LawGrids logoLAWGRIDS.ORG

Form AT-1 appended to these Regulations, TERMS AND CONDITIONS OF INTRA-STATE OPEN ACCESS: FORMAT-1 appended to these Regulations

TERMS AND CONDITIONS OF INTRA-STATE OPEN ACCESS - Form AT-1 appended to these Regulations

Text of form AT-1 appended to these Regulations

FORMAT-1 appended to these Regulations.

FORMAT-1 appended to these Regulations. (iv) SLDC shall also display bidding information on its website. (v) The floor price of transmission and wheeling charges determined on the basis of relevant order of the Commission shall be indicated in FORMAT-1. (vi) The Bids shall be accepted in FORMAT-2 up to the “bid closing time” as indicated in bidding invitation FORMAT-1.Modification / amendment to a bid, once submitted shall not be entertained. (vii) If any consumer does not participate in bidding process, his application shall be deemed to have been withdrawn and shall not be processed. (viii) SLDC shall not entertain any request for extension of time/date for submission of bids. (ix) The bidders shall quote price (rounded-off to whole number) in denomination in which floor price has been determined. (x) The quoted price shall be arranged in descending order and allocation of available capacities shall be accorded in such descending order until the available capacity is exhausted. (xi) In case of equal price quoted by two or more consumers, the allocation from the residual available capacity at any stage under sub-sub-clause (x) above shall be made in proportion to capacity being sought by such consumers. (xii) All consumers, in favour of whom full capacities have been allotted, shall pay the highest price obtained from bids. (xiii) The consumers, who are allotted less capacity, shall pay the price as quoted by them. (xiv) SLDC shall reject bid which are incomplete, vague in any manner or not found in conformity with bidding procedure. (xv) The successful bidder, in favour of whom the capacities have been allocated, shall pay transmission charges, wheeling charges, as the case may be, determined by bidding under sub clause (xii) or (xiii) of this clause. (d) The reserved capacity by a short-term open access consumer is not transferable to others. (e) The capacity available as a result of surrender or reduction or cancellation of the reserved capacity by the State Load Dispatch 25 BIHAR GAZETTE (EXTRA), 17TH JULY 2018 Centre, may be reserved for any other short-term open access consumer in accordance with these regulations. (f) On expiry of the period of the short-term open access, the short-term consumer shall not be entitled to any overriding preference for renewal of the term. (3) Within same distribution system: The procedure specified in clause (2) above, mutatis mutandis, shall apply to cases of short- term open access when the point of injection and the point of drawal are located in the same distribution system except SLDC shall be understood as distribution licensee. 15. Consent by STU, SLDC or Distribution Licensee (1) Inter-State open access: (a) STU in the case of application for grant of long-term access and SLDC in the case of grant of medium-term open access and short-term open access shall convey its consent or otherwise as per the provisions of Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations,2009 and Central Electricity Regulatory Commission (Open Access in inter-State Transmission) Regulations, 2008, respectively or their statutory re- enactments, as amended from time to time. (b) In case of applicant connected to the distribution system seeking open access, the STU or SLDC, as the case may be, before giving its consent as required in the central commission's regulations, shall obtain the consent of the distribution licensee concerned. The distribution licensee shall convey its consent or otherwise to SLDC or STU, as the case may be by e-mail or fax or by any other usually recognized mode of communication within 3 working days to enable SLDC or STU, as the case may be to provide consent within timeline mentioned in CERC Regulations. (2) Intra-State Open Access: (a) In respect of a consumer connected to a distribution system seeking Open access, the STU or SLDC or distribution licensee as the case may be shall obtain the consent of the distribution licensee concerned. The distribution licensee shall convey its consent or otherwise to the STU or SLDC as the case may be by e-mail or fax or by any other usually recognized mode of communication, within three (3) working days. (b) While processing the application from a generating station seeking consent as required under Central Commission’s Regulations for open access, the distribution licensee shall verify the following, namely- (i) Existence of infrastructure necessary for time-block-wise energy metering and accounting in accordance with the provisions of the State Grid Code in force, and (ii) Availability of capacity in the transmission/distribution network. STU or the distribution licensee, as the case may be, shall display its real-time transmission or distribution capacity on its website. (c) Where existence of necessary infrastructure and availability of capacity in the distribution network has been established, the 26 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 