LawGrids logoLAWGRIDS.ORG

Regulation 20, Central Electricity Authority (Installation & Operation of Meters) Regulations, 2006: Adoption of new technologies

Central Electricity Authority (Installation & Operation of Meters) Regulations, 2006 - Regulation 20

Text of regulation 20

Adoption of new technologies

20. Adoption of new technologies. - The distribution licensee shall make out a plan for introduction and adoption of new technologies such as pre-paid meters, time of the day meters (TOD), automatic remote meter reading system through appropriate communication system with the approval of the Appropriate Commission or as per the regulations or directions of the Appropriate Commission or pursuant to the reforms programme of the Appropriate Government. 14 SCHEDULE (see regulations 2,5,8,12 and 16) Standards on Installation and Operation of Meters Part I Standards Common To All Type of Meters (1) These standards provide for specification of meters, immunity to external factors, sealing points and functional requirements that are required from regulatory perspective. Detailed technical specification shall be prepared by the purchaser of the meter. (2) Specifications of meters Standard Reference Voltage As per IS Voltage Range As per IS Standard Frequency As per IS Standard Basic Current As per IS (Current range of consumer meters shall be so chosen as to record the load current corresponding to the sanctioned load) Accuracy Class Meters shall meet the following requirements of Accuracy Class: Interface meters 0.2S Consumer meters Up to 650 volts 1.0 or better Above 650 volts and up to 33 kilo volts 0.5S or better Above 33 kilo volts 0.2S Energy accounting and audit meters The accuracy class of meters in generation and transmission system shall not be inferior to that of 0.2S Accuracy Class. The accuracy class of meters in distribution system shall not be inferior to that of 0.5S Accuracy Class Starting Current and Maximum Current As per IS 15 Power Factor Range As per IS Power Frequency Withstand Voltage As per IS Impulse Voltage Withstand Test for 1.2/50 micro sec As per IS Power Consumption As per IS (3) Meter shall have downloading facilities of metered data through Meter Reading Instrument (MRI). (4) Immunity to External Factors The meter shall be immune to external influences like magnetic induction, vibration, electrostatic discharge, switching transients, surge voltages, oblique suspension and harmonics and necessary tests shall be carried out in accordance with relevant standard. (5) Sealing Points Sealing shall be done at the following points (as applicable): (a) Meter body or cover (b) Meter terminal cover (c) Meter test terminal block (d) Meter cabinet (6) The accuracy class of Current transformers (CTs) and Voltage transformers (VTs) shall not be inferior to that of associated meters. The existing CTs and VTs not complying with these regulations shall be replaced by new CTs and VTs, if found defective, non-functional or as per the directions of the Appropriate Commission. In case the CTs and VTs of the same Accuracy Class as that of meters can not be accommodated in the metering cubicle or panel due to space constraints, the CTs and VTs of the next lower Accuracy Class can be installed. (7) The Voltage Transformers shall be electromagnetic VT or Capacitive Voltage Transformer (CVT). 16 Part II Standards for interface meters (1) Functional Requirements: (a) The Interface meters suitable for ABT shall be static type, composite meters , as self –contained devices for measurement of active and reactive energy, and certain other parameters as described in the following paragraphs. The meters shall be suitable for being connected directly to voltage transformers (VTs) having a rated secondary line-to-line voltage of 110 V, and to current transformers (CTs) having a rated secondary current of IA (Model-A :3 element 4 wire or Model C: 2 element , 3 wire) or 5A (model-B: 3 element , 4 wire or Model D: 2 element 3 wire). The reference frequency shall be 50Hz. (b) The meters shall have a non-volatile memory in which the following shall be automatically stored: (i) Average frequency for each successive 15-minute block, as a two digit code (00 to 99 for frequency from 49.0 to 51.0Hz). (ii) Net Wh transmittal during each successive 15-minute block, upto second decimal, with plus/minus sign. (iii) Cumulative Wh transmittal at each midnight, in six digits including one decimal. (iv) Cumulative VArh transmittal for voltage high condition, at each midnight, in six digits including one decimal. (v) Cumulative VArh transmittal for voltage low condition, at each midnight, in six digits including one decimal. (vi) Date and time blocks of failure of VT supply on any phase, as a star(*) mark. (c) The meters shall store all the above listed data in their memories for a period of at least ten days. The data older than ten days shall get erased automatically. Each meter shall have an optical port on its front for tapping all data stored in its memory using a hand held data collection device. The meter shall be suitable for transmitting the data to remote location using appropriate communication medium. (d) The active energy (Wh) measurement shall be carried out on 3-phase, 4-wire principle, with an accuracy as per class 0.2 S of IEC-687/IEC-62053-22. In model- A and C, the energy shall be computed directly in CT and VT secondary quantities, and indicated in watt-hours. In model-B and Model D , the energy display and recording shall be one fifth of the Wh computed in CT and VT secondary quantities. (e) The Var and reactive energy measurement shall also be on 3-phase, 4-wire principle, with an accuracy as per class 2 of IEC-62053-23 or better. In model-A or Model C, the Var and VArh computation shall be directly in CT and VT secondary quantities. In model-B or Model D, the above quantities shall be displayed and recorded as one-fifth of those computed in CT and VT secondary quantities. There shall be two reactive energy registers, one for the period when average RMS voltage is above 103% and the other for the period the voltage is below 97%. 