(iv) SLDC shall also display bidding information on its website.
(v) The floor price of transmission and wheeling charges
determined on the basis of relevant order of the Commission
shall be indicated in FORMAT-1.
(vi) The Bids shall be accepted in FORMAT-2 up to the “bid closing
time” as indicated in bidding invitation FORMAT-1.Modification
/ amendment to a bid, once submitted shall not be entertained.
(vii) If any consumer does not participate in bidding process, his
application shall be deemed to have been withdrawn and shall
not be processed.
(viii) SLDC shall not entertain any request for extension of time/date
for submission of bids.
(ix) The bidders shall quote price (rounded-off to whole number) in
denomination in which floor price has been determined.
(x) The quoted price shall be arranged in descending order and
allocation of available capacities shall be accorded in such
descending order until the available capacity is exhausted.
(xi) In case of equal price quoted by two or more consumers, the
allocation from the residual available capacity at any stage
under sub-sub-clause (x) above shall be made in proportion to
capacity being sought by such consumers.
(xii) All consumers, in favour of whom full capacities have been
allotted, shall pay the highest price obtained from bids.
(xiii) The consumers, who are allotted less capacity, shall pay the
price as quoted by them.
(xiv) SLDC shall reject bid which are incomplete, vague in any
manner or not found in conformity with bidding procedure.
(xv) The successful bidder, in favour of whom the capacities have
been allocated, shall pay transmission charges, wheeling
charges, as the case may be, determined by bidding under sub
clause (xii) or (xiii) of this clause.
(d) The reserved capacity by a short-term open access consumer is
not transferable to others.
(e) The capacity available as a result of surrender or reduction or
cancellation of the reserved capacity by the State Load Dispatch
25
BIHAR GAZETTE (EXTRA), 17TH JULY 2018
Centre, may be reserved for any other short-term open access
consumer in accordance with these regulations.
(f) On expiry of the period of the short-term open access, the
short-term consumer shall not be entitled to any overriding
preference for renewal of the term.
(3) Within same distribution system: The procedure specified in
clause (2) above, mutatis mutandis, shall apply to cases of short-
term open access when the point of injection and the point of
drawal are located in the same distribution system except SLDC
shall be understood as distribution licensee.
15. Consent by STU, SLDC or Distribution Licensee
(1) Inter-State open access:
(a) STU in the case of application for grant of long-term access and
SLDC in the case of grant of medium-term open access and
short-term open access shall convey its consent or otherwise as
per the provisions of Central Electricity Regulatory Commission
(Grant of Connectivity, Long-term Access and Medium-term
Open Access in inter-State Transmission and related matters)
Regulations,2009 and Central Electricity Regulatory
Commission (Open Access in inter-State Transmission)
Regulations, 2008, respectively or their statutory re-
enactments, as amended from time to time.
(b) In case of applicant connected to the distribution system
seeking open access, the STU or SLDC, as the case may be,
before giving its consent as required in the central commission's
regulations, shall obtain the consent of the distribution licensee
concerned. The distribution licensee shall convey its consent or
otherwise to SLDC or STU, as the case may be by e-mail or fax
or by any other usually recognized mode of communication
within 3 working days to enable SLDC or STU, as the case may
be to provide consent within timeline mentioned in CERC
Regulations.
(2) Intra-State Open Access:
(a) In respect of a consumer connected to a distribution system
seeking Open access, the STU or SLDC or distribution licensee
as the case may be shall obtain the consent of the distribution
licensee concerned. The distribution licensee shall convey its
consent or otherwise to the STU or SLDC as the case may be by
e-mail or fax or by any other usually recognized mode of
communication, within three (3) working days.
(b) While processing the application from a generating station
seeking consent as required under Central Commission’s
Regulations for open access, the distribution licensee shall
verify the following, namely-
(i) Existence of infrastructure necessary for time-block-wise energy
metering and accounting in accordance with the provisions of
the State Grid Code in force, and
(ii) Availability of capacity in the transmission/distribution
network. STU or the distribution licensee, as the case may be,
shall display its real-time transmission or distribution capacity
on its website.
(c) Where existence of necessary infrastructure and availability of
capacity in the distribution network has been established, the
26 BIHAR GAZETTE (EXTRA) 17TH JULY 2018
distribution licensee shall convey its consent to the applicant by
e-mail or fax or by any other usually recognised mode of
communication, within three (3) working days of receipt of the
application.