distribution licensee shall convey its consent to the applicant by e-mail or fax or by any other usually recognised mode of communication, within three (3) working days of receipt of the application. (d) In case the distribution licensee as nodal agency finds that the application for consent is incomplete or defective in any respect, it shall communicate the deficiency or defect to the applicant by e-mail or fax or by any other usually recognised mode of communication, within two (2) working days of receipt of the application: (e) In case the distribution licensee refuses to give consent on the grounds of nonexistence of necessary infrastructure or unavailability of surplus capacity in the distribution network, such refusal shall be communicated to the STU or SLDC, as the case may be, by e-mail or fax or by any other usually recognized mode of communication, within the period of three (3) working days from the date of receipt of the application, along with reasons for such refusal. (f) Where the distribution licensee has not communicated any deficiency or defect in the application within two (2) days from the date of receipt of application, or refusal or consent within the specified period of three (3) working days from the date of receipt of the application or intimation from STU or SLDC, consent shall be deemed to have been granted. 16. Consideration of applications from defaulters Notwithstanding anything contained in these regulations, the Nodal Agency shall be at liberty to summarily reject an application for Open Access on the ground of non-compliance of the provisions of these regulations, more specifically the provisions relating to timely payment of the charges leviable hereunder. 17. Application by eligible entities other than consumers and generating stations connected to distribution system: The procedure for submission of the application and processing the same as laid down in this chapter in respect of the consumers shall, mutatis mutandis, be applicable to the electricity trading licensees, distribution licensees and the generating companies connected to the STU as well. 18. Allotment Priority (1) The priority for allotment of open access in intra-State transmission system shall be decided on the following criteria: (a) A distribution Licensee shall have the highest priority in allotment of open access capacity irrespective of whether the open access request is for long-term, medium-term or short- term. (b) The long-term open access applicants shall have the priority next to the distribution licensee. (c) The medium-term open access applicants shall have the priority next to the long- term open access applicants. (d) The short-term open access applicants shall have the priority next to the medium- term open access applicants. (e) Allotment priority for short-term open access applicants shall be decided subject to capacity availability. 27 BIHAR GAZETTE (EXTRA), 17TH JULY 2018 (f) An existing open access customer shall have the priority higher than new open access applicants under respective category provided the former applies for its renewal within the stipulated period prior to the expiry of existing term of open access. (g) When the requirement projected by an applicant is more than the available capacity and the said applicant is not able to limit his requirement to the available capacity, the request of applicant having next lower priority shall be taken up for consideration. CHAPTER 5 OPEN ACCESS CHARGES 19. Transmission Charges Open Access customer using transmission system shall pay the charges as stated hereunder: (1) For use of inter-State transmission system – As specified by the Central Electricity Regulatory Commission from time to time. (2) For use of intra-State transmission system: – (a) Transmission charges payable to State Transmission Utility/ transmission licensee by Long-term and Medium-term open access customer for usage of their system shall be as determined by the Bihar Electricity Regulatory Commission from time to time in accordance with the appropriate Regulations framed by the Commission. Provided that transmission charges shall be payable on the basis of contracted Capacity/ Scheduled Load or actual power flow whichever is higher. Provided further that where a dedicated transmission system used for open access has been constructed for exclusive use of an open access customer, the transmission charges for such dedicated system shall be worked out by transmission licensee for their respective systems and got approved by the Commission and shall be borne entirely by such open access customer till such time the surplus capacity is allotted and used for by other persons or purposes. Provided also that no transmission charges shall be payable in case of transaction of renewable energy generated from solar and wind sources of energy. (b) Transmission Charges payable to State Transmission Utility/transmission licensee by Short-Term Open Access customer for usage of their system shall be determined as under: Transmission Charges = ATC/(PLST X8760) (in Rs./MWh) Where, ATC= Annual Transmission Charges determined by the Commission for the State transmission system for the concerned year. PLST= Peak load projected to be served by the State transmission system in concerned year. Provided that transmission charges for short-term open access shall be payable on the basis of the energy actually scheduled for Short-Term transactions. 