LawGrids logoLAWGRIDS.ORG

Regulation 60, Indian Boiler Regulations, 1950.: Additional tests before rejection

Indian Boiler Regulations, 1950. - Regulation 60

Text of regulation 60

Additional tests before rejection

60. Additional tests before rejection.—Should a tube selected for tost ing purposes show definite ei^ns of failure in any one or more of the tests specified in Regulations 49 (a), 49(b) and 49(c), two further tests of the same kind may be made at the option of the manufacturer from two additional tubes selected from the same batch. If the repeat tests are satisfactory the tubes shall be aooepted provided that in all other respects they fulfil the conditions of this Standard. Should either of the tubes fail in any teat, the batch of tubes represented may be ro-heat-treated in accordance with Regulation 4-8 (b) and thon retosted in accordance with Regulation*! 49 (a), 49(b) and 49(c) but employing twice the number of test pieces. If these second repeat teats are satisfactory, the tubes shall bo accepted provided that in all other respects they fulfil the conditions of this Standard ; but if dofinite defects are again shown, the batch of tubos which the test pieoes represent shall bo rejected. 51. Hydraulic Test.—Each tube shall bo to, ted at the maker's -works by hydraulio pressure in accordanco with the following table governing the rolation between the test pressure and the design pressure to whioh the tube will bo subjected in •ervice. Design pressure lb 'aq. in. C p to and inoluding 600 . . . . . Above 500 up to and including 1000 . Above 1000 Hydraulio test pressure lb/sq. in. minimum 1000 Twioo the dosign pressure. 1000 above the doaign presaur*. In all cases the tensile stress (S) onjtho material when under these tests oball not oxoeed 10 tons por sq. in. as determined by the formula :— 2t Whoro D =• outside diameter of tube in inches. P —test pressure in tons per sq. in. t ^nominal thickness of tube wall in inohes. SEAMLESS CHROME-MOLYBDENUM STEEL BOILER AND SUPER- HEATER TUBES POR DESIGN STEAM TEMPEEATURES NOT EXCEEDING 1000°F (538°C) 52. General.—The se Regulations oovor both Hot finished and Cold Drawn Seamless Boiler and Superheater Tubos which shall conform in all respeots with the requirom nts heroin spocifWl. 53. (a) Material.—Th> tub^s hall be manufactured from stool produoed by the open Hearth o.' Electri proi-os ,es and shall conform to the following limits of chemi- cal composition- - Carbon , . . . . . . 0 -12% maximum, MmiRHiioflB 0 - 3 5 t o O - 8 G % Silicon 0'10 to 0 •60'% Sulphur . . . . . . . 0 -05% mnjimum PhoBphorufi . . . . . . . 0-05% maximum Molybdonum O'fiOtoO'70% Chromium 0-75 to 1-25% The sL^olmakor shall supply a certificate of the normality of the steel. (b) Heat Treatment.—Tho tubos shall bo fully annealed, or normalised at a -temperature between 16S8°F (920° C) and 1760°F (960°C). (o) Workmanship and tolerance.—The tubes shall bo well finished, olean and free from harmful defects. They RHU.11 bo reasonably straight, smooth, cylindrical and subject to the following tolerances before bending :•—• (») Diameter. -Tho external diameter of tlw tubes measured at any point shall b» within tho following tolerances of the diameter specified :•— Typo of Tubs Hot, finished Cold drawn Outside Diameter of Tube Up to and including 2J in. . Ovor 2 | in. A l l M i z e H . . . . . Tolerance h 1/64* ~ 1/32' + '% - 1% -1 0 1 or («) Thickness.- Tho thickness of tho tubes shall be within the following tolerances :— Typo of Tube Hot finished . Cold drawn Oulsido Diumoter of tube Up to mid including 2$ in. Over 2$ in . All sizes . . . . . . . Toloranoe + iH% - 7*% + ' 6% — o% + 100/ - fi% Where the ends of the tubes are swelled or reduced, the thickness at tho ends may bo deoieased below or increased itbovo the nominal thiekne-w of the tubes by an amount in proportion to tho percentage of such swelling or reduotion and, in addition to this allowance, tho tolerances relating to thickness shall aho apply. Swelling or reduotion shall be carried out befoie the heat treatment specified in Regulation 53(6). (Hi) Length.—Tho tubes bhall be not less than t KB nominal length but may be 1/8 in. greater. (d) Salection of tubes for testing.—Ait or he»t treatment, tho tubes shall be pre- sented for mechanical testing in accordance, with Regulations 54(a), *>4(b) wnd fi4(e) in batches of not more th in 100 of the same nominal diamelei and thickti"RH. The man'ifact mvr whall urovide at his own expense exirji luhfi nt the m,re of 2 per c-ent. of each diameter and thickness of tube apneifi'wl and Ihc Inspecting Officer shall select for. t o^ such ot the tnbo as he may think proper to the extent of the percentage mentioned. Should tho number of tubes specified of any one nomina1 size e\eeed 400 then, for every 100 tubes or part th >reof above that numbei, ono additional tube shall be provided. The samples for touting shall not be heat treated after jSelee/fcion. 54. (a) Tensile Test.—Tost pieces cut from the ends of the seleoted .tubos shall comply with the following requirements :-- Stripe cut from tubes and tasted in their curved oonditjon . Tost IengthH taken from finiBher) tubim (ends of tubea to be plugged for gripe). ITU untile Tonsilo Hire™ in tonH per HCJ. in. Not lobM than 27 26 Not moi'o Lhan 33 33 Minimum Elongation per cunt, on S mobos j " thick & over 10 23 Le«n tlian J" thick 17 21 (b) Flattening Test,—A ring not less 1han 2 iiichos in length cut from ono end of each selected tube shall be flattened between two parallel fiat surfaces, the width «>f which shall be not lews thttn 1J times the diameter of the lube. When the pressuro in released, the interior surfaces of the test pieces (at the middle) shall remain at a distance apart of not moie than three times the specified thickness of the tube and tho test piece shall then shew no sign of crack oi flaw, (o) Expanding Tests. - The tubes shall withstand expanding by a drift expander having a total included angle of between 40" and 60° (20° and 30° per side) to the following increases in external diameter without showing ci ack or flaw :— Thickness of Tubo 10 H.W.G. and thinner . Tlurmor than t> S.W.G. up to and including fi 9 T h i c k e r t h a n 6 . . . . . . W . G . Iucroaup m Diamoter per oont.

Previous and next

All provisions of Indian Boiler Regulations, 1950.

Questions people ask

Is regulation 60 of Indian Boiler Regulations, 1950. still in force?

No repeal of Indian Boiler Regulations, 1950. is recorded.