LawGrids logoLAWGRIDS.ORG

Rule 60, GUWAHATI BUILDING BYELAWS: Factories and building of the warehouse class: 60.1 Factories

GUWAHATI BUILDING BYELAWS - Rule 60

Text of rule 60

Factories and building of the warehouse class: 60.1 Factories

60. Factories and building of the warehouse class: 60.1 Factories: - Every room in such building shall be lighted and ventilated by sufficient number of windows, ventilators and skylight exclusive of doors having clear opening not less 1/15 of the floor area abutting on open air space of width not less than 1/3 rd the height of the part of the building-abutting-such-open-space. Provided that this requirement may be relaxed if artificial lighting and ventilation are installed to the satisfaction of the Authority. 60.2 Height of the floors:- The height of the ground floor and each of the upper floors shall not be less than 4.2m and 3.9 m. respectively and the height of the cellar or basement shall in no part be less than 2.4 m. provided that these provisions shall not apply to the extensions of the ground floor and upper floors of the existing building. 61. Special regulations for construction in hilly areas: (a) The Authority may ask for detailed topographic survey map of the site, showing the proposed ground levels of the plot and the remedial construction measures to check the undesired erosion that may effect the adjoining areas. The Authority may also give special direction for framing the proposal in such a way which involves least disturbance to the natural terrain and keeping of bare land which is not allowed. (b) If terrace cutting is done for building constructed on hill the depth and slope of the cut should be restricted according to the soil characteristic of the area. (c) Adequate drainage provision should be kept to the satisfaction of the Authority so that rain water and waste water can drain out from the plot without causing soil erosion. (d) In hill areas with slope greater than 10o special protection measures will have to be provided as specified by the Authority. Local ground conditions shall be taken into account in the determination of the appropriate precautionary work and protection walls as well as relevant code of B.I.S. as specified in Chapter- VI. (e) The maximum height of cutting for development should generally be 4 m. to 6m and cutting of slope over a height of 6m. shall not be ordinarily permitted. Height of 6m earth cutting should be from face of 1st cutting. NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006  Guwahati Metropolitan Dev. Authority  Page No. [50]  (f) If however Authority feels that special protective measures are required in the plot prior to any construction in the plot, no construction of building may be allowed by the Authority in such plot unless the protective measures are completed as directed by the Authority first. 62. Environmental-aspects-and-landscaping. The Authority may impose special provision for landscaping, in special type of building/ plot that is nature and number of plantation to be carried out, maintenance of vegetable cover in the plot for the environmental upgradation of-the-area-and-to-restrict-soil-erosion. (i) In every plot at least 20% of the land should be utilized for tree plantation and greenery. 63. (a) The Authority may impose special condition to the developer to develop the road and drain abutting that particular plot. (b) If however, developer agree to contribute towards the development charge for developing adjoining roads and drains or decides to relinquish a part of these land for improvement of road, drain or creation of open space for the locality without asking for any compensation to the satisfaction of the Authority, the Authority may consider allowing additional proportionate F.A.R. in that particular plot development of the area. (c) For allowing additional FAR under this provision, detail procedure is given in Chapter-VII. 64. In Group Housing project and projects where a number of apartment blocks are proposed in a single plot the Authority may impose special regulations for drains, recreational open space, garbage disposal etc. in addition to the regulations contained in these Byelaws. 