Form AT-60 Page-1 of 2, Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007: FORMAT-60 Page-1 of 2
Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 - Form AT-60 Page-1 of 2
Text of form AT-60 Page-1 of 2
FORMAT-60 Page-1 of 2
FORMAT-60 Page-1 of 2
PARAMETERS METHOD OF
MEASUREMENT
Periodicity- Monthly
Submission-by 20th day
MONTHLY ENVIRONMENTAL DATA OF THERMAL POWER PLANTS
III. LIQUID EFFLUENT DISCHARGE DATA
Rise in inlet to outlet
temperature oC
pH
Free available chlorine
(mg/litre)
* Amended as per EPA Notification GSR 7 dt. 22nd Dec.1998
Oil & Grease
(mg/litre)
Copper (mg/litre)
Iron (mg/litre)
Total Suspended Solids
(mg/litre)
C. COOLING TOWER BLOW DOWN (MONTH WISE AND UNIT WISE)
Free av. Chlorine
(mg/litre)
Zinc (mg/litre)
Chromium (mg/litre)
Phosphate (mg/litre)
D. ASH POND EFFLUENTS (MONTH WISE)
pH
Oil & grease
(mg/litre)
Total suspended solids
(mg/litre)
Source : EPA Notification S O 844(E) dt. 19th Nov. 1986
A. CONDENSER COOLING WATER (MONTH WISE)
B. BOILER BLOW DOWN (MONTH WISE AND UNIT WISE)
189 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
FORMAT-60, Page-2 of 2
Periodicity- Monthly
S. No. Month Energy recorded during
morning peak 4 hours block
Energy recorded during
evening peak 4 hours block
Total energy recorded
during peak hours
[(3) + (4)]
(GWh) (GWh) (GWh)
-(1)- -(2)- -(3)- -(4)- -(5)-
1 April
2 May
3 June
4 July
5 August
6 September
7 October
8 November
9 December
10 January
11 February
12 March
Total
Submission by- 7th day
MONTHLY PEAK HOURS GENERATION DATA BY COAL/LIGNITE BASED OR COMBINED CYCLE
GAS TURBINE (CCGT) POWER STATIONS
Summer: 5 Hrs to 9 Hrs
i) Name of Station:
ii) Station Capacity:
iii) No. of Units with size:
iv) Duration of Peak Hours:
190 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
Winter : 6 Hrs to 10 Hrs
Note: A copy of the meter print out covering details of energy meter readings on half hour/ fifteen minutes
basis for the morning & evening peak hours must be enclosed failing which data would be considered as
incomplete.
Date: Signature with Name & Designation of forwarding Officer
Morning Peak 4 Hrs:
Evening Peak 4 Hrs:
Summer: 18 Hrs to 22 Hrs
v) Peak Hours Generation Data for Thermal Power Stations for the year :______________
Winter : 17 Hrs to 21 Hrs
Format-61
Format 62 Page 1/3
Periodicity … Annually
Submission by 30th June
Name of the Company
(a) Ownership -State Owned / JV / IPP
(b).Address of the Company
(c) Phone No./ FAX /E-Mail address
(d) Name & Address of the Generating Station
(e) Phone No. /Fax No./e-mail address of the Generating Station
(A) TECHNICAL PARTICULARS
Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Station
Total
1 Installed capacity MW
2 Date of Commercial Operation
3 Energy generated MkWh
4 (a) Auxiliary Consumption MkWh
(b) Free Power MkWh
5 Power Sold {3 - 4(a) - 4(b)} MkWh
PPA MkWh
Regulated MkWh
Free Sale MkWh
Others MkWh
6 Availability Factor * %
7 Plant Load Factor ** %
8 Specific coal consumption (Kg/kWh)
9 Specific Secondary oil consumption (ml/kWh)
10 Completed Cost Rs. Cr.
11 Cost of generation (P/kWh)
12 Electricity Duty/Taxes (P/kWh)
13 Fuel cost Adjustment (P/kWh)
14 D M Water Consumption Ltr/kWh
(B) FINANCIAL PARTICULARS (as per Annual Report)
1. Revenue Income
a) Sale of Power Rs. Cr.
b) Misc. Income Rs. Cr.
Total 1 Rs. Cr.
2. Revenue Expenditure
I) Fixed Charges
a) Interest & financing Charges Rs. Cr.
b) Interest on Working Capital Rs. Cr.
c) Return on Equity Rs. Cr.
d) Tax on Income Rs. Cr.
e) Incentive Rs. Cr.
f) Depreciation Rs. Cr.
g) O&M Expenses (total i) to viii) below) Rs. Cr.
