Rule 47, Atomic Energy (Factories) Rules, 1996: TEMPORARY ELECTRICAL WIRING

Atomic Energy (Factories) Rules, 1996 - Rule 47

Text of rule 47

TEMPORARY ELECTRICAL WIRING

47. TEMPORARY ELECTRICAL WIRING.- (1) Frayed and / or bare wires shall not be used for temporary electrical connections during construction. All temporary wiring shall be installed and supervised by a competent electrician. Adequate protection shall be provided for all electrical wiring laid on floor which may have to be crossed over by construction machinery or by the workmen. All flexible wiring connecting the electrical appliances shall have adequate mechanical strength and shall preferably be enclosed in a flexible metal sheath. Overhead wires/cables shall be so laid that they leave adequate head room. Clearance for the above shall be obtained from the competent person. (2) All electrical circuits, other than those required for illumination of the site at night, shall be switched off at the close of day's work. The main switch board from which connections are taken for lighting, power operated machinery, etc, shall be located in an easily accessible and prominent place. No article of clothing nor stores shall be kept at the back of or over the board or anywhere near it. One 3-kg/4.5-kg CO2 extinguisher or one 5-kg dry powder extinguisher shall be provided near the switch board.

Previous and next

All provisions of Atomic Energy (Factories) Rules, 1996

Questions people ask

Is rule 47 of Atomic Energy (Factories) Rules, 1996 still in force?

No repeal of Atomic Energy (Factories) Rules, 1996 is recorded.