65. Every building shall provide one or more rain harvesting structures to collect the roof top run off. The total dimension of recharging/percolating pits/trenches should be at least 5 cubic metre dimension for every 100 sq.mtr. of roof area. Provided further that such rain water harvesting structure shall also be provided in cases of all apartment, institutional and similar buildings and buildings in hill areas. 65. (i) CONSERVATION AND HARVESTING OF RAIN WATER IN GROUP HOUSING-SCHEMES/APARTMENT-AND-COMMERCIAL COMPLEXES/ INSTITUTIONAL BUILDINGS Every Group Housing Scheme etc. shall be provided with required facilities and infrastructure for conservation and harvesting of rain water, viz., a. Percolation Pits: The paved surface around the building shall have percolation pits of 1.2m x 1.2m x 1.2m covering at least 30% of such area. Such pits shall be filled with small pebbles or brick jelly or river sand and covered with perforated concrete slabs. The following requirements are optional and to be provided depending on the site conditions. NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006  Guwahati Metropolitan Dev. Authority  Page No. [51]  b. Terrace water collection: The terrace shall be connected to a sump or the well through a filtering tank by PVC pipe. A valve system shall be incorporated to enable the first part of the rain water collected to be discharged out to the soil if it is dirty. The filtering tank measuring 0.6 m to 1.2 m square can be constructed near the sump. A tank can be divided by a perforated slab and one part should be filled by small pebbles and other by brick jelly. The bottom portion of the tank should have slope to avoid stagnation of water. c. Open Ground: Whenever there is open ground a portion of top soil should be removed and replaced with river sand to allow slow percolation of rain water. OR d. Any other methods proved to be effective in conservation and harvesting of rain water may be adopted in each and every construction taken up. 66. The following areas of Guwahati to be earmarked by the Authority by notification from time to time if not already notified in the Master Plan should normally be excluded for permission of multistoreyed building. 1. National Heritage zones consisting of places of pilgrimage and worship (like, Satra, Namghar, Devalaya, Mandir, Math, Masjid, Dargah, Gurudwara, Church) and sites of historical and cultural importance. 2. Areas falling on or abutting natural drainage channels. 3. Areas falling on or abutting wetlands. 4. Areas earmarked for infrastructure of civic amenities in the Master Plan and Zoning Regulation for Guwahati. 5. Sites on hills and foothills requiring excavation that is likely to cause soil erosion, land slide or instability of hill slope; and sites below overhanging embedded rocks without proper protection work as specified in these rules. In this regard the foot hill areas of Sarania, Kamakhya, Narakasur hills are most vulnerable. 6. Government land in the hills and in the water bodies like beels. 7. The notified forest land falling within the Guwahati Master Plan area. 8. Areas between river Brahmaputra and the main road from Raj Bhawan to Kamakhya hill. The Authority will judiciously examine all building proposals including multistoreyed buildings in the vicinity of the above areas before such proposal are cleared/allowed with such condition / modification as the Authority may decide from time to time. The protective measures to be taken in natural hazard prone areas has been given in Chapter –VI Cl. 6.12. NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006  Guwahati Metropolitan Dev. Authority  Page No. [52]  Chapter VI 67. ADDITIONAL PROVISIONS IN BUILDING REGULATIONS /BYELAWS FOR STRUCTURAL SAFETY. 67.1 STRUCTURAL DESIGN For any building under the jurisdiction of these regulations structural design/ retrofitting shall only be carried out by a Registered Structural Engineer on Record (SER) or Structural Design Agency on Record (SDAR). Proof checking of various designs/ reports shall be carried out by competent authority as per Table-1 wherever applicable. Generally, the structural design of foundations, elements of masonry, timber, plain concrete, reinforced concrete, pre-stressed concrete and structural steel shall conform to the provisions of part VI Structural Design Section – 1 Load Section – 2 Foundation Section – 3 Wood Section – 4 Masonry Section – 5 Concrete