Regulation 2, Indian Boiler Regulations, 1950.: Definitions

Indian Boiler Regulations, 1950. - Regulation 2

Text of regulation 2

Definitions

2. Definitions.—In these Regulations, unless the context otherwise requires,— (a) the "Act" means the Indian Boilers Act, 1923 ; (6) "accident" means an explosion of a boiler or steam-pipe or any damage io a boiler or steam-pipe which is calculated to weaken the strength thereof so as to render it liable to explode ; (c) "boiler" means any closed vessel exceeding five gallons in capacity which is •used expressly for generating steam under pressure, and includes any apparatus forming an integral part of a boiler, which is wholly or partly exposed to the action of the flue gases for purpose of recovery of waste heat, and also includes any mount- ings or other fittings attached to such vessel which is wholly or partly under pressure when steam is shut-off but not withstanding anything contained in section 2(b) of the Act doss not include an economiser as defined in clause (cc) of section 2 there- of- (d) "Chief Inspector" and "Inspector" mean, respectively, a person appointed to be a Chief Inspector and an Inspector under the Act; (e) ''economiser" means any part of a feed-pipe that is wholly or partly exposed to the action of flue gases for the purpose of recovery of waste heat ; [607] 40& TJ±hl iiA^E'LLa Ox. 1JND1A. j^AlltAOJtDlJNAxv.L LJ-ART i i (/) "feed-pipe" (i) moans any pipe or connected fitting wholly or part ly under pressure through which feed-water passes directly to a boiler. (ii) every reference to a steam pipe or steam pipes shall be deemed to include also a feed-pipe or foed-pjpes respectively ; (g) " Inspecting Authority " means an authority recognised by the Central Boilers Board as competent to grant n certificate in Form II* . (h) "Inspecting Officer" means— (i) in respect of material manufactured or boilers eonaUucled in any State an officer appointed by the Inspecting Authority in t ha t State. (ii) in respect of material manufactured or boilers constructed outside the States an officer acting on behalf of the Inspecting Authority ; (t) "owner" includes any person using a boiler as agent of the owner thereof and any person using a boilor ^ hich he has hired or obtained on loan from the owner thereof; (j) "prescribed" means prescribed by regulations or rules made under the Aot ; (k) "Steam-pipe" means any main pipe exceeding three inohes in internal dia- meter through which steam passos directly from a boiler to a prime-mover or other first user, and includes any connected fitting of a steam-pipe ; (1) "State"' or ' 'States" mean a State or the States to wMch these regulations extend ; and (m) " Structural alteration, addition or renewal" shall not T6»e deemed to include any lonowal or replacement of a petty nature when the part of fitting used for re- placement is not inferior in strength, efficiency or otherwise to the replaced part of fitting. *NOTM.—-Fot List of Inspecting Authorities reoogmsed by the Oontral Boilers Boardi see- Appendix U- CHAPTER I GENERAL REQUIREMENTS, APPLICATION OF STANDARD CONDITIONS AND EXCEPTIONS THERETO 3 (1) A boiler shall not bo registered undor sub-section (4-) of Section 7 of the Aot and n certificate shall not be issued under sub-section (5) of that section with reference lo a boilor, unless the sttmdnrd conditions in respect of material, design and unibtruction, 'which arc specified in. the subsequent Chapters of these Regu- lations me natiwnod in respect of such a boilor. (2) Notwithstanding anything contained in sub-regulation (1), the Chief Ins- pector may, Ruhjcrt to the provisions of Regulation 7, register a boiler and order tho issue of a certificate authorising the uso thereof, although the standard conditions are not fully satisfied in respect; of such boiler : Provided that the Chief Inspector shall not register such boiler or order the issue of such certificate, if a structural part of Hweh boilor which, is subject to piessure is made of Bessemer prpcees steel or( of cunt oi malleable cast iron. i STANDARD REQUIREMENTS ' 4. (aVM&tlWi&l.—All platwS, rivets and bars used in1 the construction of boilers shall bo tested and found to conform with the Regulations hereinafter contained, i tb) Coiistrutitibn.- Â l boilers during construction shall bo under the supervi^ eion of an Inspoctijijj Officer. (c) Inspecting Authority's certificate,—For boilers imported into the- States a. t, certificate from an Inspecting Authority in Form II certifying that the material was tested and the boiler built under their MI|><T\ Nimi >hfill be furnished to the Chief Inspector before or with the application J'oi ic^iMiiiiion. Together •with such certificate the Inspecting AiiilH.iit \ m;'\ funii.