Regulation 2, UNIFIED DEVELOPMENT CONTROL AND PROMOTION REGULATIONS FOR MAHARASHTRA STATE..: Parking
UNIFIED DEVELOPMENT CONTROL AND PROMOTION REGULATIONS FOR MAHARASHTRA STATE.. - Regulation 2
Text of regulation 2
Parking
2. Parking:- For parking of vehicles of handicapped people, the following provisions shall be
made :-
a) Surface parking for two car spaces shall be provided near entrance for the physically
UDCPR-2020
234
handicapped persons with maximum travel distance of 30 m. from building entrance.
b) The width of parking bay shall be minimum 3.6 meter.
c) The information stating that the space is reserved for wheel chair users shall be
conspicuously displayed.
d) Guiding floor materials shall be provided or a device, which guides visually impaired
persons with audible signals, or other devices, which serves the same purpose, shall be
provided.
13.1.4 Building Requirements
The specified facilities for the buildings for differently abled persons shall be as follows:-
i) Approach to plinth level
ii) Corridor connecting the entrance / exit for the differently abled.
iii) Stair-ways
iv) Lift
v) Toilet
vi) Drinking Water.
i) Approach to plinth level :-Every building should have at least one entrance accessible to the
differently abled and shall be indicated by proper signage. This entrance shall be approached
through a ramp together with the stepped entry.
ii) Ramped Approach :- Ramp shall be finished with non-slip material to enter the building.
Minimum width of ramp shall be 1800mm. with maximum gradient 1:12. Length of ramp
shall not exceed 9 m. having 800mm. high hand rail on both sides extending 300mm. beyond
top and bottom of the ramp. Minimum gap from the adjacent wall to the hand rail shall be
50mm.
iii) Stepped Approach:-For stepped approach size of tread shall not be less than 300mm. and
maximum riser shall be 150mm. Provision of 800mm. high hand rail on both sides of the
stepped approach similar to the ramped approach.
iv) Exit/Entrance Door:- Minimum & clear opening of the entrance door shall be 900mm. and
it shall not be provided with a step that obstructs the passage of a wheel chair user.
Threshold shall not be raised more than 12mm.
v) Entrance Landing:-Entrance landing shall be provided adjacent to ramp with the minimum
dimension 1800mm. x 2000mm. The entrance landing that adjoins the top end of a slope
shall be provided with floor materials to attract the attention of visually impaired persons
(limited to coloured floor material whose colour and brightness is conspicuously different
from that of the surrounding floor material or the material that emits different sound to guide
visually impaired persons hereinafter referred to as “guiding floor material”). Finishes shall
have a non-slip surface with a texture traversable by a wheel chair. Curbs, wherever
provided, should blend to a common level.
vi) Corridor connecting the entrance / exit for the differently abled:- The corridor
connecting the entrance / exit for differently abled, leading directly outdoors to a place where
information concerning the overall use of the specified building can be provided to visually
impaired persons either by a person or by signs, shall be provided as follows:-
UDCPR-2020
235
a) Guiding floor materials or device that emits sound to guide visually impaired persons
shall be provided.
b) The minimum width shall be 1500mm.
c) In case there is a difference of level, slope ways shall be provided with a slope of 1:12.
d) Hand rails shall be provided for ramps/slope ways.
vii) Stair-ways - One of the stair-ways - near the entrance / exit for the differently abled shall
have the following provisions:-
a) The minimum width shall be 1350 mm.
b) Height of the riser shall not be more than 150 mm. and width of the tread 300mm. The
steps shall not have abrupt (square) nosing.
c) Maximum number of risers on a flight shall be limited to 12.
d) Hand rails shall be provided on both sides and shall extend 300 mm. on the top and
bottom of each flight of steps.
viii) Lifts -Wherever lift is required as per regulations, provision of at least one lift shall be made
for the wheel chair user with the following cage dimensions of lift recommended for
passenger lift of 13 persons capacity of Bureau of Indian Standards.
Clear internal width 1100 mm.
Clear internal width 2000 mm.
Entrance door width 900 mm.
a) A hand rail not less than 600mm. long at 1000mm. above floor level shall be fixed
adjacent to the control panel.
b) The lift lobby shall be of an inside measurement of 1800 mm. x 1800 mm. or more.
c) The time of an automatically closing door should be minimum 5 seconds and the closing
speed should not exceed 0.25 m/sec.
d) The interior of the cage shall be provided with a device that audibly indicates the floor,
the cage has reached indicates that the door of the cage of entrance/exit is either open or
closed.
ix) Toilets :-One special W.C. in a set of toilets shall be provided for the use of differently abled
with essential provision of washbasin near the entrance for the handicapped.
a) The minimum size shall be 1500 mm. x 1750 mm.
b) Minimum clear opening of the door shall be 900mm. and the door shall swing out.
c) Suitable arrangement of vertical/horizontal handrails with 50 mm. clearance from wall
shall be made in the toilet.
d) The W.C. seat shall be 500mm. from the floor.
x) Drinking Water:-Suitable provision of drinking water shall be made for the differently abled
near the special toilet provided for them.
xi) Designing for Children:- In the buildings meant for the pre-dominant use of the children, it
will be necessary to suitably alter the height of the handrail and other fittings & fixtures, etc.
Explanatory notes:-
UDCPR-2020
236
1) Guiding / Warning Floor Material:
The floor material to guide or to warn the visually impaired persons with a change of colour
or material with conspicuously different texture and easily distinguishable from the rest of the
surrounding floor materials is called guiding or warning floor material. The material with
different texture gives audible signals with sensory warning when a person moves on this
surface with walking stick. The guiding/warning floor material is meant to give the
directional effect or warn a person at critical places. This floor material shall be provided in
the following areas:-
a) The access path to the building and to the parking area.
b) The landing lobby towards the information board, reception, lifts, staircases and toilets.
c) Immediately at the beginning/end of walkway where there is a vehicular traffic.
d) At the location abruptly changing in level or beginning/end of a ramp.
e) Immediately in front of an entrance/exit and the landing.
2) Proper signage:-
Appropriate identification of specific facilities within a building for the differently abled
persons should be done with proper signals. Visually impaired persons make use of other
senses such as hearing and touch to compensate for the lack of vision, whereas visual signals
benefit those with hearing disabilities.
Signs should be designed and located so that they are easily legible by using suitable letter
size (not less than 20 mm. high). For visually impaired persons, information board in brail
should be installed on the wall at a suitable height and it should be possible to approach them
closely. To ensure safe walking, there should not be any protruding sign which creates
obstruction in walking. Public Address System may also be provided in busy public areas.
The symbols/information should be in contrasting colour and properly illuminated because
people with limited vision may be able to differentiate amongst primary colours. International
Symbol Mark for wheel chair be installed in a lift, toilet, staircase, parking areas, etc., that
have been provided for the differently abled.
13.2 INSTALLATION OF SOLAR ASSISTED WATER HEATING (SWH) SYSTEM/ ROOF
TOP PHOTOVOLTAIC (RTPV) SYSTEM
SWH or RTPV systems shall be mandatory in all types of buildings to be constructed on plot area
of more than 4000sq.m.
In order to facilitate the installation of SWH/RTPV System, the new buildings shall have the
following provisions:-
i) All such buildings where SWH/RTPV are to be installed will have open sunny roof area
available for the installation of SWH/RTPV.
ii) The roof loading adopted in the design of such building should be at least 50 kg. per sq.m. for
the installation of SWH/RTPV.
iii) At least 25% of the roof area shall be utilized for installation of the SWH/RTPV system.
iv) Precaution should be taken that architectural elevation treatment should not cast shadow on
terrace space. As far as possible, parapet of south, east and west sides of the terrace shall be
of railing type (above 1 feet) such that it will not cast shadow on the solar collectors and
UDCPR-2020
237
maximum terrace space can be utilized.
v) All such new buildings installed with SWH shall have an installed hot water line from the
rooftop and insulated distribution pipelines to each of the points where hot water is required
in the building.
13.3 RAIN WATER HARVESTING
The provision for Rain Water Harvesting shall be made as under:-
a) All the layout open spaces/amenity spaces of housing societies and new constructions/
reconstruction/ additions on plots having area not less than 500 sq.m. shall have one or more
Rain Water Harvesting structures having a minimum total capacity as detailed in Schedule.
Provided that the Authority may approve the Rain Water Harvesting structures of
specifications different from those in Schedule, subject to the minimum capacity of Rain
Water Harvesting being ensured in each case.
b) The owner/society of every building mentioned in the (a) above shall ensure that the Rain
Water Harvesting System is maintained in good condition for storage of water for non-
potable purposes or recharge of groundwater at all times.
c) The Authority may impose a levy of not exceeding Rs.1000/- per annum for every 100sq.m.
of built-up area for the failure of the owner of any building mentioned in the (a) above to
provide or to maintain Rain Water Harvesting structures as required under these regulations.
Failure to provide Rain Water Harvesting System shall deemed to be breach of the conditions
on which the development permission has been granted.
Schedule
Rain Water Harvesting in a building site includes storage or recharging the ground water by
rainwater falling on the terrace or any paved or unpaved surface within the building site. The
following systems may be adopted for harvesting the rainwater drawn from terrace and the paved
surface.
i) Open well of a minimum 1 m. diameter and 6m. in depth into which rain water may be
channelled and allowed to filter for removing silt and floating material. The well shall be
provided with ventilating covers. The water from the open well may be used for non-potable
domestic purposes such as washing, flushing and for watering the garden etc.
ii) Rain Water Harvesting for recharge of groundwater may be done through a bore-well around
which a pit of 1m. width may be excavated upto a depth of at least 3m. and refilled with stone
aggregate and sand. The filtered rain water may be channelled to the refilled pit for
recharging the bore-well.
iii) An impressive surface/underground storage tank of required capacity may be constructed in
the setback or other open spaces and the rain water may be channelled to the storage tank.
The storage tank shall always be provided with ventilating covers and shall have draw-off
taps suitably placed so that rain water may be drawn off for domestic, washing, gardening
and such other purposes. The storage tank shall be provided with an overflow.
iv) The surplus rain water, after storage, may be recharged into ground through percolation pits
or trenches or combination of pits and trenches. Depending on the geomorphological and
topographical conditions, the pits may be of the size of 1.20 m. width X 1.20 m. length X 2m.
to 2.50 m. depth. The trenches can be of 0.60 m. width X 2 to 6 m. length X 1.50 to 2 m.
UDCPR-2020
238
depth. Terrace water shall be channelled to pits or trenches. Such pits or trenches shall be
back filled with filter media comprising the following materials :-
a) 40 mm stone aggregate as bottom layer upto 50% of the depth.
b) 20 mm stone aggregate as lower middle layer upto 20% of the depth.
c) Coarse sand as upper middle layer upto 20% of the depth.
d) A thin layer of fine sand as top layer.
e) Top 10% of the pits/trenches will be empty and a splash is to be provided in this portion
in such a way that roof top water falls on the splash pad.
f) Brick masonry wall is to be constructed on the exposed surface of pits/trenches and the
cement mortar plastered. The depth of wall below ground shall be such that the wall
prevents lose soil entering into pits/ trenches. The projection of the wall above ground
shall at least be 15 cm.
g) Perforated concrete slabs shall be provided on the pits/trenches.
h) If the open space surrounding the building is not paved, the top layer up to a sufficient
depth shall be removed and refilled with coarse sand to allow percolation of rain water
into ground.
v) The terrace shall be connected to the open well/bore-well/storage tank/ recharge pit/trench by
means of HDPE / PVC pipes through filter media. A valve system shall be provided to enable
the first washing from roof or terrace catchment, as they would contain undesirable dirt. The
mouth of all pipes and opening shall be covered with mosquito (insect) proof wire net. For
the efficient discharge of rain water, there shall be at least two rain water pipes of 100 mm.
dia. for a roof area of 100 sq.m.
vi) Rain Water Harvesting structures shall be sited as not to endanger the stability of building or
earthwork. The structure shall be designed such that no dampness is caused in any part of the
walls or foundation of the building or those of an adjacent building.
vii) The water so collected/recharged shall as far as possible be used for non-drinking and non-
cooking purpose. Provided that when the rain water in exceptional circumstances will be
utilised for drinking and/or cooking purpose, it shall be ensured that proper filter arrangement
and the separate outlet for bypassing the first rain water has been provided. Provided further
that, will be ensured that for such use, proper disinfectants and the water purification
arrangements have been made.
The structures constructed under this provision shall not be counted towards FSI
computation.
13.4 GREY WATER RECYCLING AND REUSE
Grey Water - It means waste water from bathrooms, sinks, shower and wash areas, etc.
Applicability -These Regulations shall be applicable to all Developments/ Redevelopments/part
Developments for the uses as mentioned under Regulation No. 13.4.1 to 13.4.6 shall have the
provision for treatment, recycling and reuse of Grey Water. The applicant shall along with his
application for obtaining necessary layout approval/ building permission shall submit a plan
showing the location of Grey Water Treatment Plant, furnishing details of calculations,
implementation, etc. This Plan shall accompany with the applicant’s commitment to monitor the
UDCPR-2020
239
system periodically from the date of occupation of the respective building.
13.4.1 For Layout Approval/Building Permission
i) In case of Residential layouts, area admeasuring 10000 sq.m. or more, in addition to 10%
open space, prescribed in the bye- laws, a separate space for Grey Water Treatment and
Recycling Plant should be proposed in the layout. This may be proposed in amenity space
as per Regulation No. 3.5.
ii) On the layout Plan, all Drainage lines, Chambers, Plumbing lines should be marked in
different colour and submit the layout for approval to the Authority.
iii) The recycled water shall be used for gardening, car washing, toilet flushing, irrigation, etc.
and in no case for drinking, bathing, washing utensils, clothes etc.
iv) A clause must be included by the owner/ developer in the purchase agreement that the
purchaser, owner of the premises/organization or society of the purchasers shall ensure that:
a) The recycled water is tested every six months either in municipal laboratory or in the
laboratory approved by Authority or by State Government and the result of which shall
be made accessible to the competent authority/ EHO of the respective ward office.
b) Any recommendation from testing laboratory for any form of corrective measures that
are needed to be adopted shall be compiled. Copy of any such recommendation and
necessary action taken shall also be sent by the testing laboratories to the Competent
Authority/ EHO of respective Wards.
c) Maintenance of Recycling Plant should be done by the Developer or Housing Society
or Owner.
13.4.2 Group Housing/Apartment Building
In case of Group Housing scheme or a multi-storeyed building having 100 or more tenements,
Grey Water Recycling Plant as mentioned in Regulation No. 13.4.1 above, should be constructed.
In case of EWS/ LIG tenements, this shall be provided for tenements 150 or more.
