Rule 4, Reallocation the capacity available to three distribution companies: The above alioc3tion is subject to following conditions
Reallocation the capacity available to three distribution companies - Rule 4
Text of rule 4
The above alioc3tion is subject to following conditions
4. The above alioc3tion is subject to following conditions:-
(a) The allocation of power is tentative and may be reviewed again as and when required.
(b) The above proportions of capacity allocation shaH be revised in case of change in allocar:on of
unallocated power in inter-state Generating Stations (ISGS)by the Government of India.
. .
Table-3: New Generating St3tionS expeded during FY 2008-09
(c) 11P Power T~ding Company Ltd. (fradeco) shaH arrange short term power purchases ...-hid: shall
be allocated by Tradeco to Discoms based 011 their requisition or otherwise allocation sbll be .
done among the three Discoms in the same {XO portion as indicated in Table-2 aoove.
5. The capacities as indiC3ted in Table·3 below are assigned to the Madhya Pradesh Power Trading CCl:J.pany
Limited (fradeco) subject to the condition that three distributioo companies of the State shall be having firsl ..:narge
on such capacities. Tradeco will allocate power as per the requirement subjeCt to the available capacity and Slrplus
power if any, s~all be traded by Tradeco. Bulk Power Supply Tariff shall be decided by the Appropriate Commssion.
107
8(,
14 ~
MW
(2)
New Generation Stations
(1)
Kahelhaon STPs Stage-ll (Phase-!)
Sipat Themlal Project Stage-I
Sipal Thenna I Project Stage-II
~~,~ 19 llA 2008 228 (1)
(I) (2)
Amarkantak Extension
DVC Project (MTPS & errS)
Birsinghpur Extension
210
400
500
Total .. 1,446
In addition to above additional capacity, if any including CentraUState Sector the same shall also be
assigned to Tradeco.
Capacity allocation (of unallocated capacity) and
Arrangements made for short term power purchase
6. Following general guidelines shall be applicable for monthly allocation of power among discoms:
Each Discom shall submit their demand to'MP Tradeco for the next month by 15th of each month.
MP Tradeco shall allocate the unallocated capacity as shown in Table-3 among Discoms by 20th
of each month. Allocation shall be as per the requirement subject to the available capacity.
For day ahead scheduling of power, the prevalent rules and regulations as laid down by Madhya
Pradesh Electricity Regulatiory Commission shall be applicable.
On the basis of capacity allocation, SLDC shall intimate entitlement of each discom in ISGS,
MPPGCL (MP Share), NHDC Joint Ventures, SSP etc. to MP Tradeco.
MP Tradeco, in consultation with Discorns, shall furnish the requisition of power of respective
Discot!l in ISGS. MPPGCL (MP Share), NHDC Joint Ventures, SSP etc. to SLDC limited to
entitlement.
MP Tradeco, shall also furnish details of Short Term Power Purchase to be allocated to Discoms
based on their requisition.
Discoms while submitting their requisition to MP Tradeco shall also indicate surplus/deficit if any,
which can be allocated to other Discorns by SLDC in consultation with respective Discom.
SLDC after receipt of MP drawal Schedule from WRLDC shall compile and issue drawal Schedule
of each Discom to t-1P Tradeco and generation Schedule to MPPGCL (MP share) based on merit
order despatch.
The surplus power shall be sold outside the state or to any other utilities by the MP Tradeco in
case of non-absorption by the Discoms. .
Priority in allocation shall be given to those Discoms who submit the demand in time. If any
Discom fails to submit the demand in time allocation shall be made appropriately by MP Tradeco
as per overall availability.
SLDC will calculate the UI charges among Discoms/Generators based on Total .allocation and
scheduling (Intra State ABT).
Discoms shall provide short-term power requirement to MP Tradeco at least four months in
advance. .
In the event of non submission of monthly requirement by Discoms in time, the decision of MP
Tradeco shall be final and binding on the Discoms in regard to
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
'}
> • (i)
(j)
(k)
(I)
(m)
I.
11.
Previous and next
All provisions of Reallocation the capacity available to three distribution companies
Questions people ask
Is rule 4 of Reallocation the capacity available to three distribution companies still in force?
No repeal of Reallocation the capacity available to three distribution companies is recorded.