Appendix II, 24. Integrity Management System for Natural gas pipelines, Regulation, 2012: APPENDIX-II
24. Integrity Management System for Natural gas pipelines, Regulation, 2012 - Appendix II
Text of appendix II
APPENDIX-II
APPENDIX-II
CRITICAL ACTIVITIES IMPLEMENTATION SCHEDULE
CRITICAL ACTIVITY TIME SCHEDULE
Cathodic Protection (CPI lnsoection As per Petroleum and
Pioaina/lntelliaent Piqoina Natural Gas Regulatory
Surveillance Board (Technical
Coatina Survey Standards and
Hydro-testing Specifications
including Safety
Standards for natural
gas pipelines)
Renulations. 2009
GIS Maooina lmolementation 2 years
Leak Detection Svstem lmolementation 2 years
63
THE GAZETTE OF INDIA : EXTRAORDINARY [PART Ill-SEC. 4)
APPENDIX· Ill
SUGGESTIVE CHART FOR SELECTION OF INTEGRITY ASSESSMENT METHOD• WITH RESPECT
TO SPECIFIC THREAT
Threat Group Threat Integrity Assessment Assessment interval
Method•
(A)Time-Dependent
External Corrosion lnline inspection, Max.I 0 year**
External Corrosion
Direct Assessment
Internal Corrosion Inline inspection, Max. I 0 year••
Internal Corrosion
Direct Assessment
Stress Corrosion lnline inspection, Max. I 0 year••
Cracking Direct Assessment
(B} Stable
a} Manufacturing Defective Pipe Seam Hydro-test (Post Before
related defects Construction), Iniine commissioning or as
Defective Pipe inspection and when required
b) Welding I Defective Pipe Girth
Fabrication related Weld
.
Defective fabrication
Weld
Wrinkle bend or buckle Caliper Pigging I
. Electronic Gauging
Pi•<>ing (EGP)
Stripped threads/broken Visual Examination I
pipe Gas Leakage Survey
c) Equipment Gasket I 0-ring Failure Visual Examination I
Gas Leakage Survey
Control I Relief Visual Examination I
euuipment malfunction Gas Leakage Survey
Seal pump packing Visual Examination I
failure Gas Leakage Survey
(C)Time-lndependent
a)Third Party I Damage inflicted by Public Education (See Monthly /quarter! y
Mechanical first, second, or third Communication Plan
Damage parties (Instantaneous I & preventive actions),
Immediate failure) Patrolling, ROW
Maintenance, External
Protection
Previously da,maged Above + Leakage
pipe (delayed failure Survey, Rehabilitation
mode)
Vandalism All above
b)lncorrect Incorrect Operational Compliance Audits
Operations procedure
-· .. -
wh~n I c) Weather Weather related Leakage survey, As and
Related and Surveillance required
Outside Forces Li11.htninl! Sunze diverters
Heavy rains or floods Anti-buoyancy
.inspection,
Surveillance
Earth Movements Strain monitoring,
Leakaiie survev.
Creek Area Effects Surveillance, Pipe to As and when
Soil Potential surveys required
near creek, Leakage
survey, Anti-Buoyancy
Inspection, Integrated
Surveillance Svstem
Muddy/Marshy area Surveillance, Pipe to As and when
effects Soil Potential surveys, required
Leakage survey,
Cathodic Protection
monitoring, Integrated
Surveillance Svstem
River Bed Movements Surveillance, Pipe to As and when
Soi I Potential surveys, required
Leakage survey,
Cathodic Protection
monitoring, Anti-
Buoyancy Inspection,
Integrated Surveillance
Svstem
• Some of the Important lntegrtty Assessment Methods hove been briefed In Schedule-
5 of these regulations
•• lnline Inspection frequency to be as per Petroleum and Natural Gos Regulatory
Boord (Technlcal Standards and Specifications Including Safety Standards tor natural
gos plpellnes) Regulations, 2009
Previous and next
All provisions of 24. Integrity Management System for Natural gas pipelines, Regulation, 2012
Questions people ask
Is appendix II of 24. Integrity Management System for Natural gas pipelines, Regulation, 2012 still in force?
No repeal of 24. Integrity Management System for Natural gas pipelines, Regulation, 2012 is recorded.