-Ji .1 Al< n or.uidi m of Inspection book in Form I prepared in the ]II;IMIUT pu MiMicd h.v UCJMII.U ion :>M> in respect of the ins- pection of the boiler during construction and the hydraulic test applied on comple- tion. In the case of steel made and tested by well-known makers in India or other countries the certificate of the makers in Form IV as prescribed in Regulation 26 may be accepted in. lieu of a certificate from an Inspecting Authority. The Central Boilers Board shall decide whether for the purpose of this Regula- tion a maker is " well-known" or not. (d) Certificates, etc. under section 14(1) (c) of the Act.—In advance of or along with an application for registration of a boiler, the following certificates and draw- ings or specifications should be furnished to the Chief Inspector, namely:— (i) A certificate in Form III of manufacture and test signed by the maker or by a responsible representative of the maker of the boiler containing a description of the boiler, its principal dimensions, particulars of the kind of material used in its construction, the thickness of all plates, the diameter of and method of forming the rivet holes in the shell platep, particulars of any departure from ordinary practice- in making the shell such as solid rolling or welding, the hydraulic test to •which the boiler was subjected, the intended -working pressure, the area of heating surface, the maximum continuous evaporative capacity, the year and place of make, and the works number of the boiler. There may be included in such certificate a further declaration that samples of the angle, stay or rivet bars and rivets used in the construction of the boiler have been certified by the makers to have been tested and found to comply with the re- quirements of Chapter II; in which declaration the kind of material used and the limits of tensile breaking strength with which the tests-comply shall be stated with sufficient precision to obviate the risk of confusion in making nllo-w imii-. Where such further declaration is included in such certificate, the cortiii<;)1-1.- v<i\ rrc <l to in clause (iii) of this sub-regulation shall not be required. (ii) A drawing or print to a scale, in the case of large boilers of not less than f inch to the foot and, in the case of small boilers, of not less than 1J inches to the foot, showing the principal dimensions and a longitudinal section and end -new of the boiler, and bearing the works number of the boiler and the maker's cffice stamp. The drawing shall show details of riveting of longitudinal and circumferential sean\<- with pitch of rivets, cross spacing of rivet rows and diameters of rivet holes : the radii of curvature of dished end plates, fillets of flangep and corners of bent plates, and where gusset stays are fitted, the number and diameter of rivet holes in each gusset etay.f In the case of water tube boilers, the foregoing scales phall apply to the main boiler drums only, but in addition a general arrangement drawing of the boiler to a scale of not less than "J" to the foot shall be provided. (iii) A certificate from the steel maker and a certificate from the maker of the plates, rivets or bars, of the nature referred to in Regulations 26 and 27 respectively. The certificate from the maker of the plates, rivets or bars, shall show the charge numbers, the plate or bar numbers and the number and dimensions of the various plates, etc., tested, their ultimate tensile breaking strength in tons per square inch of section, th" y "r"' • "" elongation and the length on which measured, the number, kind .,. •• . • ,. '•• or other tests made and the date of tests: Provided that whore an Inspecting Authority furnishes a certificate in Form I I together with a Memorandum of Inspection book in Form I in accordance with Bub-regulation (c), the certificates proscribed, under oluuses (i) and (iii) need not be furnished to the Chief Inspector when application is made for registiation of the boiler. But should any question arise in respect of the fitnoss of the boilers for the working pressure approved by the Inspecting Authority within a period of three years from the dato of their certificate, tho owner shall, if requested by the Chief Inspector, obtain and furnish the original documents specified in the said clauses. (p) Maker's stamp.—The boiler shall have stamped upon its front plate in a • oonapiouous position tho following particulars :— Mtiker's nmae Year at muke Work's nurabor Toated to lbn. on IiispiK'ting Officer's or Inspecting Authority's official tttamp.

Previous and next

All provisions of Indian Boiler Regulations, 1950.

Questions people ask

Is regulation 2 of Indian Boiler Regulations, 1950. still in force?

No repeal of Indian Boiler Regulations, 1950. is recorded.