Regulation 41, Indian Boiler Regulations, 1950.: Additional test before rejection
Indian Boiler Regulations, 1950. - Regulation 41
Text of regulation 41
Additional test before rejection
41. Additional test before rejection.—(a) Should a tube seleoted for testing
purposes show definile signs of failure in any one or moro of the testa speoified in
Regulations 38, 39 and 40, two further tests of the same kind may be made at the
option of the manufacturer from two additional tubes selooted from tho same batch.
(b) If the ropeat tests tire satisfactory the tubes shall be accepted provided
that in all other respects they fulfil the conditions of this Standard. Should either
of tho tubes fail in any test, the biitch of tubes represented may be re-heat-treated in
accordance with. Rogulation 36(b) and then retested in accordance with Regulations
38,31) and 40 but employing twico the number of tost pieces. If these seoond
repeat tests are satisfactory, the tubes shall be accepted provided that in all other
respects they fulfil the conditions of this Standard; but if definite defects are again
shown, the batch of tubes which tho test pieces represent shall be rejocted.