13.4.3 Educational, Industrial, Commercial, Government, Semi-Government Organizations,
Hotels, Lodgings, etc.
For all above buildings having built-up area 1500 sq.m. or more or if water consumption is 20,000
litre per day whichever is minimum, then provision for Grey Water Treatment Plant as mentioned
in Regulation No. 13.4.1 is applicable.
13.4.4 Hospitals
Those Hospitals having 40 or more beds, Grey Water Recycling Plant as mentioned in Regulation
No. 13.4.1 is applicable.
13.4.5 Vehicle Servicing Garages
All Vehicle servicing garages shall ensure that the Grey water generated through washing of
vehicles is treated and recycled back for the same use as mentioned in Regulation No.13.4.1
13.4.6 Other Hazardous uses
All other Establishments/ Buildings where chances of Waste Water generated containing harmful
chemicals, toxins are likely and where such water cannot be directly led into municipal sewers, the
concerned Competent Authority may direct the Owners, users of such Establishments, Buildings
UDCPR-2020
240
to treat their Waste Water as per the directions laid in Regulation No. 13.4.1
13.4.7 Incentive
The Owner/Developer/Society setting up and agreeing to periodically maintain such Grey Water
Treatment and Recycling Plant entirely through their own expenditure shall be eligible for an
incentive in the form of fiscal benefits in Property Tax to the extent of 5% to Tenement
holder/Society.
13.4.8 Penalty Clause
Any person/ Owner/ Developer/ Organization/ Society violating the provisions of these bye- laws,
he shall be fined Rs.2,500/- on the day of detection and if the violation continues, then he shall be
fined Rs.100/- for every day as concrete action after written Notice from Authority.
If any person/ Owner/Developer/ Organization/ Society fails to operate as determined by the
Authorised Officer of the Authority and from the observations of test results and/or physical
verification) the Recycling plant, then he will be charged a penalty of Rs.300/- per day and
disconnection of Water connection also.
13.5 SOLID WASTE MANAGEMENT
It shall be mandatory for:-
i) Housing complexes, Commercial establishments, hostels, hospitals having aggregate built-up
area more than 4,000 sq.m. or more.
ii) All three star or higher category hotels.
To establish a dedicated Solid waste management system to treat 100% wet waste being generated
in such buildings.
The treatment of wet waste shall be done through an organic waste composters/ vermiculture pits
or other similar technologies of suitable capacity installed through reputed vendors.
The disposal of dry waste, e-waste, hazardous waste shall be carried out through authorised
recyclers or any other system as specified by the Authority
-*-*-*-*-*-
UDCPR-2020
241
CHAPTER – 14
SPECIAL SCHEMES
14.1 INTEGRATED TOWNSHIP PROJECT (ITP)
14.1.1 For Regional Plan Area
14.1.1.1 Applicability:-
These regulations shall be applicable to the areas under Regional Plan sanctioned under the
provisions of Maharashtra Regional and Town Planning Act, 1966 (hereinafter referred to as
“the said Act”).
Provided that, if the Development Control Regulations regarding development of Integrated
Township Project for an area over which a Planning Authority/Special Planning
Authority/Area Development Authority has been appointed or constituted or deemed to have
been appointed are yet to be sanctioned, then in considering the application for permission,
these regulations, shall be applicable, mutatis mutandis, till such Authority adopts the
Regulations in this regard.
If the ITP falls within the jurisdiction of more than one authority then in such cases
Government can issue directives at the time of Locational Clearance or at any time regarding as
to which authority shall give permission and supervise the project subject to terms and
conditions as may be specified.
14.1.1.2 Requirements of Site:-
The area proposed for Integrated Township shall fulfil the following requirements:-
i) Any suitable area having area of 40 hect. (100 Acres) or more at one place.
ii) The area shall be one, contiguous, unbroken and uninterrupted. Provided that, such area if
divided by one or more water courses (such as nallah, canals, etc.), existing or proposed
roads of any width or by railways, pipeline etc., shall be treated as one, contiguous,
unbroken and uninterrupted, subject to condition that the Project Proponent/s shall
construct necessary connecting roads or bridges as per site requirements at his own cost
with due permission from concerned authorities. Integrated Township area may also
include;
a) Lands in afforestation zone provided that such land is not a forest land and subject
to no construction being allowed on land having slope more than 1:5.
b) Lands within the buffer zone of National Park subject to restriction on
development permissible in such buffer zone and subject to NOC of Forest
Department.
c) Tribal land subject to permission granted under MLR code, Government lands
allotted to project proponent subject to Regulation No. 14.1.1.13 (ii).
d) Private forest land that have been restored back after completion of section 22(a)
Enquiry of Maharashtra Private Forest Act, 1975 shall be allowed to be part of the
ITP with the condition that development permission shall be granted on such land
only after necessary permission under the provision of Forest Conservation
Act,1980.
UDCPR-2020
242
e) Buffer zone of Eco-sensitive Zone notified subject to all restriction on
development and FSI permissible in such buffer zone.
f) Areas under flood line/ flood zone subject to clearance from Water Resource
Department.
g) Areas under Hill Top/ Hill Slope Zone, and (b), (e), (f) mentioned above as shown
on Regional Plan/Development Plan subject to condition as mentioned in
Regulation No. 14.1.1.7 (i) (c) However total of these areas shall be restricted to
maximum 40% of total area under ITP.
iii) If the Integrated Township area is more than 200 Ha., it can be segregated as long as each
parcel is more than 40 Ha. and is located within a radius of 5 kms. Provided that the land
use mix is maintained in each parcel.
iv) The area shall have an access by means of an existing, or proposed road having minimum
width of 18 m. In case of proposed road, such area shall have an access by existing road
having width 12 m. for the purpose of declaration locational clearance and LoI of such
project but it is necessary for the project proponent to have an existing access of 18 m.
before sanction of Commencement Certificate to the FSI beyond 25% of project.
Provided that Government land or land belonging to tribal can be considered for the
purpose of road if there is a registered Agreement. However development permission
shall be granted only after due permission of appropriate authority is given.
v) The ITP Area shall not include the area under:-
a) Notified forest, (excluding the private forest land subject to NOCs of forest
Department.)
b) Water bodies like river, creek, canal, reservoir, etc. Mangroves, Tidal Zone, Mud
Flats
c) The area under Notified National Parks.
d) Defence Estates
e) Cantonment Boards
f) Any restricted area.
g) Quarry Zone, Notified SEZ, designated port/harbour areas, wildlife corridor and
biosphere reserves, Gaothan/Congested Area.
h) The historical and archaeological places notified under the relevant act.
i) Any other area that may be declared by the Govt. of Maharashtra from time to
time.
14.1.1.3 Ownership of Lands:-
The project proponent/s shall have the ownership of all the land parcels under project.
(Explanation - for this clause, ownership includes rights accrued vide one or more registered
Development Agreement/s or Power of Attorney (PoA) for such development and disposal, on
behalf of land owner/owners).
14.1.1.4 Permission and Declaration of Project by State Government
i)The Project Proponent/s shall apply to the State Government for obtaining permission and
UDCPR-2020
243
declaration of such project to be a “Integrated Township Project”. Such application shall
be accompanied by the following attested documents in two sets:-
a) Details of ownership of land viz. extracts of V.F.No. 7/12 or Property Register
Cards, in original having date not more than six months prior to the date of
submission. In case of rights accrued through registered Development Agreement
or PoA, attested copies of such documents.
b) Self-attested list of S.No./G.No./CTS showing name of owner as per record of
rights, total area of such land parcel, area owned by the applicant in such land
parcel, the name of person/ company owning the Development Rights, area
proposed to be included in project from such land parcel.
c) Part plan of sanctioned Regional Plan, showing all the lands falling in the project.
d) No Objection Certificate from the officer at Divisional level, Water Resources
Department in respect of lands falling in “Command Area” of any Irrigation
Project unless these powers are exercisable by the higher authority.
e) Village maps showing the lands falling in the project.
f) Certificate from concerned Forest Officer not below the rank of Dy. Conservator of
Forests at Divisional level (unless these powers are exercisable by higher
authority), showing that the lands under project do not form part of and not
included in reserved forest or protected forest or non-classified forest or not
acquired under the provisions of the Maharashtra Private Forest (Acquisition) Act,
1975 and also, confirming that such lands do not form part of the Notified National
Parks, prohibited area of Notified Wildlife Sanctuaries and Notified Bird
Sanctuaries.
g) Certificate from the concerned revenue officer not below the rank of Tahasildar,
showing the lands under project do not include lands belonging to tribal or that
tribal land included in ITP have necessary permission under MLR code.
h) Certificate from the Director of Archaeological Department, Maharashtra State,
showing that the lands under project do not include monuments notified by the
Archaeological Department, Heritage buildings and Precincts. Such certificate
should also mention the distance to be kept around such places, if any.
i) Receipt of processing fee (non-refundable) paid, at the concerned branch office of
the Town Planning Department, at the rate of Rs.5000/- per ha. for the current year
with the yearly rise of Rs.500/- per ha. starting from the month of January every
year.
ii)On receipt of an application under Clause (i) above, the Government may, after consulting
the Director of Town Planning, Maharashtra State, by notification in the Official Gazette,
grant the Locational Clearance and declare such project to be a “Integrated Township
Project”, subject to such general and/or special conditions or, reject the application, under
the provisions of Section 18(3) of the said Act, within a period of 90 days from the date
of receipt of application or reply from the Project Proponent/s in respect of any
requisition made by the Government, whichever is later. If the project proponent fails to
comply with the conditions specified while granting location clearance within the
specified time limit, then in such cases location clearance given earlier stands
UDCPR-2020
244
automatically cancelled and no refund or adjustment of premium/ fees/ expenses etc. shall
be eligible.
(Explanation - In circumstances described in Clause (ii) above, such grant of permission
and declaration of project shall be made under the provisions of Section 18(3) of the
Maharashtra Regional and Town Planning Act, 1966 )
iii)Every such permission and declaration shall remain in force for a period of two years, if not
applied for Letter of Intent under Regulation No. 14.1.1.5, from the date of issue of
Locational Clearance Notification and thereafter it shall lapse.
Provided that, the Director of Town Planning, Maharashtra State, Pune may, on
application made by Project Proponent/s before expiry of the above period extend such
period by two years in aggregate. Provided also that, it is not mandatory on Project
Proponent/s to submit all the papers afresh as prescribed under Clause (i) above, however
the affidavit regarding the ownership of land about any dispute shall be mandatory.
iv) Such lapse shall not bar any subsequent application for fresh proposal.
v) The Director of Town Planning, Maharashtra State, on the request of Project Proponent/s,
by notification in the Official Gazette, may grant to add or delete any area, not exceeding
50%of the total area under Locational Clearance, subject to condition that the remaining
area shall not be less than 40 Hect. The permissible FSI and other parameters shall
increase or decrease accordingly.
14.1.1.5 Letter of Intent (LOI) by the Collector
i) The Project Proponent/s shall apply to the Collector for obtaining the Letter of Intent for
such project. Such application shall be accompanied by the ownership documents as
prescribed in Regulation No. 14.1.1.4 (i)(a) & (i) (b) and with locational clearance
notification issued by the Government.
ii) The Collector shall verify and satisfy himself that Ownership and Development Rights of
all the lands under project are with the Project Proponent/s before issuing the Letter of
Intent.
iii) On receipt of an application under Clause (i) above, the Collector shall grant the Letter of
Intent for the whole area or separately for any part thereof, which shall not be less than 40
Ha. at the first instance, subject to conditions as may be deem fit, or reject the
application, within a period of 45 days from the date of receipt of application or reply
from the Project Proponent/s in respect of any requisition made by the Collector,
whichever is later.
Provided that, in case of rejection, the Collector shall mention the grounds for such
refusal.
iv) Every such Letter of Intent shall remain in force for a period of two year, if not applied
for Development Permission under Regulation No 14.1.1.6, from the date of issue of
Letter of Intent, unless renewed. Provided that, the Collector may, on application made
by Project Proponent/s before expiry of the above period extend such period by two years
in aggregate. Provided also that letter of intent granted by collector under earlier
regulations may also be extended subject to other conditions of these regulations.
UDCPR-2020
245
14.1.1.6 Master Layout Plan Approval by the Collector:-
i) The project proponent/s shall apply to the concerned Collector for obtaining the approval
to the Master Layout Plan of the entire area as per Letter of Intent. Such application shall
be accompanied by the documents in two sets as prescribed below:-
a) Attested copy of Gazette Notification issued by the Government under Regulation
No. 14.1.1.4(ii).
b) Attested copy of Letter of Intent issued by Collector under Regulation No.14.1.1.5.
c) Part plan of sanctioned Regional Plan showing the lands under the Master Layout
Plan.
d) Village Map showing the lands under the Master Layout Plan.
e) In case, project has no access from existing road having right of way of 18 m. then
documents showing the ownership of Project Proponent/s in lands proposed for 18m.
wide access road.
f) Bank Guarantee of requisite amount as prescribed in Regulation No.14.1.1.12 (vi)
g) Undertaking and Affidavit as may be prescribed by the Collector.
h) Copies of Master Layout Plan with or without Building Plans in three sets prepared
and signed by expert in respective field and team headed by an Architect or Town
Planner registered with Institute of Town Planners India (ITPI)with sign of
owner/developer.
i) Contour map showing contour levels of lands under Master Layout Plan. Trueness of
the contour shall be certified and attested by the surveying agency and the Project
Proponent/s under their signature and seal.
j) Colored Google earth image/ Bhuvan image/ Drone survey image etc. showing lands
under Master Layout Plan.
k) Phased Program for development of physical infrastructure with amenities under
project, along with the project cost details.
ii) If the application is not accompanied by the documents mentioned in Regulation
No.14.1.1.6(i) above, the Collector convey the same to the Project Proponent/s
immediately within 10 working days giving specific time period for fulfilment of such
documents and if the same are not submitted by the said project proponent in given time
then return the proposal at his level only.
iii) On receipt of application, complete in all respects, as prescribed under Regulation No.
