furnaeos of horizontal boilers that ha\e bcoome distoited, may be auitablv reinforced. (k) Anti-collapse rings shall lie of substantial nection either of single or double anglos bolted back to back with strew stays not less than 7/8th inch in diameter and about 7 inches in pitoh paused through flat of* angle and screwed into tho furnace, the ends being oilhcr rounded or riveted over on the fire side and fitted with nuta at tho other. Tho stay bolts nhall be fitted -with ferrules not Jess than 1 moh, in. depth botweon furnace and angle ring. (I) Welding shall not be accej>ted for tho repair of any part of a boiler for whioh •welding is forbidden for a now boilor undor these regulations. Hoiler shells shall not bo repairod by wolding beyond the filling up of a small isolated oorrodod or pitted part or the making up of wasted edges of oponings. (m) Cracks or grooving in dished or flat end plates of cylindrical sheJls or in the bends of furnace flanges in a circumferential direction may be veod out and welded. Butt welding oftwioke tubes,— Smoke tubes may be butt welded either by fusion welding, flash welding or oxy-acetelyne welding, and theso should be tested hydrauli- Oftlly at tho discretion of the Chief Inspector. (») Wasted parts of circular furnaces and fire-boxes and fire exposed flat platei* as in rectangular fire-boxes and i ombustion chambers may be cut out and be roplaoed by now pieces welded in or they ma\ be built up by welding. Longitudinal cracks in circular furnaces and fire-boxeh and riacks in rectangular fire-boxes and combus- tion ohanibeis may be welded, (o) ISfo stay shall bo welded. (p) For the purposes of these jegulations renewed parts shall be deemed to bo parts of a new boilor intended for usto at tho pressure at which the boiler under re- netfal m used, 393. Submission of plans ol boilers.—(a) In the oaseofland boileri made in India or outside India for use in the States the Chief Inspector may, on receipt of a Treasury acknowledgment of the prescribed foe, receive for examination in advance the plans and particulars of material^ design and construction of boilers HO as to avoid questions arising at the examination of the finished boilers. (b) Tho fee required under sub-regulation (a) shall be half the fee whioh would be required to accompany an application for the registration of the boiler (vide Regulation 385). (c) Tho Chief Inspector shall, after examination of the plans and particulars intimate to the proposers whether ho is satisfied with the design and fitness of the parts for the intended prossurw and, if not, what modification is nocedsary ihorein. When plans and particulars of boilers have boen approved, the Inspector in making hie examination shall see that tho designs as approved have been carefully folio-wed out and that tho material corresponds with the approved particulars. SBO. 8] THE GAZETTE OF INDIA EXTBAORDINAEY 74£ (d) The above proooduro shall be followod in the case of extensive repairs or alterations to boilers, but no foe shall bo lovjable for the examination of such plans and particulars. STEAM PIPES 394. Inspections of steam pipes.—(a) Kteain pipen shall bo inspected and by hydrauli- cally tested before erection in place, the test jiressuro to bo that proscribed in tho Standard Conditions for etoani pipes. A certificate from an Inspecting Authority or a rooognisod Jtnakor stating that this has been done may bo accepted. l i tho Inwpootor is stisfied with the tost, tho pipes may be oroctod in position , at the stoam teat of the boiler ho shall examine thorn under steam pressure. No separate certi- ficate for the stoam pipes shall be issued, nor shall a separate foe be charged for their inspection. (b) At subsequent inspections of tho boiler or at any other time, tho Inspector may make an external inspection of tho steam pipes and for this purpose may require a part of the lagging at the flanges to be removed, and the pipe mado bare. If as a result of this inspection tho Inspector is of opinion that tho pipes or any portions of thoin are in an unsatisfactory condition he shall report the matter to the Chief Inspector, who may require the whole of the lagging to bo removed and may require any pipo or pipes to bo hydraulically tested. The test prossuro at such hydraulio tewt shall be not less than frwue the working pressuro of the boiler. (c) The date and hydraulic pressure to which steam pipes were subjected shall1 be entered in the certificate for the boiler and such entries shall be continued from time to time in the renewal certificates for the boiler. 