Section – 6 Steel of National Building Code of India (NBC), taking into consideration the Indian Standards as given below: For General Structural Safety 1. IS: 456:2000 “Code of Practice for Plain and Reinforced Concrete 2. IS: 800-1984 “Code of Practice for General Construction in Steel 3. IS: 801-1975 “Code of Practice for Use of Cold Formal Light Gauge Steel Structural Members in General Building Construction 4. IS 875 ( Part 2):1987Design loads ( other than earthquake ) for buildings and structures Part2 Imposed Loads 5. IS 875 ( Part 3):1987Design loads ( other than earthquake ) for buildings and structures Part 3 Wind Loads 6. IS 875 ( Part 4):1987Design loads ( other than earthquake ) for buildings and structures Part 4 Snow Loads 7. IS 875 ( Part 5):1987Design loads ( other than earthquake ) for buildings and structures Part 5 special loads and load combination 8. IS: 883:1966 “Code of Practice for Design of Structural Timber in Building 9. IS: 1904:1987 “Code of Practice for Structural Safety of Buildings: Foundation” 10. IS1905:1987 “Code of Practice for Structural Safety of Buildings: Masonry Walls 11. IS 2911 (Part 1): Section 1: 1979 “Code of Practice for Design and Construction of Pile Foundation Section 1 Part 1: Section 2 Based Cast-in-situ Piles Part 1: Section 3 Driven Precast Concrete Piles Part 1: Section 4 Based precast Concrete Piles Part 2: Timber Piles Part 3 Under Reamed Piles Part 4 Load Test on Piles NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006  Guwahati Metropolitan Dev. Authority  Page No. [53]  For Cyclone/Wind Storm Protection 12. IS 875 (3)-1987 "Code of Practice for Design Loads (other than Earthquake) for Buildings and Structures, Part 3, Wind Loads" 13. Guidelines (Based on IS 875 (3)-1987) for improving the Cyclonic Resistance of Low rise houses and other building For Earthquake Protection 14. IS: 1893-2002 "Criteria for Earthquake Resistant Design of Structures (Fifth Revision)" 15. IS:13920-1993 "Ductile Detailing of Reinforced Concrete Structures subjected to Seismic Forces - Code of Practice" 16. IS:4326-1993 "Earthquake Resistant Design and Construction of Buildings - Code of Practice (Second Revision)" 17. IS:13828-1993 "Improving Earthquake Resistance of Low Strength Masonry Buildings - Guidelines" 18. IS:13827-1993 "Improving Earthquake Resistance of Earthen Buildings - Guidelines", 19. IS:13935-1993 "Repair and Seismic Strengthening of Buildings - Guidelines" For Protection of Landslide Hazard 20. IS 14458 (Part 1): 1998 Guidelines for retaining wall for hill area: Part 1 Selection of type of wall. 21. IS 14458 (Part 2): 1997 Guidelines for retaining wall for hill area: Part 2 Design of retaining/breast walls 22. IS 14458 (Part 3): 1998 Guidelines for retaining wall for hill area: Part 3 Construction of dry stone walls 23. IS 14496 (Part 2): 1998 Guidelines for preparation of landslide – Hazard Zonation maps in mountainous terrains: Part 2 Macro-Zonation Note: Whenever an Indian Standard including those referred in the National Building Code or the National Building Code is referred, the latest revision of the same shall be followed except specific criteria, if any, mentioned above against that code. 67.2 STRUCTURAL DESIGN BASIS REPORT In compliance of the design with the above Indian Standard, the Registered Structural Engineer on Record will submit a structural design basis report in the proforma attached herewith covering the essential safety requirements specified in the Standard. (i) The “Structural Design Basis Report (SDBR)”consists of four arts(FormNo.6) Part-1 - General Information/ Data Part-2 - Load Bearing Masonry Buildings Part-3 – Reinforced Concrete Buildings Part-4 - Steel Buildings NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006  Guwahati Metropolitan Dev. Authority  Page No. [54]  (ii) Drawings and Documents to be submitted for approval of appropriate authorities shall include SDBR as detailed below: Part - 1 Completed Part - 2 (if applicable) – completed Part -3 (if applicable) – undertaking that completed Part 3 will be submitted before commencement of construction. Part– 4 (if applicable) – undertaking that completed Part 4 will be submitted before commencement of construction. (iii) SDBR as detailed below shall be submitted to the appropriate authority as