LawGrids logoLAWGRIDS.ORG

Rule 46, Atomic Energy (Factories) Rules, 1996: CONSTRUCTION & ERECTION

Atomic Energy (Factories) Rules, 1996 - Rule 46

Text of rule 46

CONSTRUCTION & ERECTION

46. CONSTRUCTION & ERECTION.-Manager shall take appropriate measures with the approval of the Inspector to minimise the effects of occupational hazards arising out of animals, reptiles, rodents, poisonous plants and weeds, weather conditions and living conditions. (1) General.- (a) Site preparation - While preparing the site for construction, bush and other wood, debris, etc, shall be removed and promptly disposed of so as to minimize the attendant hazards. Temporary buildings for construction offices and storage shall be so located as to cause the minimum fire hazards and shall be constructed from non-combustible materials as far as practicable. Atomic Energy Factory Rules, 1996 72 Rule 46 (b) Access for Fire Fighting Equipment & Vehicles - Access for fire fighting equipment shall be provided to the construction site at the start of construction and maintained until all construction work is completed: (i) Free access from the street to fire hydrants/static water tanks, where available, shall be provided and maintained at all times; (ii) No materials for construction shall be placed within 3m of hydrants/static water tanks; and (iii) During building operations, free access to permanent, temporary or portable first-aid fire fighting equipment shall be maintained at all times. (c) Access to the Upper Floors During Construction- In all buildings over two storeys high, at least one stairway shall be provided in usable condition at all times. This stairway shall be extended upward as each floor is completed. As far as possible, there shall be a handrail on the staircase. (2) Storage, Stacking & Handling of Materials.-Construction of Plant and Building: Construction requires various kinds of materials such as cement; lime; masonary units; aggregate;. fly ash; timber; protective clothing; electrical fittings etc. These shall be stored and handled as per prevalent good practices & relevant national standards in order to ensure quality & quantity of materials used in the construction and safety of personnel handling these materials. (3) Safety Requirements for Erection of Structural Steel Work.- (a) Organization of Work - The agency responsible for erecting the steel work shall analyze the proposed erection scheme for safety. The erection scheme shall cover safety aspects right from the planning stage up to the actual execution of the work and make provision for personnel protective equipments. (b) Safety of Men: (i) General - Skilled workers trained in relevant jobs shall only be employed in jobs requiring skills. (1) All personnel protective equipments like helmets, goggles, safety shoes, gloves, aprons etc. shall be suitable for the job & shall conform to relevant Indian Standards. (2) When the work is in progress, the area shall be cordoned off by barricades to structural components, or falling into excavated trenches or getting injured by falling objects. Atomic Energy Factory Rules, 1996 73 Rule 46 (3) Warning signs shall be displayed where necessary to indicate hazards, for example (a) '440 VOLTS', (b) 'DO NOT SMOKE', (c) 'MEN WORKING AHEAD', etc. (4) All electrically operated hand tools shall be provided with proper earthing. (5) Hand lamps shall be of low voltage preferably 24 V to prevent electrical hazards. (ii) Anchors for guys or ties shall be checked for proper placement. The weight of concrete in which the anchors are embedded shall be checked for uplift and sliding: (1) Split-end eye anchors shall only be used in good, solid rock. (2) The first load lifted by a guy derrick shall be kept at a small height for about 10 minutes and the anchors immediately inspected for any signs or indications of failure. (3) When a number of trusses or deep girders are loaded in one car or on one truck, all but one being lifted shall be tied back unless they have been tied or braced to prevent their falling over and endangering men unloading. (4) The erection gang shall have adequate supply of bolts, washers, rivets, pins, etc. of correct size. Enough number of bolts shall be used in connecting each piece using a minimum of two bolts in a pattern to ensure that the joint will not fail due to dead load and erection loads. All splice connections in columns, crane girders, etc., shall be completely bolted or riveted or welded as specified in the drawing before erection. (5) Safety belts shall always be provided & used for working at heights. The ropes shall be chemically treated to resist dew and rotting. These shall not be tied on sharp edges of steel structures. They shall be tied generally not more than 2 to 3 m. away from the belt. (6) On a guy derrick or climbing crane job, the tool boxes used by the erection staff shall be moved to the new working floor each time the rig is changed. On a mobile crane job, the boxes shall be moved as soon as the crane starts operating in a new area too far away for the men to reach the boxes conveniently. Atomic Energy Factory Rules, 1996 74 Rule 46 (7) Baskets or containers to hold small materials such as bolts and drift pins shall be provided to men working on floats or scaffolds. Men shall be trained to use such containers, and to keep small tools gathered up and put away in tool boxes when not in use. Material shall not be dumped overboard when a scaffold is to be moved. Rivet heaters shall have safe containers or buckets for hot rivets