395. Submission of plans oi steam pipes.—Hans of steam pipes shall be submitted to the Chief Inspootor before construction or at tho tjmo of registration of the boiler for hie dooision whether tho pipes and thoir arrangement comply with the regula- tions. CHAPTER X SAFETY OF PERSONS INSIDE BOILERS 396. Safety of persona working inside toilers.—(a) No person shall be oompol- led or allowed, by the owner or person in charge, to go inside a steam boiler for any purpose whatsover unless tho boiler is effectively disconnected in the manner horo- i natter prescribed from any stoam or hot water communication with any other boiler. (6) Effective disconnection shall be made cither by the removal of tho boiler stop valve or of a length of piping from aJl steam and hot water connections with any other boiler, vessel or pipe containing steam or hot water or by tho insertion of substantial blank flanges between the boiler stop valves and piping. The shutting of a atop valvo, stop cock or automatic isolating valvo alone shall not be deemed to' constitute compliance with this regulation. (c) Xho owner of a boiler to which this regulation is applicable shall obtain the approval of the Chief Inspector in writing to the method of disconnection which he proposes to use and shall be responsible for ensuring that the method so approved is followed in praotioe. CHAPTER XI ETMEABD CCKE1TICJF ICR 1BE DESIGN AKD COEfcItUCTl.CN OF ECOKCMIEEKS AliD FEED PIPES. EC0N0M1SERS 500.—(a) An eoonomisor shall not be registered undor sub-sootion (4) of section 7 of tho Act and a certificate shall not be issued under sub-section (5) of that section. 744 THE GAZETTE OF INDIA EXTRAORDINARY [PART H •with reference to an economiser, unions the standard conditions in respect of material, design and constnictioji, which aro specified in this Chapter aro satisfied in respect of such economises Where tho oconomisor heating surface is designed to permit the generation of steam and there are no valves interposed betwoen this heating surfaoo and the boilor drum, then the euonomisor shall be designed in accordance with Chapters I to VJII of the Regulations where these apply: Provided that an eoonomisor in use at the time Chapter XI of theso Regulations oame into force, may be e>o registered and such Certificate may bo inmied in respect thereof notwithstanding that such .standard conditions are not satisfied in respect of such economises (i) Notwithstanding anything oontainod in sub-regulation (a) the Chief Ins- pector may, subject to tho provisions of Regulation 502, register an oconomisor and order tho issue of a certificate authorising the use thoreof, although the standard conditions aro not fully salisfiod in respect of such economises GKNERAJ, REQUIREMENTS 501.—(a) All enst iron and vtocl headers and Ihe parts used in tho assembly of •fln economiser sliall conform with Ihc requirements of thin Chapter in respect of mateiiil spe'ification and test, workmanship and structural requirements. (b) All economises under eonwbr notion shall be under the supervision of an Inspecting Authority and must bo so ecitified by that Authority. (c) For econouiisors impoiied into tho States to which those Regulations extend, a certificate from the Inspecting Authurily in Form "VII certifying thai tho material Was tested and the eoouomisor built unrlor its supervision shall bo furnished to tho Chief Inspector before or with tho first application for registration. (d) In advance of or along with an application for registration, the following ehall be furnished : (i) a certificate in Form VTII of manufacture and test signed by the Maker or by a responsible ieprcsentative of the Maker, containing the descrip- tion of the eoonomiser, particulars of the material used in its construction, and the dimensions of the several parts with the declaration that tho limits of tensile breaking Btrength and tests comply with the standard conditions ; (ii) a certificate from the Maker of the material, stating the tensilo breaking strength and the elongation provided that if the Maker and Manufacturer bo the samo, the Manufacturer's precise statement showing the above information shall be accepted. (e) To suit owners convenience whore possible it is recommended thftt econo- misers be installed in two or more sections, 503. Where no oertifioutos are produced, tho working pressure as found by formula will be reduced by 10% . When the workmanship is however in any way doubtful and the Chief Inspector is not satisfied that any of the foregoing conditions would be sufficient to moot the oircuinstances, he may at his discretion reduce tho working pressure by such percentage as he deems fit, 503. Makers' certificates (or steel economisers.