soon as design of foundation is completed, but not later than one month prior to commencement of construction. Part-1 Completed Part-2, Part-3 or Part-4 ( if applicable) Completed 67.3 SEISMIC STRENGTHENING/RETROFITTING Prior to seismic strengthening/ retrofitting of any existing structure, evaluation of the existing structure as regards structural vulnerability in the specified wind/ seismic hazard zone shall be carried out by a RSE/RSDA. If as per the evaluation of the RSE/RSDA the seismic resistance is assessed to be less than the specified minimum seismic resistance as given in the note below, action will be initiated to carry out the upgrading of the seismic resistance of the building as per applicable standard guidelines. Note: (a) for masonry buildings reference is to be made to IS: 4326 and IS: 13935 and (b) for concrete buildings and structures reference to be made to BIS code on evaluation and seismic strengthening for retrofitting of RCC buildings under preparation at present. 67.4 REVIEW OF STRUCTURAL DESIGN (i) The competent authority shall create a Structural Design Review Panel (SDRP) consisting of senior SER’s and SDAR’s whose task will be to review and certify the design prepared by SER or SDAR whenever it is decided to be referred by the competent authority. (ii) The reviewing agency shall submit addendum to the certificate or a new certificate in case of subsequent changes in structural design. (iii) Table-1 gives requirements of SDRP for different seismic zones namely III, IV and V and for structures of different complexities NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006  Guwahati Metropolitan Dev. Authority  Page No. [55]  TABLE – 1 PROOF CHECKING REQUIREMENTS FOR STRUCTURAL DESIGN SR NO. TYPE OF STRUCTURE / RCC SUBMISSION FROM SER or SDAR TO BE PROOF - CHECKED 01 LOAD BEARING BUILDINGS UPTO 3 STOREYS SDBR* NOT TO BE CHECKED / SUBMITTED 02 BUILDINGS UPTO SEVEN STOREYS (R.C.C. / STEEL FRAMED STRUCTURE) SDBR TO BE CHECKED PRELIMINARY DESIGN NOT TO BE CHECKED BUT REQUIRED TO BE SUBMITTED 03 BUILDINGS MORE THAN SEVEN STOREYS ( R.C.C. / STEEL FRAMED STRUCTURE) SDBR TO BE CHECKED PRELIMINARY DESIGN TO BE CHECKED DETAILED STRUCTURAL DESIGN AND STRUCTURAL DRAWINGS TO BE CHECKED 04 PUBLIC BUILDINGS (A) LOAD BEARING BUILDINGS / RCC UPTO 3 STOREYS SDBR NOT TO BE CHECKED (B) R.C.C./STEEL STRUCTURES SDBR TO BE CHECKED PRELIMINARY DESIGN TO BE CHECKED DETAILED STRUCTURAL DSIGN AND STRUCTURAL DRAWINGS TO BE CHECKED 05 SPECIAL STRUCTURES SDBR TO BE CHECKED PRELIMINARY DESIGN TO BE CHECKED DETAILED STRUCTURAL DESIGN-AND STRUCTURAL DRAWINGS TO BE CHECKED * SDBR - Structural Design Basis Report Notes: • Public building means assembly of large number of people including schools, hospitals, courts etc. • Special structure means large span structures such as stadium, assembly halls, or tall structures such as water tanks, TV tower, chimney, etc. It will be seen from the table that there is a wide range of structure typology, and the requirement by the competent authority for third party verification will depend on the type of structure. NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006  Guwahati Metropolitan Dev. Authority  Page No. [56]  67.5 CERTIFICATION REGARDING STRUCTURAL SAFETY IN DESIGN Registered Structural Engineer on Record (SER) or Structural Design Agency on Record (SDAR) shall give a certificate of structural safety of design as per proforma given in Form-3 and Form-14 at the time of completion. 67.6 CONSTRUCTIONAL SAFETY 67.6.1 Supervision All construction except RCC load bearing buildings upto 3 storeys shall be carried out under supervision of the Construction Engineer on Record (CER) or Construction Management Agency on Record (CMAR) for various seismic zones. 67.6.2 Certification of structural safety in construction CER/ CMAR shall give a certificate of structural safety of construction as per proforma given in Form-13 at the time of completion. 