Rule 47, Atomic Energy (Factories) Rules, 1996: TEMPORARY ELECTRICAL WIRING
Atomic Energy (Factories) Rules, 1996 - Rule 47
Text of rule 47
TEMPORARY ELECTRICAL WIRING
47. TEMPORARY ELECTRICAL WIRING.-
(1) Frayed and / or bare wires shall not be used for temporary electrical connections during
construction. All temporary wiring shall be installed and supervised by a competent
electrician. Adequate protection shall be provided for all electrical wiring laid on floor
which may have to be crossed over by construction machinery or by the workmen. All
flexible wiring connecting the electrical appliances shall have adequate mechanical
strength and shall preferably be enclosed in a flexible metal sheath. Overhead
wires/cables shall be so laid that they leave adequate head room. Clearance for the above
shall be obtained from the competent person.
(2) All electrical circuits, other than those required for illumination of the site at night, shall
be switched off at the close of day's work. The main switch board from which
connections are taken for lighting, power operated machinery, etc, shall be located in an
easily accessible and prominent place. No article of clothing nor stores shall be kept at the
back of or over the board or anywhere near it. One 3-kg/4.5-kg CO2 extinguisher or one
5-kg dry powder extinguisher shall be provided near the switch board.