14.1.1.6(i) above, the Collector shall forward the same to the concerned Divisional Joint
Director of Town Planning for technical consultation within 10 working days.
iv) The office of the Divisional Joint Director of Town Planning shall send its remarks to
Collector within two months from the receipt of proposal from the Collector or receipt of
reply from the Project Proponent/s in respect of any requisition made by him, whichever
is later. Such master layout approval will be given with the condition that project
proponent will not commence work without environmental clearance. Such
environmental clearance shall be submitted at the time of sanction to the building
permission. Sanctioned master Plan layout along with complete set of drawings shall be
endorsed to the concerned branch office of Town Planning Department, for the further
UDCPR-2020
246
permissions.
v) Approval to the Master Plan:- The Collector shall grant approval to the master layout or
reject the application, under Section 18 of the said Act, within one month from the receipt
of reply from the Divisional Joint Director of Town Planning as mentioned in Regulation
No. 14.1.1.6 (iv) above.
vi) Approval to the building plan:- Detailed building permission under the master layout
plan sanctioned as per Regulation No. 14.1.1.6(v) shall be granted by the Assistant
Director of Town Planning/Town Planner of concerned Branch within 30 days from the
receipt of the proposal from the project proponent as mentioned in (a) below.
a) The Project Proponent/s shall apply to the concerned head of the Branch office of
the Town Planning Department, for grant of building permission, alongwith all
relevant documents and attested copy of Environment Clearance for the project
from MoEF or the Authority empowered by the MoEF.
b) The Project Proponent/s shall submit the certificate of Architect regarding completion
of plinth stating that the construction of plinth is as per the approved building Plans
to the concerned branch office of the Town Planning along with approved Plan.
The Branch Office of the Town Planning verify the same within stipulated time
period. If it is found that the construction of plinth is not as per the building
permission sanctioned, the said office shall reject such plinth checking certificate.
In such circumstances, the Project Proponent/s shall either demolish the said plinth
or get the revised plan sanction according to changes. If it is found that the
construction of plinth is as per the building permission sanctioned, then granting
the plinth checking certificate is not necessary.
14.1.1.7 Planning Considerations
i) Permissibility in respect of Zoning:-
a) Notwithstanding anything contained in any regulation for the time being in force,
the project to be notified under this regulation may be permissible in any land-use
zone/s of sanctioned Regional Plan/ Development Plan, excepting areas mentioned
in Regulation No. 14.1.1.2(v).
b) For the areas falling in zones, other than residential, commercial and U1 & U2 zone
as per the sanctioned Regional Plan the Project Proponent/s shall have to pay a
premium for permitting project in such zones at the rates prescribed below in Table
No. 14 A :-
Table No. 14 A
Sr.
No.
Type of Zone Premium
Charges
1 Afforestation Zone, Hill Top & Hill Slope Zone as shown
on Regional Plan / Development Plan.
15 %
2 Public / Semi-public Zone, Industrial Zone, TH & LP 8 %
3 Agriculture/ No Development Zone/G1 zone / Low Density
Residential Zone / Buffer Zone of ESZ and other zones
excepting at Sr. No. a & b above.
10 %
Explanation: Premium charges shall be calculated by considering the agriculture land
UDCPR-2020
247
rate of the said land as prescribed in Annual Statement of Rates (ASR) without applying
the guidelines. If agriculture land rate is not mentioned in ASR, in such cases the
Agricultural land rate for such land will be decided by referring the matter to the
Inspector General of Registration. Thereafter the premium will be calculated by
considering the land rate given by IGR in such cases. Out of total premium10% shall be
paid at the time of Locational Clearance, 10%paid at the time of letter of Intent, 20 %at
the time of sanctioning of Master Layout Plan and remaining 60%shall be in four equal
instalments per year and subject to interest as per Prime Lending Rate. (PLR)
c) Restriction on development-No construction shall be permitted on the lands within
the HFL (Blue line),land in Hill Top & Hill Slope Zone and on lands having slope
equal to or more than 1:5 in the said Project, whether specifically marked as such
on the Regional Plan/ Development Plan or not. No development of any sort and
activity involving cutting/ levelling/ filling shall be permissible on such sloping
lands. Provided that, it shall be permissible to use such lands for Plantation, Park,
Garden purposes, access road to township development with minimum cutting and
other users as otherwise permissible in respective Regional Plan/ Development
Plans and the FSI of such lands shall be permissible to the extent as prescribed in
Regulation No. 14.1.1.7(ii).
d)In the Buffer zone of notified ESZ and in ESZ’s, only those development activities and
FSI as permissible under MoEF notification of the ESZ (as amended from time to
time) under Environment Protection Act, 1986 shall be permitted. All the
development in this buffer zones shall be in accordance with MoEF notifications.
ii) Permissible Floor Space Index (FSI):-
a) Notwithstanding anything contained in any regulation for the time being in force, if
premium as mentioned in 14.1.1.7 (i) (b) is paid by the project proponent then the
basic permissible FSI for such project shall be 1.0 to be calculated on Gross Plot
Area under Master Layout Plan without deducting any areas under the slopes
within HFL, etc.
b) Further, additional FSI on payment of premium as mentioned below Table No. 14 B
shall be permissible on payment of premium at the rate of 10% of the weighted
average land rate of the said land as prescribed in Annual Statement of Rates for
the relevant year, without applying the guidelines therein. Such premium shall be
paid at the time of Building permission.
Table No. 14 B
Area under Township Additional built-up area on
payment of premium
40 hect. and upto 200 Hector. Up to 70 % of basic permissible FSI
More than 200 hect. and upto 500
Hector
Up to 80 % of basic permissible FSI
More than 500 hect. Hector Up to 100 % of basic permissible FSI
c) Over and above the FSI as prescribed above, an additional FSI in lieu of
construction of tenements for social housing shall be permissible as prescribed in
UDCPR-2020
248
Regulation No.14.1.1.9, without charging premium.
d) It shall be permissible to utilise the maximum permissible built-up area as
prescribed above, anywhere in the area under sanctioned Master Layout Plan.
iii) Mandatory Town-Level Amenities - Area and FSI Allocations:-
Master Layout Plan shall provide for town-level area and FSI allocation, to be kept at one
or more places, as follows :-
a) Spaces for Recreation
Table No. 14 C
Sr.
No.
Particulars Minimum Area
Required
Conditions
i Garden/s and
Park/s
5% of Master Layout
Area.(out of this 50% area
may be allowed on Hill
Top Hill Slope Zone,
Buffer Zone of ESZ and
within HFL)
Out of this at least 1000 sq.m. area
shall be kept open for Town
Plaza/Town Square, at one place and
remaining area shall be kept open
and may be allowed to be proposed
at suitable places. Major public
amenities / activities shall be cluster
around this area.
ii Play
Ground/s
7.5% of Master Layout
Area (may be allowed in
Buffer Zone of ESZ
having slope less than 1:
5)
Maximum 10% of area under Play
Ground which may accommodate
indoor games, stadiums and allied
users only.
Note - These spaces shall be exclusive of open spaces to be required at sector-level layouts.
Notwithstanding anything contained RP-DCPR, 10% open space shall be provided in sector
level layout. Such open space shall be calculated by considering area of the sector excluding
roads in Master Layout Plan and Town Level Amenity spaces excepting Economic Activities.)
b) Spaces for combined School/s (Primary School/s + High School/s) -
Table No. 14 D
Sr.
No.
Particulars Minimum
Area Required
Minimum Built-up
Area required
i For Master Layout area of 40 Ha. 5,000 sq.m. 5,000 sq.m.
ii For Master Layout area more than
40 Ha.
To be increased proportionately with
increase in Master Layout area and be
proposed at one or more locations, as per
requirements.
Note-
1) The requirements prescribed above are by considering School to be run in double shift,
2) Requirement of plot area and built up area shall be exclusive of Play Ground spaces.
Hence it is mandatory to show separate Play Ground adjoining to school building at the
UDCPR-2020
249
rate of 7 sq.m./ student.
c) Community Health Care Facilities:- Primary and Secondary Health Care
Facilities like Dispensary, Maternity Home, Hospital etc.
Table No. 14 E
Sr.
No.
Particulars Minimum Area
Required
Minimum Built-up
Area required
i For Master Layout area of 40 Ha. 1,000 sq. m. 1500 sq. m.
ii For Master Layout area more than
40 Ha.
To be increased proportionately with
increase in Master Layout area and be
proposed at one or more locations, as per
requirements.
d) Community Market:-
Table No. 14 F
Sr.
No.
Particulars Minimum Area
Required
Minimum Built-up
Area required
i General Market including Mutton and Fish Market
For Master Layout area upto &
inclusive of 200 Ha.
1000 sq.m.
As per requirement
For Master Layout area more than
200 Ha.
To be increased proportionately with
increase in Master Layout area and be
proposed at one or more locations, as per
requirements.
ii Vegetable Market
For Master Layout area upto &
inclusive of 200 Ha.
1000 sq.m.
As per requirement
For Master Layout area more than
200 Ha.
To be increased proportionately with
increase in Master Layout area and be
proposed at one or more locations, as per
requirements.
Note- Users mentioned in (i) & (ii) above may be clubbed together for convenience purpose,
without altering the requirements in plot area and built-up area.
e) Public Assembly Facilities:-Town Hall and/or Auditorium including Library
Table No. 14 G
Sr.
No.
Particulars Minimum Area
Required
Minimum Built-up
Area required
i For Master Layout area up to &
inclusive of 100 Ha
5000 sq.m. 5000 sq.m.
UDCPR-2020
250
ii For Master Layout area more than
100 hact. and upto 200 Ha.
10000 sq.m. 10000 sq.m.
iii For Master Layout area more than
200 Ha.
To be increased proportionately with
increase in Master Layout area and be
proposed at one or more locations, as per
requirements.
f) Economic Activities:-Economic activities including users such as Market, Multiplex,
Mall, Information Technology & Information Technology enabled Services (IT &
ITES) including SEZs, Essential Shopping, Recreational Centres, Trade &
Commerce, Education, Hospitals, Non-polluting Industries, Service Industries,
Entertainment, Tourism, Star Category Hotels, Convention Centres, Gymnasiums,
Socio-economic activities, such as workshop, hostel for Autistic
persons,challenged persons and Senior Citizens except independent residential
tenements as per requirements.
Table No. 14 H
Sr.
No.
Particulars Minimum
Area Required
Minimum Built-up
Area required
i For Master Layout area of 40 Ha. 40000 sq.m. 80000 sq.m.
ii For Master Layout area more than
40 Ha.
To be increased proportionately with
increase in Master Layout area and be
proposed at one or more locations, as per
requirements.
Note :-
1) Users as mentioned in b, c, d, e & f may be clubbed together, in Economic Activities
Component, subject to condition that, total built-up area should not be less than the
summation of minimum required for all such users, irrespective of their individual plot
area requirements.
2) The required parking spaces for all such amenities as per norms shall be provided in same
plot.
g) Public Utilities:- For Master Layout area up to & inclusive of 200 Ha.
Table No. 14 I
Sr.
No.
Particulars Minimum Area
Required
Permissible Built-up
Area
i Fire Brigade Station
3000 sq.m. or as
prescribed by the
Director of Fire
Services, Maharashtra
As per recommendations
of the Director of Fire
Services, Maharashtra
State/Chief fire Officer of
UDCPR-2020
251
State/ Chief fire
Officer of the concern
Authority.
the concern Authority.
ii Sewage Waste
Management
Project(SWMP)
4000 sq.m. As per requirements
iii Cremation Ground 2000 sq.m. As per requirements
iv Burial Ground 2000 sq.m. As per requirements
v Bus Station / Transport
Hub
3000 sq.m.
vi Police Station 1000 sq.m.
vii Electric Sub-station As per requirement
viii Other Public Utilities As per requirement
ix Public Parking Facilities As per prevailing
DCR
x Solid waste management As per requirement
Note:
1) If the facility of Cremation Ground/ Burial Ground is available in the village where the
Township is located in such case these requirements need not be insisted subject to NOCs
of respective Gram Panchayat.
2) If Police Station is available within 1km. area from the proposed Township, then such
facility need not to be provided.
h) Transport & Communication:-
i) The entire area of the project shall have a proper road pattern, taking into
consideration the linkages with existing roads within the project and outside
area as well. All such roads shall be developed by the Project Proponent/s as
per standard prescribed by the Indian Road Congress.
ii) The width of the -
a) Classified Road should not be less than as may be prescribed by
concerned public authority;
b) Main / Arterial / Ring Road should be of minimum right of way of 18 m.
c) Other Sub-Arterial roads, Collector streets, local streets, etc., shall be
proposed as per the requirements to cater to the need of occupancies on
such roads including for pedestrians.
d) Network of cycle track in entire Township area of minimum width of 3
meter shall be provided without clashing with the vehicular traffic, to
the extent possible.
UDCPR-2020
252
iii) It may be permissible for Project Proponent/s, to realign the Regional Plan /
Development Plan Roads, and earlier existing roads passing through the
project area, without changing the entry and exit points of such roads.
iv) All the Regional Plan / Development Plan Roads and all the Main/ Arterial /
Ring Roads, shall always be open for general public, irrespective of the fact
that, they resides in the project or not.
General Note for Amenities (a) to (h):
1) The requirements prescribed above for items (a) to (f) are by considering FSI proposed
for the project is only 1.0. If the FSI proposed is increased or decreased then the only
built up area requirement shall be increased or decreased proportionately.
2) The requirements prescribed above for items (g) are for Master Layout area up to &
inclusive of 200 Ha. It shall be increased or decreased proportionately and may be
proposed at one or more locations, as per requirements.
iv) Residential Activities:-
Table No. 14 J
Sr.
No.
Particulars Area Built-up Area
i Residential Activities
(including lands required for
social housing, infrastructure
such as water storage, drainage
and garbage disposal, etc.)
The land excluding
the land required for
purposes as shown
(iii) (a) to (h).
Remaining built-up
area subject to
minimum 60% of
the total proposed
Basic Residential
FSI.
14.1.1.8 Development Control Regulations:-
For those aspects which are not covered under this regulation, the prevailing provisions as
prescribed in the Standardised Development Control and Promotion Regulations for Regional
Plan in Maharashtra shall apply mutatis-mutandis. The provisions of MoEF CRZ notifications
amended from time to time shall also be applicable.
However where in prevailing DCR of the respective authority the maximum height of building
is not mentioned in such cases the maximum height shall be allowed subject to provisions of
Maharashtra Fire Prevention and Life safety measures Act 2006 and any restriction imposed by
Chief Fire Officer.
14.1.1.9 Social Housing:-
i) The Master Layout Plan shall provide sufficient space for construction of small tenements
for persons from EWS and LIG categories (hereinafter referred to as the “Social Housing
Component”), as a social responsibility with FSI as mention in Regulation No. 14.1.1.9
(iii). Out of this Social Housing Component 25% FSI shall be utilised exclusively for
construction of EWS tenements and remaining 75% FSI may be used for LIG tenements.
Out of the total tenements constructed as Social Housing component, one third (1/3rd)
tenements shall be kept for Rental Housing tenements which will be disposed on Rent
only by the project Proponents.