—The Makei .shall furnish tho .Inspecting Officer with a certificate in the following form:— "We hereby certify that the material described below has been made by the Open Hearth or an Elootrio process acid/basic and has been satisfactorily tested in the presence of the Inspecting Offioor/our Test House Manager in accordance with tho Standard Testa." • 8 B O . 8 ] T H E G A Z E T T E O P I N D I A E X T R A O R D I N A R Y 7 « ? 504. For all now eoonominerH the hydraulic test must be applied as shown 'below :— On component? before nna«mbly Oast iron tube?, lieud«vn & Bends Steel tubes, headers & Bends . Hydraulic t*>3t prosaure Twifn working pressure: Minimum pressure 500 lb./sq. in. Twioo working preHtiuro: Miaunuin piVHaure 1000 Ib./sq. m. 'Max. prtwaure 1000 lb./&q. in. pluH working pr^HRiire. NOT]].—"Worki IU: presKUi'rt " ulitill be tlio hitflmst procure at whiuh the ecoiiumisor reliof valves arc to \w a"t, Tile nbove t̂ mt jnsHinve ^luill bu hold lor a inniuaum period often inmubes. 605. Material of construction, worksmanship and manufacture.^—AH material used in the construction of presmirc parts shall be i,csted and shall ooiiform with the following requirements :— [a) The workmanship throughout shall be of the highest standard. All castings shall be well finished, free from defects, porous places and blow holes, and true to dimensions without warping. Where ohaplets are used, there must be satisfactory fusion with the metal. Chaplets must bo proporly tinned with metal free from lead. (&) The screw threads of all bolts must be of British Standard Whitworth forme. (c) All oomponent parts shall whore necessary bo manufactured to limit gaugea to seoure interchangeability throughout. CAST IRON TUBES AND HEADERS 506. Process of manufacture.—Th<-> minimum tonsilo strength shall bo in accord- ance with the following tablo :— Mnin cross Hoctioiiiil tbickneni of rusting ropre wnl n I i n . "Up to 5/8 Oviir 5/8 and not exceeding 1-1/8 . Dia. of test bur fin eimt i n . o aio 1-2 'lnu^e din. (>t lost pieon i n . 0-504 0-708 'Minimum tonailo strenath tons/aq. in. tOHH 1 t 0 13-0 llsa'iors ton^ lfi-0 1S-0 On analysis, the sulphur and phosphorus content of the iron shall not exceed the following percentages :•— Component Tubes Hoaderti Sulphur p<'T uent miw. 0-12 0-10 l'lioaphorus per cent max. 1-20 1-00 t*S THE GAZETTE OF INDIA EXTRAORDINARY [PART I I 507. Teat bars, (a) When tho test bars are cant separately,Uitiy .'-hall be poured at the same time and from the same ladle of metal as the casting or castings they represent. The number of test bars specified in Regulation 508 shall be applicable to all oastings of each melt. (b) When tho bars are cast on the mould for the casting and the mould for the test piece shall be joined together in such a manner that the liquid metal fills both moulds at tho same operation. (c) All test bars shall be oast in green sand or dry sand moulds according as to- whether the casting or castings they represent are moulded in green sand, or in loam or dry sand respectively. (d) The test bars shall not be subjected to any heat treatment after leaving the moulds except where the castings are heat treated. 608. Number of tensile tests.—(a) Tho number of ttints required for each batch of castings shall be in aooodance with the following table the various classes of cast- ings being divided into 4 representative groups ;—• Group ] 2 3 Up to 28 lbs Ovnr 2S ]bn. Ovor J <vwt. Wolght Of L'tlitlllgH iind up to 1 cwt. . . . . •mil up to 1 ton. Teat roquirementn One teat for etiuh 30 cwts. of castings or part thereof. Ono test for each 2 tons of cast- ings or part thortiof. One test for each 4 tone of cast- ings or part thereof- lti tho ftljove Groups J, 2 and J), till onntings represented by one tei. must be poured froini the samu ludlo of wiino heat as the bar or burs provided for the test. 4 Over J ton and important ctiHtmgH . . , One test for eaoh 4 tons of oant- ingH or part thereof or for each casting weighing 4 ton» or moru. (b) The additional tests to be oarriod out before a casting or batch of castings is rejeoted shall be in accordance with the following table:— 1st tost pioue 2nd test piofie . If th is fails . . . . . I f th i s pasHtw . . . . . i f this foils . . . . . The Heucmd tea t pieco Hhn.ll be touted. Tho bti toh or sep^rato cast ing ropresented shall l>e aooepted. T h e b»toh or separa te cas t ing represen ted m a y be rejeateil . (c) Provided always that in the case of failure of both test pieces if either show obvious defects a third test piece may be taken from a broken casting or a pieoe may be out from u. usable casting for further testing as follows:—• i)rd teat pieue . i f th i s pasHerf . . . . . If th is failn . . . . . T h e ba tch or separa ta oastinga represented shall bo accepted. The bntch or separa te cas t ing represented m a y be rejeotod. 