Rule 7, Jammu and Kashmir Control of Building Operations Act: Grant of Permission
Jammu and Kashmir Control of Building Operations Act - Rule 7
Text of rule 7
Grant of Permission
7. Grant of Permission. ––(1) The Chairman of the Authority shall place the
application and Building Plan alongwith the Inspector’s report before the Authority
for its consideration.
(2) The Authority shall either grant the permission subject to such conditions
as may be specified or refuse to grant permission on such grounds as may also be
specified and recorded.
1. Substituted by Notification No. LSG(J)-94/147 dated 03.12.1998.
6
(3) The Authority shall decide the matter within a maximum period of sixty
days from the date of submission of the application and in case no decision can be
taken within this stipulated period, the permission shall be deemed to have been
accorded.
(4) In case the Authority refuses the grant of permission the grounds of such
refusal shall be communicated to the applicant in writing within seven days from
the date of the decision.
(5) The permission shall be issued only after the applicant deposits the build-
ing permission fees as approved by the competent authority.
1[(6) Before granting permission no objection certificate from Assistant
Commissioner (Nazool) for all Government lands and Assistant Commissioner
(Revenue) for all non-Government lands shall be obtained. In addition to this no
objection certificate from Chief Town Planner shall also be obtained with reference
to the Master Plan/Town Planning Scheme.]
Previous and next
All provisions of Jammu and Kashmir Control of Building Operations Act