Form AT-58, Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007: FORMAT-58
Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 - Form AT-58
Text of form AT-58
FORMAT-58
FORMAT-58
Periodicity- Monthly
Submission-by 20th day
HEAT RATE DATA OF COAL/LIGNITE BASED THERMAL POWER STATIONS FOR MONTH ………YEAR ………20…..20…...
(i) Station Name: --------------------------------------------------
(ii) Station Capacity: -(No. of units with size)
2.0 Design parameters for the Station:
Unit No. Unit
Capacity
(MW)
Date of
commissio
ning
Make Boiler
Efficiency
(%)
Turbine
Heat Rate
(kcal/kWh)
Unit Heat Rate
(Col.7x100)/ Col.6
(kcal/kWh)
Weighted Design Station
Heat Rate w.r.t. Capacity
(kcal/kWh)Boiler Turbine
3.0 Operational Performance Data For The Station (month-wise) For The Year : -------------------------
Month Coal /
Lignite
stocks at
the
beginning
of the
month
Coal /
Lignite
stocks at
the end of
the month
(Tonnes)
Coal /
Lignite
received
during the
month
(Tonnes)
Total Coal /
Lignite
consumptio
n during the
month
Col.(2+4-3)
(Tonnes)
Generation
(MkWh)
during the
month
Average
GCV of
Coal /
Lignite
(kcal/kg)
Specific Coal /
Lignite
Consumption
(kg/kWh)
Col.(5)/{(6)*1000}
Oil Consumption (kl) Specific
Oil
Consumpti
on
(ml/kWh)
Col.(9)/(6)
Avg. GCV
of Oil
(kcal/l)
Actual Station
Heat Rate
Col.(7x8) +
Col. (10x11)/1000
(kcal/kWh)
Weighted/
Total For
The Year
(April -
March)
Weighted
average
Weighted
average
1 2 3 4 5 6 7
Module# 1
:
:
:
:
Module# n
1 2 3 4 5 6 7 8 9 10 11 12
April
May
:
:
:
:
March
Weighted/AV.
Total (March
to March)
187 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
3.0 Operational Performance Data For The Station For The Year : ---------------------------
Actual Station
Heat Rate
Col.(7x8+10x11)
kcal/kWh)
Specific Liquid
fuel
Consumption
(l/Kwh))
(5)/(6)*1000)
Gas Consumption
(at S.T.P.)
(million Cu.m)
Specific Gas
Consumption
(Cu.m/kWh)
(9)/(6)
Average GCV
of Gas (at
S.T.P.)
(kcal/Cu. m)
Month Liquid fuel
stock at the end
of the month
(kl)
Liquid fuel
received
during the
month
(kl)
Weighted
Design Station.
Heat Rate
w.r.t.Capacity
(kcal/kWh)
Module Heat
Rate (kcal/kWh)
Total Liquid fuel
consumption
during the month
Col.(2+4-3)
(kl)
Generation
(MkWh)
Average GCV
of Liquid Fuel
(kcal/l)
Liquid fuel
stock in the
beginning of
the month
(kl)
No. of Modules Module
Capacity
(MW)
Date of
commissioning
Make
Gas Turbine Steam Turbine
(if any)
Previous and next
Questions people ask
Is form AT-58 of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 still in force?
No repeal of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 is recorded.