(d) In case the distribution licensee as nodal agency finds that the
application for consent is incomplete or defective in any respect,
it shall communicate the deficiency or defect to the applicant by
e-mail or fax or by any other usually recognised mode of
communication, within two (2) working days of receipt of the
application:
(e) In case the distribution licensee refuses to give consent on the
grounds of nonexistence of necessary infrastructure or
unavailability of surplus capacity in the distribution network,
such refusal shall be communicated to the STU or SLDC, as the
case may be, by e-mail or fax or by any other usually recognized
mode of communication, within the period of three (3) working
days from the date of receipt of the application, along with
reasons for such refusal.
(f) Where the distribution licensee has not communicated any
deficiency or defect in the application within two (2) days from
the date of receipt of application, or refusal or consent within
the specified period of three (3) working days from the date of
receipt of the application or intimation from STU or SLDC,
consent shall be deemed to have been granted.
16. Consideration of applications from defaulters
Notwithstanding anything contained in these regulations, the
Nodal Agency shall be at liberty to summarily reject an application
for Open Access on the ground of non-compliance of the
provisions of these regulations, more specifically the provisions
relating to timely payment of the charges leviable hereunder.
17. Application by eligible entities other than consumers and
generating stations connected to distribution system:
The procedure for submission of the application and processing
the same as laid down in this chapter in respect of the consumers
shall, mutatis mutandis, be applicable to the electricity trading
licensees, distribution licensees and the generating companies
connected to the STU as well.
18. Allotment Priority
(1) The priority for allotment of open access in intra-State
transmission system shall be decided on the following criteria:
(a) A distribution Licensee shall have the highest priority in
allotment of open access capacity irrespective of whether the
open access request is for long-term, medium-term or short-
term.
(b) The long-term open access applicants shall have the priority
next to the distribution licensee.
(c) The medium-term open access applicants shall have the priority
next to the long- term open access applicants.
(d) The short-term open access applicants shall have the priority
next to the medium- term open access applicants.
(e) Allotment priority for short-term open access applicants shall
be decided subject to capacity availability.
27
BIHAR GAZETTE (EXTRA), 17TH JULY 2018
(f) An existing open access customer shall have the priority higher
than new open access applicants under respective category
provided the former applies for its renewal within the stipulated
period prior to the expiry of existing term of open access.
(g) When the requirement projected by an applicant is more than
the available capacity and the said applicant is not able to limit
his requirement to the available capacity, the request of
applicant having next lower priority shall be taken up for
consideration.
CHAPTER 5
OPEN ACCESS CHARGES
19. Transmission Charges
Open Access customer using transmission system shall pay the
charges as stated hereunder:
(1) For use of inter-State transmission system – As specified by the
Central Electricity Regulatory Commission from time to time.
(2) For use of intra-State transmission system: –
(a) Transmission charges payable to State Transmission Utility/
transmission licensee by Long-term and Medium-term open
access customer for usage of their system shall be as
determined by the Bihar Electricity Regulatory Commission
from time to time in accordance with the appropriate
Regulations framed by the Commission.
Provided that transmission charges shall be payable on the
basis of contracted Capacity/ Scheduled Load or actual power
flow whichever is higher.
Provided further that where a dedicated transmission
system used for open access has been constructed for exclusive
use of an open access customer, the transmission charges for
such dedicated system shall be worked out by transmission
licensee for their respective systems and got approved by the
Commission and shall be borne entirely by such open access
customer till such time the surplus capacity is allotted and
used for by other persons or purposes.
Provided also that no transmission charges shall be payable
in case of transaction of renewable energy generated from solar
and wind sources of energy.
(b) Transmission Charges payable to State Transmission
Utility/transmission licensee by Short-Term Open Access
customer for usage of their system shall be determined as
under:
Transmission Charges = ATC/(PLST X8760) (in Rs./MWh)
Where,
ATC= Annual Transmission Charges determined by the
Commission for the State transmission system for the
concerned year.
PLST= Peak load projected to be served by the State
transmission system in concerned year.
Provided that transmission charges for short-term open access
shall be payable on the basis of the energy actually scheduled
for Short-Term transactions.
28 BIHAR GAZETTE (EXTRA) 17TH JULY 2018
Provided further that no transmission charges shall be payable
in case of open access transaction of renewable energy
generated from solar and wind sources of energy.