UDCPR-2020
253
ii) Social Housing tenements shall be constructed with area as specified by the MHADA for
EWS and LIG category respectively.
iii) The minimum Social Housing component shall be constructed at 15% of the Residential
basic FSI of the area available for Residential Development as prescribed in Regulation
No. 14.1.1.7 (iv) (hereinafter referred to as the “Social Housing component”).
iv) Social Housing tenements shall be constructed as per the general and special
specifications prescribed by concerned unit of MHADA for their projects.
v) The Project Proponent/s, after getting commencement certificate of Social Housing
component as mentioned above shall immediately intimate to MHADA regarding the
numbers of Social Housing Component to be disposed by them to the allottees. Upon
such intimation, MHADA within a period of six months, from the date of receipt of such
intimation after following procedure of lottery system shall prepare the list of the allottees
from the district as far as possible and forward it to the Project Proponent/s. The project
proponent shall dispose of such housing tenements to the allottees at the construction cost
mentioned in ASR applicable of the year of disposal (date of occupancy certificate) plus
25% additional cost. Out of this 25% additional cost, 1% shall be paid to MHADA
towards administration charges.
If the allottees fails to deposit the amount within specified time limit, then the allotment
shall stand cancelled and MHADA can give fresh names of allottees from waiting list
within one month.
Provided that if the MHADA is unable to provide the list of the allottees as mentioned
above then the project proponent shall dispose of such social housing tenements in the
market at the construction cost in ASR applicable to the land of the year of disposal plus
20% additional cost.
vi) Every Occupation Certificate for the regular tenements shall be granted only alongwith
the Occupation Certificate in proportionate with Social Housing component.
vii) Amalgamation of such Social Housing tenements shall not be permitted in any case.
viii) The purchaser of tenement under social housing shall deposit an amount equivalent to
10% of the construction cost of tenement, as prescribed in Annual Statement of Rates
prevailing at the time of occupation, with the Project Proponent/s as one-time
maintenance deposit for onsite infrastructure maintenance.
ix) The Project Proponent/s shall maintain the premises and common spaces outside the
building/s of social housing including concerned all basic infrastructure and amenities, in
good condition in the same manner with the maintenance of remaining area of the project.
x) The purchaser of tenement under social housing shall have to pay all the government taxes,
duties like stamp duty, GST etc. and also the fees charged for use of common amenities
at actual, to the Project Proponent/s, as per the requirement, from time to time.
14.1.1.10 Liability of Project Proponent/s:-
i) The entire project shall be an integrated one with all facilities within the boundaries of
such project. All the on-site infrastructure i.e. internal roads, approach road, street lights,
water supply and drainage system shall be mandatory and constructed/ maintained in
future by the Project Proponent/s. Proposed internal roads and Open Spaces in the
UDCPR-2020
254
layouts shall be used only for ITP.
ii) The Regional Plan Roads & Reservations which are included in ITP shall be Developed by
project proponent and after development made available to the general public. Such
reservations may be allowed to shift within 500 m. (within Township Area Only) in
consultation with the concerned Divisional Joint Director of Town Planning.
iii)It shall be the responsibility of the Project Proponent/s to develop and maintain all the
infrastructure in good condition till handing over to the appropriate authority.
The project proponent may collect periodical contribution or raise corpus funds for the
maintenance of infrastructure from the purchasers of tenements or statutory bodies of the
purchasers of tenements formed by the developer for this purpose.
Provided that, the Project Proponent/s shall handover the infrastructure, for maintenance
purpose, only after the completion of the project, to the Urban Local Body or appropriate
authority, when constituted in the area comprised by the project along with the unutilized
corpus fund collected for maintenance of common infrastructure.
iv) Project Proponent/s shall mandatorily provide facilities for making the Township
SMART-
a) For the people residing in the project area, an efficient and timely public
transportation system up to the nearest public transportation station/hub/depot/stand.
He shall develop it himself or tie with Government / Semi Government or private
transport agency for such efficient public transportation. The number of buses and
trips will be decided by MSRTC / Local Transport Authority.
b) Continuous unobstructed footpath of minimum 2 m. width on either sides of all street
/ roads of width ROW 12 m. or more and of a lesser width for roads / Streets of
ROW less than 12 m.
c) Dedicated and physically segregated bicycle track with a width of 3 m. or more,
should be provided for entire Township Area.
d) Pedestrian friendly pathways, encouragement to non-motorized transport, intelligent
traffic management, non-vehicle street / zones, smart parking, energy efficient street
lighting visible improvement in the area i.e. replacing existing overhead electric
wiring with underground wiring, encroachment free public areas,
e) Arranging generation of power through non-conventional energy sources like solar,
wind and other shall be mandatorily provided with at least 10% of total requirement
of common physical infrastructure of the project;
f) To provide energy management by adopting advanced technology like installing
Solar Water Heating System, Solar Lamps/Lights in common areas, LED Lamps,
auto-operated street lights, solar pumps, etc. all external lighting shall be of LED,
Solar Water Heating System, Solar Lamp shall be compulsorily provided;
g) To provide effective water management by adopting water harvesting techniques like
rain water harvesting, recycling of used water, metered water supply to the users
under project, double plumbing pipeline. The recycled water shall be used for flush
system, gardening, carwash and industrial use;
h) To provide effective safety & security measures like CCTV surveillance at strategic
UDCPR-2020
255
locations, centralized control room, etc.;
i) Arranging smart and fast internet/broad band connectivity to all residences, e-
governance online system for grievance redressal;
j) Encouraging and providing platform for citizens participations in decision making
about public community issues.
k) Arranging real time environmental monitoring i.e. air pollution, noise pollution etc.
shall be observed.
l) Encouraging and providing platform for e-DCR for building plans with BIM, 3-D
maps on GIS of the utility services network and properties in the city, central
command, control and emergency response center for all infrastructure facilities.
Project Proponent/s shall also provide urban design concept plans along with Master
Plan.
m) It shall be obligatory on the part of Project Proponent/s to provide the infrastructure
and green building norms that are necessary as per the guidelines as may be laid
down by the Government, under the policy of development of ‘Smart City’ from time
to time.
n) Ensure that the buildings have at least 3 star ratings from GRIHA
v) Project Proponent/s shall also mandatorily provide for:-
a) Water Supply-Safe and potable drinking water at the rate of 90 litters per capita
per day, exclusive of requirement of water for fire fighting and gardening purposes.
The storage capacity of the same shall be at least 1.5 times of the actual required
quantity as determined by expected population (Resident and Floating) and other
uses. The Project Proponent/s would be required to develop proper internal
distribution with double pipe plumbing for reuse of treated water at appropriate
places and maintenance system along with smart metering and shall specially
undertake rain water harvesting, groundwater recharging and waste water recycling
within the project.
Provided that, the Project Proponent/s should not use groundwater as a source of
water, to meet the above requirement.
b) Drainage and Garbage Disposal:- The Project Proponent/s shall make suitable and
environment friendly arrangements for the disposal and treatment of sewage and
solid waste generated in the project at source, as per the norms of the Maharashtra
Pollution Control Board. The Project Proponent shall provide zero discharge in
ITP for solid as well as liquid waste.
The Project Proponent/s should provide facilities for water conservation by
different means such as Rain Water Harvesting, Recycling of Waste Water, etc.
and also set-up, in the project area itself, the Solid Waste Management Project
(SWMP) with a sufficient capacity for processing of 100% garbage and solid
waste.
c) Power:- The Project Proponent/s shall ensure continuous and quality power supply
for the project area. The Project Proponent/s may draw the power from any
existing supply system or may go in for arrangement of captive power generation
with the approval from the concerned authority. If power is drawn from any
UDCPR-2020
256
existing supply system, the Project Proponent/s shall, before commencement of
development, procure a firm commitment of power for the entire Township from
the power supply company.
14.1.1.11 Occupancy Certificate:-
i) Application for obtaining the Occupancy Certificate for buildings in project, in full or part
shall be submitted by Project Proponent/s to the concerned branch Officer of Town
Planning. Such application shall be accompanied by -
a) All the relevant documents alongwith coloured Google Earth / Bhuvan /Drone survey
image showing the area under Master Layout Plan;
b) Documents showing compliance of the conditions prescribed while according
sanctions from time to time;
c) Appropriate declaration/s and undertaking/s made by the Project Proponent/s and his
technical personnel’s;
d) Any other requirement as may be prescribed by the Collector.
ii) The concern Branch Officer of Town Planning shall grant Occupancy Certificate or
reject the application giving specific reason within one month from the receipt of
application.
iii) The Collector, before issuing the Occupancy Certificate for the project as a whole, shall
verify and satisfy himself about the completion of erection / development/construction
of all the basic required infrastructure in Master Layout plan. In case, an application for
part occupancy, such completion shall be as prescribed in phase programme.
14.1.1.12 General Stipulations:-
i) Development of basic infrastructure and amenities shall be completed by the Project
Proponent/s to the satisfaction of the Collector either for whole or as per phases, of the
project.
ii) It shall not be mandatory for the Project Proponent/s to provide Amenity Space as
otherwise required as per regulation of Regional Plan / Development Plan, if any.
iii) The Project Proponent/s shall plant indigenous trees at the rate of at least 150 trees per
ha. and maintain it properly. The certificate to that effect issued by the Deputy
Conservator of Forest or an Officer nominated by him for this purpose shall be produced
by Project Proponent/s at the time of application for Final Occupation Certificate under
Regulation No. 14.1.1.11.
iv) All the powers and functions that are supposed to be exercised by the Collector under
this regulation shall be exercised by the Chief Officer / Chief Executive Officer of the
concerned Planning Authority wherever applicable, excepting the powers to grant Letter
of Intent under Regulation No. 14.1.1.5 of this regulation.
Provided that, before grant or refusal to the Master Layout Plan, the Chief Officer /
Chief Executive Officer of the Authority shall, consult the, concerned Divisional Joint
Director of Town Planning as prescribed in Regulation No.14.1.1.6(iii) and (iv), if the
Planning Officer posted in such Authority is below the rank of Joint Director of Town
Planning, and to the concerned branch office of Town Planning as prescribed in
Regulation No. 14.1.6(vi) and Regulation No. 14.1.1.11, if the Planning Officer posted
UDCPR-2020
257
in such Authority is below the rank of Assistant Director of Town Planning.
v) All the amounts of scrutiny fees, charges, premium etc. payable to the Government shall
be deposited with the concerned Branch office of the Town Planning. In circumstances
described in proviso of Regulation No. 14.1.1.12(iv) above, 50% of such amount shall
be deposited with the concerned Branch office of the Town Planning, and 50% to the
concerned Planning Authority.
vi) The Project Proponent/s shall submit a bank guarantee of an amount equal to the 15% of
estimated development cost required for development of the basic Physical
infrastructure such as roads, water supply, drainage & garbage disposal, Trunk
installations for power supply, fire brigade station & fire engines. Such development
cost be worked out as per respective phases taking into consideration the phased
programme for development of infrastructure with amenities under project as submitted
and as required under Regulation NO. 14.1.1.6(i).Certificate regarding estimated
development cost shall be produced by the respective Architect of the project. If Bank
Guarantee as mentioned above is submitted then separate security deposit shall not be
insisted by the authority.
vii) The Project Proponent/s shall construct and maintain the Fire Station building &
Infrastructure at their cost. The project proponent shall post well-trained staff at fire
station as per the recommendations of the Director of Fire Services, Maharashtra State /
Chief Fire Officer of the concerned Authority or the cost of staff appointed by Chief
Fire Officer for this purpose shall be borne by the Project Proponent. The amount of all
expenditure on such staff shall be the responsibility of the Project Proponent/s. After
completion of fire station and as per requirement such fire brigade/station shall be
handed over to the nearest respective authority on the terms and condition decided by
the respective authority and project proponent.
viii) Developer shall complete the Special Township Project within 10 years or such period
as allowed by the Government from the approval to the master plan. Developer shall
develop and maintain the all infrastructure (internal street light, roads etc.) upto the
completion of the ITP project. Within such period or till the authority is formed as per
Regulation No. 14.1.1.12 (ix), the concession in property tax levied by the respective
Grampanchayat or the respective Planning Authority shall be 66% of normal rate as
prescribed under the Grampanchayat Act or under Maharashtra Municipal Council,
Nagar Panchayat and Industrial Town ship Act 1965 or Maharashtra Municipal
Corporation ACT. Such property tax shall be levied from date of Occupancy Certificate.
Respective Grampanchayat /Planning Authority shall provide mandatory provisions like
Birth and Death Registration Certificate etc. for the same period in such ITP. Provided
that the utilities like fire brigade, police station/chowky etc. shall be handed over to the
nearest respective Authority at the terms and condition decided by the respective
authority.
ix) A local Authority shall be formed under section 3 read with section 341 of the
Maharashtra Municipal Council, Nagar Panchayat and Industrial Town ship Act 1965
according to population of such town ship. The newly formed respective authority shall
take over the operation maintenance of infrastructure in the Integrated Township Project
area with the previous approval of Government. However, if the area under ITPs merged
in any Local Authority then operation and maintenance of infrastructure in such
UDCPR-2020
258
Integrated Township Project area shall be made by the respective Local Authority.
x) Licensing to the Project Proponent/s - The respective Authority shall provide licenses to
the Project Proponent/s for telephone Connection, Power and other utilities in the
Township area as per existing rules & regulations. After granting the license from the
respective Authority, the project proponent/s shall provide utilities in the Township area
as per the conditions laid down by the respective authority.
xi) It shall be mandatory for the Project Proponent/s to provide appropriate width of road to
the land not owned by the project proponent which is surrounded by the Township Area.
14.1.1.13 Special Concessions
i) Deemed conversion for Non-Agricultural (N.A.) Use:- The lands under approved Master
Layout Plan shall be considered as deemed N.A. No separate permission shall be
required under the provisions of Maharashtra Land Revenue Code, 1966. The amount of
non-agricultural assessment shall be exempted to the extent of 50% of the normal rate
for the land under Integrated Township Project.
ii) Grant of Government land:- The Government land/s, if surrounded or adjacent by the
lands owned by the Project Proponent/s, may preferably be granted to the Project
Proponent/s, as per the rules and regulations to that effect, by the Revenue and Forest
Department of the State Government. Maximum 10% of the total area under township
shall be allowed to be included in such township.
iii) Concession in Stamp Duty:- For the purchase of land by project proponent for
township area or for the first transaction from Project Proponent/s to Purchaser of any
unit under any user from approved Master Layout Plan or subsequent building plan
under this Regulation, concession of 50% of stamp duty as otherwise required under the
Mumbai Stamp Act, shall be granted. This concession will be available only at one stage
i.e. either at the time of land purchase or at the time of sale of units. Also, if the project
proponent assigns the rights to his own subsidiary companies for the running of the
Amenities in such Township project as per the approved plan in such cases concession
of 50 % of stamp duty as otherwise required under the Mumbai Stamp Act, shall be
granted.
iv) Exemption in payment of Development Charges:- 50 % of the amount of
Development Charges under sub-section (3) of Section 124F of the said Act shall be
exempted for institution use or, change of use of any land or building or, development
of any land or building, proposed for project undertaken by a Project Proponent/s under
this Regulation.
v) Relaxation from Mumbai Tenancy and Agriculture Land Act:- The condition that,
only the agriculturist will be eligible to buy the agriculture land shall not be applicable
to the Project Proponent/s for purchasing agriculture land for Integrated Township under
this Regulation.
vi) Exemption from Ceiling for holding agriculture land:- The limit for holding
agriculture land, stipulated in the Maharashtra Agricultural Lands (Ceiling and
Holdings) Act, 1961 shall not be applicable to the Project Proponent/s for development
of Integrated Township Project under this Regulation.
vii) Exemption from scrutiny fee:- The amount of scrutiny fee shall be exempted to the
UDCPR-2020
259
extent of 50% of the normal rate for building permission under Integrated Township
Project.
viii) Exemption from royalty on minor minerals:- The amount of royalty on minor
minerals as per the Maharashtra Minor Mineral Extraction (Development and
Regulation) Rules shall be exempted to the extent of 50% for the earth which is
extracted while developing the land within Township area and fully exempted if the said
excavated material is used in the same project.
