Form 6, GUWAHATI BUILDING BYELAWS: FORM NO. 6
GUWAHATI BUILDING BYELAWS - Form 6
Text of form 6
FORM NO. 6
FORM NO. 6
STRUCTURAL DESIGN BASIS REPORT
1. This report to accompany the application for Building Development Permission.
2. In case information on items 3, 10, 17, 18 and 19 can not be given at this time, it
should be submitted at least one week before commencement of construction.
Part 1: General Data
Sl
No
Description Information Notes
1 Address of the building
• Name of the building
• Plot number
• Subplot number
• TPS scheme
a. Name
b. Number
• Locality/Township
• District
2 Name of owner
3 Name of Builder on record
4 Name of Architect/Engineer on record
5 Name of Structural engineer on record
6 Use of the building
7 Number of storeys above ground level
(including storeys to be added later, if
any)
8 Number of basements below ground
Level
9 Type of structure
• Load bearing walls
• R.C.C frame
• R.C.C frame and Shear walls
• Steel frame
10 Soil data
• Type of soil
• Design safe bearing capacity
IS: 1893 Cl. 6.3.5.2
IS: 1904
11 Dead loads (unit weight adopted)
• Earth
• Water
• Brick masonry
• Plain cement concrete
• Reinforced cement concrete
• Floor finish
• Other fill materials
• Piazza floor fill and landscape
IS: 875 Part 1
12 Imposed (live) loads
• Piazza floor accessible to Fire Tender
• Piazza Floor not accessible to
Fire Tender
IS: 875 Part 2
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [77]
. h�Floor loads
. h�Roof loads
13 Cyclone / Wind
• Speed
• Design pressure intensity
IS: 875 Part 3
14 Seismic zone IS:1893 2002
15 Importance factor IS:1893 (2002) Table 6
16 Seismic zone factor(Z) IS:1893 Table 2
17 Response reduction factor IS: 1893 Table-7
18 Fundamental natural period
- approximate
IS: 1893 Cl. 7.6
19 Design horizontal acceleration spectrum
value (Ah)
IS: 1893 Cl. 6.4.2
20 Expansion / Separation Joints
Part 2: Load bearing masonry buildings
Sl
No
Description Information Notes
1 Building category IS:4326 Cl. 7 read with
IS: 1893
Bld/Zone II III IV V
Ord. B C D E
Important C D E E
2 Basement Provided
3 Number of floors including Ground
Floor (all floors including stepped
floors in hill slopes)
4 Type of wall masonry
5 Type and mix of Mortar IS:4326 Cl. 8.1.2
6 Re: size and position of openings
(See note No.1)
• Minimum distance (b5)
• Ratio (b1+b2+b3)/l1 or
(b6+b7)/l2
• Minimum pier width
between consequent
opening (b4)
• Vertical distance (h3)
• Ratio of wall height to thickness4
• Ratio of wall length
between cross wall to
thickness
IS:4326 Table 4, Fig.7
7 Horizontal seismic band
• at plinth level
• at window sill level
• at lintel level
• at ceiling level
• at eave level of sloping roof
• at top of gable walls
• at top of ridge walls
P IP NA
(see note no.2)
IS:4326 Cl. 8.4.6
IS:4326 Cl. 8.3
IS:4326 Cl. 8.4.2
IS:4326 Cl. 8.4.3
IS:4326 Cl. 8.4.3
IS:4326 Cl. 8.4.4
8 Vertical reinforcing bar
• at corners and T junction of
walls
• at jambs of doors and
window openings
IS:4326 Cl. 8.4.8
IS:4326 Cl. 8.4.9
9 Integration of prefab
roofing/flooring elements through
IS:4326 Cl. 9.1.4
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [78]
reinforced concrete screed
10 Horizontal bracings
in pitched truss
• in horizontal plane at the
level of ties
• in the slopes of pitched
roofs
Part 3 : Reinforced concrete framed buildings
Sl
No
Description Information Notes
1 Type of Building
i�Regular frames
i�Regular frames with Shear walls
i�Irregular frames
i�Irregular frames with shear walls
i�Soft storey
IS: 1893 Cl. 7.1
2 Number of basements
3 Number of floors including ground floor
4 Horizontal floor system
i�Beams and slabs
i�Waffles
i�Ribbed Floor
i�Flat slab with drops
i�Flat plate without drops
5 Soil data
i�Type of soil
iRecommended type of foundation
- Independent footings
- Raft
- Piles
iRecommended bearing capacity of soil
iRecommended, type, length, diameter and
load capacity of piles
iDepth of water table
iChemical analysis of ground water
iChemical analysis of soil
IS: 1498
6 Foundations
iDepth below ground level
iType
• Independent
• Interconnected
• Raft
• Piles
7 System of interconnecting foundations
i�Plinth beams
i�Foundation beams
IS: 1893 Cl. 7.12.1
8 Grades of concrete used in different parts of
