Rule 60, GUWAHATI BUILDING BYELAWS: Factories and building of the warehouse class: 60.1 Factories
GUWAHATI BUILDING BYELAWS - Rule 60
Text of rule 60
Factories and building of the warehouse class: 60.1 Factories
60. Factories and building of the warehouse class:
60.1 Factories: - Every room in such building shall be lighted and ventilated
by sufficient number of windows, ventilators and skylight exclusive of
doors having clear opening not less 1/15 of the floor area abutting on
open air space of width not less than 1/3 rd the height of the part of the
building-abutting-such-open-space.
Provided that this requirement may be relaxed if artificial lighting and
ventilation are installed to the satisfaction of the Authority.
60.2 Height of the floors:- The height of the ground floor and each of the
upper floors shall not be less than 4.2m and 3.9 m. respectively and the
height of the cellar or basement shall in no part be less than 2.4 m.
provided that these provisions shall not apply to the extensions of the
ground floor and upper floors of the existing building.
61. Special regulations for construction in hilly areas:
(a) The Authority may ask for detailed topographic survey map of the site,
showing the proposed ground levels of the plot and the remedial
construction measures to check the undesired erosion that may effect the
adjoining areas. The Authority may also give special direction for
framing the proposal in such a way which involves least disturbance to
the natural terrain and keeping of bare land which is not allowed.
(b) If terrace cutting is done for building constructed on hill the depth and
slope of the cut should be restricted according to the soil characteristic
of the area.
(c) Adequate drainage provision should be kept to the satisfaction of the
Authority so that rain water and waste water can drain out from the plot
without causing soil erosion.
(d) In hill areas with slope greater than 10o special protection measures will have
to be provided as specified by the Authority. Local ground conditions shall be
taken into account in the determination of the appropriate precautionary work
and protection walls as well as relevant code of B.I.S. as specified in Chapter-
VI.
(e) The maximum height of cutting for development should generally be 4
m. to 6m and cutting of slope over a height of 6m. shall not be ordinarily
permitted. Height of 6m earth cutting should be from face of 1st cutting.
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [50]
(f) If however Authority feels that special protective measures are required in the
plot prior to any construction in the plot, no construction of building may be
allowed by the Authority in such plot unless the protective measures are
completed as directed by the Authority first.
62. Environmental-aspects-and-landscaping.
The Authority may impose special provision for landscaping, in special
type of building/ plot that is nature and number of plantation to be carried out,
maintenance of vegetable cover in the plot for the environmental upgradation
of-the-area-and-to-restrict-soil-erosion.
(i) In every plot at least 20% of the land should be utilized for
tree plantation and greenery.
63. (a) The Authority may impose special condition to the developer to
develop the road and drain abutting that particular plot.
(b) If however, developer agree to contribute towards the development charge
for developing adjoining roads and drains or decides to relinquish a part of
these land for improvement of road, drain or creation of open space for the
locality without asking for any compensation to the satisfaction of the
Authority, the Authority may consider allowing additional proportionate
F.A.R. in that particular plot development of the area.
(c) For allowing additional FAR under this provision, detail procedure is given in
Chapter-VII.
64. In Group Housing project and projects where a number of apartment blocks are
proposed in a single plot the Authority may impose special regulations for
drains, recreational open space, garbage disposal etc. in addition to the
regulations contained in these Byelaws.
65. Every building shall provide one or more rain harvesting structures to collect
the roof top run off. The total dimension of recharging/percolating pits/trenches
should be at least 5 cubic metre dimension for every 100 sq.mtr. of roof area.
Provided further that such rain water harvesting structure shall also be
provided in cases of all apartment, institutional and similar buildings and
buildings in hill areas.