20. Scheduling and system operation charges
Scheduling and system operation charges shall be payable by the
Open Access customers at the following rates:
(1) In respect of inter-State open access
(a) Long-term access and Medium-term open access
(i) Regional Load Despatch Centre fees and charges including
charges for the Unified Load Despatch and Communication
Scheme as specified by the Central Commission under section
28(4) of the Act.
(ii) State Load Despatch Centre charges as specified by the
Commission under sub-section (3) of section 32 of the Act.
(b) Short-term open access
(i) Regional Load Despatch Centre and State Load Despatch
Centre charges as specified by the Central Commission.
(2) In respect of intra-State open access
(a) Long-term access and medium-term open access:- Long-term
access and medium-term open access customers shall be liable to
pay SLDC charges determined by the Commission under sub-
section (3) of section 32 of the Act.
(b) Short-term open access- A composite operating charge @
Rs.2,000/- per day or part of the day shall be payable by a short-
term open access customer for each transaction to the SLDC or as
determined by the Commission from time to time. The operating
charge includes fee for scheduling and system operation, energy
accounting, fee for affecting revisions in schedule on bonafide
grounds and collection and disbursement of charges.
21. Wheeling Charges:
Wheeling charges payable to distribution licensee, by an open
access customer for usage of its distribution system shall be as
determined by the Commission in the tariff order from time to
time:
Provided that Wheeling charges shall be payable on monthly basis,
by the Open access consumer on the basis of scheduled energy.
Provided further that no wheeling charges shall be payable in case
of transaction of renewable energy generated from solar and wind
sources of energy.
Provided further that where a dedicated distribution system used
for open access has been constructed for exclusive use of an open
access customer, the wheeling charges for such dedicated system
shall be worked out by distribution licensee for their respective
systems and got approved by the commission and shall be borne
entirely by such open access customers till such time the surplus
capacity is allotted and used for by other persons or purpose.
22. Cross subsidy surcharge
(1) If open access facility is availed of by a subsidising consumer of a
distribution licensee of the State, then such consumer, in addition
to transmission and/or wheeling charges, shall pay cross subsidy
surcharge determined by the Commission from time to time.
Provided that Cross subsidy surcharge determined on Per Unit
basis shall be payable, on monthly basis, by the open access
29
BIHAR GAZETTE (EXTRA), 17TH JULY 2018
consumers based on the actual energy drawn during the month
through open access.
Provided also that cross subsidy surcharge shall not be levied in
case distribution access is provided to a person who has
established a captive generation plant for carrying the electricity to
the destination of his own use.
(2) The Cross subsidy surcharge shall be determined by the
Commission in accordance with the principles and formula
stipulated in the Tariff Policy notified by Central Government
under section 3 of the Act.
23. Additional Surcharge
(1) An open access consumer, receiving supply of electricity from a
person other than the distribution licensee of his area of supply,
shall pay to the distribution licensee an additional surcharge, in
addition to wheeling charges and cross-subsidy surcharge, to meet
the fixed cost of such distribution licensee arising out of his
obligation to supply as provided under sub-section (4) of section
42 of the Act.Such additional charge payable by open access
consumer to the distribution licensee shall be as determined by
the Commission in the distribution tariff order from time to time.
Provided that Additional surcharge shall be payable on monthly
basis, by the open access consumers based on the actual energy
drawn during the month through open access.
Provided also that such additional surcharges shall not be levied
in case distribution access is provided to a person who has
established a captive generation plant for carrying the electricity to
the destination of his own use.
(2) The additional surcharge shall become applicable only if the
obligation of the licensee in terms of power purchase
commitments has been and continues to be stranded or there is
an unavoidable obligation and incidence to bear fixed costs
consequent to such a contract.
(Note: The fixed cost related to network assets is recovered
through wheeling charges.)
(3) The distribution licensee shall submit to the Commission along
with its ARR, a detailed calculation statement of fixed cost which
the licensee is incurring towards his obligation to supply,
mentioning the hourly stranded data with its merit order dispatch.
24. Standby charges for drawal of power by open access customer
from distribution licensee
In cases of outages of generator supplying to open access
customer under open access, standby arrangements shall be
provided by the distribution licensee for a maximum period of 42
days in a year, subject to the load shedding as is applicable to the
embedded consumer of the licensee at a charge under Temporary
connection tariff for that category of consumer as determined by
the consumer from time to time.
Provided that such charge shall not exceed 125% of the normal
tariff for that category of consumers.
Provided that in cases where temporary rate of charge is not
available for that consumer category the distribution licensee shall
charge 125% of the normal tariff for that category of consumers.