609. Standard test piece.—The tensile test bar shall conform to tho dimensions, shown in the following. Bars roay be tested with either plain or screwed ends. B iii. 10-875 1-20 D in. 0-G64 0-798 A in. 0-20 0-60 -p in. 2 R in. 3* C K in. i in. H j * a l - i / s (1-1/8) (13SW) F HL. a 1-1/8 u in. 7-1/16 «i in. 4-13/16 5-7/8 Main prong KOC- tionul thioknoiw of ousting reprwentwd. in. Up to 5/8 Over 5/8 and not exoeorlmg 1-1/8 Tlie toat btvfH nhnll bo ra~ii an cylmrlricul bars of the diameter.-! given in Ool. B and mnohined •io^the dimeiiBiona givon in Coî . D <fc P in the rtbove Tuble. CONSTRUCTIONAL REQUIREMENTS CAST IRON ECONOMISERS 510. (a) The Manufacturer shall, on the basin r>f design details, satisfy the Ins- ipeoting Authority regarding the design and strength of all parts of Cast Iron Econo- ttnisei'B for which, under these Rogulationa, specifio design and stress limitation have mot been imposed, subject to the following muximuni working pressures :— Max. W.P. (1) Ordinary Vertical Tube 250 lb./sq. in. (2) Ordinary Vertical Tube with strengthened tubes . 300 lb./ sq. in. <(3) Ring Stay Vertical Tube 350 lb./sq. in. (̂4) Gil) Tube type of approved design . . , 450 lb./ sq. in. (6) A certificate from the Inspecting Authority regarding tho safe working pressure of such parts of Cast lion 'Econoinisers for which design and sirens limita- tions have not been imposed undei these Regulations, should be furnished to the Chief Inspector. 611. "Joint bolts and studs (or cast iron economisers.— (a) The maximum working pressure for the bolts and studs shall bo calculated by Regulation 618. (b) The use of studs tapped into euit iron is perrm'si-oblo where:— (i) The studs and nuts are not in the paih of the fluo gases. (ii) The studs arc carefully threaded to gauge and fitted into tapped holea of ample depth". 612. Use 01 cast Iron.-—Where Iho water temperature is expected to exoeoj 425°F. the use of oast iron for pressure parts is prohibited. STEEX ECONOMISERS WITH OR WITHOUT CAST IRON SLEEVES ON THE TUBES 518. Tubes, Construction—(a) The tubes shall bo mamifacturtd in accordance with Regulation 151. (&) Suitable provision shall bo made for supporting horizontal tubes at <jne or more intervals in their length to relievo bending shosses, and these supports as woll as the ond connections must permit free expansion. 614. Tubes Working pressure.—The working pressure of tho tubes shall be calculated ;n accordance with Regulation 338. 616. Headers: Construction.—(a) The headers shull be constructed in accordance with Regulation 154. (6) Branches shall be secured by one of the following methods:— (1) Expanded, belled and welded. (2) Strength welded with additional securing means. (3) Full depth-strength weld. (4) Branches lens than 2 inch bore may be screwed and weal welded. (c) Open ends of forged for seamless steel tube 1 lenders may be closed by for- ging, or the ends may bo secured by bolting, .screwing, or welding in an appioved manner. 616. Headers: Working pressure, (a) Rectangular headers. Tho working pres- sure shall be calculated in accordance with Regulation 340. (b) Cylindrical heudeis. The working pressure shall be calculated in accoid- ance with Regulations 270 and 271. 517. Attachment of tubes to headers (a) Tubes shall be eonnocttd to the tube plates by one of the following methods-.