building
9 Method of analysis used
10 Computer software used IS: 1893 Cl. 7.9
11 Torsion included
12 Base shear
a. Based on approximate fundamental period
b. Based on dynamic analysis
IS: 1893 Cl. 7.5.3
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [79]
c. Ratio of a/b
13 Distribution of seismic forces along the height
of the building
IS:1893 Cl. 7.7
(provide sketch)
14 The column of soft ground storey specially
designed
IS:1893 Cl. 7.10
15 Clear minimum cover provided in
• Footing
• Column
• Beams
• Slabs
• Walls
IS: 456 Cl. 26.4
16 Ductile detailing of RC frame
• Type of reinforcement used
• Minimum dimension of beams
• Minimum dimension of columns
• Minimum percentage of reinforcement of beams at
any cross section
• Maximum percentage of reinforcement at any
section of beam
• Spacing of transverse reinforcement in 2-d length of
beams near the ends
• Ratio of capacity of beams in shear to capacity of
beams in flexure
• Maximum percentage of reinforcement in column
• Confining stirrups near ends of columns and in
beam-column joints
a. Diameter
b. Spacing
• Ratio of shear capacity of columns to maximum
seismic shear in the storey
IS: 456 Cl. 5.6
IS:13920 Cl. 6.1
IS:13920Cl. 7.1.2
IS: 456 Cl. 26.5.1.1(a)
IS:13920 Cl. 6.2.1
IS: 456 Cl. 26.5.1.1(b)
IS:13920 Cl. 6.2.2
IS: 13920 Cl. 6.3.5
IS: 456 Cl. 26.5.3.1
IS: 13920 Cl. 7.4
General Notes
1. A certificate to the effect that this report will be completed and submitted at least one
month before commencement of Construction shall be submitted with the application
for Building Development Permission.
2. In addition to the completed report following additional information shall be submitted,
at the latest, one month before commencement of Construction.
2.1 Foundations
2.1.1 Incase raft foundation has been adopted indicate K value used for analysis of the raft
2.1.2 Incase pile foundations have been used give full particulars of the piles, type, dia, length,
capacity
2.1.3 Incase of high water table indicate system of countering water pressure, and indicate the
existing water table, and that assumed to design foundations.
2.2 Idealization for Earthquake analysis
2.2.1 Incase of a composite system of shear walls and rigid frames, give distribution
of base shear in the two systems on the basis of analysis, and that used for
design of each system.
2.2.2 Indicate the idealization of frames and shear walls adopted in the analysis with the help of
sketches.
2.3 Submit framing plans of each floor
2.4 Incase of basements, indicate the system used to contain earth pressures
Part 4 : Buildings in Structural Steel
1 Adopted method of Design O Simple
O Semi-rigid
O Rigid
IS: 800; Cl. 3.4.4
IS: 800; Cl. 3.4.5
IS: 800; Cl. 3.4.6
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [80]
2 Design based on O Elastic analysis
O Plastic analysis
IS: 800; Section-9
SP: 6 (6)
3 Floor Construction O Composite
O Non-composite
O Boarded
4 Roof Construction O Composite
O Non-composite
O Metal
O Any other
5 Horizontal force resisting system
adopted
O Frames
O Braced frames
O Frames & shear
walls
Note: Seismic force
As per IS:
1893Would
depend on system
6 Slenderness ratios maintained Members defined in
Table 3.1, IS: 800
IS: 800; Cl. 3.7
7 Member deflection limited to Beams, Rafters
Crane Girders
Purlins
Top of Columns
IS: 800; Cl. 3.13
8 Structural members O Encased in
Concrete
O Not encased
IS: 800; Section-10
9 Proposed material O General weld-able
O High strength
O Cold formed
O Tubular
IS: 2062
IS: 8500
IS: 801, 811
IS: 806
10 Minimum metal thickness Specified for
corrosion protection
O Hot rolled sections
O Cold formed sections
O Tubes
IS: 800, Cl. 3.8
Cl. 3.8.1 to Cl. 3.8.4
Cl. 3.8.5
Cl. 3.8.5
11 Structural connections O Rivets
O C T Bolts
O S H F G Bolts
O Black Bolts
O Welding-
Field Shop (Specify welding
type proposed)
O Composite
IS: 800; Section-8
IS: 1929,2155,1149
IS: 6639, 1367
IS: 3757, 4000
IS: 1363, 1367
IS: 816, 814, 1395,
7280, 3613, 6419
6560, 813, 9595
Minimum Fire rating
Proposed, with method
O Rating ---------- hours
O Method proposed-
- In tumescent Painting
- Spraying
- Quilting
- Fire retardant boarding
IS: 1641, 1642, 1643
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006