30 BIHAR GAZETTE (EXTRA) 17TH JULY 2018
Provided also that open access customers would have the option
to arrange stand-by power from any other source.
25. Other Charges
In addition to the above charges, the regulatory charges,
congestion charges and any other charges imposed by Central
Commission and/or State Commission shall be payable by the
open access customers.
CHAPTER 6
SCHEDULING, METERING, REVISION AND LOSSES
26. Scheduling:
(1) Notwithstanding anything contained in the succeeding clauses of
this regulation, scheduling of inter-State open access transactions
shall be as specified by the Central Commission.
(2) Subject to the foregoing clause, intra-State open access
transactions in respect of consumers of load 10 MW and above
and all generating stations irrespective of the capacity shall be
scheduled by SLDC in accordance with the provisions of the State
Grid Code.
(3) There shall be no scheduling required in respect of open access
consumer having load of less than 10 MW.
Provided that the generating station from which such
consumer has contracted power shall be subjected to scheduling
requirements as per the applicable grid code.
27. Metering:
(1) In case of open access consumer including all generating stations,
Special Energy Meters shall be installed at the point of injection
and point of drawal by the State Transmission Utility or the
distribution licensee as the case may be, for and at the cost of the
customer.
(2) Special Energy Meters installed shall be capable of time-
differentiated measurements for time-block-wise active energy and
voltage differentiated measurement of reactive energy in
accordance with the Indian Electricity Grid Code/Bihar Electricity
Grid Code.
(3) Special Energy Meters shall be open for inspection by any person
authorized by the State Transmission Utility or the State Load
Despatch Centre or the Distribution licensee.
(4) Special Energy Meters shall always be maintained in good
condition by the open access customers and shall be periodically
tested and calibrated by State Transmission Utility/Distribution
licensee.
(5) All the open access customers shall abide by the metering
standards of CEA.
28. Revision:
Revision of scheduled energy shall be permitted in accordance
with the provisions of IEGC or the Bihar Electricity Grid Code as
the case may be.
29. Losses:
(1) Transmission losses:
(a) Inter-State transmission:
(i) Long-term access and medium-term open access: The buyers shall
bear apportioned energy losses in the transmission system in
31
BIHAR GAZETTE (EXTRA), 17TH JULY 2018
accordance with the provisions specified by the Central
Commission.
(ii) Short-term Open Access: The buyers and sellers shall absorb
apportioned energy losses in the transmission system in
accordance with the provisions specified by the Central
Commission.
(b) Intra-State transmission: The transmission losses for the intra-
State system, as determined by the Commission in their tariff
orders for the applicable year, shall be apportioned in proportion
to the actual energy drawal by the open access customers and
shall be payable in kind.
(2) Distribution loss:
The system losses for the distribution system, as determined by
the Commission for various voltage levels in their tariff orders for
the applicable year, shall be apportioned in proportion to the
actual energy drawal by the open access customers and shall be
payable in kind at relevant voltage level.
CHAPTER 7
IMBALANCE AND REACTIVE ENERGY CHARGES
30. Imbalance Charge
(1) Scheduling of all transactions pursuant to grant of long-term
access or medium term open access or short-term open access
shall be carried out on day-ahead basis in accordance with the
relevant provisions of IEGC for inter-State transactions and in
accordance with Bihar Electricity Grid Code, Commission’s
applicable Regulations and orders for intra-State transactions.
(2) In case of deviation by open access consumers with load of less
than 10 MW, the difference between the scheduled energy and the
actual drawal shall be accounted through the Time of Day (ToD)
Meters on monthly basis and settled at the rate of the imbalance
charge as determined by the Commission. In case of under-drawal
as a result of non availability of the distribution system or
unscheduled load shedding, the open access consumer shall be
compensated by the distribution licensee at the average power
purchase cost of the distribution licensee.
[Explanation.- For the purpose of this regulation, unscheduled
load shedding means, load shedding during hours other than the
hours for which load shedding has been announced by the
distribution licensee. BERC may notify the number of days before
which a distribution licensee should declare scheduled load
shedding]
(3) Deviations between the schedule and the actual injection/drawal
(net over /under drawal or injection) in respect of open access
consumers with load of 10 MW and above and the Generating
Stations irrespective of the capacity, shall be settled based on the
composite accounts for imbalance transactions issued by SLDC on
a weekly cycle in accordance with the charges specified by the
Commission.