17 (f) The 15-minute Wh shall have a +ve sign when there is a net Wh export from substation busbars, and a –ve sign when there is a net Wh import. The integrating (cumulative) registers for Wh and Varh shall move forward when there is Wh/Varh export from substation busbars, and backward when there is an import. (g) The meters shall also display (on demand), by turn, the following parameters : (i) Unique identification number of the meter (ii) Date (iii) Time (iv) Cumulative Wh register reading (v) Average frequency of the previous 15-minute block (vi) Net Wh transmittal in the previous 15-minute block, with +/-sign (vii) Average percentage voltage (viii) Reactive power with +/- sign (ix) Voltage-high VArh register reading (x) Voltage-low VArh register reading. (h) The three line-to-neutral voltages shall be continuously monitored, and in case any of these falls below 70%, the condition shall be suitably indicated and recorded. The meters shall operate with the power drawn from the VT secondary circuits, without the need for any auxiliary power supply. Each meter shall have a built-in calendar and clock, having an accuracy of 30 seconds per month or better. (i) The meters shall be totally sealed and tamper-proof, with no possibility of any adjustment at site, except for a restricted clock correction. The harmonics shall be filtered out while measuring Wh, Var and VArh, and only fundamental frequency quantities shall be measured/computed. (j) The Main meter and the Check meter shall be connected to same core of CTs and VTs. Part III Standards for consumers meters (1) Measuring Parameters (a) The consumer meter shall be suitable for measurement of cumulative active energy utilized by the consumer. (b) The consumer meter may have the facilities to measure, record and display one or more of the following parameters depending upon the tariff requirement for various categories of consumers. All parameters excluding instantaneous electrical parameters shall also be stored in memory. (i) Cumulative reactive energy (ii) Average power factor (iii) Time of use of energy 18 (iv) Apparent power (v) Maximum demand (vi) Phase voltage and line currents (2) All the three phase meters shall have data storage capacity for at least 35 days in a non-volatile memory. (3) Anti-Tampering Features (a) The meter shall not get damaged or rendered non-functional even if any phase and neutral are interchanged. (b) The meter shall register energy even when the return path of the load current is not terminated back at the meter and in such a case the circuit shall be completed through the earth. In case of metallic bodies, the earth terminal shall be brought out and provided on the outside of the case. (c) The meter shall work correctly irrespective of the phase sequence of supply (only for poly phase). (d) In the case of 3 phase, 3 wire meter even if reference Y phase is removed, the meter shall continue to work. In the case of 3 phase, 4 wire system, the meter shall keep working even in the presence of any two wires i.e., even in the absence of neutral and any one phase or any two phases. (e) In case of whole current meters and LV CT operated meter, the meter shall be capable of recording energy correctly even if input and output terminals are interchanged. (f) The registration must occur whether input phase or neutral wires are connected properly or they are interchanged at the input terminals. (g) The meter shall be factory calibrated and shall be sealed suitably before dispatch. (h) The meter shall be capable of recording occurrences of a missing potential (only for VT operated meters) and its restoration with date and time of first such occurrence and last restoration along with total number and duration of such occurrences during the above period for all phases. (i) Additional anti-tampering features including logging of tampers such as current circuit reversal, current circuit short or open and presence of abnormal magnetic field may be provided as per the regulations or directions of the Appropriate Commission or pursuant to the reforms programme of the Appropriate Government. 19 20 Part IV Standards for energy accounting and audit meters (1)The energy accounting and audit meters shall be suitable for measurement, recording and display of cumulative active energy with date and time. (2) The energy accounting and audit meters may also have the facility to measure, record and display one or more of the following parameters depending upon the energy accounting and audit requirement. All parameters excluding instantaneous electrical parameters shall also be stored in memory. (a) Apparent power (b) Phase wise kilowatt at peak KVA (c) Phase wise KVA(reactive) at peak KVA (d) Phase wise voltage at peak KVA (e) Power down time (f) Average power factor (g) Line currents (h) Phase voltages (i) Date and time (j) Tamper events (3) The energy accounting and audit meter shall have data storage capacity for at least 35 days in a non-volatile memory. (4) Energy accounting and audit meters shall have facility to download the parameters through meter reading instruments as well as remote transmission of data over communication network. Sd/- (R. Dahiya) Secretary, Central Electricity Authority 20180308120858 meter_reg (Published in the Gazette of India, Extraordinary, Part III, section iv) Central Electricity Authority New Delhi, dated the 17th March, 2006 NOTIFICATION No. 502/70/CEA/DP&DIn exercise of the powers conferred by sub-section (1) of section 55 and clause (e) of section 73 read with sub-section (2) of section 177 of Electricity Act, 2003, the Central Electricity Authority hereby makes the following reg Short title and commencement. - SCHEDULE (see regulations 2,5,8,12 and 16) Standards on Installation and Operation of Meters Part I Standards Common To All Type of Meters (6) The accuracy class of Current transformers (CTs) and Voltage transformers (VTs) shall not be inferior to that of associated meters. The existing CTs and VTs not complying with these regulations shall be replaced by new CTs and VTs, if found Part III Standards for consumers meters Part IVStandards for energy accounting and audit meters

Previous and next

All provisions of Central Electricity Authority (Installation & Operation of Meters) Regulations, 2006

Questions people ask

Is regulation 20 of Central Electricity Authority (Installation & Operation of Meters) Regulations, 2006 still in force?

No repeal of Central Electricity Authority (Installation & Operation of Meters) Regulations, 2006 is recorded.