Rule 4, Jammu and Kashmir Control of Building Operations Act: Application for permission
Jammu and Kashmir Control of Building Operations Act - Rule 4
Text of rule 4
Application for permission
4. Application for permission. ––(1) Every person intending to undertake or
carry out the development of any site, or erect or re-erect any building or make or
extend any excavation or layout any means of access to a road shall apply in Form
‘A’ to the Chairman of the concerned Authority. Such application shall accompany
the following documents :––
(i) 8 copies of the Building Plans duly drawn and signed either by an
Architect registered with the Council of Architects or by a Draftsman
registered with the concerned Municipality/Town Area Committee/No-
tified Area Committee ;
(ii) an attested copy of the proof of ownership record of the land.
(2) The Building Plan shall indicate the following details :––
(i) the key plan of location which shall clearly and unambiguously de-
scribe the location of the proposed building ;
(ii) the nature and the use of the existing site and the use of the proposed
building ;
(iii) sections and elevations of the buildimgs in each floor ;
5
(iv) specifications of the building ;
(iv) the position of the door/ windows and drainage outlets with reference
to the adjacent site ;
(vi) the positions of approach to the site.
Previous and next
All provisions of Jammu and Kashmir Control of Building Operations Act
Questions people ask
Is rule 4 of Jammu and Kashmir Control of Building Operations Act still in force?
No repeal of Jammu and Kashmir Control of Building Operations Act is recorded.