14.1.1.14 Transition Policy
i) It shall be permissible for the Project Proponent/s, to whom Special Township Project has
already been granted location clearance and / or LOI or the project is on-going wherein
part Occupancy Certificate is granted before 26/12/2016 to -
a) Continue such Special / Integrated Township Project under the erstwhile
regulations under which LC is granted without considering these regulations.
b) If the project proponents wish to develop township according to this regulations
then he may apply for grant of Letter of Intent or Master Layout Plan as the case
may be wherever required, under this regulation.
ii) If in case as described in Regulation No. 14.1.1.14 (i) (b), the construction of the project is
on-going and the Occupation Certificate, either in fully or partly has granted or not been
granted, it shall be permissible for the Project Proponent/s to choose an option to prefer
this regulation subject to payment of premium as prescribed in Regulation No. 14.1.1.7
(i) and (ii). In such cases premium shall be calculated on balance area which shall be
the difference of FSI permitted as per earlier regulation and that being availed as per this
regulation.
14.1.1.15 Appeal
Anyone aggrieved by an order passed under prevailing byelaws may within forty days of the
date of communication of the order prefer an appeal to the Director of Town Planning,
Maharashtra State, Pune. The appeal shall be decided within 60 days.
14.1.1.16 Control by the State Government -
Director of Town Planning M.S Pune is authorised on behalf of Government to monitor the
Township Project and submit his report once in six months to Government.
14.1.1.17 Government may relax any provisions from these regulation considering the site condition of
the particular project.
14.1.1.18 Read the concern Planning Authority/ Special Planning Authority constituted under relevant
Acts instead Collector, wherever applicable.
14.1.1.19 The rate of premium mentioned in the Regulation No. 14.1.1.7 (i) (b) and 14.1.1.7(ii) (b) can
be revised by the Government from time to time.
14.1.2 For Development Plan area
Regulations for Integrated Township Projects for Regional Plan mentioned in Regulation No
14.1.1 shall be applicable to Development Plan area with modified Regulations as mentioned
below.
UDCPR-2020
260
14.1.1.4 (ii) ---------------------------
(Explanation - In circumstances described in Regulation No. 14.1.1.4 (ii) above, such
grant of permission and declaration of project shall be made under the provisions of
Section 18(3) read with section 44 (2) of the Maharashtra Regional and Town Planning
Act, 1966)
14.1.1.6 (i)---------------------------
e) In case, project has no access from existing road having right of way of
18m. then documents showing the ownership or registered agreement for
permanent right of way, as the case may be, of Project Proponent/s in lands
proposed for 18 m. wide access road.
j) Colored Google earth image / Bhuvan image/ Drone survey image etc. showing
lands under Master Layout Plan, signed by project proponent
iv) The office of the Divisional Joint Director of Town Planning shall send its remarks to
Authority within two months from the receipt of proposal from the Authority or
receipt of reply from the Project Proponent/s in respect of any requisition made by
him, whichever is later. Such master layout approval will be given with the
condition that project proponent will not commence work without environmental
clearance. Such environmental clearance shall be submitted at the time of sanction to
the building permission.
14.1.1.6 (vi) -Approval to the building plan:-Detailed building permission under the
master layout plan sanctioned as per Regulation No. 14.1.1.6(v) shall be granted by the
concerned Authority with prior consultation as prescribed in proviso to Regulation No.
14.1.1.12(iv) within 30 days from the receipt of the proposal from the project proponent as
mentioned in 14.1.1.6 (vi) (a).
14.1.1.6 (vi) (b) -The Project Proponent/s shall submit the certificate of Architect
regarding completion of plinth stating that the construction of plinth is as per the approved
building Plans to the concerned branch office of the Town Planning along with approved
Plan. The Branch Office of the Town Planning verify the same within stipulated time
period. If it is found that the construction of plinth is not as per the building permission
sanctioned, the said office shall reject such plinth checking certificate. In such
circumstances, the Project Proponent/s shall either demolish the said plinth or get the
revised plan sanction according to changes. If it is found that the construction of plinth is
as per the building permission sanctioned, then granting the plinth checking certificate is
not necessary.
However, notwithstanding anything mentioned above, before grant or refusal to the Master
Layout Plan, the Authority shall, consult the, concerned Divisional Joint Director of Town
Planning as prescribed in Regulation No. 14.1.1.6 (iii) and (iv) if the planning officer
posted in such Authority is below the rank of Joint Director of Town Planning, and to the
concerned branch office of Town Planning as prescribed in Regulation No. 14.1.1.6(vi)
and Regulation No. 14.1.1.11, if the Planning Officer posted in such Authority is below
the rank of Assistant Director of Town Planning.
UDCPR-2020
261
14.1.1.7 (iii) ---------------------------
h) Transport & Communication:-
i) The entire area of the project shall have a proper road pattern, taking into
consideration the linkages with proposed roads of D.P. and R.P. existing roads
within the project and outside area as well. All such roads shall be developed by the
Project Proponent/s as per standard prescribed by the Indian Road Congress.
14.1.1.11 (ii) - On receipt of application as prescribed under Regulation No.14.1.1.11(i)
the Planning Authority shall forward the same to the concerned officer as stipulated in the
proviso to Regulation No. 14.1.1.12(iv) for technical consultation within 10 working days.
Following new Regulation shall be added.
14.1.1.7 (v) - Share of Local / Planning Authority.
The integration of Integrated Township Projects included in the Local / Planning
Authority, an area @ 2% of gross area shall be earmarked and shall be handed over free of
cost to the respective Authority for development of the City Level Facilities.
For determining eligibility of ITP, the above 2% area shall be considered in area
calculation. This area shall not contain area under hill slopes, and shall be accessible by
major road. Base FSI of such 2% land shall be made available to the applicant on
remaining land.
14.2 TRANSIT ORIENTED DEVELOPMENT (TOD)
The following regulations in respect of Transit Oriented Development shall be applicable for
the areas mentioned herein under. These provisions shall come in to operation where
Authorities either have or proposed RTS/ Metro-rail/ BRTS corridors in their Development
Plans and have started implementing them.
14.2.1 For Pune Municipal Corporation Area
Kept in abeyance.
14.2.2 Pune Metropolitan Region Development Authority area.
For this areas, the regulations specified in Regulation No. 14.2.1 are applicable mutatis –
mutandis
14.2.3 For Nagpur Municipal Corporation and Nagpur Metropolitan Region Development
Authority.
Following Regulations are applicable for Development / Redevelopment of building falling
within Nagpur Metro Rail Corridor (NMRC)
i) Definitions
a) Nagpur Metro Rail Corridor (NMRC) - It is the area falling within 500 m.
distance on either side of the Nagpur Metro Rail measured from its Centre line
and also includes the area falling within 500 m. distance from the longitudinal end
of the last Metro Railway Station. This regulation is also applicable for all the
Planning Authorities from where the Metro Rail is passing through.
b) Base permissible FSI - It is the FSI that is otherwise permissible on any land
UDCPR-2020
262
with respect to zone shown as per the sanctioned development plan and the
relevant provision of the Principal DCR excluding the TDR and the premium FSI,
redevelopment incentive FSI that can be received.
c) Gross plot area - Gross Plot Area means total area of land after deducting area
under reservation or deemed reservation like amenity space if any, area under
D.P. Road and Road widening.
ii) Maximum Permissible FSI
The maximum permissible total FSI in NMRC shall be 4.00 including the basic
permissible FSI, subject to condition that, the additional FSI over and above the basic
permissible FSI shall be allowed within the overall limit of maximum permissible FSI,
as given in the Table No 14 O below :-
Table No. 14 O
Sr.
No.
Minimum Road
Width
Plot Area Maximum
Permissible FSI
1 9.00 m. Below 1000 sq.m. 2.00
2 9.00 m. 1000 sq.m. or above 3.00
3 12.00 m. 2000 sq.m. or above 3.50
4 15.00 m. 2000 sq.m. or above 4.00
Explanation:-
1) The maximum permissible FSI as per the above Table shall be determined by
satisfaction of both the criterias viz. Minimum Road width as well as plot area,
simultaneously. However in case, both these criterias are not satisfied simultaneously,
the maximum permissible FSI shall be the minimum of that permissible against each of
these two criterias, as illustrated below ;
2) Land owner / Developer shall not have option to use TDR in NMRC.
Illustrations: -
Table No. 14 P
Plot Area
Road width
Less than 9m. 9 m. &
above
12 m. &
above
15 m.
&
above
below 1000 sq.m. As mentioned in Chapter 6 2 2 2
1000 sq.m. up to 2000 sq. m. As mentioned in Chapter 6 3 3.5 3.5
Above 2000 sq.m. As mentioned in Chapter 6 3 3.5 4.0
a) Premium to be Paid
Additional FSI over and above basic permissible FSI of respective land use zones
as mentioned in Chapter 6 may be permitted on the payment of premium as may
be decided by the Govt. from time to time.
UDCPR-2020
263
i) The additional FSI as prescribed in the Table under provision 1.2 above, in case
of development / redevelopment proposed in the NMRC with minimum
tenement density per hectare of the gross plot area as given below.
Minimum Numbers of Tenements = Gross Plot Area x Maximum Proposed
FSI for Residential use x 200 Tenement per Hector.
ii)However, subject to the provisions of regulation A.3herein below, if the
tenement density proposed is less than that stipulated in the table under
A.2.1(a),the premium to be paid in that event shall be the additional
premium as may be decided by the Govt. from time to time and such
premium shall be chargeable on the total additional FSI to be availed
beyond the basic permissible FSI.
iii) For construction of buildings mentioned in Chapter 7, the rates of premium
shall be as mentioned in the said Chapter.
b) Impact Assessment and Integrated Mobility Plan
Such additional FSI over and above the base permissible FSI, shall be granted by
the Commissioner, Nagpur Municipal Corporation / Chairman, Nagpur
Improvement Trust, any Planning Authorities from where the Metro Rail is
passing through after taking into account the Impact Assessment of the
implementation of these regulations regarding the impact on the city and sector
level infrastructure and amenities as well as traffic and environment on such
NMRC. Such Impact Assessment shall also contain measures to be undertaken to
mitigate its likely impact and the Action Plan for implementation of such
measures in a time bound manner. It shall also contain Integrated Mobility Plan
envisaging therein inter-linkages between different modes of mass transport,
parking management, traffic management and pedestrianisation.
c) The maximum permissible FSI as given in Table under Regulation No.(ii) above
shall be calculated on the gross plot area.
d) In case of plot / plots falling partly within the NMRC, the FSI permissible shall be
as follows, provided that the total area of the plot (plot falling within NMRC plus
plot falling outside NMRC) shall be as prescribed in the table in Regulation
No.(ii) above:-
(i) Where 50% or more area of such plot / plots falls within NMRC, these
regulations including FSI shall apply to the total area of such plot / plots.
(ii) Where less than 50% area of such plot / plots falls within NMRC, these
regulations including FSI shall be applicable to the part of plot / plots
falling within NMRC, whereas for the part of plot / plots falling outside
NMRC, these regulations except provisions regarding FSI shall be
applicable. The FSI permissible for the part falling outside NMRC shall be
as mentioned in chapter 6.
Moreover, the owner shall have option of either to opt for UDCPR
provisions in toto or opt for TOD regulations in toto. In case, the owner
opts for development as per UDCPR provisions, then he may be allowed to
utilise FSI as per TOD regulations over and above the maximum potential
UDCPR-2020
264
mentioned in Table 6-A or 6-G.
e) Notwithstanding anything contained in any other provisions of these
regulations, TDR shall not be allowed to be received on the plots within
NMRC, irrespective of its location in congested area / non-congested area
as per the Sanction Development Plan of Nagpur.
iii) Permissible mixed use in NMRC:
Mixed use in the form of residential and commercial, fully commercial use may be
permissible on the residential plot in NMRC fronting on the road width of 12 m. and
above. Mix use on plot / plots in commercial zone of sanction Development Plan falling
under NMRC shall be permissible as per these Development Control and Promotion
Regulations and the FSI permissible as per his Regulation over and above as mentioned
in Chapter 6 shall be allowed on the payment of premium, as per subject to Maximum
building potential as mentioned in Regulation No. (ii) above
iv) Other provisions regarding marginal open spaces shall be governed by the proposed
height of structure, as given in the provisions (v) below and should conform to the
Maharashtra Fire Prevention and Life Safety Measures Act, 2006 (Maharashtra Act No.
III of 2007) as amended from time to time. No building permission shall be issued
without NOC of the Fire Officer. Other regulations regarding room sizes, apertures for
light and ventilation shall be as per these Development Control and Promotion
Regulations in force.
v) Marginal Spaces
Table No. 14 Q
Sr.
No.
Building
Height
Side and Rear
Margins
Remark
a 15 m. and
below
H/2-4 Minimum 3.0m. for Residential
minimum 4.5 m. for Commercial and
Minimum 6.0m. for Special Buildings.
b Above 15 m.
and upto 24 m.
H/5
Minimum 4.5 m. for Residential and
Commercial Building and 6 m. for
Special Building.
c Above 24 m. Minimum 6.0 m.
Note-1. Maximum Side / Rear / Front Margin shall be 12.00 m. However if Developer /
Owners provides more than 12 m. side and rear margins it may be allowed.
Note-2. The Municipal Commissioner may relax the side & rear marginal distances as per
Regulation No. 2.4 of UDCPR subject to following provisions.
A) If clear minimum marginal distance is proposed from one side as per these
Regulation then other side marginal distance may be relaxed up to 50%.