— (1) Expanding wiih bell mouthing or seal welding. (2) Strength welding. (3) Mechanical bolted joint. (b) Roller expanded tubes shall project through the neck or bearing part ini the holes by at least a quarter of an inch and shall be secured fiom drawing out by being beUmouthed to the extent of 1/32" for each inch in diameter plus 2/32", (c) Tubes expanded into headers may bo seal-welded inside or outride the header. Where a seal weld is provided inside the header, the tube end projection) and bollmouth specified in (b) is not required. (d) In the case of roller expanded tubes the tube holes in the headers shall be formed in suoh a way that the tubes can be effectively tightened in them. There shall be a neck or belt o£ parallel seating of at least J inch. (e) Where the tubes are strength welded dircot to the hcadois, the technique followed ahull be approved by the Inspecting Authority and all welds shall bo,suit- ably heat troatod. (f) Bolted joints shu.ll be designed in accordance with Regulation 518. (g) Tube spaoers supporting clips and lugs may be welded to the tubes. (h) The tubes shall be so arranged that they are accessible for cleaning internally and externally. JOINT BOLTS AND HTUTXS 518. Joint bolts.—The niuuimuin working prmuro for the bolts shall b» determined by the following formula:'— NxC / 1-28 V W.P.= - £ — ( D - — Q — j Eqn. (121). N — No. of bolts securing the parts. n = No. of screw threads per inch. D = Bolt diameter in inches measured over the threads. A = the area exposed to pressure which is assumed to bo bounded by a line midway between the pitch line of the bolts and tho inner edge of the flange where flat joints are used with joint rings. Where conical joint faces are used with joint rings of curvilinear cross section, tho area exposed to pressure shall bo assumed to extend to the root of the thread where the tube ends are screwed, or to a corresponding boundary if the flanges are attached by other means. 0 = 4,700 for steel bolts or studs of 28 tons/sq. in. minimum ultimato tensilu stress where the diameter over thread is less than 3/4 inch. C = 5,100 for steel bolts or studs of 30 tons/sq. in. minimum ultimate tonsilo stress whore tho diameter over thread is less than 3/4 inch. 0 = 5,600 for steel bolts or studs of 35 tons/sq, in. minimum ultimate tensile stress where the diameter over thread is loss than 3/4 inoh- C = 5,600 for steel bolts or studs of 28 tons/sq. in. minimum ultimate tensile stress where the diameter over thread is not leas than 3/4 inch and not greater than 7/8 inch. C = 7,000 for steel bolts for studs of 28 tons/sq. in. minimum ultimato tensile stress where the diameter over thread is greater than 7/8 inch. VALVES AND MOUNTINGS 519. (a) Thermometers.- All economises shall be provided wil h Thcrmomoters or moasui ing water temperature adjacent to the inlet and outlet connections. (6) Relief valves.--A \alvo which shall prevent increase of pressure beyond a predetermined limit shall be fitted to every economise!" (except where cconomisers are designed to permit steam genoration itnd have open connections to the boiler drum) and the design shall provide against unauthorised interference with the loading. Economises with pressure parts of cast iron arid arranged in groups of tiers connected by circulaiinir piping shnll have a relief valve fixod on each group of tier. Relief valves should Inn e a minimum diameter of 2". (c) Pressure Gauge.—Moans for indioating the proHBure in the economise* •shall be provided by a Pressure Gauge constructed on the lines of Regulation 327. (d) Air release valves.—Moans must be provided for tho release of air at *11 points where air accumulation may ooeur. (e) Blow oft drain valves.-—A-feans must be provided for draining the coonomiacr 'completely of water. (/) Non-return valves.-—Economizers provided "with means for heating the "incoming feed by mixing it with hot water from the eoonomiser outlet must have a non-return valve in tho hot water return line. (g) Reserve Flues.—In every case a receive flue shall be provided for by- paHfling the flue gases when no water in being fed to tho boiler through the economizer. (h) Explosion Doors.—To relieve thi ce onomiser of exoessivo pressure aeew- mulation due to internal explosions doors preferably of horizontally hinged 'self- flealing' type shall be fitted. (i) Hydraulio Tests.—All valves and mountings shall be tested by hydraulic pressure to not less than twice the working pressure subject to a maximum of 1000 Hi./ sq. in. plus tho working pressure. NOTE.—The working pressure Bha]] bo tho highetft proHSuro at whioh the econumiaer •relief valvea »ro to be 8ot. FEED PIPES 620. General.—Feed pipes may be made of steel, oast iron or copper but •oast iron pipes will not be accepted for a working pressure over 200 lbs persq. in. or 425°F. Copper feed pipes shall be solid drawn and not exceed 8" external diameter .and may bo used for a working pressure not exceeding 350 lbs. or 300°K. Design pressure tor feed piping.