left over at the end of the day. (8) During the erection of tall buildings, nylon nets at a height of 3 to 4 m. shall be provided to ensure safety of men if there is a fall from heights. In case of industrial buildings the height of which is in excess of 4 m a temporary strong net shall be provided below the roof, at a height of 3 m to 4 m above the floor, over which workers are working. (9) Safety Against Fire - A fire protection procedure shall be set up if there is to be any flame cutting, burning, heating, riveting or any operation that could start a fire. Following precautions shall be observed during welding and cutting operations. (a) The workers shall be instructed not to throw objects like hot rivets, cigarette stubs, etc, around. (b) Sufficient number of fire extinguishers, preferably of soda acid type shall be placed at strategic points. Extinguishers shall always be placed in cranes, hoists, compressors and similar places. Where electrical equipments are involved, CO2 or dry powder extinguishers shall be provided. (10) Riding on a load, tackle or runner shall be prohibited. (11) The load shall never be allowed to rest on wire ropes. Ropes in operation shall not be touched. Wire ropes/manila ropes conforming to acceptable standards shall be used for guying. (12) Lifting Appliances - Necessary precautions as laid down in rule 37 shall be followed. (c) Safety of Structure: General -The structure itself shall be safeguarded during its erection & erection of columns shall be immediately followed by vertical bracing between columns before the roof structure is erected. Atomic Energy Factory Rules, 1996 75 Rule 46 (4) Excavation.- (a) Excavation shall be planned in advance so that hazards due to falling and things falling are avoided. Accident prevention measures shall be adopted and effectively carried out on each job because of inherent dangers. (b) Underground utilities such as water mains, drainage lines, electrical cables, gas lines etc. shall be located and protected wherever necessary. (c) Adequate measures shall be taken to prevent dislodgement of loose or unstable earth, rock or other material from falling into the excavation by proper timbering. (d) Cutting shall be done from top to bottom. Under no circumstances undermining or undercutting shall be done. (e) No excavation below the level of any foundation of a building or structure (if the excavation is liable to effect the building) shall be commenced unless adequate shoring has been provided to prevent any danger to the building. (f) In every excavation work along sloping ground, sides and slopes of ground shall be maintained in a safe condition by scaling, benching or barricading. Loose earth and loose rock shall be scaled continuously. To ensure safety of workers engaged on such work, each worker shall be provided with safety belt attached to a safety line. On steep slopes workers shall not be permitted to work one above the other. All such scaling work shall be done under good supervision. (g) All trenches, 120 cm or more in depth, shall at all times be supplied with at least one ladder for each 30 meters in length or fraction thereof. Ladder shall be extended from bottom of the trench to at least one metre above the surface of the ground. (h) Every accessible part on an excavation or an opening in the ground into which a person is liable to fall vertically through a height of 2 meters, shall be barricaded to a height of one metre. (i) Measures shall be taken to prevent spectators and other workmen who are not engaged in excavation work, from approaching excavation areas by placing warning signals etc. near the site of the excavation. Provisions shall also be made to prevent animals from falling into excavation areas. (5) Shoring.- (a) Additional precautions by way of shoring and bracing shall be taken to prevent slides, slips or caveins when excavations or trenches are made in locations subject to vibrations from railway or road traffic, the operation of Atomic Energy Factory Rules, 1996 76 Rule 46 machinery or any other source of vibration. (b) Excavations over 1.2 m in depth, unless in solid rock or hard soil shall be shored and braced or sloped to the angle of repose of the material when consolidated. All shoring and bracing shall extend to the bottom of the excavation when necessary. (c) Materials used for bracing, shoring etc. shall be in good serviceable condition and timbers shall be sound and free from large and loose knots. (d) No person shall work in an excavation shaft, earth work of tunnel unless all timbering or planks used therein has been inspected by a competent person before the commencement of the work. (6) Night work.- (a) Excavated areas shall be adequately lighted up for night work. (b) During night, a red danger light shall be displayed at a conspicuous place near the excavation site to warn approaching traffic and men. (7) Disposal of soil.- The excavated material shall be dumped sufficiently away from the edge of the excavated trench to avoid the excavated material slipping and falling into the trench. The excavated materials and any other material or load shall not be dumped or placed within 1.5m of the edges of the trench or half of the depth of the trench whichever is more. (8) Scaffolding.