B) Front margin relaxation to allow additional FSI may be granted subject to condition
that the Minimum road width shall be 12 m. and above.
Note-3.In case semi-detached construction as per these regulations, common wall
UDCPR-2020
265
constructed is allowed and marginal distance shall be provided for other side as
per these regulations.
(v)(a) No projections shall be allowed in one side marginal spaces as mentioned in Note 2(A)
above so that this marginal spaces remain free from all encumbrances for the movement
of fire tenders. However open balconies may be allowed in the marginal spaces where
concession as mentioned in Note No. 2(A) above is allowed, after leaving minimum 3.0
m. distance from the plot boundaries, subject to Fire NOC.
In case if ramp is necessary from accessibility, such ramp may be allowed after living 6
m. clear margin. However such Ramp may be allowed in side margin where relaxation
is to granted as per provision mentioned in Note No. 2(A) above subject to NOC of the
Fire Department.
(v)b) For calculation of marginal distances, the height of the parking floors (Maximum two
floors above the Ground Level) shall not be taken in account, However height of such
parking floors will be counted towards the total height of the building for deciding the
building as high rise building and for civil Aviation purpose.
(v)(c) Car lift / mechanical parking shall be permissible, as per these regulations as amended
from time to time.
vi) Parking
Parking in the NMRC shall be provided as per the table given below :-
Table No. 14 R
Sr.
No.
Occupancy
One parking space for every
Transit Oriented
Development Influence Zone
Car Scooter
/Motorcy
cle
Cycle
1 Residential
(a) Tenements having carpet
area
From 25 and upto 40 sq.m.
For 2 units above 40 and
upto 60 sq.m.
For every unit above 60 and
upto 80 sq.m.
For every unit above 80
sq.m.
0
1
1
1
1
1
1
2
2
2
2
1
2 Govt. &
Semi Govt.
Private
business
buildings
100 sq.m. carpet area or
fraction thereof
1 2 2
Note:-
UDCPR-2020
266
1) Parking spaces for differently - abled persons shall be provided as stipulated in these
regulations in each new construction / development / re- development in the NMRC.
2) On street parking shall not be permissible, unless specifically allowed in the impact
assessment and mobility report.
(vi)(a) Incentive for providing Public Parking in the area falling within the radius of 200 m.
from the Metro Station.
If the owner / developer of the plot falling within the radius of 200 m. from the Metro Station,
is willing to provide Public Parking space over and above the parking spaces required
as per the table given in Regulation No. (vi) above of this regulation, the same shall be
allowed and in that case the premium to be paid by such developer / owner as per
Regulation No. 14.2.3 (ii)(a) shall be reduced by the amount equal to the premium
worked out for 25% of the area earmarked for such additional Public Parking space,
subject to following conditions:-
i) Such parking area shall be in the built-up form and shall be handed over to
Planning Authority free of cost before granting the Occupation Certificate to the
project. The Planning Authority should enter into an agreement with owner /
developer for such parking space at the time of granting Commencement
Certificate to the project. Such Public Parking area shall be clearly shown on the
proposed building plan / layout and a condition to above effect shall be
incorporated in the Commencement Certificate.
ii) The parking area shall have independent access from major road adjacent to the
plot and with proper entry and exits.
iii) The parking area to be made available at individual site shall be at minimum
100 sq.m. at one place either at Ground floor / Stilt floor or first floor.
iv) The maximum parking area that can be provided shall be decided by the
Commissioner, Nagpur Municipal Corporation / the Chairman, Nagpur
Improvement Trust, as the case may be, on considering the location of such site
and the parking requirement.
v) A board showing the location of such public parking space should be displayed
at suitable places by the Planning Authority.
vi) Area covered under such parking shall not be counted towards FSI consumption.
vii) Concerned land owner / developer / society / public company shall not be
allowed to operate the public parking.
viii) The proposed development shall be further subject to such conditions as may be
decided by the Municipal Commissioner / Chairman, NIT, as the case may be.
vii) In case of development or redevelopment, proposed by the Authority / individual
applicant / any other Planning Authority, from the edge of the Metro Rail, within 10m.
distance from the Metro Rail, on its either side, the concerned Planning Authority i.e.
Nagpur Improvement Trust / Nagpur Municipal Corporation before granting such
permission for development / redevelopment shall seek prior NOC from the Nagpur
Metro Railway Corporation Ltd as required under the Metro Railways (Construction of
Works) Act, 1978 from the point of view of safety of the Metro Railway and such other
UDCPR-2020
267
related matters.
viii)The provisions of these UDCPR shall be applicable except, express provisions of these
TOD regulations. However in case of any conflict between TOD Regulations and any
other Regulation/s of UDCPR, TOD Regulations shall prevail for the NMRC.
ix) No Compound wall / fencing shall be permissible on the boundary of plot facing the
road and 50% front marginal distance (subject to minimum and maximum of 3m.) shall
be kept accessible and to be used as foot paths for pedestrians. However, it shall be
permissible for the applicant to construct / erect fencing, on the boundary, after leaving
the space for pedestrians as specified above.
However for the plots situated on 9 m., 12 m.. & 15 m., wide Roads having 100%
residential use therefore above rule shall not be made applicable.
a) Large wholesale stores, auto dealer showrooms, warehouses/storages, auto service
centres, Garages etc. shall not be permissible in NMRC.
b) Provision of Inclusive housing shall not be applicable in NMRC.
c) For Gunthewari development regularized under the provisions of Maharashtra
Gunthewari Development Act, 2001 and falling in NMRC, seeking provisions for
Development / redevelopment, these regulations shall apply.
d) The width of passage shall be minimum 1.2 m. for residential use & 2 m. for
commercial use.
e)Above regulation shall be applicable to all the buildings (i.e. newly proposed buildings
as well as old buildings for utilization of FSI) in TOD.
f) In case of redevelopment scheme, size of tenement can be relaxed for Rehab
Component subject to other provisions of UDCPR. However for free sale
component TOD Regulation shall be made applicable.
g) In case of independent unit / Bungalow for self-use, such Development /
Redevelopment may be allowed within base FSI subject to UDCPR.
h) The layout of building / group housing layout or standalone building on a plot /
plots situated in NMRC over which construction is started and for which
occupancy certificate is not granted may be revised and balance potential if any
may be allowed as per the above provisions subject to following :-
Marginal Distance – The existing marginal distances including front margin may
be allowed for higher floor / floors and necessary relaxation to that extent may be
granted by the Municipal Commissioner subject to compliance of all fire
requirements and fire NOCs by charging hardship premium. Hardship premium is
to be decided by Municipal Commissioner. In any case sanctioned existing
marginal /front margin distance shall not be reduced.
14.2.4 For other Municipal Corporations and other Metropolitan Region Development
Authority area.
For these areas, the regulations specified in Regulation No. 14.2.1shall be applicable.
UDCPR-2020
268
14.2.5 Regulations for BRT Corridor in Pimpri-Chinchwad Municipal Corporation.
The Regulations for development along the BRT corridor in Pimpri-Chinchwad Municipal
Corporation area sanctioned vide Government Notification No. TPS-1812/737/12/CR
506/13/Reconstruction No. 110/UD-13, dated 03/03/2010and amended from time to time, shall
be applicable with following modifications.
FSI receiving or development potential of the plot shall be as below.
Sr.
No.
Road width in meters Basic
FSI
FSI on
payment
of
premium
Maximum
permissible
TDR
loading
Maximum
building potential
on plot including
in-situ FSI
1 2 3 4 5 6
1 Below 9 m. 1.00 -- -- 1.00
2 9 m. and above but below 12 m. 1.00 0.50 0.75 2.25
3 12 m. and above but below 15 m. 1.00 0.50 1.00 2.50
4 15 m. and above but below 24 m. 1.00 0.50 1.25 2.75
5 24 and above but below 30 m. 1.00 0.50 1.50 3.00
6 30 and above 1.00 0.50 1.75 3.25
14.3 AFFORDABLE HOUSING SCHEME
i) The Authority may permit implementation of Affordable Housing Scheme in
accordance with the provisions of these Regulations. Affordable Housing Scheme
(hereinafter referred to as ‘the Scheme’) shall be permissible only on the lands situated
within the limits of Municipal Corporation.
a) Affordable Housing Scheme shall be permissible in Residential Zone only
and on plots having access from an existing or proposed Development Plan
Road having width equal to or in excess of 18 m. or an existing road in respect
of which Regular Line of Street has been declared under the relevant
provisions of Maharashtra Municipal Corporation Act, for a width of 18 m. or
more. However in case of a proposed road, the land under the said proposed
road shall be acquired before the approval of building plans for the Affordable
Housing Scheme.
b) Minimum plot area for the Affordable Housing Scheme shall be 4000 sq.m.,
excluding area under D.P. Roads and D.P. Reservations, if any.
c) The plot under the Scheme shall be independent, unencumbered and contiguous.
d) The Scheme shall not be permissible in congested areas, demarcated as
such on the Development Plan.
e) Maximum permissible FSI (including the basic FSI of 1.00) under the Scheme
shall be 3.00 on the gross plot area, including mandatory layout recreational
open space and Amenity Space. The FSI to be utilized shall be in the
proportion of 1:3 for the Affordable Housing Component and the Free Sale
Housing Component on ¼th and ¾th part of the land respectively. Thus
UDCPR-2020
269
Affordable Housing and Free Sale Housing shall be proposed on the same plot
of land but on two separate independently buildable pockets.
f) Under Affordable Housing Scheme, upto 15% of the total built-up area of the
Affordable Housing Component may be used for construction of
shops/commercial use as per the direction of Urban Local Body and such
commercial built-up area shall be handed over to the concerned ULB free of cost.
g) An Affordable Housing Unit shall be a self-contained dwelling unit of 27.88 sq.m.
carpet area. However the carpet area of a Housing Unit shall be 160 sq.ft., where
the construction under the Rental Housing Scheme has already commenced.
h) The amenity space for Affordable Housing shall be as per these regulations and it
shall be proportionately provided in the area earmarked for the Affordable
Housing Component and the area kept for Free Sale Housing component.
Provided that where the Scheme is to be implemented on a plot in Industrial
Zone where the Planning Authority has duly permitted Residential user under
the relevant provisions of the Development Control Regulations :-
i) no further area shall be required to be kept as amenity space under this
Regulation for the Scheme if the area prescribed to be kept as amenity
space while permitting residential user in Industrial Zone is equal to or
more than 10% of the gross plot area.
ii) only the balance area shall be required to be kept as amenity space under
this Regulation for the Scheme if the area of amenity space prescribed by
the Planning Authority, while permitting residential user in Industrial zone,
falls short of 10%.
ii) a) Notwithstanding anything contained in the relevant provisions of
the Development Control Regulations for the respective Municipal Corporation
regarding the provision of Amenity Space in general, and also regarding
permitting Residential User in Industrial Zone, it shall be obligatory on the
Developer / Owner to develop the amenity space for users (hereinafter referred
to as prescribed amenity users) such as School, Play Ground, Garden, Health
Care Facilities, Multipurpose Hall, Auditorium, etc. with the approval of
Authority as per the specifications prescribed by the said Authority, subject to the
condition that atleast 50% of such amenity space shall be kept for open users,
before seeking Occupancy Certificate for the Free Sale Housing Component of
the Scheme, failing which the land under such amenity space shall be handed
over free of cost to the Planning Authority and such land shall be developed by
the Authority for the aforesaid prescribed amenity users only.
No compensation in the form of TDR shall be admissible to the Owner / Developer for
development of such prescribed amenities under this Regulation.
b) Irrespective of whether the Owner / Developer develops the prescribed amenity
users as per the provisions of Clause (iii) above or fails to do so, the process of
handing over the land under such amenity space, along with the developed
prescribed amenities, where such prescribed amenities have been developed,
shall be completed within one month from the date of application by the
UDCPR-2020
270
Developer / Owner for seeking Occupancy Certificate for the free sale housing
component of the Scheme and if such handing over process is not completed
within the said period, the occupancy certificate for the free sale housing
component of the Scheme shall be withheld by the Authority till such amenity
space, along with developed prescribed amenities, where such prescribed
amenities have been developed, is handed over to the Authority.
c) Under the Affordable Housing Scheme, there shall be a welfare hall and a Balwadi
at the rate of 30 sq.m. for every multiple or part of 200 residential units and an
office for Co-operative Housing Society at the rate of 30 sq.m. per every multiple
or part of 500 residential units which shall be treated as a part of Affordable
Housing Component and shall not be counted towards the FSI while computing
3.00 FSI on the site and shall be given along with layout/DP roads and shops,
free of cost to the concerned ULB. These facilities shall be constructed at
locations as suggested by the concerned ULB and shall be transferred free of
cost to it.
iii)Under the Affordable Housing Scheme, off-site infrastructure charges at the rate of 5%
of the land rate as given in the Annual Statement of Rates (ASR) prepared by the
Inspector General of Registration, Maharashtra State, for the year in which
Commencement Certificate is issued (without applying guidelines of ASR),subject to a
minimum of Rs.2000 per sq.m., shall be paid by the Developer for the built up area,
over and above the normal permissible FSI. This amount shall be paid to the
concerned ULB.
iv) Release of FSI under the Scheme shall be as follows:-
FSI for Affordable Housing Component and the Free Sale Housing Component
under the Scheme shall be released in accordance with the following Table No. 14 R.
Table No. 14 S
Sr.
No.
Stages of Release of FSI Affordable
Housing
Component*
Free Sale
Compone
nt*
1. On Grant of Building Permission /
Commencement Certificate up to plinth by
Commissioner to the Affordable Housing Project
3.00 1.00
2. On Completion of 50% BUA of Affordable
Component
-- 0.75
3. On Completion of 100% BUA of Affordable
Component
-- 0.75
4. On handing over of 25% land and completed
Affordable Component
-- 0.50
Total 3.00* 3.00*
* Explanation - The FSI of 3.00 is to be calculated separately on the one-fourth of
plot area for Affordable Housing Component as well as three-fourth of plot area for
UDCPR-2020
271
Free-Sale Housing component.
v) The Affordable Housing Component under the Scheme shall be handed over along with
the ¼th part of the total plot of land, free of cost to the concerned ULB.
vi)(a) The affordable housing stock created under the scheme shall be allotted by the
concerned ULB as follows :-
Table No. 14 T
Percentage Allotment to Category
of stock
Rate of allotment
50 Respective ULBs for use as PAP
ownership free of cost tenements or
staff quarters or transit
accommodation.
