Appendix III, GUWAHATI BUILDING BYELAWS: APPENDIX-III
GUWAHATI BUILDING BYELAWS - Appendix III
Text of appendix III
APPENDIX-III
APPENDIX-III
Penalties to be levied for violations of provisions of Master Plan/ Zoning
Regulations & Byelaws.
(i) All provisions of Byelaws except items given below shall not be compounded/
regularized and shall have to be rectified by alteration/ demolition at the risk
and cost of owner.
Compoundable Items:
(1) Coverage - Maximum of 5%
(2) F.A.R. - Maximum of 10%
(3) Setback - Upto 2′-6″
(4) Open space - maximum 10% reduction
(5) Total height of building - 1.5%
Non compoundable Items:
(1) Use of building
(2) Addition of extra floor
(3) Parking norms
(4) Projection/ encroachment of public land.
Note: Additional floors will mean additional floors beyond the compoundable FAR.
Compoundable Items
If a building or part thereof has been constructed unauthorisedly i.e. without
obtaining the required building permit from the Authority as required by Building
Byelaws the same shall be compounded at the following rates provided the construction
otherwise conforms to the provisions of Building Byelaws & Master Plan and Zoning
Regulations. For this party shall have to submit the request for permission in the
prescribed procedure to the Committee headed by Vice Chairman in case of GMDA
and Standing Appeal Committee in case of GMC.
Rates
(1) For building built prior to 1998.
(i) Five times the rate of normal permission fees for residential, public
& semi public, institutional, educational buildings.
(ii) Ten times the rate of normal permission fees for commercial
apartment, industrial & similar buildings.
(2) For buildings built after 1998 upto 2002.
(i) In addition to the rates prescribed in (I), the normal building
permission fees will be charged.
N.B.: For incomplete building, the regularization fees to be computed on pro-rata
basis.
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [67]
(3) Rates for deviation of the Building Byelaws other than non-compoundable
items specified in (i) of appendix –III shall be compounded at following rates
for building constructed upto 2002.
(i) Rs. 500.00/sq.mtr. of area to be compounded for residential, public &
semi public and educational buildings.
(ii) Rs. 3000.00/Sq.mtr. of area to be compounded for commercial,
apartment, industrial building.
N.B: (i) 5% escalation charge /year will be added for buildings constructed after
2002.
(ii) The buildings not covered specifically under above categories shall be
compoundable as decided by the Authority considering the merit of each case.
Residential & non residential buildings:
Upto 0.15mtr - No penalty
Above 0.15 mtr to 0.3 mtr - Rs. 10.00 per sq. mtr.
Above 0.30 mtr to 0.75 mtr - Rs. 20.00 per sq. mtr.
If a building has more than one violation the total regularisation fee will be
calculated after considering each violation separately as per these provisions.
Note: The Authority may however refuse regularisation of construction even with
penalties as specified in the above provisions if in the opinion of the Authority this may
infringe public safety and general environment of adjoining area.
NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006
Guwahati Metropolitan Dev. Authority Page No. [68]
Previous and next
Questions people ask
Is appendix III of GUWAHATI BUILDING BYELAWS still in force?
No repeal of GUWAHATI BUILDING BYELAWS is recorded.