65. (i) CONSERVATION AND HARVESTING OF RAIN WATER IN
GROUP HOUSING-SCHEMES/APARTMENT-AND-COMMERCIAL
COMPLEXES/ INSTITUTIONAL BUILDINGS
Every Group Housing Scheme etc. shall be provided with required
facilities and infrastructure for conservation and harvesting of rain
water, viz.,
a. Percolation Pits:
The paved surface around the building shall have percolation pits
of 1.2m x 1.2m x 1.2m covering at least 30% of such area. Such
pits shall be filled with small pebbles or brick jelly or river sand
and covered with perforated concrete slabs.
The following requirements are optional and to be provided
depending on the site conditions.
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [51]
b. Terrace water collection:
The terrace shall be connected to a sump or the well through a
filtering tank by PVC pipe. A valve system shall be incorporated
to enable the first part of the rain water collected to be
discharged out to the soil if it is dirty.
The filtering tank measuring 0.6 m to 1.2 m square can be constructed
near the sump. A tank can be divided by a perforated slab and one part
should be filled by small pebbles and other by brick jelly. The bottom
portion of the tank should have slope to avoid stagnation of water.
c. Open Ground:
Whenever there is open ground a portion of top soil should be removed
and replaced with river sand to allow slow percolation of rain water.
OR
d. Any other methods proved to be effective in conservation and
harvesting of rain water may be adopted in each and every construction
taken up.
66. The following areas of Guwahati to be earmarked by the Authority by notification from
time to time if not already notified in the Master Plan should normally be excluded for
permission of multistoreyed building.
1. National Heritage zones consisting of places of pilgrimage and worship (like,
Satra, Namghar, Devalaya, Mandir, Math, Masjid, Dargah, Gurudwara,
Church) and sites of historical and cultural importance.
2. Areas falling on or abutting natural drainage channels.
3. Areas falling on or abutting wetlands.
4. Areas earmarked for infrastructure of civic amenities in the Master Plan and
Zoning Regulation for Guwahati.
5. Sites on hills and foothills requiring excavation that is likely to cause soil
erosion, land slide or instability of hill slope; and sites below overhanging
embedded rocks without proper protection work as specified in these rules. In
this regard the foot hill areas of Sarania, Kamakhya, Narakasur hills are most
vulnerable.
6. Government land in the hills and in the water bodies like beels.
7. The notified forest land falling within the Guwahati Master Plan area.
8. Areas between river Brahmaputra and the main road from Raj Bhawan to
Kamakhya hill.
The Authority will judiciously examine all building proposals including
multistoreyed buildings in the vicinity of the above areas before such proposal
are cleared/allowed with such condition / modification as the Authority may
decide from time to time. The protective measures to be taken in natural hazard
prone areas has been given in Chapter –VI Cl. 6.12.
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [52]
Chapter VI
67. ADDITIONAL PROVISIONS IN BUILDING REGULATIONS /BYELAWS
FOR STRUCTURAL SAFETY.
67.1 STRUCTURAL DESIGN
For any building under the jurisdiction of these regulations structural design/
retrofitting shall only be carried out by a Registered Structural Engineer on Record
(SER) or Structural Design Agency on Record (SDAR). Proof checking of various
designs/ reports shall be carried out by competent authority as per Table-1 wherever
applicable.
