Rule 7, Jammu and Kashmir Control of Building Operations Act: Grant of Permission

Jammu and Kashmir Control of Building Operations Act - Rule 7

Text of rule 7

Grant of Permission

7. Grant of Permission. ––(1) The Chairman of the Authority shall place the application and Building Plan alongwith the Inspector’s report before the Authority for its consideration. (2) The Authority shall either grant the permission subject to such conditions as may be specified or refuse to grant permission on such grounds as may also be specified and recorded. 1. Substituted by Notification No. LSG(J)-94/147 dated 03.12.1998. 6 (3) The Authority shall decide the matter within a maximum period of sixty days from the date of submission of the application and in case no decision can be taken within this stipulated period, the permission shall be deemed to have been accorded. (4) In case the Authority refuses the grant of permission the grounds of such refusal shall be communicated to the applicant in writing within seven days from the date of the decision. (5) The permission shall be issued only after the applicant deposits the build- ing permission fees as approved by the competent authority. 1[(6) Before granting permission no objection certificate from Assistant Commissioner (Nazool) for all Government lands and Assistant Commissioner (Revenue) for all non-Government lands shall be obtained. In addition to this no objection certificate from Chief Town Planner shall also be obtained with reference to the Master Plan/Town Planning Scheme.]

Previous and next

All provisions of Jammu and Kashmir Control of Building Operations Act

Questions people ask

Is rule 7 of Jammu and Kashmir Control of Building Operations Act still in force?

No repeal of Jammu and Kashmir Control of Building Operations Act is recorded.