Rs. Cr.
ii) Employee Cost Rs. Cr.
iii) Adm. & Gen Expenses Rs. Cr.
iv) Insurance Charges Rs. Cr.
v) Training Rs. Cr.
vi) R&D Rs. Cr.
vii) Water Charges Rs. Cr.
viii) Others Rs. Cr.
h) Energy Purchase Rs. Cr.
i) Any other Rs. Cr.
Total(I) Fixed Charges (a to i) Rs. Cr.
i) Spares and Consumables
Separately for each generating station for the financial Year………………..
GENERATING COMPANY DATA FOR FINANCIAL STUDY
191 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
Format 62 Page 2/3
Periodicity … Annually
Submission by 30th June
Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Station
Total
II) Variable Charges
a) Main Fuel Expenses
Main Fuel cost Rs. Cr.
Transportation Cost Rs. Cr.
Total (a)
b) Secondary Fuel Expenses
Fuel Cost Rs. Cr.
Transportation Cost Rs. Cr.
Total (b)
Total (II) Variable Charges (a+b) Rs. Cr.
Total Fixed & Variable Charges (I+II) Rs. Cr.
c) Taxes/ Duties included in variable Charges
Taxes/ Duties on primary fuel Rs. Cr.
VAT on transport of primary fuel Rs. Cr.
Taxes/ Duties on secondary fuel Rs. Cr.
VAT on transport of secondary fuel Rs. Cr.
3 Profit / (Loss) (before Tax) Rs. Cr.
Provision for Tax Rs. Cr.
Profit / (Loss) (after Tax) Rs. Cr.
4 Sources of Fund
a) Equity
I) Paid-up Capital Rs. Cr.
ii) Reserves and Surpluses Rs. Cr.
b) Loans
I) Secured Rs. Cr.
ii) Un Secured Rs. Cr.
Total (a+b) Rs. Cr.
5 Application of Funds
a) Gross Block Rs. Cr.
b) Less: Accumulated Depreciation Rs. Cr.
c) Net Block Rs. Cr.
d) Capital Works in Progress Rs. Cr.
e) Investments
- in Power Sector Rs. Cr.
- outside Power Sector Rs. Cr.
f) Current Assets, Loans and Advances
I) Inventory Rs. Cr.
ii) Receivables# Rs. Cr.
iii) Advances Rs. Cr.
iv) Cash & Bank Balance Rs. Cr.
Total (f) Rs. Cr.
g) Less: Current Liabilities and Provision Rs. Cr.
I) Current Liabilities Rs. Cr.
ii) Provisions Rs. Cr.
Total (I+II) Rs. Cr.
h) Net Current Asse (f-g) Rs. Cr.
i) Misc. Expenditure Rs. Cr.
Total (c+d+e+h+i) Rs. Cr.
6 Investment during the Year Rs. Cr.
7 Assets created during year***
192 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
193 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III – SEC.4]
Notes:
N
* Availability = 1000x ∑ DCi / {NxICx(100-AUXn) }%
i = 1
Where,
IC = Installed Capacity of the generating station in MW,
DCi = Average declared capacity for the 1st day of the period in MW,
N = Number of days during the period, and
AUXn = Normative Auxiliary Energy Consumption as a percentage of gross
generation;
N
** PLF = 10000 x ∑ SGi / {N x IC x (100-AUXn)}%
i = 1
Where,
IC = Installed Capacity of the generating station in MW,
SGi = Scheduled Generation in MW for the 1st time block of the period,
N = Number of time blocks during the period, and
AUXn = Normative Auxiliary Energy Consumption as a percentage of gross
generation;
Reference: Central Electricity Regulatory Commission (Terms and Conditions of Tariff)
Regulations, 2004 dated 26th March 2004.
Website: www.cercind.org
*** Please furnish complete details of all the assets created during the year
# Details of Receivables:
Sl
No
Source At beginning of year At end of year
1
2
3
4
Format 62 Page 3/3
Periodicity … Annually
Submission by 30th June
Format- 63 Page 1/2
Periodicity … Annually
Submission by 30th June
TRANSMISSION COMPANY DATA FOR FINANCIAL STUDY
Name of the Company
(a) Date of obtaining license and its validity period
(b) Ownership -State Owned / JV / IPP
(c). Address of the Company
(d) Phone No.