28 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 Provided further that no transmission charges shall be payable in case of open access transaction of renewable energy generated from solar and wind sources of energy. 20. Scheduling and system operation charges Scheduling and system operation charges shall be payable by the Open Access customers at the following rates: (1) In respect of inter-State open access (a) Long-term access and Medium-term open access (i) Regional Load Despatch Centre fees and charges including charges for the Unified Load Despatch and Communication Scheme as specified by the Central Commission under section 28(4) of the Act. (ii) State Load Despatch Centre charges as specified by the Commission under sub-section (3) of section 32 of the Act. (b) Short-term open access (i) Regional Load Despatch Centre and State Load Despatch Centre charges as specified by the Central Commission. (2) In respect of intra-State open access (a) Long-term access and medium-term open access:- Long-term access and medium-term open access customers shall be liable to pay SLDC charges determined by the Commission under sub- section (3) of section 32 of the Act. (b) Short-term open access- A composite operating charge @ Rs.2,000/- per day or part of the day shall be payable by a short- term open access customer for each transaction to the SLDC or as determined by the Commission from time to time. The operating charge includes fee for scheduling and system operation, energy accounting, fee for affecting revisions in schedule on bonafide grounds and collection and disbursement of charges. 21. Wheeling Charges: Wheeling charges payable to distribution licensee, by an open access customer for usage of its distribution system shall be as determined by the Commission in the tariff order from time to time: Provided that Wheeling charges shall be payable on monthly basis, by the Open access consumer on the basis of scheduled energy. Provided further that no wheeling charges shall be payable in case of transaction of renewable energy generated from solar and wind sources of energy. Provided further that where a dedicated distribution system used for open access has been constructed for exclusive use of an open access customer, the wheeling charges for such dedicated system shall be worked out by distribution licensee for their respective systems and got approved by the commission and shall be borne entirely by such open access customers till such time the surplus capacity is allotted and used for by other persons or purpose. 22. Cross subsidy surcharge (1) If open access facility is availed of by a subsidising consumer of a distribution licensee of the State, then such consumer, in addition to transmission and/or wheeling charges, shall pay cross subsidy surcharge determined by the Commission from time to time. Provided that Cross subsidy surcharge determined on Per Unit basis shall be payable, on monthly basis, by the open access 29 BIHAR GAZETTE (EXTRA), 17TH JULY 2018 consumers based on the actual energy drawn during the month through open access. Provided also that cross subsidy surcharge shall not be levied in case distribution access is provided to a person who has established a captive generation plant for carrying the electricity to the destination of his own use. (2) The Cross subsidy surcharge shall be determined by the Commission in accordance with the principles and formula stipulated in the Tariff Policy notified by Central Government under section 3 of the Act. 23. Additional Surcharge (1) An open access consumer, receiving supply of electricity from a person other than the distribution licensee of his area of supply, shall pay to the distribution licensee an additional surcharge, in addition to wheeling charges and cross-subsidy surcharge, to meet the fixed cost of such distribution licensee arising out of his obligation to supply as provided under sub-section (4) of section 42 of the Act.Such additional charge payable by open access consumer to the distribution licensee shall be as determined by the Commission in the distribution tariff order from time to time. Provided that Additional surcharge shall be payable on monthly basis, by the open access consumers based on the actual energy drawn during the month through open access. Provided also that such additional surcharges shall not be levied in case distribution access is provided to a person who has established a captive generation plant for carrying the electricity to the destination of his own use. (2) The additional surcharge shall become applicable only if the obligation of the licensee in terms of power purchase commitments has been and continues to be stranded or there is an unavoidable obligation and incidence to bear fixed costs consequent to such a contract. (Note: The fixed cost related to network assets is recovered through wheeling charges.) (3) The distribution licensee shall submit to the Commission along with its ARR, a detailed calculation statement of fixed cost which the licensee is incurring towards his obligation to supply, mentioning the hourly stranded data with its merit order dispatch. 