67.7 QUALITY CONTROL AND INSPECTION 67.7.1 Inspection All the construction for highrise buildings higher than seven storeys, public buildings and special structures shall be carried out under quality inspection program prepared and implemented under the Quality Auditor on Record (QAR) or Quality Auditor Agency on Record (QAAR) in seismic zones IV & V. 67.7.2 Certification of safety in quality of construction Quality Auditor on Record (QAR) or Quality Auditor Agency on Record (QAAR) shall give a certificate of quality control as per proforma given in Form-15. Quality Inspection Programme to be carried on the site shall be worked out by QAR/ QAAR in consultation with the owner, builder, CER/ CMAR. 67.8.1 CONTROL OF SIGNS (HOARDINGS) AND OUTDOOR DISPLAY STRUCTURES AND PAGING TOWER AND TELEPHONE TOWER AND OUTDOOR DISPLAY STRUCTURES Following provisions shall apply for telecommunication infrastructure. a) Location: The telecommunication infrastructure shall be either placed on the building roof tops or on the ground or open space within the premises subject to other regulations. b) Type of structure NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006  Guwahati Metropolitan Dev. Authority  Page No. [57]  (i) Steel fabricated tower or antennae on M.S. pole. (ii) Pre-fabricated shelters of fibre glass or P.V.C. on the building roof top/terrace for equipment. (iii) Masonry structure/ Shelter on the ground for equipment. (iv) D.G. Set with sound proof cover to reduce the noise level. c) Requirement: (i) Every applicant has to obtain/ procure the necessary permission from the “Standing Advisory Committee on Radio Frequency Allocation” (SACFA) issued by the Ministry of Telecommunications. (ii) Every applicant will have to produce the structural safety & stability certificate for the tower as well as the building from the Structural Engineer on Record (SER) which shall be the liability of both owner and SER. (iii) Applicant has to produce / submit plans of structure to be erected. d) Projection: No Pager and/or telephone tower shall project beyond the existing building line of the building on which it is erected in any direction. 67.9 STRUCTURAL REQUIREMENTS OF LOW COST HOUSING Notwithstanding anything contained herein, for the structural safety and services for development of low cost housing, the relevant provisions of applicable IS Codes shall be enforced. 67.10 INSPECTION The general requirement for inspection of the development shall also include the following regulations. 67.10.1 General Requirements The building unit intended to be developed shall be in conformity with Regulations on requirement of site. Generally all development work for which permission is required shall be subject to inspection by the competent authority as deemed fit. The applicant shall keep a board at site of development mentioning the Dag No, Patta No., Revenue Village, Mouza, Building Permit No. name of owner and name of Architect on Record, Engineer on Record , developer, Structural Engineer on Record , Construction Engineer on Record . 67.10.2 Record of Construction Progress (a) Stages for recording progress certificate and checking:- NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006  Guwahati Metropolitan Dev. Authority  Page No. [58]  i) Plinth, in case of basement before the casting of basement slab. ii) First storey. iii) Middle storey in case of highrise building. iv) Last storey. (b) At each of the above stages, the owner / developer / builder shall submit to the designated officer of the competent authority a progress certificate in the given formats ( Form No. 7-10 ) This progress certificate shall be signed by the Construction Engineer on Record. (c) The progress certificate shall not be necessary in the following cases: i) Alteration in building not involving the structural part of the building. ii) Extension of existing residential building on the ground floor upto maximum 15 sq mt. in area. (d) Completion Report i) It shall be incumbent on every applicant whose plans have been approved, to submit a completion report in Form No.11. ii) It shall also be incumbent on every person / agency who is engaged under this Development Control Regulations to supervise the erection or re-erection of the building, to submit the completion report in Form No.12 and 13 prescribed under these Development Control Regulations. iii) No completion report shall be accepted unless completion plan is approved by the competent authority. (e) The final inspection of the work shall be made by the concerned competent authority within 21 days from the date of receipt of notice of completion report. 