-—-The design pressure shall be the maxi- mum pressure generated in overcoming friction and other losses in the feed piping under ordinary working conditions, or the maximum pressure which can be genera- ted by the boiler feed pumps unless special provision is made to prevent that pressure being communicated to the pipe line. 521. Steel feed pipes.-—Sleel food pipes shall bo in accordanoo with Chapter tvrn. 522. Cast iron teed pipes.—(a) The standard condiiions for material of oonstruo- Jtion and tests for oast iron pipes shall oomply with Regulations 505 to 509. (ft) Tho maximum working pressure shall be determined by tho following for- imula:— 130 (t - ft) "m*- = d̂ Eqn. (J22) t = thickness in thirty-seconds of an inch. d — the external diamotor of the pipe in inches. 523. Copper teed pipes.—(a) The standard conditions for material of construc- tion and tests for copper pipes shall comply with Regulation 35. (b) Tho maximum working pressure shall be determined by the following "•formula.'-—• _ 60(t-3) W i ' ~ d Eqn. (123) t = thickness in hundredths of an inoh. d = external diameter of the pipe in inches. Hita 3FJ ife. ^AiuJTiii OS liiDiA-iwvi-AO. REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISED. 524. Preparation for inspection.— (a) At each inspection the ooonomiaor shall be tmptied and thoroughly cleaned internally and externally and in the flues. All mountings shall be opened up and caps removed to permit adequate inspection. (b) The owner of an economiser to which this Regulation is applicable shall obtain the approval of the Chief Inspector hi writing to the method of disconnection which he proposes to use and shall be responsible for ensuring that the method BO approved is followed in practice. 526. Procedure lor registration.— (a) On receipt of an application for rugiBtra- tlon the Inspector, shall, after the economiser has boen prepared for examina- tion, take full particulars of the design and ascertain the working pressure allowed by the Regulations. (6) If aa required under Regulation 510(a), a certificate from the Inspecting Authority has not been furnished, the Chief Inspector shall determine the fitness of such parta as per the following formulae subject to the limitation prescribed under Reg. 510(a) :— (1) Economise™ with pressed socket lointe not reinforced.— W P ^ r e a °f Socket in contact, ' = (width inside Hoader) (Pitch of tubes in Header) Friction Factor. W.l\=Working pressure in fbs. per sq In Eqn. (124) Friction Factor = 300. (ii) Headers for above Economises :— _ „ 20 ( t-6) a W ' R = V~ Eqn. (12«) t -= ThiekncRs of flat sides hi thirty seconds of an inch. b = j j o p i u i u U I U I M ^ t ^ - u\ ' ^i > " ' j. ^ • (iii) Economisers with pressed socket joints reinforced.— Area of Socket in contact, x W l P> ° (width inside Header) (Pitch of tubea in Header) Friction Factor + k _ , , No. of Btays per header _ \ Where k»«v^-—? r—~ i—J XJf . . . ISqn, (l«o' " No. of sockets per header ^ * Where^friction factor = 300. wnd P=300 for approved design of reinforcing stay. In no case value of K shall be considered greater than 160. (iv) Tubes for above Economises :— m _ 200 (t-6) W. P. - — j - — - E q D , (127) Where t *= Thickness in thirty seoon'la of an inch, d =̂ External dmrneter in inches. - L - E U V U A i ^ i . i . m V f I N D I A - E A l l t A U . , ~ > 1 . A . J . L i A • * * • (v) Headers for Eoonomisers with reinforced socket joints i— W l * ~ d Eqn. (128) t ™ thiokness in thirty seconds of an inch, d = External diameter in inches. (vi) Manifold Pipes lor above Economizers :— W P - 200(^7) w ' ^ ' ~ B Eqn. (129) t » - Thiokneas in thirty seconds of an inoh, d = External diameter In inches, (vii) Oast iron Eoonomiser with gills or other extended surlaoe Tubes i— W P =. 5 0 0 ( t~C) W.±\ =- — g Eqn. (130) t = Thiokness in thirty seconds of an inoh. C ™ 8 for portion where gills act as reinforcement ; 10 for portion not re- inforced. d = External diameter in inch 03. (viii) Bends and Manifold Pipes lor above Economisers :— 200 (t-10) W - P" = ~ d Eqn. (131) t ™ Thickness in thirty seconds of an inoh. d -» External diameter in inches. (e) The Inspeotor shall enter full particulars of the economise! together with the required calculations of various parts in a Memorandum of the Inspection Book (Form IX) and submit it to the Chief Inspeotor. (d) If no formula or co-cffloient applicable to any part, other than what 1B mentioned above, is contained in the Regulations, the Chief Inspeotor shall at hla dieoretion determine the fitness of the part. (e) After Inspecting the Eoonomiser and ascertaining, as preaorlbed, the maximum working pressure to which It may be worked, the Inspeotor shall witness the hydraulic test in aooordance with Regulation No. 527 and may issue a Provi- •ional Order in Form X. 626. Procedure at subsequent inspection.