24. Standby charges for drawal of power by open access customer from distribution licensee In cases of outages of generator supplying to open access customer under open access, standby arrangements shall be provided by the distribution licensee for a maximum period of 42 days in a year, subject to the load shedding as is applicable to the embedded consumer of the licensee at a charge under Temporary connection tariff for that category of consumer as determined by the consumer from time to time. Provided that such charge shall not exceed 125% of the normal tariff for that category of consumers. Provided that in cases where temporary rate of charge is not available for that consumer category the distribution licensee shall charge 125% of the normal tariff for that category of consumers. 30 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 Provided also that open access customers would have the option to arrange stand-by power from any other source. 25. Other Charges In addition to the above charges, the regulatory charges, congestion charges and any other charges imposed by Central Commission and/or State Commission shall be payable by the open access customers. CHAPTER 6 SCHEDULING, METERING, REVISION AND LOSSES 26. Scheduling: (1) Notwithstanding anything contained in the succeeding clauses of this regulation, scheduling of inter-State open access transactions shall be as specified by the Central Commission. (2) Subject to the foregoing clause, intra-State open access transactions in respect of consumers of load 10 MW and above and all generating stations irrespective of the capacity shall be scheduled by SLDC in accordance with the provisions of the State Grid Code. (3) There shall be no scheduling required in respect of open access consumer having load of less than 10 MW. Provided that the generating station from which such consumer has contracted power shall be subjected to scheduling requirements as per the applicable grid code. 27. Metering: (1) In case of open access consumer including all generating stations, Special Energy Meters shall be installed at the point of injection and point of drawal by the State Transmission Utility or the distribution licensee as the case may be, for and at the cost of the customer. (2) Special Energy Meters installed shall be capable of time- differentiated measurements for time-block-wise active energy and voltage differentiated measurement of reactive energy in accordance with the Indian Electricity Grid Code/Bihar Electricity Grid Code. (3) Special Energy Meters shall be open for inspection by any person authorized by the State Transmission Utility or the State Load Despatch Centre or the Distribution licensee. (4) Special Energy Meters shall always be maintained in good condition by the open access customers and shall be periodically tested and calibrated by State Transmission Utility/Distribution licensee. (5) All the open access customers shall abide by the metering standards of CEA. 28. Revision: Revision of scheduled energy shall be permitted in accordance with the provisions of IEGC or the Bihar Electricity Grid Code as the case may be. 29. Losses: (1) Transmission losses: (a) Inter-State transmission: (i) Long-term access and medium-term open access: The buyers shall bear apportioned energy losses in the transmission system in 31 BIHAR GAZETTE (EXTRA), 17TH JULY 2018 accordance with the provisions specified by the Central Commission. (ii) Short-term Open Access: The buyers and sellers shall absorb apportioned energy losses in the transmission system in accordance with the provisions specified by the Central Commission. (b) Intra-State transmission: The transmission losses for the intra- State system, as determined by the Commission in their tariff orders for the applicable year, shall be apportioned in proportion to the actual energy drawal by the open access customers and shall be payable in kind. (2) Distribution loss: The system losses for the distribution system, as determined by the Commission for various voltage levels in their tariff orders for the applicable year, shall be apportioned in proportion to the actual energy drawal by the open access customers and shall be payable in kind at relevant voltage level. CHAPTER 7 IMBALANCE AND REACTIVE ENERGY CHARGES 30. Imbalance Charge (1) Scheduling of all transactions pursuant to grant of long-term access or medium term open access or short-term open access shall be carried out on day-ahead basis in accordance with the relevant provisions of IEGC for inter-State transactions and in accordance with Bihar Electricity Grid Code, Commission’s applicable Regulations and orders for intra-State transactions. (2) In case of deviation by open access consumers with load of less than 10 MW, the difference between the scheduled energy and the actual drawal shall be accounted through the Time of Day (ToD) Meters on monthly basis and settled at the rate of the imbalance charge as determined by the Commission. In case of under-drawal as a result of non availability of the distribution system or unscheduled load shedding, the open access consumer shall be compensated by the distribution licensee at the average power purchase cost of the distribution licensee. [Explanation.