LawGrids logoLAWGRIDS.ORG

Form XIV, Bangalore Metro Railway (General) Rules, 2011: FORM XIV

Bangalore Metro Railway (General) Rules, 2011 - Form XIV

Text of form XIV

FORM XIV

FORM XIV [See rule 5(1) (n)] BRIEF PARTICULARS OF SIGNALLING/ TRAIN CONTROL AND TELE­ COMMUNICATION SYSTEMS Section: Bangalore Metro Railway Length: Gauge : 143Smm Signaling and Train Control systems 1. Continuous Automatic Train Control system has been provided on section for movements of trains between stations and ------ between the depot and running lines. 2. The continuous automatic Train control system works on the principle of target speed with cab signals by means of continuous transmission from track to train through coded Audio Frequency Track Circuit, ensuring safe movement of trains by continuously generating a safe operating envelope defined by the Limit of Movement Authority and the Maximum Safe speed. 3. The Continuous Automatic Train Control system provides the following modes of train operation. (i) Automatic mode (ii) Coded Manual mode (iii) Run on sight mode (iv) Restricted Manual mode (v) Cut -Out mode 103 104 THE GAZETTE OF INDIA : EXTRAORDINARY [PART Il�SEc. 3(i)] 4. Train operation on main lines is controlled from Operation Control Centre which normally operates under Automatic Train Control system with routes being set and trains interval regulated by computer control. Facility for manual setting of routes and individual operation of point if required has also been provided. Automatic Train Supervision system at Operations Control Centre monitors and controls train operation. 5. A local Control by means of Video Display Unit workstation has been provided in the station control room to enable the Traffic Controller to hand over control of the signals at specific station if required. 6. stations on the section have been provided with Computer based interlocking system. 7. A digital Mobile Train Radio Communication System based on Terrestrial Trunked Radio specifications has been provided on the section to provide radio communication between traffic controller, dept controller and the train operator. 8. A telephone system interconnecting stations, Operation Control Centre and depots has been provided I do hereby certify:

Previous and next

All provisions of Bangalore Metro Railway (General) Rules, 2011

Questions people ask

Is form XIV of Bangalore Metro Railway (General) Rules, 2011 still in force?

No repeal of Bangalore Metro Railway (General) Rules, 2011 is recorded.