(4) Payment of imbalance charges shall have a high priority and the
concerned constituents (licensees or the open access customers as
the case may be) shall pay the indicated amounts within 10 (ten)
days of the issue of the statement, into a State imbalance pool
32 BIHAR GAZETTE (EXTRA) 17TH JULY 2018
account operated by the SLDC. The person who has to receive the
money on account of imbalance charges would then be paid out
from the State imbalance pool account, within three (3) working
days.
(5) If payments against the above imbalance charges are delayed by
more than two days, i.e., beyond twelve (12) days from the date of
issue of statement, the defaulting party shall have to pay simple
interest @ 0.04% for each day of delay. The interest so collected
shall be paid to the person whose payment has been delayed.
Persistent payment defaults, if any, shall be reported by the SLDC
to the Commission, for initiating remedial action.
31. Reactive Energy Charge
(1) In respect of open access consumer having a load of 10 MW or
above, the payment for the reactive energy charges by open access
consumers shall be in accordance with provisions stipulated in
the relevant Grid Code.
(2) In respect of open access consumers of load less than 10 MW,
reactive energy charges shall be calculated on Power Factor basis
as specified by the Commission.
CHAPTER 8
COMMERCIAL MATTERS
32. Billing, collection and disbursement
Billing in respect of the charges payable under these regulations
shall be made as per the following procedure:
(1) Inter-State transactions:
(a) Short-term Open Access
(i) Collection and disbursement of transmission charges for use of
CTU and STU systems and operating charges payable to RLDCs
and SLDCs towards short-term open access shall be made by the
nodal RLDC in accordance with the procedure specified by the
Central Commission.
(ii) The short-term open access customer connected to distribution
system of a distribution licensee shall pay to such distribution
licensee the charges payable to the distribution licensee on
monthly basis within 3 days from the grant of the short-term open
access by the nodal agency.
(b) Long-term access and medium- term open access
(i) Billing, collection and disbursement of charges payable to RLDC
including Unified Load Despatch and Communication Scheme
shall be in accordance with the procedure specified by the Central
Commission.
(ii) Bills towards the charges payable to SLDC shall be raised by the
STU/SLDC directly to the open access customer connected to STU
and to the distribution licensee in respect of the customers
connected to the distribution system, before the 3rd working day
of the succeeding calendar month.
(iii) Distribution licensee shall raise the bill with the open access
customer connected to it within 3 days of receipt of bill from
SLDC.
(iv) Open access customer connected to the distribution licensee shall
pay the charges within five days of receipt of bill from distribution
33
BIHAR GAZETTE (EXTRA), 17TH JULY 2018
licensee. The distribution licensee shall disburse the amount
payable to STU/SLDC on a monthly basis.
(v) Open access customer connected to the STU shall pay the bills
within five working days of receipt of the bill.
(2) Intra-State transactions:
(a) Short-term Open Access
(i) The short-term open access customer shall deposit with SLDC the
transmission charges and operating charges within 3 working
days of grant of the short- term open access by SLDC.
(ii) In addition to the above, the short-term open access customer
connected to distribution system of a distribution licensee shall
also pay to SLDC, the charges payable to the distribution licensee
within 3 days from the grant of the short-term open access by the
nodal agency. Such charges would be disbursed to the
distribution licensee on a weekly basis.
(b) Long-term and Medium-Term open access
SLDC, transmission licensees and distribution licensee, where
applicable, shall communicate to STU, the details of the bills due
to them by the 3rd working day of the succeeding calendar month.
STU shall separately indicate the above charges and raise the bill
with the open access customer, together with the charges
receivable by it, if any, before the 5th working day of the above
month. The open access customer shall pay the charges within 7
days from the date of receipt of the bill. STU shall disburse the
charges payable to SLDC, transmission licensee and distribution
licensee on a monthly basis.
33. Late payment surcharge
In case the payment of any bill for charges payable under these
regulations is delayed by a open access customer beyond the due
date, without prejudice to any action under the Act or any other
regulation thereunder, a late payment surcharge at the rate of
1.25% per month shall be levied.
34. Default in payment
(1) Non-payment of any charge or sum of money payable by the open
access customer under these regulations (including imbalance
charges) shall be considered non-compliance of these regulations
and shall be liable for action under section 142 of the Act in
addition to action under section 56 of the Act. The STU or any
other transmission licensee or a distribution licensee may
discontinue open access after giving customer an advance notice
of fifteen days without prejudice to its right to recover such
charges by suit.