- For the purpose of this regulation, unscheduled load shedding means, load shedding during hours other than the hours for which load shedding has been announced by the distribution licensee. BERC may notify the number of days before which a distribution licensee should declare scheduled load shedding] (3) Deviations between the schedule and the actual injection/drawal (net over /under drawal or injection) in respect of open access consumers with load of 10 MW and above and the Generating Stations irrespective of the capacity, shall be settled based on the composite accounts for imbalance transactions issued by SLDC on a weekly cycle in accordance with the charges specified by the Commission. (4) Payment of imbalance charges shall have a high priority and the concerned constituents (licensees or the open access customers as the case may be) shall pay the indicated amounts within 10 (ten) days of the issue of the statement, into a State imbalance pool 32 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 account operated by the SLDC. The person who has to receive the money on account of imbalance charges would then be paid out from the State imbalance pool account, within three (3) working days. (5) If payments against the above imbalance charges are delayed by more than two days, i.e., beyond twelve (12) days from the date of issue of statement, the defaulting party shall have to pay simple interest @ 0.04% for each day of delay. The interest so collected shall be paid to the person whose payment has been delayed. Persistent payment defaults, if any, shall be reported by the SLDC to the Commission, for initiating remedial action. 31. Reactive Energy Charge (1) In respect of open access consumer having a load of 10 MW or above, the payment for the reactive energy charges by open access consumers shall be in accordance with provisions stipulated in the relevant Grid Code. (2) In respect of open access consumers of load less than 10 MW, reactive energy charges shall be calculated on Power Factor basis as specified by the Commission. CHAPTER 8 COMMERCIAL MATTERS 32. Billing, collection and disbursement Billing in respect of the charges payable under these regulations shall be made as per the following procedure: (1) Inter-State transactions: (a) Short-term Open Access (i) Collection and disbursement of transmission charges for use of CTU and STU systems and operating charges payable to RLDCs and SLDCs towards short-term open access shall be made by the nodal RLDC in accordance with the procedure specified by the Central Commission. (ii) The short-term open access customer connected to distribution system of a distribution licensee shall pay to such distribution licensee the charges payable to the distribution licensee on monthly basis within 3 days from the grant of the short-term open access by the nodal agency. (b) Long-term access and medium- term open access (i) Billing, collection and disbursement of charges payable to RLDC including Unified Load Despatch and Communication Scheme shall be in accordance with the procedure specified by the Central Commission. (ii) Bills towards the charges payable to SLDC shall be raised by the STU/SLDC directly to the open access customer connected to STU and to the distribution licensee in respect of the customers connected to the distribution system, before the 3rd working day of the succeeding calendar month. (iii) Distribution licensee shall raise the bill with the open access customer connected to it within 3 days of receipt of bill from SLDC. (iv) Open access customer connected to the distribution licensee shall pay the charges within five days of receipt of bill from distribution 33 BIHAR GAZETTE (EXTRA), 17TH JULY 2018 licensee. The distribution licensee shall disburse the amount payable to STU/SLDC on a monthly basis. (v) Open access customer connected to the STU shall pay the bills within five working days of receipt of the bill. (2) Intra-State transactions: (a) Short-term Open Access (i) The short-term open access customer shall deposit with SLDC the transmission charges and operating charges within 3 working days of grant of the short- term open access by SLDC. (ii) In addition to the above, the short-term open access customer connected to distribution system of a distribution licensee shall also pay to SLDC, the charges payable to the distribution licensee within 3 days from the grant of the short-term open access by the nodal agency. Such charges would be disbursed to the distribution licensee on a weekly basis. (b) Long-term and Medium-Term open access SLDC, transmission licensees and distribution licensee, where applicable, shall communicate to STU, the details of the bills due to them by the 3rd working day of the succeeding calendar month. STU shall separately indicate the above charges and raise the bill with the open access customer, together with the charges receivable by it, if any, before the 5th working day of the above month. The open access customer shall pay the charges within 7 days from the date of receipt of the bill. STU shall disburse the charges payable to SLDC, transmission licensee and distribution licensee on a monthly basis. 