Form XV, Bangalore Metro Railway (General) Rules, 2011: FORM XV
Bangalore Metro Railway (General) Rules, 2011 - Form XV
Text of form XV
FORM XV
FORM XV
[See rule 5(3) I
CERTIFICATE
(a) that the moving and fixed dimensions for Bangalore Metro Railway have
in every case been worked to. Also that these dimensions will be
observed in future and that no work or structure infringing the
dimensions will hereafter be permitted without the sanction of the
Central Government.
(b) that each bridge or viaduct conforms to the approved standard of
loading without exceeding the maximum permissible stress on the
available material in any member or portion of the structure.
..
(
[ '11'1 II-� J''))
(c) that every coaching vehicle constructed or procured for the use of. the
metro railway has been provided with electro-
pneumatic/regenerative/air brake and effective means of
comm1oU11ication between passengers and the train operator.
(d) that the metro railway shall be worked as per the system specified in the
Bangalore Metro Railway General Rules, 2011.
(e) that the 750 v DC electric traction equipment can be used for the public
carriage of passengers without danger to the public and that the Rules
for the design and inspection of equipment for electric traction as per
chapter X of the rules for opening of metro railway for public carriage of
passengers, 2011 have been complied with.
(f) that the signaling and telecommunication equipment have been
installed in accordance with the approved instructions and they are safe
for passing traffic.
(g) that adequate facilities for handicapped passengers have been made
available at the stations and in the trains.
(h) that has been delegated to accompany the Commissioner
for metro railway safety on his inspection and all information supplied or
engagements entered into by him shall bear my authority
Signature with seal of
Officer in-charge of Bangalore Metro Railway Administration
1152 Gl/11-14
l(Jf
Section:
Railway
Length:
THE GAZETTE OF iNDIA EXTRAORDINARY
Previous and next
All provisions of Bangalore Metro Railway (General) Rules, 2011
Questions people ask
Is form XV of Bangalore Metro Railway (General) Rules, 2011 still in force?
No repeal of Bangalore Metro Railway (General) Rules, 2011 is recorded.