(2) In case of default in payment of charges due to the Load Despatch
Centre the Load Despatch Centre concerned may refuse to
schedule power to the defaulting open access customer and direct
the licensee concerned to disconnect such customer from the grid.
35. Payment Security Mechanism
In case of long-term open access and medium-term open access,
the applicant for open access will open an irrevocable Letter of
Credit equivalent to the estimated amount of various charges for a
period of two months in favour of the agency responsible for
collection of various charges.
34 BIHAR GAZETTE (EXTRA) 17TH JULY 2018
CHAPTER 9
INFORMATION SYSTEM
36. Information system
The State Load Dispatch Centre shall post following information
on its website in a separate web page titled “Open access
information” and also issue a monthly and annual report
containing such information.
(1) A status report on long-term access or medium-term open access
customers indicating:
(a) Name of customer;
(b) Period of open access granted (date of commencement and
date of termination);
(c) Point of injection;
(d) Point of drawal;
(e) Transmission system / distribution system used, and
(f) Open access capacity used.
(2) A status report on short-term open access customers indicating:
(a) Name of customer;
(b) Period of open access granted (date of commencement and
date of termination);
(c) Point of injection;
(d) Point of drawal;
(e) Transmission system / distribution system used, and;
(f) Open access capacity used.
(3) Peak load flows and capacity available including the reserve
capacity on all EHV lines and HV lines emanating from EHV
substations.
(4) The information regarding average loss in transmission and
distribution system as determined by respective licensees.
CHAPTER 10
MISCELLANEOUS
37. Under –Utilization or Non-Utilization of open access capacity
in intra-State transmission system
(1) Long-term open access: A long-term customer may relinquish
the long-term access rights fully or partly before the expiry of the
full term of long-term access, by making payment of compensation
for stranded capacity as follows:-
(a) Long-term customer who has availed access rights for at least
7(seven) years
(i) Notice of one (1) year – If such a customer submits an application
to the State Transmission Utility at least 1 (one) year prior to the
date from which such customer desires to relinquish the access
rights, there shall be no charges.
(ii) Notice of less than one (1) year – If such a customer submits an
application to the State Transmission Utility at any time lesser
than a period of 1 (one) year prior to the date from which such
customer desires to relinquish the access rights, such customer
shall pay an amount equal to 66% of the transmission charges for
the stranded transmission capacity for the period falling short of a
notice period of one (1) year.
(b) Long-term customer who has not availed access rights for at
least 7 (seven) years – such customer shall pay an amount equal
35
BIHAR GAZETTE (EXTRA), 17TH JULY 2018
to 66% of the estimated transmission charges (net present value)
for the stranded transmission capacity for the period falling short
of 7 (seven) years of access rights:
Provided that such a customer shall submit an application
to the State Transmission Utility at least 1 (one) year prior to the
date from which such customer desires to relinquish the access
rights:
Provided further that in case a customer submits an
application for relinquishment of long-term access rights at any
time at a notice period of less than one year, then such customer
shall pay an amount equal to 66% of the estimated transmission
charges (net present value) for the period falling short of a notice
period of one (1) year, in addition to 66% of the estimated
transmission charges (net present value) for the stranded
transmission capacity for the period falling short of 7 (seven) years
of access rights.
(c) The discount rate applicable for computing the net present
value as referred to in sub-clause (a) and (b) of clause (1) above
shall be the discount rate to be used for bid evaluation in the
Central Commission’s Notification issued from time to time in
accordance with the Guidelines for Determination of Tariff by
Bidding Process for Procurement of Power by distribution
Licensees issued by the Ministry of Power.
(d) The compensation paid by the long-term customer for the
stranded transmission capacity shall be used for reducing
transmission charges payable by other long-term customers and
medium-term customers in the year in which such compensation
payment is due in the ratio of transmission charges payable for
that year by such long- term customers and medium-term
customers.
(2) Medium-term Open Access customers -A medium-term open
access customer may relinquish rights, fully or partly, by giving at
least 30 days prior notice to the nodal agency:
Provided that the medium-term open access customer
relinquishing its rights shall pay applicable transmission charges
for the period of relinquishment or 30 days whichever is lesser.
(3) Short-term open access customer
(a) The short-term open access scheduled energy accepted by the
nodal agency in advance or on first-come-first-served basis may be
cancelled or revised downwards on an application to that effect
made to the nodal agency by the short-term open access
customer:
Provided that such cancellation or downward revision of the
short-term open access scheduled energy shall not be effective
before expiry of a minimum period of two (2) days:
Provided further that the day on which notice for
cancellation or downward revision of schedule is served on the
nodal agency and the day from which such cancellation or
downward revision is to be implemented, shall be excluded for
computing the period of two (2) days.
