LawGrids logoLAWGRIDS.ORG

Appendix III, GUWAHATI BUILDING BYELAWS: APPENDIX-III

GUWAHATI BUILDING BYELAWS - Appendix III

Text of appendix III

APPENDIX-III

APPENDIX-III Penalties to be levied for violations of provisions of Master Plan/ Zoning Regulations & Byelaws. (i) All provisions of Byelaws except items given below shall not be compounded/ regularized and shall have to be rectified by alteration/ demolition at the risk and cost of owner. Compoundable Items: (1) Coverage - Maximum of 5% (2) F.A.R. - Maximum of 10% (3) Setback - Upto 2′-6″ (4) Open space - maximum 10% reduction (5) Total height of building - 1.5% Non compoundable Items: (1) Use of building (2) Addition of extra floor (3) Parking norms (4) Projection/ encroachment of public land. Note: Additional floors will mean additional floors beyond the compoundable FAR. Compoundable Items If a building or part thereof has been constructed unauthorisedly i.e. without obtaining the required building permit from the Authority as required by Building Byelaws the same shall be compounded at the following rates provided the construction otherwise conforms to the provisions of Building Byelaws & Master Plan and Zoning Regulations. For this party shall have to submit the request for permission in the prescribed procedure to the Committee headed by Vice Chairman in case of GMDA and Standing Appeal Committee in case of GMC. Rates (1) For building built prior to 1998. (i) Five times the rate of normal permission fees for residential, public & semi public, institutional, educational buildings. (ii) Ten times the rate of normal permission fees for commercial apartment, industrial & similar buildings. (2) For buildings built after 1998 upto 2002. (i) In addition to the rates prescribed in (I), the normal building permission fees will be charged. N.B.: For incomplete building, the regularization fees to be computed on pro-rata basis. NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006  Guwahati Metropolitan Dev. Authority  Page No. [67]  (3) Rates for deviation of the Building Byelaws other than non-compoundable items specified in (i) of appendix –III shall be compounded at following rates for building constructed upto 2002. (i) Rs. 500.00/sq.mtr. of area to be compounded for residential, public & semi public and educational buildings. (ii) Rs. 3000.00/Sq.mtr. of area to be compounded for commercial, apartment, industrial building. N.B: (i) 5% escalation charge /year will be added for buildings constructed after 2002. (ii) The buildings not covered specifically under above categories shall be compoundable as decided by the Authority considering the merit of each case. Residential & non residential buildings: Upto 0.15mtr - No penalty Above 0.15 mtr to 0.3 mtr - Rs. 10.00 per sq. mtr. Above 0.30 mtr to 0.75 mtr - Rs. 20.00 per sq. mtr. If a building has more than one violation the total regularisation fee will be calculated after considering each violation separately as per these provisions. Note: The Authority may however refuse regularisation of construction even with penalties as specified in the above provisions if in the opinion of the Authority this may infringe public safety and general environment of adjoining area. NEW REVISED BUILDING BYELAWS FOR GUWAHATI METROPOLITAN AREA-2006  Guwahati Metropolitan Dev. Authority  Page No. [68] 

Previous and next

All provisions of GUWAHATI BUILDING BYELAWS

Questions people ask

Is appendix III of GUWAHATI BUILDING BYELAWS still in force?

No repeal of GUWAHATI BUILDING BYELAWS is recorded.