Ownership Free of cost
25 Government of Maharashtra and its
statutory bodies/Govt. undertaking
for use as PAP tenements or staff
quarters or transit accommodation
Ownership Free of cost
25 As affordable housing by MHADA
subject to the general or specific
direction of the Government
Ownership Free of cost to MHADA
which shall dispose of
the same as per its policy
and drawl of lots
b) The affordable housing stock shall be disposed of as per the prevailing policy
of MHADA regarding pricing and disposal of its housing stock meant for
affordable housing. Each project approved under the Scheme shall be brought to
the notice of the Government of Maharashtra and its statutory bodies/Government
undertakings by means of press advertisement and if the Government of
Maharashtra or any of its statutory bodies/ Government Undertakings doesn’t
place firm requirement for the housing stock earmarked for them in the Scheme
before the completion certificate / occupation certificate for the said scheme is
issued, the same shall come to the share of MHADA for outright sale as per the
prevailing policy of the MHADA.
vii) a) The other aspects of the development of affordable housing scheme, not specifically
dealt with hereinabove, shall be as per the relevant provisions of UDCPR.
b) It shall also be permissible for the developer / owner to utilise the FSI available
for free sale housing component, fully / partly for any other user otherwise
permissible as per UDCPR.
c) In case owing to genuine hardship and site conditions, relaxation in marginal
open spaces is sought by the developer / owner, the authority may consider such
request, using its discretionary powers under the UDCPR, subject to the condition
that in no case shall the clear marginal open space be reduced below 6 m. No
premium shall be charged for granting such relaxation in marginal open spaces
in respect of affordable housing component of the scheme.
UDCPR-2020
272
14.4 PRADHAN MANTRI AWAS YOJANA
14.4.1 For Development Plan area.
i) For developable zone.
In any developable zone such as Residential / Commercial / Public semi-public / Urbanisable
Zone / Urbanisable Zone U-1, U-2 / Industrial etc., Affordable Housing for the
Economically Weaker Sections (EWS) &Low Income Group (LIG), undertaken by
Government / any Institutions authorized by the Government or Owner / any Private
Developer (hereinafter referred to “the Project Proponent”), shall be permitted, subject
to the following conditions.
Conditions :-
1. These Regulations shall only be applicable for development undertaken under
"Pradhan Mantri Awas Yojana” wherein all the tenements shall be constructed for
EWS / LIG with the use of latest technology, subject to condition no.3 herein
below.
2. Such Development shall be permitted in Industrial Zone only after leaving amenity
space as per Regulation No. 4.8.1. However, no premium shall be charged for
allowing residential use in the form of PMAY in Industrial Zone.
3. The permissible FSI for such projects shall be the maximum building potential on
the plot mentioned in Regulation No. 6.1 or 6.3 subject to maximum 2.5 which
shall be treated as allowable basic FSI for such project. No premium FSI or TDR
shall be required to be loaded for availing this FSI upto 2.5. However, where
building potential as per Regulation No. 6.1 or 6.3 exceeds 2.5, in such cases
permissibility of availing building potential above 2.5 shall be in the form of
premium FSI or TDR or both which may be utilised for the permissible uses
under this UDCPR.
4. Out of the FSI allowed in PMAY, 10% of the basic FSI mentioned in Regulation
No. 6.1 or 6.3, shall be allowed for commercial use.
5. The Municipal Commissioner / Metropolitan Commissioner / Chief Executive
Officer/ Chief Officer, before granting development permission, shall verify and
satisfy himself in respect of the feasibility of providing basic infrastructure
facilities like electricity, water supply, sewerage etc. required for the project.
6. The project proponent shall plan proper internal Road network including major
linkage upto outside roads, wherever necessary.
7. The project proponent shall provide all the basic facilities and utilities, on-site
infrastructure such as Road, Water Line, Drainage Line, Street Light, Waste
Water Recycling Plant etc. at his own cost to the satisfaction of the Authority. In
no case the burden of providing infrastructure shall lie with the Authority.
Provided that the project proponent shall lay the water, drainage/sewage lines up to the
nearest existing lines which are laid by the concerned Planning Authority.
8. The carpet area of the tenement shall not be more than the carpet area as may be
decided by the Government of Maharashtra from time to time in respect of EWS
/LIG Housing.
UDCPR-2020
273
9. Amalgamation of two or more tenements shall not be permissible under any
circumstances.
10. All other guidelines and norms shall be followed as may be decided by the
Government of India or State Government, from time to time in respect of
“Pradhan Mantri Awas Yojana”.
ii) For No Development Zone / Agricultural Zone / Green Zone-1.
All above Regulation No. 14.4.1(i) with following modification shall be applicable for
Pradhan Mantri Awas Yojana to be permitted in No Development Zone / Agricultural
Zone / Green Zone-1.
a) The minimum width of approach road shall be 9 m.
b) The permissible FSI for such projects shall be 1.0 on gross plot area.
14.4.2 For Regional Plan area.
The Regulations No.14.4.1 shall be applicable for Pradhan Mantri Awas Yojana to be
permitted in following areas of Regional Plan, in respective zones.
i) In Mumbai Metropolitan Regional Plan area
a) PMAY shall be permissible in urbanisable zone U-1, U-2 / Urbanisable Zone of
entire Mumbai Metropolitan Regional Plan, with FSI and other provisions
mentioned in Regulation No.14.4.1(i).
b) PMAY shall be permissible in zones, other than urbanisable zoneU-1, U-2 /
Urbanisable Zone, within distances mentioned in following table, with FSI and
other provisions mentioned in Regulation No.14.4.1(ii).
ii) In other Regional Plan Area.
PMAY shall be permissible in respective zones, within distances mentioned in
following table with FSI and other provisions mentioned in Regulation
No.14.4.1(i) & (ii).
Sr
No.
Within distance from Outer peripheral distance from the
Boundary of the Urban Local Bodies
where PMAY is permissible
1 Municipal Corporations 2.0 k.m.
2 Municipal Councils / Nagarpanchayats 1.0 k.m.
14.5 CONSERVATION OF HERITAGE BUILDINGS / PRECINCTS / NATURAL
FEATURES
14.5.1 Applicability
This regulation will apply to heritage sites which means, artefacts, structures, areas and
precincts of historic and/or architectural and / or cultural significance (hereinafter as ‘Listed
Buildings / Heritage Buildings and Listed Precincts / Heritage Precincts’’) and those natural
features of environmental significance including scared graves, hills, hillocks, water bodies
(and the areas adjoining the same) etc. within the areas of Planning Authorities and Regional
Plan.
UDCPR-2020
274
14.5.2 Preparation of List of Heritage Buildings, Heritage Precincts and Natural Features
The Authority on advice of Heritage Committee shall prepare heritage list and shall issue
public notice in the local newspapers declaring his intention to include the buildings or modify
such list of buildings, structures artefacts, areas and precincts of historic and /or cultural
significance and the list of natural features of environmental significance, including sacred
groves, hills, hillocks, water bodies etc. and invite objections and suggestions from any person
in respect of the proposed inclusion within a period of 30 days from the date of such notice.
While preparing the list, the authority shall strictly insure that such structure / precinct has
heritage value and is liable for inclusion in the list in view of its national, regional, or local
importance as specified in Regulation No. 14.5.8. The structure / precinct which do not comply
the requirements specified in the said regulation shall not be included in the list. Generally, the
following aspects shall be ascertained while preparing the list.
a) Its value for architectural, historical or cultural reasons
b) The date and/or period and/or design and/or unique use of the building or artefact
c) Relevance to social or economic history
d) Association with well-known persons or events
e) A building or groups of buildings and/or areas of a distinct architectural design and/or
style, historic period or way of life having sociological interest and/or community value
f) The unique value of a building or architectural features or artefact and/or being part of a
chain of architectural development that would be broken if it were lost
(g) Its value as a part of a group of buildings
(h) Representing forms of technological development
(i) Vistas of natural/scenic beauty or interest, including water front areas, distinctive and/or
planned lines of sight, street line, skyline or topographical features.
(j) Open spaces sometimes integrally planned with their associated areas having a distinctive
way of life and for which they have the potential to be areas of recreation
(k) Industrial sites of historical interest
(l) Archaeological sites
(m) Natural heritage sites
(n) Sites of scenic beauty
All such heritage structures shall be documented in the Heritage List Card as given in
Appendix - L and the Heritage List Card shall be duly authenticated by the authorised heritage
conservationist upon his site visit, stating the significance of heritage site for its appropriate
grading.
The Authority shall issue notice to the owner of the buildings, artifacts, areas and precincts of
historic and/or cultural significance etc. and invite objections and suggestions from such person
in respect of proposed inclusion within 30 days from the date of such notice.
The Authority, in respect of any objections or suggestions, shall decide the same after giving
hearing to such persons and send the list as finalised by him to the State Government for
approval. The State Government may sanction the said heritage list with modification, if
required. This list will be called Final Heritage List. For this, modification under section 37 or
UDCPR-2020
275
20 of the Maharashtra Regional and Town Planning Act, 1966 need not be necessary.
Thereafter, the Authority may amend the Final Heritage List from time to time as and when
required, on the advice of the Heritage Committee. In such case it shall not be necessary to
follow the procedure under Section 37 or section 20 of the Maharashtra Regional and Town
Planning Act of 1966, but the procedure as laid down above in this regulation shall be
followed.
The heritage lists which have been approved by the Government before coming into force these
regulations, shall remain valid and shall be the part of these regulations.
14.5.3 Restriction on development, Redevelopment/repairs etc.
No development or redevelopment or engineering operations or addition, repairs, renovation
including the painting of buildings, replacement of special features or plastering or demolition
of any part thereof of the said listed buildings, or listed precincts or listed natural features shall
be allowed except with the prior written permission of the Authority. Before granting any such
permissions, the Authority shall consult the Heritage Conservation Committee to be appointed
by the State Government (hereinafter referred to as ‘the said Heritage Conservation
Committee’) and shall act on the advice of the Heritage Conservation Committee.
Provided that before granting any permission for demolition or major alterations/ addition to
listed buildings (or buildings within listed precincts) objections and suggestions from the
public shall be invited and duly considered by the Heritage Conservation Committee.
Provided that, in exceptional cases for reasons to be recorded in writing the Authority may
overrule the advice of the Heritage Conservation Committee.
Provided further that the power to overrule the advice of the Heritage Conservation Committee
shall not be delegated by the Authority to any other officer.
If the application for development, alteration, modification of the Heritage precincts or listed
building is rejected under this regulation or while granting such permission any conditions are
imposed on the owner which deprives him to use the FSI, the said owner shall be compensated
by grant of Development Right Certificate.
14.5.4 Incentive uses for Heritage Buildings.
After the commencement of this Regulation, the Heritage Precincts or the Listed Buildings
shall not be permitted to be used for any commercial or office purpose except with the
concurrence of the Heritage Conservation Committee. However, in cases of buildings included
in the Heritage Conservation List, if the owner /owners agree to maintain the listed Heritage
Building in an ideal state of preservation with due repairs / restorations and if the owner /
owners give a written undertaking to that effect, may be allowed by the Authority in
consultation with Heritage Conservation Committee to convert part or the whole of the
building to commercial / office use / any other different use that is beneficial to the
preservation of the same Provided that, if the heritage building is not maintained suitably or if
the heritage value of the building is allowed to be spoiled in any manner, the Authority shall
withdraw the permission forthwith.
14.5.5 Grant of Transferable Development Rights to Owners/ Lessees of Heritage
Buildings/Heritage Precincts.
If the owner is deprived of using permissible FSI on the said plot or development permission is
UDCPR-2020
276
granted to him with conditions which deprive him of use of permissible FSI, then he shall be
entitled for TDR as decided by the Authority in consultation with Heritage Conservation
Committee. The utilization of this TDR shall be as per TDR Regulation.
14.5.6 Maintaining Skyline
Building included in heritage precinct shall maintain the skyline, roof profile, built form edges,
and respect the architectural style (without any high-rise development) as may be existing in
the surrounding area, so as not to diminish or destroy the value and beauty of the said heritage
building/ heritage precinct. The development within the precinct shall be in accordance with
the guidelines framed by the Authority on the advice of the Heritage Conservation Committee.
14.5.7 Restrictive Covenants
Covenants, terms and conditions, imposed under Regulations existing as on the date of this
Regulation, on the leasehold plots either by the State Government or by the Planning
Authority, shall continue to be imposed, in addition to the UDCPR. However, in case of any
conflict with the heritage preservation interest/ environmental conservation and the said
Development Control and Promotion Regulations, this heritage regulation shall prevail.
14.5.8 Grading of the Listed Buildings/Listed Precincts.
Grade-I Grade-II Grade-III
(A) Definitions
Heritage Grade-I comprises
Buildings and precincts of
National or Historic importance,
excellence in architectural style,
design technology and material
usage and/or aesthetics;
associated with a great historic
event, personality, movement or
institution. They have been and
are the prime landmarks of the
city and of National importance.
Heritage Grade - II (A and B)
comprises buildings and
precincts of Regional
importance, possessing special
architectural or aesthetic merit,
or cultural or historical
significance though of a lower
scale than Heritage Grade-I.
They are local landmarks, which
contribute to the image and
identity of the region. They may
be the work of master craftsmen
or may be models of proportion
and ornamentation or designed
to suit a particular climate.
Heritage Grade - III comprises
buildings and precincts of local
importance for townscape, they
evoke architectural, aesthetic, or
sociological interest though not
as in Heritage Grade - II. These
contribute to determine the
character of the locality and can
be representative of life-style of a
particular community or region
and, may also be distinguished
by setting on a street line or
special character of the façade
and uniformity of height width
and scale.
(B) Objective
Heritage Grade-I richly deserves
careful preservation.
Heritage Grade-II deserves
intelligent conservation.
Heritage Grade-III deserves
intelligent conservation (though
on a lesser scale than Grade-II
and special protection to unique
features and attributes.)
(C) Scope for Change
No interventions be permitted
either on exterior or interior
Grade-II (A) External, internal changes and
adaptive reuse would by and
UDCPR-2020
277
unless it is necessary in the
interest of strengthening and
prolonging the life of the
buildings or precincts or any part
of features thereof. For this
purpose absolutely essential and
minimum changes would be
allowed and they must be in
accordance with the original.
Repairs shall be with the use of
like to like material.
Internal changes and adaptive
reuse and external changes may
by and large be allowed but
subject to strict scrutiny. Care
would be taken to ensure the
conservation of all special
aspects for which it is included
in Heritage Grade-II
Grade-II (B)
In addition to the above,
extension of Additional building
in the same plot or compound,
in certain circumstances be
allowed, provided that, the
extension/additional building is
in harmony with (and does not
detract from) the existing
heritage buildings or precincts
especially in terms of height,
and facade.
large be allowed. Changes can
include extensions, and
additional buildings in the same
plot or compound. However any
changes should be such that they
do not detract from the existing
heritage building/ precinct.