Generally, the structural design of foundations, elements of masonry, timber, plain
concrete, reinforced concrete, pre-stressed concrete and structural steel shall conform to
the provisions of part VI Structural Design Section – 1 Load Section – 2 Foundation
Section – 3 Wood Section – 4 Masonry Section – 5 Concrete Section – 6 Steel of
National Building Code of India (NBC), taking into consideration the Indian Standards
as given below:
For General Structural Safety
1. IS: 456:2000 “Code of Practice for Plain and Reinforced Concrete
2. IS: 800-1984 “Code of Practice for General Construction in Steel
3. IS: 801-1975 “Code of Practice for Use of Cold Formal Light Gauge Steel
Structural Members in General Building Construction
4. IS 875 ( Part 2):1987Design loads ( other than earthquake ) for buildings and
structures Part2 Imposed Loads
5. IS 875 ( Part 3):1987Design loads ( other than earthquake ) for buildings and
structures Part 3 Wind Loads
6. IS 875 ( Part 4):1987Design loads ( other than earthquake ) for buildings and
structures Part 4 Snow Loads
7. IS 875 ( Part 5):1987Design loads ( other than earthquake ) for buildings and
structures Part 5 special loads and load combination
8. IS: 883:1966 “Code of Practice for Design of Structural Timber in Building
9. IS: 1904:1987 “Code of Practice for Structural Safety of Buildings:
Foundation”
10. IS1905:1987 “Code of Practice for Structural Safety of Buildings: Masonry
Walls
11. IS 2911 (Part 1): Section 1: 1979 “Code of Practice for Design and Construction
of Pile Foundation Section 1
Part 1: Section 2 Based Cast-in-situ Piles
Part 1: Section 3 Driven Precast Concrete Piles
Part 1: Section 4 Based precast Concrete Piles
Part 2: Timber Piles
Part 3 Under Reamed Piles
Part 4 Load Test on Piles
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [53]
For Cyclone/Wind Storm Protection
12. IS 875 (3)-1987 "Code of Practice for Design Loads (other than Earthquake) for
Buildings and Structures, Part 3, Wind Loads"
13. Guidelines (Based on IS 875 (3)-1987) for improving the Cyclonic Resistance
of Low rise houses and other building
For Earthquake Protection
14. IS: 1893-2002 "Criteria for Earthquake Resistant Design of Structures (Fifth
Revision)"
15. IS:13920-1993 "Ductile Detailing of Reinforced Concrete Structures subjected
to Seismic Forces - Code of Practice"
16. IS:4326-1993 "Earthquake Resistant Design and Construction of Buildings -
Code of Practice (Second Revision)"
17. IS:13828-1993 "Improving Earthquake Resistance of Low Strength Masonry
Buildings - Guidelines"
18. IS:13827-1993 "Improving Earthquake Resistance of Earthen Buildings -
Guidelines",
19. IS:13935-1993 "Repair and Seismic Strengthening of Buildings - Guidelines"
For Protection of Landslide Hazard
20. IS 14458 (Part 1): 1998 Guidelines for retaining wall for hill area: Part 1
Selection of type of wall.
21. IS 14458 (Part 2): 1997 Guidelines for retaining wall for hill area: Part 2 Design
of retaining/breast walls
22. IS 14458 (Part 3): 1998 Guidelines for retaining wall for hill area: Part 3
Construction of dry stone walls
23. IS 14496 (Part 2): 1998 Guidelines for preparation of landslide – Hazard
Zonation maps in mountainous terrains: Part 2 Macro-Zonation
Note: Whenever an Indian Standard including those referred in the National Building
Code or the National Building Code is referred, the latest revision of the same shall be
followed except specific criteria, if any, mentioned above against that code.
67.2 STRUCTURAL DESIGN BASIS REPORT
In compliance of the design with the above Indian Standard, the Registered Structural
Engineer on Record will submit a structural design basis report in the proforma
attached herewith covering the essential safety requirements specified in the Standard.
(i) The “Structural Design Basis Report (SDBR)”consists of four
arts(FormNo.6)
Part-1 - General Information/ Data
Part-2 - Load Bearing Masonry Buildings
Part-3 – Reinforced Concrete Buildings
Part-4 - Steel Buildings
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [54]
(ii) Drawings and Documents to be submitted for approval of appropriate
authorities shall include SDBR as detailed below:
Part - 1 Completed
Part - 2 (if applicable) – completed
Part -3 (if applicable) – undertaking that completed Part 3 will be submitted
before commencement of construction.
Part– 4 (if applicable) – undertaking that completed Part 4 will be submitted
before commencement of construction.
(iii) SDBR as detailed below shall be submitted to the appropriate authority as
soon as design of foundation is completed, but not later than one month
prior to commencement of construction.