33. Late payment surcharge In case the payment of any bill for charges payable under these regulations is delayed by a open access customer beyond the due date, without prejudice to any action under the Act or any other regulation thereunder, a late payment surcharge at the rate of 1.25% per month shall be levied. 34. Default in payment (1) Non-payment of any charge or sum of money payable by the open access customer under these regulations (including imbalance charges) shall be considered non-compliance of these regulations and shall be liable for action under section 142 of the Act in addition to action under section 56 of the Act. The STU or any other transmission licensee or a distribution licensee may discontinue open access after giving customer an advance notice of fifteen days without prejudice to its right to recover such charges by suit. (2) In case of default in payment of charges due to the Load Despatch Centre the Load Despatch Centre concerned may refuse to schedule power to the defaulting open access customer and direct the licensee concerned to disconnect such customer from the grid. 35. Payment Security Mechanism In case of long-term open access and medium-term open access, the applicant for open access will open an irrevocable Letter of Credit equivalent to the estimated amount of various charges for a period of two months in favour of the agency responsible for collection of various charges. 34 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 CHAPTER 9 INFORMATION SYSTEM 36. Information system The State Load Dispatch Centre shall post following information on its website in a separate web page titled “Open access information” and also issue a monthly and annual report containing such information. (1) A status report on long-term access or medium-term open access customers indicating: (a) Name of customer; (b) Period of open access granted (date of commencement and date of termination); (c) Point of injection; (d) Point of drawal; (e) Transmission system / distribution system used, and (f) Open access capacity used. (2) A status report on short-term open access customers indicating: (a) Name of customer; (b) Period of open access granted (date of commencement and date of termination); (c) Point of injection; (d) Point of drawal; (e) Transmission system / distribution system used, and; (f) Open access capacity used. (3) Peak load flows and capacity available including the reserve capacity on all EHV lines and HV lines emanating from EHV substations. (4) The information regarding average loss in transmission and distribution system as determined by respective licensees. CHAPTER 10 MISCELLANEOUS 37. Under –Utilization or Non-Utilization of open access capacity in intra-State transmission system (1) Long-term open access: A long-term customer may relinquish the long-term access rights fully or partly before the expiry of the full term of long-term access, by making payment of compensation for stranded capacity as follows:- (a) Long-term customer who has availed access rights for at least 7(seven) years (i) Notice of one (1) year – If such a customer submits an application to the State Transmission Utility at least 1 (one) year prior to the date from which such customer desires to relinquish the access rights, there shall be no charges. (ii) Notice of less than one (1) year – If such a customer submits an application to the State Transmission Utility at any time lesser than a period of 1 (one) year prior to the date from which such customer desires to relinquish the access rights, such customer shall pay an amount equal to 66% of the transmission charges for the stranded transmission capacity for the period falling short of a notice period of one (1) year. (b) Long-term customer who has not availed access rights for at least 7 (seven) years – such customer shall pay an amount equal 35 BIHAR GAZETTE (EXTRA), 17TH JULY 2018 to 66% of the estimated transmission charges (net present value) for the stranded transmission capacity for the period falling short of 7 (seven) years of access rights: Provided that such a customer shall submit an application to the State Transmission Utility at least 1 (one) year prior to the date from which such customer desires to relinquish the access rights: Provided further that in case a customer submits an application for relinquishment of long-term access rights at any time at a notice period of less than one year, then such customer shall pay an amount equal to 66% of the estimated transmission charges (net present value) for the period falling short of a notice period of one (1) year, in addition to 66% of the estimated transmission charges (net present value) for the stranded transmission capacity for the period falling short of 7 (seven) years of access rights. (c) The discount rate applicable for computing the net present value as referred to in sub-clause (a) and (b) of clause (1) above shall be the discount rate to be used for bid evaluation in the Central Commission’s Notification issued from time to time in accordance with the Guidelines for Determination of Tariff by Bidding Process for Procurement of Power by distribution Licensees issued by the Ministry of Power. (d) The compensation paid by the long-term customer for the stranded