- (a) Suitable scaffolds shall be provided for workmen for all works that cannot be done safely from the ground. (b) All the members of a scaffold such as planks, braces, vertical supports, horizontal supports shall be of sound material, good construction and of adequate strength. They shall be properly maintained. (c) No plank shall be kept loose so that levering of the plank is avoided. Nails of proper size shall be used for construction of scaffolds in sufficient numbers and driven fully in. (d) Scaffolding or staging more than 3.5 metres above the ground floor swung or suspended from an overhead support or erected with stationary support shall have a guard rail properly attached, bolted, braced and otherwise secured at least one metre high above the floor or platform of such scaffolding or staging and extending along the entire length of the outside and ends thereof with only such opening as may be necessary for the delivery of materials. Such scaffolding or staging shall be so Atomic Energy Factory Rules, 1996 77 Rule 46 fastened as to prevent it from swaying from the building or structure. (e) On unprotected scaffolds at high elevations the men must wear life belts suitably anchored to some substantial part of the structure. (f) Side screens shall be provided on scaffold erected along passageways. (g) The platform of a suspended scaffold shall not be less than 45 cm. wide and points of suspension not more than 3 m apart and so arranged, that, at the working position, the edge is as close as practicable to the working face when persons have to work in a sitting position. Suspended scaffolds shall be tested as before use to ensure that minimum safety factors are maintained. The test will be made by raising the working surface 30 cm. above the ground and loading it with at least three times the maximum weight that will be imposed upon it. (h) A safe and convenient means of access shall be provided to the platform or scaffold. Means of access may be a portable ladder, fixed ladder, ramp or a stairway. The use of cross braces or frame work as means of access to the working surface shall not be permitted. (i) All scaffolds, before use, shall be examined by the engineer in charge. (j) Every working place and approach thereto, every place where raising or lowering operations with the use of lifting appliance are in progress and all openings dangerous to persons employed shall be adequately and suitably lighted. (k) During dismantling of scaffolds necessary precautions shall be taken to prevent injury to persons due to fall of loose materials. (l) Bracings and other members of the scaffolds shall not be removed prematurely while dismantling the entire scaffold which shall be maintained stable and rigid so as to avoid the danger of collapse. (m) Care shall be taken to see that no uninsulated electric wire exists within 3 metres of the working platform, gangways, runs, etc. of the scaffold. (n) Good house-keeping shall be maintained at all times upon scaffolds, platforms and ramps. Excessive storage of materials thereon shall be avoided. Care must be taken to avoid accumulation of small objects such as tools, pieces of Atomic Energy Factory Rules, 1996 78 Rule 46 reinforcing steel, waste concrete, which may easily be disturbed or knocked off. Hand rails shall be kept in good repair and securely nailed or otherwise fastened down. Scaffold shall be cleared of tools, materials and rubbish at the end of each working day/shift. (9) PLATFORMS.- The following minimum width of platforms are recommended for various types of works, namely:- (a) Where platform is not more than 2 m above the ground or solid floor: (i) For painters, decorators and similar workmen ... ... 30 cm. (ii) For other types (Men and tools only) ... ... ... 50 cm. (b) Where platform is more than 2 m above the ground or solid floor: (i) For men, tools and materials ... ... . 120 cm. (ii) For men, tools, materials and vehicles such as wheel barrows ... ... 150 cm. (10) GANGWAYS & RUNS.- (a) Undue or unequal sagging shall be avoided from all planks forming a gangway or run by suitably supporting them. The slope of all gangways or runs shall be restricted to 1 vertical and 12 horizontal. (b) Where the slope of the gangway or run renders additional foothold necessary, and in every case where the slope is more than 1 in 12, there shall be provided proper stepping laths which shall- (i) have a minimum section of 50 x 30 mm and be placed at maximum interval of 45 cm.; and (ii) be of the full width of the gangway or run except that they may be interrupted over a width of not more than 10 cm to facilitate the movement of barrows. (11) CONCRETE PLACEMENT.- (a) All workers handling cement & mortar shall be provided with protective gear. (b) Concrete buckets for use with cranes shall be constructed without flanges or projections that may collect concrete which might be dislodged and fall on workmen. Buckets shall be provided with proper dumping mechanism. Atomic Energy Factory Rules, 1996 79 Rules 46-50 (c) A man shall be specially employed as signalman to watch the movement of the bucket and warn the crew and vibrator operators of the approaching bucket so that all workers may clear out of the area affected by the bucket. Signalman shall be so stationed in a safe place that they can see the entire area where concrete is being placed. (12) Work in open areas and specially at height shall be stopped under adverse weather conditions such as strong winds, snowfall, rainfall and under any other conditions specified by Safety Officer/Inspector.

Previous and next

All provisions of Atomic Energy (Factories) Rules, 1996

Questions people ask

Is rule 46 of Atomic Energy (Factories) Rules, 1996 still in force?

No repeal of Atomic Energy (Factories) Rules, 1996 is recorded.