Part-1 Completed
Part-2, Part-3 or Part-4 ( if applicable) Completed
67.3 SEISMIC STRENGTHENING/RETROFITTING
Prior to seismic strengthening/ retrofitting of any existing structure, evaluation of the
existing structure as regards structural vulnerability in the specified wind/ seismic
hazard zone shall be carried out by a RSE/RSDA. If as per the evaluation of the
RSE/RSDA the seismic resistance is assessed to be less than the specified minimum
seismic resistance as given in the note below, action will be initiated to carry out the
upgrading of the seismic resistance of the building as per applicable standard
guidelines.
Note: (a) for masonry buildings reference is to be made to IS: 4326 and IS: 13935 and
(b) for concrete buildings and structures reference to be made to BIS code on
evaluation and seismic strengthening for retrofitting of RCC buildings under
preparation at present.
67.4 REVIEW OF STRUCTURAL DESIGN
(i) The competent authority shall create a Structural Design Review Panel (SDRP)
consisting of senior SER’s and SDAR’s whose task will be to review and certify
the design prepared by SER or SDAR whenever it is decided to be referred by
the competent authority.
(ii) The reviewing agency shall submit addendum to the certificate or a new
certificate in case of subsequent changes in structural design.
(iii) Table-1 gives requirements of SDRP for different seismic zones namely III, IV
and V and for structures of different complexities
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [55]
TABLE – 1
PROOF CHECKING REQUIREMENTS FOR STRUCTURAL DESIGN
SR
NO.
TYPE OF STRUCTURE / RCC SUBMISSION FROM
SER or SDAR
TO BE PROOF - CHECKED
01 LOAD BEARING BUILDINGS
UPTO 3 STOREYS
SDBR* NOT TO BE CHECKED /
SUBMITTED
02 BUILDINGS UPTO SEVEN
STOREYS (R.C.C. / STEEL
FRAMED STRUCTURE)
SDBR TO BE CHECKED
PRELIMINARY DESIGN
NOT TO BE CHECKED BUT
REQUIRED TO BE SUBMITTED
03 BUILDINGS MORE THAN
SEVEN STOREYS ( R.C.C. /
STEEL FRAMED
STRUCTURE)
SDBR TO BE CHECKED
PRELIMINARY DESIGN TO BE CHECKED
DETAILED STRUCTURAL
DESIGN AND
STRUCTURAL DRAWINGS
TO BE CHECKED
04
PUBLIC BUILDINGS
(A) LOAD BEARING
BUILDINGS / RCC UPTO 3
STOREYS
SDBR
NOT TO BE CHECKED
(B) R.C.C./STEEL
STRUCTURES
SDBR
TO BE CHECKED
PRELIMINARY DESIGN
TO BE CHECKED
DETAILED STRUCTURAL
DSIGN AND STRUCTURAL
DRAWINGS
TO BE CHECKED
05
SPECIAL STRUCTURES
SDBR
TO BE CHECKED
PRELIMINARY DESIGN
TO BE CHECKED
DETAILED STRUCTURAL
DESIGN-AND
STRUCTURAL DRAWINGS
TO BE CHECKED
* SDBR - Structural Design Basis Report
Notes:
• Public building means assembly of large number of people including schools,
hospitals, courts etc.
• Special structure means large span structures such as stadium, assembly halls,
or tall structures such as water tanks, TV tower, chimney, etc.
It will be seen from the table that there is a wide range of structure typology, and the
requirement by the competent authority for third party verification will depend on the
type of structure.
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [56]
67.5 CERTIFICATION REGARDING STRUCTURAL SAFETY IN DESIGN
Registered Structural Engineer on Record (SER) or Structural Design Agency on
Record (SDAR) shall give a certificate of structural safety of design as per proforma
given in Form-3 and Form-14 at the time of completion.
67.6 CONSTRUCTIONAL SAFETY
67.6.1 Supervision
All construction except RCC load bearing buildings upto 3 storeys shall
be carried out under supervision of the Construction Engineer on Record (CER)
or Construction Management Agency on Record (CMAR) for various seismic
zones.