transmission capacity shall be used for reducing transmission charges payable by other long-term customers and medium-term customers in the year in which such compensation payment is due in the ratio of transmission charges payable for that year by such long- term customers and medium-term customers. (2) Medium-term Open Access customers -A medium-term open access customer may relinquish rights, fully or partly, by giving at least 30 days prior notice to the nodal agency: Provided that the medium-term open access customer relinquishing its rights shall pay applicable transmission charges for the period of relinquishment or 30 days whichever is lesser. (3) Short-term open access customer (a) The short-term open access scheduled energy accepted by the nodal agency in advance or on first-come-first-served basis may be cancelled or revised downwards on an application to that effect made to the nodal agency by the short-term open access customer: Provided that such cancellation or downward revision of the short-term open access scheduled energy shall not be effective before expiry of a minimum period of two (2) days: Provided further that the day on which notice for cancellation or downward revision of schedule is served on the nodal agency and the day from which such cancellation or downward revision is to be implemented, shall be excluded for computing the period of two (2) days. (b) The person seeking cancellation or downward revision of short- term open access scheduled energy shall pay the transmission charges for the first two (2) days of the period for which the 36 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 cancellation or downward revision of schedule, as the case may be, has been sought, in accordance with the schedule originally approved by the nodal agency, and thereafter in accordance with the revised schedule prepared by the nodal agency during the period of such cancellation or downward revision. (c) In case of cancellation, operating charges specified in Regulations 20 of these regulations shall be payable for two (2) days or the period of cancellation in days, whichever is less. 38. Computation of capacity availability for open access (1) The capacity available for the open access shall be computed for each transmission segment and for every sub-station by the STU following the methodology given below: (a) Available open access capacity of a transmission system segment: = (DC-(SD+AC)) + NC - ND where, DC=Designed capacity of the transmission segment in MW, SD = Sustained demand (peak load experienced) in MW recorded in the segment, AC = Already allotted capacity, but not availed in MW, NC = New capacity in MW expected to be added and ND= New Demand expected to be added. provided that for an embedded consumer seeking open access within the contract demand the available open access capacity of the transmission system segment shall be computed by using the formula (DC-(SD-AC))+NC-ND (b) Available open access capacity of a sub-station: = (TC-(SP+AC)) +NC – ND where, TC= Transformer capacity of the substation in MVA, SP= Sub-station peak in MVA, AC= Already allotted capacity but not availed in MVA ,NC= New transformer capacity in MVA expected to be added and ND = New Demand expected to be added. provided that for an embedded consumer seeking open access within the contract demand the available open access capacity shall be computed by using (TC-(SP-AC)) +NC – ND (c) The STU shall update these values on monthly basis on the first calendar day of the month and publish it in their website. (2) The appropriate distribution licensee shall determine the available capacity adopting the above methodology for allotment for the portion of the distribution system over which open access has been requested for. 39. Curtailment Priority When, because of constraints or otherwise, it becomes necessary to curtail the open access service of the customers, subject to the requirements of Bihar Electricity Grid Code, the short-term open access customers shall be curtailed first, followed by the medium- term open access customers and thereafter followed by long-term open access customers. The open-access to a distribution licensee and generating company shall be the last to be curtailed. Provided that within a category, the open-access customers shall have equal curtailment priority and shall be curtailed on pro- rata basis. SLDC shall frame guidelines for curtailment of open access customers. 40. Dispute Resolution Mechanism 37 BIHAR GAZETTE (EXTRA), 17TH JULY 2018 (1) The complaints regarding all grievances and disputes relating to open access shall be made to the respective nodal agency in writing. (2) The nodal agency shall investigate and endeavour to resolve the grievance/disputes through mutual agreements. (3) If the nodal agency is unable to redress the grievance, dispute or the open access customer is aggrieved with the decision of the nodal agency, the matter may be brought before the Commission by either of the parties. 41. Powers to Remove Difficulties If any difficulty arises in giving effect to any of the provisions of these regulations, the Commission may by general or special order, direct the State Transmission Utility, State Load Dispatch Centre, intra-State licensees and the open access customer, to take such action, as may appear to the Commission to be necessary or expedient for the purpose of removing difficulties. 