—(a) After tho eoonomisor has been cleaned the Inspector shall make a thorough examination so far as its construot- tion permits. The external condition of tho tubes should be carefully noted for was- ting especially at tho feed inlet end and all aooessible tubes should be calipored. The Internal surfaces of cast iron tubes should be closely observed for graphitic wasting as far as it is possible and in the event of any tube failure these should be broken up for scrutiny so that the general internal condition of the other tubes may bo estimated, (&) Where tubes or other parts are wasted, the strength should be re-citloulat- »d. (c) Thii scraper goar should be examined to note if any parts are missing if the length of travel is adequate and if tho scrapers are correctly adjusted, {d) All cap bolts are to be inspeoted, also the condition and position of the dampens and baffles. . OJ inn ijtAunlln OJ;_ 1, JJlA JHA:L&&,Q. JLJlJiA, 1^ (e) The reoord of eaoh Inspeotion and calculations will be entered in the Memo- randum of Inspaction Book. 527. Prooedure lor Hydraulio test.—Every ooonomiser for registration shall be hydraulioally tested in the presence of an Inspector to l\ times the working pressure. Subsequent hudraulic test may be oarrled out after repairs or when the Inapeotoi oonsidera it neoessary. During the test all parts externally and in the fluea ihall be noted for leakag es . 528. Memorandum o£ inspection book.—In this book the Inspootor shall enter all particulars iind dimensions of the economlser with the required oaloulutionfl for the various parts together with details of hydraulic test. At subsequent inspeo- tion the Inspector shall enter all notes pertaining to the condition oi. the various parts. 529. Registration Books will bo maintained on the lines of Regulation 387. 630. Grant of certificate.—A certificate for the use of an ooonomiser shall be granted in Form XI. 531. Casual visits.—(a) Tho Inspector shall note if tho ooonomiser is working eatinfaotorily, and if the relief valves, are correctly adjusted, if the soraper gear la operating and if the external brickwork is free from cracks. (b) He shall also ascertain that the makers' instructions for working arebeing atriotly followed by the owner. NOTE,—-It is rerommonded thnt the fin d inlet lemporature to the oconomiaor should not ho leas than 100°F to prevont sweating nml consequent external corrosion of tho tubo and bottom headers. 532. Economiser rating.—Tho rat ing fchall bo oquivuk-nt to the area of, the heating surface in square feet which shall be computed from the tubea and^the Headers. 533. Registration lee,—An application for registration shall be accompanied by appropriate fee. For Eoonomifler rating not exoooding 500 . , . , . . l(1or TSooiionaiser rating oxoeeding COO but not exoooding 1,000 For Economieor rating o^coddinK 1,000 but not exceeding 1,500 . For Eoonomiser rating exoooding 1,800 but not oxceeding 2,000 . For 13oonominer rating exceeding 2,000 but not oxcooding 2,(500 . For Eoonoraieer rating exceeding 2,500 ba t not exoooding 3,000 For Koonomiaor rating excoeding 3,000 bu t not exceeding 3,500 . For Economizer rating exfoedJiig 3,500 but not oxoooding 4,000 For Economisor rating exceeding 4,000 but not oxcooding 4,500 For Eoonomiaor rtiting oxcooding 4,rtOO bu t not exceeding 6,000 . For Eoonomiser rating exceeding 5,000 . . . . . . Ra. 60 60 70 80 GO 100 110 120 130 140 160 534. Engraving of Registry Number.—(a) Koch section, branch j.ijjj or detachable part subject to the working pressure shall be marked for identification •with a Registry Number and also the appropriate device as shown in Regulation 382. (b) In the onse of the ordinary vertical typo of cast iron economisers, the devioc and number shall be stamped on the header flange connected to the top branch 'pipe. In each case tho stamping shall be on some conspicuous part not affected by the gases or other oorrodin^ influence. The letter "W should be prefixed to the number in tho denominator. x. i U.P. Sec-4 THE GAZETTE OF INDIA EXTRAORINARY. [PART II]

Previous and next

All provisions of Indian Boiler Regulations, 1950.

Questions people ask

Is regulation 872 of Indian Boiler Regulations, 1950. still in force?

No repeal of Indian Boiler Regulations, 1950. is recorded.