67.6.2 Certification of structural safety in construction
CER/ CMAR shall give a certificate of structural safety of construction
as per proforma given in Form-13 at the time of completion.
67.7 QUALITY CONTROL AND INSPECTION
67.7.1 Inspection
All the construction for highrise buildings higher than seven storeys,
public buildings and special structures shall be carried out under quality
inspection program prepared and implemented under the Quality Auditor on
Record (QAR) or Quality Auditor Agency on Record (QAAR) in seismic zones
IV & V.
67.7.2 Certification of safety in quality of construction
Quality Auditor on Record (QAR) or Quality Auditor Agency on
Record (QAAR) shall give a certificate of quality control as per proforma given
in Form-15.
Quality Inspection Programme to be carried on the site shall be worked
out by QAR/ QAAR in consultation with the owner, builder, CER/ CMAR.
67.8.1 CONTROL OF SIGNS (HOARDINGS) AND OUTDOOR DISPLAY STRUCTURES
AND PAGING TOWER AND TELEPHONE TOWER AND OUTDOOR DISPLAY
STRUCTURES
Following provisions shall apply for telecommunication infrastructure.
a) Location: The telecommunication infrastructure shall be either placed on
the building roof tops or on the ground or open space within the
premises subject to other regulations.
b) Type of structure
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [57]
(i) Steel fabricated tower or antennae on M.S. pole.
(ii) Pre-fabricated shelters of fibre glass or P.V.C. on the building
roof top/terrace for equipment.
(iii) Masonry structure/ Shelter on the ground for equipment.
(iv) D.G. Set with sound proof cover to reduce the noise level.
c) Requirement:
(i) Every applicant has to obtain/ procure the necessary permission
from the “Standing Advisory Committee on Radio Frequency
Allocation” (SACFA) issued by the Ministry of
Telecommunications.
(ii) Every applicant will have to produce the structural safety &
stability certificate for the tower as well as the building from the
Structural Engineer on Record (SER) which shall be the liability of
both owner and SER.
(iii) Applicant has to produce / submit plans of structure to be erected.
d) Projection: No Pager and/or telephone tower shall project beyond the
existing building line of the building on which it is erected in any
direction.
67.9 STRUCTURAL REQUIREMENTS OF LOW COST HOUSING
Notwithstanding anything contained herein, for the structural safety and services for
development of low cost housing, the relevant provisions of applicable IS Codes shall
be enforced.
67.10 INSPECTION
The general requirement for inspection of the development shall also include the
following regulations.
67.10.1 General Requirements
The building unit intended to be developed shall be in conformity with
Regulations on requirement of site. Generally all development work for which
permission is required shall be subject to inspection by the competent authority
as deemed fit.
The applicant shall keep a board at site of development mentioning the
Dag No, Patta No., Revenue Village, Mouza, Building Permit No. name of
owner and name of Architect on Record, Engineer on Record , developer,
Structural Engineer on Record , Construction Engineer on Record .
67.10.2 Record of Construction Progress
(a) Stages for recording progress certificate and checking:-
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [58]
i) Plinth, in case of basement before the casting of basement slab.
ii) First storey.
iii) Middle storey in case of highrise building.
iv) Last storey.
(b) At each of the above stages, the owner / developer / builder shall submit
to the designated officer of the competent authority a progress certificate
in the given formats ( Form No. 7-10 ) This progress certificate shall
be signed by the Construction Engineer on Record.
(c) The progress certificate shall not be necessary in the following cases:
i) Alteration in building not involving the structural part of the
building.
ii) Extension of existing residential building on the ground floor
upto
maximum 15 sq mt. in area.
(d) Completion Report
i) It shall be incumbent on every applicant whose plans have been
approved, to submit a completion report in Form No.11.
ii) It shall also be incumbent on every person / agency who is engaged
under this Development Control Regulations to supervise the
erection or re-erection of the building, to submit the completion
report in Form No.12 and 13 prescribed under these Development
Control Regulations.
iii) No completion report shall be accepted unless completion plan is
approved by the competent authority.