FAX
E-Mail address
(e) Region of Transmission
A TECHNICAL PARTICULARS
1 Length of Lines
i) 400KV Ckt kms
ii) 220KV Ckt kms
iii) 132KV Ckt kms
iv) Any Other Ckt kms
2 Details of Sub. Stations
MVA of S/S No. of Sub. Stations No. of Transformers
400 KV (400 / 220 KV )
(400 /132 KV )
220 KV ( 220 /132 KV )
( 220/66 KV )
(220/33 KV )
(220 /11 KV)
132KV (132/66KV)
(132/33KV)
(132/11KV)
Any other
3 Service Failure No. of hrs.
Total system
50% or more
30% to 50%
10% to 30%
1 to 10%
Less than 1%
4 Transmission Losses (Technical)
(in their own system)
5 Total Units Wheeled MkWh
6 a Transformer failures during the year Nos.
b Average time taken to replace Hrs.
damaged transformer
B FINANCIAL PARTICULARS (as per Annual Report)
1 Revenue Income
a) Wheeling of Power Rs. Cr.
b) Misc. Income Rs. Cr.
c) Subsidy Rs. Cr.
Total (1) Rs. Cr.
2 Revenue Expenditure
Fixed Charges
a) Interest & financing Charges
b) Depreciation Rs. Cr.
c) O&M Expenses
i) Rs. Cr.
ii) Employee Cost Rs. Cr.
iii) Adm. & Gen Expenses Rs. Cr.
iv) Insurance Charges Rs. Cr.
v) Training Rs. Cr.
vi) R&D Rs. Cr.
viii) Others Rs. Cr.
d) Provisions Rs. Cr.
Total (a+b+c+d) Rs. Cr.
Spares and Consumables
194 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
Format- 63 Page 2/2
Periodicity … Annually
Submission by 30th June
3 Profit / (Loss) (before Tax) Rs. Cr.
Provision for Tax Rs. Cr.
Profit / (Loss) (after Tax) Rs. Cr.
4 Sources of Fund
a) Equity
I) Paid up Capital Rs. Cr.
ii) Reserves and Surpluses Rs. Cr.
b) Loans
I) Secured Rs. Cr.
ii) Un Secured Rs. Cr.
Total (a+b) Rs. Cr.
5 Application of Funds
a) Gross Block Rs. Cr.
b) Less Accumulated Depreciation Rs. Cr.
c) Net Block Rs. Cr.
d) Capital Work in Progress Rs. Cr.
e) Investments
in Power Sector Rs. Cr.
outside Power Sector Rs. Cr.
f) Current Assets, Loans and Advances
I) Inventory Rs. Cr.
ii) Receivables Rs. Cr.
iii) Advances Rs. Cr.
iv) Cash & Bank Balance Rs. Cr.
Total (f) Rs. Cr.
g) Less Current Liabilities and Provision Rs. Cr.
I) Current Liabilities Rs. Cr.
ii) Provisions Rs. Cr.
Total (i+ii) Rs. Cr.
h) Net Current Assets (f-g) Rs. Cr.
i) Misc. Expenditure Rs. Cr.
Total (c+d+e+h+i) Rs. Cr.
6 Investment during the year Rs. Cr.
7 Assets created during the year
8 Electricity Duty / Taxes if applicable
9 Number of Employees
Technical Nos.
Non technical Nos.
10 Persons Trained during year Nos.
195 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
Format 64 Page 1/4
Periodicity Annually
Submission by 30th June
DISTRIBUTION COMPANY DATA FOR FINANCIAL STUDY
For the financial Year………………..
Name of the Company
(a) Date of obtaining license and its validity period
(b) Ownership -State Owned / JV / IPP
(c). Address of the Company
(d) Area(s) of Distribution (Names), Area in sq.km., population and maps
(e) Phone No./ FAX /E-Mail address
(A) TECHNICAL PARTICULARS
1 Energy Purchased
Sl.
No. kWh Rs Cr.
a
b
c
Total
2 Units (Energy) Billed kWh
3 Realised Units kWh
4 Distribution Losses
(a) Technical losses %
(b) Commercial losses (see foot note) %
( c) Collection Efficiency (from col.11of table 5) %
(d) AT&C Losses [4(b) /4( c)] %
196 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
Cost
Sources
Units Purchased
Format-64 Page 2/4
Periodicity Annually
Submission by 30th June
5 Details of Energy Consumption
Consumers Consumption Tariff
Billed Revenue
Realised
Revenue
Collection
Efficiency
Metered Unmetered Flat Rate Total
kWh paisa/Unit Slab
wise Rs Cr. Rs Cr. (10/9)
1 2 3 4 5 6
7 8
9 10 11
a Domestic (Slab wise)
Slab 1
Slab 2
Slab 3
Slab 4
b
c Industrial
EHT >33KV
HT >650Volts&<33KV
LT upto 650 Volts
d Agriculture
HT(Metered)
LT(Metered)
LT(Unmetered)
e Railways Traction
f Bulk Supply
g
h Street lighting
I Licensees
j Others
TOTAL
6 Average waiting period for obtaining new connection
a Domestic days
b Commercial days
c Industrial days
7 Length of EHT lines……..……………………..CktKm.
Length of HT lines……………………………..Ckt Km.