(b) The person seeking cancellation or downward revision of short-
term open access scheduled energy shall pay the transmission
charges for the first two (2) days of the period for which the
36 BIHAR GAZETTE (EXTRA) 17TH JULY 2018
cancellation or downward revision of schedule, as the case may
be, has been sought, in accordance with the schedule originally
approved by the nodal agency, and thereafter in accordance with
the revised schedule prepared by the nodal agency during the
period of such cancellation or downward revision.
(c) In case of cancellation, operating charges specified in Regulations
20 of these regulations shall be payable for two (2) days or the
period of cancellation in days, whichever is less.
38. Computation of capacity availability for open access
(1) The capacity available for the open access shall be computed for
each transmission segment and for every sub-station by the STU
following the methodology given below:
(a) Available open access capacity of a transmission system segment:
= (DC-(SD+AC)) + NC - ND where, DC=Designed capacity of the
transmission segment in MW, SD = Sustained demand (peak load
experienced) in MW recorded in the segment, AC = Already allotted
capacity, but not availed in MW, NC = New capacity in MW
expected to be added and ND= New Demand expected to be added.
provided that for an embedded consumer seeking open
access within the contract demand the available open access
capacity of the transmission system segment shall be computed
by using the formula (DC-(SD-AC))+NC-ND
(b) Available open access capacity of a sub-station: = (TC-(SP+AC))
+NC – ND
where, TC= Transformer capacity of the substation in MVA, SP=
Sub-station peak in MVA, AC= Already allotted capacity but not
availed in MVA ,NC= New transformer capacity in MVA expected to
be added and ND = New Demand expected to be added.
provided that for an embedded consumer seeking open
access within the contract demand the available open access
capacity shall be computed by using (TC-(SP-AC)) +NC – ND
(c) The STU shall update these values on monthly basis on the first
calendar day of the month and publish it in their website.
(2) The appropriate distribution licensee shall determine the available
capacity adopting the above methodology for allotment for the
portion of the distribution system over which open access has
been requested for.
39. Curtailment Priority
When, because of constraints or otherwise, it becomes necessary
to curtail the open access service of the customers, subject to the
requirements of Bihar Electricity Grid Code, the short-term open
access customers shall be curtailed first, followed by the medium-
term open access customers and thereafter followed by long-term
open access customers. The open-access to a distribution licensee
and generating company shall be the last to be curtailed.
Provided that within a category, the open-access customers
shall have equal curtailment priority and shall be curtailed on pro-
rata basis.
SLDC shall frame guidelines for curtailment of open access
customers.
40. Dispute Resolution Mechanism
37
BIHAR GAZETTE (EXTRA), 17TH JULY 2018
(1) The complaints regarding all grievances and disputes relating to
open access shall be made to the respective nodal agency in
writing.
(2) The nodal agency shall investigate and endeavour to resolve the
grievance/disputes through mutual agreements.
(3) If the nodal agency is unable to redress the grievance, dispute or
the open access customer is aggrieved with the decision of the
nodal agency, the matter may be brought before the Commission
by either of the parties.
41. Powers to Remove Difficulties
If any difficulty arises in giving effect to any of the provisions of
these regulations, the Commission may by general or special
order, direct the State Transmission Utility, State Load Dispatch
Centre, intra-State licensees and the open access customer, to
take such action, as may appear to the Commission to be
necessary or expedient for the purpose of removing difficulties.
42. Repeal and Savings
(1) Save as otherwise provided in these regulations, the Bihar
Electricity Regulatory Commission (Terms and Conditions for
Open Access) Regulations, 2005,shall stand repealed from the
date of commencement of these regulations.
(2) Notwithstanding such repeal, anything done or purported to have
been done under the repealed regulations shall be deemed to have
been done or purported to have been done under these
regulations.
(3) Nothing in these regulations shall be deemed to limit or otherwise
affect the power of the Commission to make such orders as may
be necessary to meet the ends of justice.
(4) Nothing in these regulations shall bar the Commission from
adopting in conformity with provisions of the Act, a procedure
which is at variance with any of the provisions of these
regulations, if the Commission, in view of the special
circumstances of a matter or a class of matters, deems it just or
expedient for deciding such matter or class of matters.