(e) The final inspection of the work shall be made by the concerned
competent authority within 21 days from the date of receipt of notice of
completion report.
67.10.3 Issue of Occupancy Certificate
The Authority issuing occupancy certificate before doing so shall
ensure that following are complied with for consideration of safety
against natural hazard.
(i) Certificate of lift Inspector has been procured & submitted by the
owner regarding satisfactory erection of lift.
(ii) The certificate of competent authority and or fire department for
completion and or fire requirements as provided in these
regulations has been procured and submitted by the owner.
(iii) If any project consists of more than one detached or semi
detached building / buildings in a building unit and any building
/ buildings thereof is completed as per provisions of D.C.R..
(such as parking, common plots, internal roads, height of the
building, infrastructure facilities, lift and fire safety measures),
the competent authority may issue completion certificate for
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [59]
such one detached or semi detached building / buildings in a
building unit.
The occupancy certificate shall not be issued unless the
information is supplied by the owner and the Architect on
Record/ Engineer on Record concerned in the schedule as
prescribed by the competent authority from time to time.
67.11 MAINTENANCE OF BUILDINGS
In case of building older than fifty years, it shall be the duty of the owner of a building,
to get his building inspected by a Registered Structural Engineer (RSE) within a year
from the date of coming into force of these regulations. The Structural Inspection
Report (Form No.16) shall be produced by the owner to the appropriate authority. If
any action for ensuring the structural safety and stability of the building is to be taken,
as recommended by SER, it shall be completed within five years.
For other buildings, the owner shall get his building inspected after the age of building
has crossed forty years. The procedure shall be followed as per above regulation.
67.12 PROTECTIVE MEASURES IN NATURAL HAZARDPRONE AREAS
In natural hazardprone areas identified under the landuse Zoning Regulations,
structures, buildings and installations which cannot be avoided, protective measures for
such construction/ development should be properly safeguarded based on the
suggestion given in Appendix A.
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [60]
APPENDIX –I
MINIMUM NO. OF OFF-STREET PARKING SPACE
Sl No. Type of Use One Parking space will be provided for every
Car Scooter
1 Residential building
(In case of Group
housing &
apartment
buildings)
Every unit of 60 sq. mt. Every unit below 60 sq.
mt to 40 sq. mt
2 Theatres, Cinemas,
Auditorium
15 seats of
accommodation
10 seats of
accommodation
3 Retail business 50 sq. mt. or fraction
thereof
20 sq. mt. of sales area
4 Office building 100 sq. mt. of area or
fraction thereof
20 sq. mt. of office floor
area
5 Hospital 5 beds (private) 10 beds
(public)
5 beds of accommodation
6 Hotel 3 guest rooms
7 Restaurants 10 seats of
accommodations
6 seats of
accommodations
8 Industrial building 20 employees in the
industry
15 employees in the
industry
9 Wholesale and
Warehouses
60 sq. mt. floor area and
fraction thereof for car
and scooter
-
10 Educational 50 sq. mt. area or fraction
thereof of the
administrative office area
and public service area
-
11 Marriage
Hall/Community
Hall
50 sq. mt. plot area -
12 Stadium and
exhibition center 30 seats -
Minimum No. of Off-Street Parking space
1) For calculation of total car parking area the area of one car parking space will
be as specified in 58 10 (4)
2) For calculation of scooter parking space, one car parking space will be
equivalent to 6 scooter parking.
3) 2.5 car parking space will be equivalent to one parking space of heavy vehicle
in Industrial and Whole-sale, Warehouse buildings.
4) In all building of various uses except residential buildings (as provided in Sl.1)
as mentioned above, parking space of each car and scooter has to be provided.
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [61]
Previous and next
Questions people ask
Is rule 60 of GUWAHATI BUILDING BYELAWS still in force?
No repeal of GUWAHATI BUILDING BYELAWS is recorded.