LawGrids logoLAWGRIDS.ORG

Regulation 4, Central Electricity Authority (Grid Standards) Regulations, 2010: Operation Planning

Central Electricity Authority (Grid Standards) Regulations, 2010 - Regulation 4

Text of regulation 4

Operation Planning

4. Operation Planning.- The Regional Power Committee shall periodically review the performance of the grid for the past period and plan stable operation of the grid for the future, considering various parameters and occurrences such as frequency profile, voltage profile, line loading, grid incident, grid disturbance, performance of system protection schemes and protection coordination. Page 8 of 19

Previous and next

All provisions of Central Electricity Authority (Grid Standards) Regulations, 2010

Questions people ask

Is regulation 4 of Central Electricity Authority (Grid Standards) Regulations, 2010 still in force?

No repeal of Central Electricity Authority (Grid Standards) Regulations, 2010 is recorded.