Length of LT lines……………………………..Ckt Km.
8 Availability of distribution Net work (%) =(Nos. of hours for which network was available/Total no. of hours) x 100
Foot Note: 4(b) Commercial losses = (Energy purchased- Energy billed)/Energy purchased =[Total(1)-(2)]/Total(1)
Non-domestic (Commercial)
197 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
No. of consumers
Water works/ irrigation public
works
Format - 64 Page 3/4
Periodicity Annually
Submission by 30th June
(B) FINANCIAL PARTICULARS (as per Annual Report)
1 Revenue Income
a Sale of Power Rs. Cr.
b) i) Misc. Income Rs. Cr.
ii) Subvention Received from State Govt. Rs. Cr.
Total (1) Rs. Cr.
2 Revenue Expenditure
Fixed Charges
a) Interest & financing Charges
b) Depreciation Rs. Cr.
c) O&M Expenses
i)
Rs. Cr.
ii) Employee Cost Rs. Cr.
iii) Adm. & Gen Expenses Rs. Cr.
iv) Insurance Charges Rs. Cr.
v) Training Rs. Cr.
vi) R&D Rs. Cr.
viii) Others Rs. Cr.
d) Provisions Rs. Cr.
Total (a+b+c+d) Rs. Cr.
3 Profit / (Loss) (before Tax)
Tax Provision for Tax Rs. Cr.
Profit / (Loss) (after Tax) Rs. Cr.
4 Sources of Fund
a) Equity
I) Paid-up Capital Rs. Cr.
ii) Reserves Rs. Cr.
b) Loans
I) Secured Rs. Cr.
ii) Un Secured Rs. Cr.
c) Consumer Contribution Rs. Cr.
Total (a+b+c) Rs. Cr.
198 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
Spares and Consumables
Format - 64 Page 4/4
Periodicity Annually
Submission by 30th June
5 Application of Funds
a) Gross Block Rs. Cr.
b) Less Accumulated Depreciation Rs. Cr.
c) Net Block Rs. Cr.
d) Capital Work in Progress Rs. Cr.
e) Investments
in Power Sector Rs. Cr.
outside Power Sector Rs. Cr.
f) Current Assets, Loans and Advances
I) Inventory Rs. Cr.
ii) Receivables Rs. Cr.
iii) Advances Rs. Cr.
iv) Cash & Bank Balance Rs. Cr.
Total (f) Rs. Cr.
g) Less Current Liabilities and Provision Rs. Cr.
I) Current Liabilities Rs. Cr.
ii) Provisions Rs. Cr.
Total (i+ii) Rs. Cr.
h) Net Current Assets (f-g) Rs. Cr.
i) Misc. Expenditure Rs. Cr.
Total (c+d+e+h+i) Rs. Cr.
6 Investment during the year Rs. Cr.
7 Details of assets created during the year
8 Electricity Duty/ Taxes p/unit
9 Fuel Cost Adjustment p/unit
10 Total Number of Employees
Technical Nos.
Non technical Nos.
11 Persons Trained during the year Nos.
199 THE GAZETTE OF INDIA : EXTRAORDINARY
Name of the Entity………………………………….
NAME OF POWER PLANT…………………………………………
Installed capacity [Total …….……..MW] 15 year action plan…………………[MW]
9 year action plan…………………[MW]
YEAR…………………….. LTPM-- [LAKH TONNES PER MONTH]
S.
No. Month Coal
Ash
content
Ash
Generation Ash Utilized
%age
utilization Bricks Cement Concrete Roads &
Hydro
Sector Ash dyke
Agriculture/
Mine fill Others/
consumed %age Embankment raising
Wasteland
High value
LTPM LTPM LTPM added areas
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 APRIL
2 MAY
3 JUNE
4 JULY
5 AUGUST
6 SEPTEMBER
7 OCTOBER
8 NOVEMBER
9 DECEMBER
10 JANUARY
11 FEBRUARY
12 MARCH
TOTAL
ANNUAL (MTPA)
NOTE:
MTPA - Million Tonnes per Annum
200 THE GAZETTE OF INDIA : EXTRAORDINARY
MONTHLY ABSTRACT OF ASH GENERATION AND UTILISATION
Half yearly Sub-total
Previous and next
Questions people ask
Is form AT-60 Page-1 of 2 of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 still in force?
No repeal of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 is recorded.