Appendix IV, 24. Integrity Management System for Natural gas pipelines, Regulation, 2012: APPENDIX-IV
24. Integrity Management System for Natural gas pipelines, Regulation, 2012 - Appendix IV
Text of appendix IV
APPENDIX-IV
APPENDIX-IV
Minimum Quallflcatlon and Experience for fleld Personnel In Protect Phase
gs well as O&M Stage
Discipline Tier· I Tier-II Tier-ill
Supervisor Level Operator Level
I
t
Degree In Diploma In Mechanical !Tl with ot least I year
Mechanical Mechanical Engineering + at least I experience in the relevant
En11.ineerinu vear of Exnerience field of oneration
Degree In
• Diploma In Metallurgical
IT! with at least I year
Metallurgical Metallurgical
Engineering + at least I
experience in the relevant year of Experience in
Engineering Pipeline corrosion control field of operation
THE GAZETTE OF INDIA : EXTRAORDINARY [PART Ill-SEC. 4]
Degree In l&C I Diploma In l&C I
!Tl with at least I year
Instrumentation Electronics Electronics + at least I experience in the relevant
&Control Engineering year of Experience field of operation
Degree In
Diploma In Electronics JTI with at least I year
or Communication
Electronics & Electronics or
Engineering+ at least I experience in the relevant
Communication Communication field of operation
Engineering
year of Experience in
SCAD A
Degree In Diploma In Electrical
IT! with at least I year
Electrical Electrical Engineering+ at least I experience in the relevant
Engineering year of Experience field of operation
Fireman course passed and
proficient in operation of
Equivalent Degree Diploma In F&S
fire water pumps and fire
Fire & Safety In F&S Engineering I at least l tenders with heavy vehicles
Engineering year of Experience driving license I at least I
year experience in the
relevant field of operation
Diploma In Civil
ITI with at least l year
Civil
Degree In Civil
Engineering+ at least l experience in the relevant
Engineering
year of Experience field of operation
Note: Each Natural gas pipeline shall have SME (Subject Matter Expert) having qualification in
any of the discipline mentioned above witll minim11111.S ~ ofrele_"."~~-~-~~.!l.<;e, ..
RATAN P. WATAL. Secy.
[ADVT-111/4/hay./l 88/l 2]
Prinud i,y the Manascc. (jovemmenl of India Ptm., Ring Road, Mayapuri. N;;w Delhi-1 lOOfl·I
and P\Jblishrd by die Controller of Publicaucms, Delhi~t 10054
I
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
Page 25
Page 26
Page 27
Page 28
Page 29
Page 30
Page 31
Page 32
Page 33
Page 34
Page 35
Page 36
Page 37
Page 38
Page 39
Page 40
Page 41
Page 42
Page 43
Page 44
Page 45
Page 46
Page 47
Page 48
Page 49
Page 50
Page 51
Page 52
Page 53
Page 54
Page 55
Page 56
Page 57
Page 58
Page 59
Page 60
Page 61
Page 62
Page 63
Page 64
Page 65
Page 66
Previous and next
All provisions of 24. Integrity Management System for Natural gas pipelines, Regulation, 2012
Questions people ask
Is appendix IV of 24. Integrity Management System for Natural gas pipelines, Regulation, 2012 still in force?
No repeal of 24. Integrity Management System for Natural gas pipelines, Regulation, 2012 is recorded.