42. Repeal and Savings (1) Save as otherwise provided in these regulations, the Bihar Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2005,shall stand repealed from the date of commencement of these regulations. (2) Notwithstanding such repeal, anything done or purported to have been done under the repealed regulations shall be deemed to have been done or purported to have been done under these regulations. (3) Nothing in these regulations shall be deemed to limit or otherwise affect the power of the Commission to make such orders as may be necessary to meet the ends of justice. (4) Nothing in these regulations shall bar the Commission from adopting in conformity with provisions of the Act, a procedure which is at variance with any of the provisions of these regulations, if the Commission, in view of the special circumstances of a matter or a class of matters, deems it just or expedient for deciding such matter or class of matters. (5) Open access customers to the intra-State transmission system and the distribution system in the State on the date of coming into force of these regulations under an existing agreement / contract shall be entitled to continue to avail such access to the transmission and distribution system on the same terms and conditions, as stipulated under such existing agreement/contract. Such persons are eligible to avail long-term access or medium- term open access under these regulations on expiry of such existing agreement/contract. However such persons, shall have to make application with the nodal agency for long-term access or medium-term open access category as the category may be, at least thirty days prior to the expiry of such existing agreement/contract. 43. Power to amend The Commission may, at any time may add, vary, alter, modify, or amend, any provision of these regulations By order of the Commission, NIRAD PRAKASH, Secretary. 38 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 Format-I CONGESTION INFORMATION AND INVITATION OF BIDDING (to be invited by SLDC) (See regulation 14.2.c) SLDC Bidding Invitation No.___________ Date_________ 1 Customer Application No. <as provided by customer on FORMAT-1> Date 2 Period of Transaction < 1 months and more / less than 1 months / day- ahead > 3 Nature of Customer* < seller/buyer/captive user/trader(on behalf of seller/buyer/captive user) > 4 Customer Name 5 Registration Code Valid up to <* In terms of power transfer> 6. The anticipated congestion (transformer and electric line/link) is as follow: Network Corridor Congestion Period Margin/ Capacity Available Total Capacity Applied by all the Customers Sub-station with Transformation capacity Electric Line/Link with capacity Date Hours MW MW From To From To Intra-State Transmission System Intra-State Distribution System Inter-State Transmission System 39 BIHAR GAZETTE (EXTRA), 17TH JULY 2018 7. In view of above please submit bid on format [FORMAT-ST4]. The details for bidding are hereunder: (a) Bid Invitation Date Time (b) Bid Submission Date Time (c) Bid Opening Date Time (d) Bids Invited for Time Intra-State Network Corridor Congestion Period Margin/Capacity Available for Bidding Floor Price Sub- station Electric Line/Link Date Hours MW Rs./kWh From To From To Name of Transmission System Name of Distribution System 8. In case of non submission of bid, application shall be deemed to have been withdrawn and shall not be processed. Place Signature (with Stamp) Date Name & Signature 40 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 Format-II BID PROPOSAL (to be submitted by the customer to SLDC) (See regulation 14.2.c) Ref: SLDC Bidding Invitation No. ________________ Date__________ To: Dy. General Manager (SLDC), 1 Customer Application No. <as provided by customer on FORMAT-1> Date 2 Period of Transaction < 1 months and more / less than 1 months / day- ahead > 3 Nature of Customer* < seller/buyer/captive user/trader(on behalf of seller/buyer/captive user) > 4 Customer Name 5 Registration Code Valid up to <* In terms of power transfer> 6. In reference to above bidding invitation, I hereby submit my bid as follows: Bidding Details as provided by SLDC Intra-State Network Corridor Congestion Period Margin/ Capacity Available Floor Price Bid Price to be Quoted by Bidder Sub- station Electric Line/Link Date Hours MW Paise./ KWh Paise./KWh* From To From To Name of Transmission System Name of Distribution System < * Bidder shall quote price (rounded-off to whole number) in denotation of floor price > 7. I do hereby agree that determined bid price(s) shall be transmission and/or wheeling charges. Place Signature (with stamp) Date Name & Designation ———— PUBLISHED AND PRINTED BY THE SUPERINTENDENT, BIHAR SECRETARIAT PRESS, PATNA. Bihar Gazette (Extra) 662—571+400—Egazette Website: http://egazette.bih.nic.in

Previous and next

All provisions of TERMS AND CONDITIONS OF INTRA-STATE OPEN ACCESS

Questions people ask

Is form AT-1 appended to these Regulations of TERMS AND CONDITIONS OF INTRA-STATE OPEN ACCESS still in force?

No repeal of TERMS AND CONDITIONS OF INTRA-STATE OPEN ACCESS is recorded.