(5) Open access customers to the intra-State transmission system
and the distribution system in the State on the date of coming into
force of these regulations under an existing agreement / contract
shall be entitled to continue to avail such access to the
transmission and distribution system on the same terms and
conditions, as stipulated under such existing agreement/contract.
Such persons are eligible to avail long-term access or medium-
term open access under these regulations on expiry of such
existing agreement/contract. However such persons, shall have to
make application with the nodal agency for long-term access or
medium-term open access category as the category may be, at
least thirty days prior to the expiry of such existing
agreement/contract.
43. Power to amend
The Commission may, at any time may add, vary, alter, modify, or
amend, any provision of these regulations
By order of the Commission,
NIRAD PRAKASH,
Secretary.
38 BIHAR GAZETTE (EXTRA) 17TH JULY 2018
Format-I
CONGESTION INFORMATION AND INVITATION OF BIDDING
(to be invited by SLDC)
(See regulation 14.2.c)
SLDC Bidding Invitation No.___________ Date_________
1 Customer Application No. <as provided by customer
on FORMAT-1>
Date
2 Period of Transaction < 1 months and more / less than 1 months / day-
ahead >
3 Nature of Customer* < seller/buyer/captive user/trader(on behalf of
seller/buyer/captive user) >
4 Customer Name
5 Registration Code Valid up to
<* In terms of power transfer>
6. The anticipated congestion (transformer and electric line/link) is as follow:
Network Corridor Congestion Period Margin/
Capacity
Available
Total
Capacity
Applied by
all the
Customers
Sub-station
with
Transformation
capacity
Electric
Line/Link
with
capacity
Date Hours MW MW
From To From To
Intra-State Transmission
System
Intra-State Distribution
System
Inter-State Transmission
System
39
BIHAR GAZETTE (EXTRA), 17TH JULY 2018
7. In view of above please submit bid on format [FORMAT-ST4]. The details for
bidding are hereunder:
(a) Bid Invitation Date Time
(b) Bid Submission
Date
Time
(c) Bid Opening Date Time
(d) Bids Invited for Time
Intra-State Network
Corridor
Congestion Period Margin/Capacity
Available for
Bidding
Floor
Price
Sub-
station
Electric
Line/Link
Date Hours MW Rs./kWh
From To From To
Name of Transmission
System
Name of Distribution
System
8. In case of non submission of bid, application shall be deemed to have been
withdrawn and shall not be processed.
Place Signature (with Stamp)
Date Name & Signature
40 BIHAR GAZETTE (EXTRA) 17TH JULY 2018
Format-II
BID PROPOSAL
(to be submitted by the customer to SLDC)
(See regulation 14.2.c)
Ref: SLDC Bidding Invitation No. ________________
Date__________
To: Dy. General Manager (SLDC),
1 Customer Application
No.
<as provided by customer on
FORMAT-1>
Date
2 Period of Transaction < 1 months and more / less than 1 months / day-
ahead >
3 Nature of Customer* < seller/buyer/captive user/trader(on behalf of
seller/buyer/captive user) >
4 Customer Name
5 Registration Code Valid up to
<* In terms of power transfer>
6. In reference to above bidding invitation, I hereby submit my bid as follows:
Bidding Details as provided by SLDC
Intra-State
Network Corridor
Congestion Period Margin/
Capacity
Available
Floor
Price
Bid Price to be
Quoted by
Bidder
Sub-
station
Electric
Line/Link
Date Hours MW Paise./
KWh
Paise./KWh*
From To From To
Name of
Transmission
System
Name of
Distribution
System
< * Bidder shall quote price (rounded-off to whole number) in denotation of floor
price >
7. I do hereby agree that determined bid price(s) shall be transmission and/or
wheeling charges.
Place Signature (with stamp)
Date Name & Designation
————
PUBLISHED AND PRINTED BY THE SUPERINTENDENT,
BIHAR SECRETARIAT PRESS, PATNA.
Bihar Gazette (Extra) 662—571+400—Egazette
Website: http://egazette.bih.nic.in
Previous and next
All provisions of TERMS AND CONDITIONS OF INTRA-STATE OPEN ACCESS
Questions people ask
Is form AT-1 appended to these Regulations of TERMS AND CONDITIONS OF INTRA-STATE OPEN ACCESS still in force?
No repeal of TERMS AND CONDITIONS OF INTRA-STATE OPEN ACCESS is recorded.