67.10.3 Issue of Occupancy Certificate The Authority issuing occupancy certificate before doing so shall ensure that following are complied with for consideration of safety against natural hazard. (i) Certificate of lift Inspector has been procured & submitted by the owner regarding satisfactory erection of lift. (ii) The certificate of competent authority and or fire department for completion and or fire requirements as provided in these regulations has been procured and submitted by the owner. (iii) If any project consists of more than one detached or semi detached building / buildings in a building unit and any building / buildings thereof is completed as per provisions of D.C.R.. (such as parking, common plots, internal roads, height of the building, infrastructure facilities, lift and fire safety measures), the competent authority may issue completion certificate for NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006  Guwahati Metropolitan Dev. Authority  Page No. [59]  such one detached or semi detached building / buildings in a building unit. The occupancy certificate shall not be issued unless the information is supplied by the owner and the Architect on Record/ Engineer on Record concerned in the schedule as prescribed by the competent authority from time to time. 67.11 MAINTENANCE OF BUILDINGS In case of building older than fifty years, it shall be the duty of the owner of a building, to get his building inspected by a Registered Structural Engineer (RSE) within a year from the date of coming into force of these regulations. The Structural Inspection Report (Form No.16) shall be produced by the owner to the appropriate authority. If any action for ensuring the structural safety and stability of the building is to be taken, as recommended by SER, it shall be completed within five years. For other buildings, the owner shall get his building inspected after the age of building has crossed forty years. The procedure shall be followed as per above regulation. 67.12 PROTECTIVE MEASURES IN NATURAL HAZARDPRONE AREAS In natural hazardprone areas identified under the landuse Zoning Regulations, structures, buildings and installations which cannot be avoided, protective measures for such construction/ development should be properly safeguarded based on the suggestion given in Appendix A. NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006  Guwahati Metropolitan Dev. Authority  Page No. [60]  APPENDIX –I MINIMUM NO. OF OFF-STREET PARKING SPACE Sl No. Type of Use One Parking space will be provided for every Car Scooter 1 Residential building (In case of Group housing & apartment buildings) Every unit of 60 sq. mt. Every unit below 60 sq. mt to 40 sq. mt 2 Theatres, Cinemas, Auditorium 15 seats of accommodation 10 seats of accommodation 3 Retail business 50 sq. mt. or fraction thereof 20 sq. mt. of sales area 4 Office building 100 sq. mt. of area or fraction thereof 20 sq. mt. of office floor area 5 Hospital 5 beds (private) 10 beds (public) 5 beds of accommodation 6 Hotel 3 guest rooms 7 Restaurants 10 seats of accommodations 6 seats of accommodations 8 Industrial building 20 employees in the industry 15 employees in the industry 9 Wholesale and Warehouses 60 sq. mt. floor area and fraction thereof for car and scooter - 10 Educational 50 sq. mt. area or fraction thereof of the administrative office area and public service area - 11 Marriage Hall/Community Hall 50 sq. mt. plot area - 12 Stadium and exhibition center 30 seats - Minimum No. of Off-Street Parking space 1) For calculation of total car parking area the area of one car parking space will be as specified in 58 10 (4) 2) For calculation of scooter parking space, one car parking space will be equivalent to 6 scooter parking. 3) 2.5 car parking space will be equivalent to one parking space of heavy vehicle in Industrial and Whole-sale, Warehouse buildings. 4) In all building of various uses except residential buildings (as provided in Sl.1) as mentioned above, parking space of each car and scooter has to be provided. NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006  Guwahati Metropolitan Dev. Authority  Page No. [61] 

Previous and next

All provisions of GUWAHATI BUILDING BYELAWS

Questions people ask

Is rule 60 of GUWAHATI BUILDING BYELAWS still in force?

No repeal of GUWAHATI BUILDING BYELAWS is recorded.