(D) Procedure
Development permission for the
changes would be given by the
Authority on the advice of the
Heritage Conservation
Committee.
Development permission for the
changes / additional
construction would be given by
the Authority on the advice of
Heritage Conservation
Committee.
Development permission for the
changes / additional construction
would be given by the Authority
on the advice of the Heritage
Conservation Committee.
(E) Vistas/ Surrounding
Development
All developments in areas
surrounding Heritage Grade-I
shall be regulated and controlled
by ensuring that it does not mark
the grandeur of or view from
Heritage Grade-I
14.5.9 Signs and Outdoor Display Structures
No display or advertising signs and outdoor display structures on listed building and / or the
Heritage Precincts shall be permitted except accordance with part X (sign and outdoor display
structure) National Building Code of India.
Prohibition of advertising signs and outdoor display structure in certain cases :
Notwithstanding the provisions mentioned above no advertising sign or outdoor display
structures shall be permitted on buildings of architectural, aesthetic, historic or heritage
UDCPR-2020
278
importance as may be decided by the Authority, Committee or also on Government buildings,
save that in the case of Government buildings only such advertising signs or outdoor display
structures may be permitted that relate to the activities of the said buildings and related
programs.
Provided that, if the Heritage Conservation Committee so advises, the Authority shall refuse
permission for any sign or outdoor display structure.
14.5.10 Composition of Heritage Conservation Committee.
There shall be Heritage Conservation Committee for the areas within the jurisdiction of
Planning Authority and Regional Plan area. This Committee shall be constituted by the
Government in consultation with the Authority. The committee shall comprise of the following
members:-
i) Chairman Appointed by the Government Chairman
ii) Joint Director of Town Planning of the Concerned Division
(For the areas excluding Municipal Council and Regional Plan area)
(Assistant Director of Town Planning of the District for Municipal
Councils)
Member
iii) Divisional/ District officer of Archaeological Survey of India Member
iv) Divisional/ District officer of Archaeological Survey of Maharashtra Member
v) Convenor, INTACH Local Chapter Member
vi) Heritage Conservation Architect having more than 10 years of
experience and membership of the Council of Architecture
Member
vii) Historian having experience of more than 10 years in the field of
History.
Member
viii) Structural Engineer having experience of more than 10 years and
member of Institute of Engineers.
Member
ix) City Engineer (Planning Authority)/ Chief Planner (Metropolitan
Authority or SPA or NTDA) / Chief Officer (Municipal Council) /
Assistant Director of Town Planning of the District. (Regional Plan
area)
Member
secretary
The tenure of the Chairman and Members of categories (vi) to (viii) above shall change after
every three years provided however that, the same person shall be eligible for re-appointment as
Member.
The Heritage Conservation Committee shall come into existence with effect from the date of its
publication in the official Gazette. However, Heritage Committees constituted by the
Government before coming into force of these regulation, shall remain in operation till further
period as may be specified.
No act of the Committee done in good faith, shall be deemed to be invalid by reason only of
some defect subsequently discovered in the organization of the Committee or in the Constitution
of the Committee or in the appointment of the Member or on the ground that such member was
disqualified for being appointed.
UDCPR-2020
279
The Chairman and in his absence the chosen Member of the Committee shall preside over the
meeting of the Committee.
14.5.11 The Terms of reference of the Committee :-
i) To advise whether development permission should be granted under this Regulation and
the conditions of such permission.
ii) To prepare a list or supplementary list of buildings, artefacts, structures, areas/ precincts
of historic, aesthetic, architectural, cultural significance and a supplementary list of
natural features of environmental significance including sacred groves, hills, hillocks etc.,
water bodies (and the areas adjoining the same) to which this regulation would apply.
iii) To advise whether any relaxation, modification, alteration, or variance of any of the
Development Control and Promotion Regulations is called for.
iv) To suggest amendments, changes or special regulations or modification to regulations for
listed buildings and the heritage precincts regulated under these regulations
v) To advise on the extent of Development Rights to be granted to the owners of listed
Buildings or Heritage Precincts.
vi) To advise whether development Rights Certificates may be allowed to be consumed in a
heritage precinct.
vii) To advise whether to allow commercial /office user of any listed building of Heritage
Precincts and when to terminate the same.
viii) To advise on erection of outside advertisement/ bill boards.
ix) To recommend guidelines to be adopted by those private parties or any other agency,
who sponsor beautification schemes at public intersections and elsewhere.
x) To advise on the cost of repairs to be given to the owners to bring the existing building
back to the original condition. For this purpose, the Committee may suggest ways to raise
funds through private sources.
xi) To advise on special designs and elements and guidelines for listed buildings and control
of height and essential façade characteristics such as maintenance of the buildings and to
suggest suitable design adopting new materials for replacements keeping the old form
intact to the extent possible.
xii) To advise on preparation of guideline relating to design elements and conservation
principles to be adhered to and to advise on other guideline for the purpose of this
regulation.
xiii) To consider any other issue as may be required from time to time during course of
scrutiny of development permissions and in overall interest of heritage/ environmental
conservation.
In the absence of Heritage Conservation Committee, the Authority shall consult the Government
before giving such permission.
14.5.12 Heritage Conservation Fund
i) Heritage buildings included in the said list shall be maintained by the owners of the said
buildings themselves, with a view to give monetary help for such maintenance/repairs a
separate fund may be created which would be kept at the disposal of the Authority, who
UDCPR-2020
280
will utilise these funds on the advice of the Heritage conservation Committee. The
Authority may, in such cases disburse appropriate amount to the owner or may get
maintenance/ repair work done through Planning Authority/ Collector.
ii) 2% of total development charges collected shall be transferred to the Heritage
Conservation Fund.
iii) The fund may also be used to support the cost of listing of heritage sites and cost towards
expert guidance and fees for architects, engineers and other expert.
iv) The Authority shall have right to remove any unauthorized construction in the property
enlisted as heritage property and recover the expenses of such removal/ demolition work
from the owner as per provisions of the Act.
v) The Authority shall have right to enter into any such heritage property to repair such
property to avoid any damage or injury, and the amount shall be spent form Heritage
Conservation Fund and shall be recovered from the owner as arrears of taxes due to the
Authority.
vi) If Heritage structure listed in Grade I needs conservation, preservation and immediate
repairs and if the structure is affected due to vandalism by occupier/ owner, then the
Authority shall have right to acquire such heritage property and conserve its heritage
value.
14.6 SLUM REHABILITATION SCHEME FOR PUNE, PCMC, PCNTDA AND NAGPUR.
The slum Rehabilitation Scheme Regulations for Pune, Pimpri-Chinchwad and Nagpur
Municipal Corporation shall be applicable as sanctioned by the Government from time to time.
14.7 SLUM REHABILITATION SCHEME FOR OTHER MUNICIPAL CORPORATIONS.
Slum rehabilitation scheme for other Municipal Corporations, excluding covered in Regulation
No. 14.6, shall be as below.
14.7.1 Eligibility for redevelopment scheme
i) A person eligible for redevelopment scheme shall mean a protected occupier as defined
in Chapter IB of Maharashtra Slums Areas (Improvement, Clearance and
Redevelopment) Act, 1971 as amended time to time, (hereinafter referred to as the Slum
Act) and orders issued there under.
ii) Subject to the foregoing provisions, only the actual occupants of the hutment shall be
held eligible, and the so-called structure-owner other than the actual occupant if any,
even if his name is shown in the electoral roll for the structure, shall have no right
whatsoever to the reconstructed tenement against that structure.
14.7.2 Definition of Slum, Pavement, and Structure of hut
i) Slums shall mean those censused, or declared and notified, in the past or hereinafter
under the Slum Act. Slum shall also mean area/pavement stretches hereinafter notified or
deemed to be and treated as Slum Rehabilitation Areas.
ii) If any area fulfils the condition laid down in section 4 of the Slum Act, to qualify as slum
area and has been censused or declared and notified shall be deemed to be and treated as
Slum Rehabilitation Areas.
iii) Slum Rehabilitation area shall also mean any area declared as such by the SRA though
UDCPR-2020
281
preferably fulfilling conditions laid down in section 4 of the Slum Act, to qualify as slum
area and/or required for implementation of any slum rehabilitation project. Any area
where a project under Slum Rehabilitation Scheme (SRS) has been approved by CEO,
SRA shall be a deemed slum rehabilitation area.
iv) Any area required or proposed for the purpose of construction of temporary or permanent
transit camps and so approved by the SRA shall also be deemed to be and treated as Slum
Rehabilitation Areas, and projects approved in such areas by the SRA shall be deemed to
be Slum Rehabilitation Projects.
v) A pavement shall mean any Municipal/Govt. /Semi-Govt. pavement, and shall include
any viable stretch of the pavement as may be considered viable for the purpose of SRS.
vi) A structure shall mean all the dwelling area of a protected occupier as defined in Chapter
I-B of Slums Act, and orders issued thereunder.
vii) A composite building shall mean a building comprising both rehab and free-sale
components and part thereof in the same building.
viii)Censused shall mean those slums located on lands belonging to Govt., any undertaking of
Govt., or Corporation and incorporated in the records of the land-owning authority as
having been censused in 1976, 1980, or 1985 or prior to 1st January, 1995, and 1st Jan
2000
14.7.3 Joint ownership with spouse
The reconstructed tenement shall be of the ownership of the hutment dweller and spouse
conjointly, and shall be so entered and be deemed to be so entered in the records of the co-
operative housing society, including the share certificates or all other relevant documents.
14.7.4 De-notification as Slum Rehabilitation Area
SRA on being satisfied that it is necessary to do so, or when directed by the State Govt, shall de-
notify the Slum Rehabilitation Area.
14.7.5 Applicability
The following provisions will apply for redevelopment/construction of accommodation for
hutment/pavement-dwellers through owners/developers/co-operative housing societies of
hutment/pavement-dwellers/public authorities such as MHADA, MIDC, MMRDA etc./Non-
Governmental Organizations anywhere within the limits of Municipal Corporation. However,
NGO should be registered under the Maharashtra Public Charitable Trusts Act, 1961 and the
Societies Registration Act, 1960 at least for the last five years and should also be approved by
SRA.
14.7.6 Right of the Hutment Dwellers
i) Hutment-dwellers, in the slum or on the pavement, eligible in accordance with the
provisions of this Regulation shall in exchange of the protected dwelling structure, be
given free of cost a residential tenement having a carpet area of 27.88 sq.m. including
balcony, bath and water closet, but excluding common areas.
For this purpose, “carpet area” means the net usable floor area within a tenement
excluding that covered by the walls or any other areas specifically exempted from floor
space index computation as per prevailing Regulation.
UDCPR-2020
282
ii) Even those protected dwelling structures having residential areas more than 27.88 sq.m.
shall be eligible only for 27.88 sq.m. of carpet area where Carpet area means area of
tenements as mentioned in (i) above.
iii) All eligible hutment dwellers taking part in the SRS shall have to be rehabilitated in
accordance with the provisions of these Regulations. It may be in situ and in the same
scheme as far as possible.
iv) Pavement dwellers and hutment dwellers in the slum on land required for vital public
purpose or such location which are otherwise unsuitable for human habitation or non-
suitable due to other statutory restriction shall not be rehabilitated in-situ but in other
available location and in accordance with these Regulations. Competent Authority
appointed by the State Government in Housing Department shall on the basis of
verification of documents, as may be prescribed, shall decide on the eligibility of hutment
dwellers.
v) The eligibility of a person including a transferee, under a scheme of Slum redevelopment
shall be established in accordance with Chapter I B of Slum Act, and orders issued
thereunder.
vi) An individual agreement shall be entered into by the owner/developer/co-operative
housing society/NGO with the eligible hutment-dwellers in the slum/pavement.
vii) An individual agreement entered into between hutment-dweller and the
owner/developer/co-operative society/ NGO shall be in the joint names of pramukh
hutment dweller and spouse for every protected dwelling structure
viii) Hutments dwellers in category having a differently abled person or female headed
households shall be given first preference in allotment of tenements. Thereafter lots shall
be drawn for allotment of tenements from the remaining tenements to the other eligible
hutment-dwellers before grant of occupation certificate to rehab Building.
ix) Transfer of Photo passes- Since, only the actual occupant at present will be eligible for
redevelopment; there shall be no need to regularize the transfers of photo passes that have
occurred so far. A photo pass will be given after the new tenement has been occupied.
x) Any person who owns a dwelling unit on ownership basis in Municipal Corporation
areas, shall not be held eligible under the scheme. Any person who can be held eligible
under more than one SRS, shall be held eligible in only one scheme.
xi) Premium for ownership and terms of lease -That part of Government / Municipal
Corporation /MHADA land on which the rehabilitation component of the SRS will be
constructed, shall be leased to the Co-operative Housing Society of the slum-dwellers on
30 years lease period. Annual lease rent of Rs. 1001 for 4000 per sq.m. of land or part
thereof shall be payable and lease shall be renewable for a further period of 30 years at a
time. Simultaneously land under free sale component shall be leased directly to the
Society/Association of the purchasers of the tenement under free sale component for 30
years with a provision for further renewal for a period of 30 years at a time. The lease
rent for the free sale component shall be fixed by SRA.
Further, the Developer/Co-op. Housing Society shall pay premium at the rate of 25% of
ASR of the year of issue of LOI, in respect of SRS proposed to be undertaken on lands
owned by Government, Semi-Government undertakings and Local Bodies and premium
UDCPR-2020
283
shall go to land owing authority such as MHADA, Municipal Corporation, MMRDA, as
the case may be. The premium instalment so recovered shall be remitted to concerned
land owing authority within 30 days from the date of recovery.
In the case of Government land, the premium shall be deposited in Nivara Nidhi.
The amount of premium shall be recovered in instalment as may be prescribed by Govt.
from time to time. Land owning authority such as Municipal Corporation, MMRDA,
MHADA shall not recover land premium in any other form. Proposals for SRS on land
owned by Central Government shall not be accepted unless NOC for the scheme is
obtained from Central Government.
xii) Automatic cancellation of Vacant Land Tenure and leases- If any land or part of any land
on which slum is located is under vacant land tenure, the said tenure/lease created by
Municipal Corporation or Authority shall stand automatically terminated as soon as letter
of Intent is issued by SRA for a SRS, which is a public purpose, on such land is prepared
and submitted for approval to the SRA. Any arrears of dues to be collected by Municipal
Corporation shall not be linked to the issue of any certificate or NOC relating to the Slum
Rehabilitation Scheme.
On sanction of SRS, rights of Imla malik, municipal tenants or any other tenancy shall
stand terminated in respect of the sanctioned SRS.
xiii) Recovery of pending dues such as assessment, compensation, occupational charges, non-
agricultural tax/dues etc. pending with public authorities such as State Govt, MHADA,
and/or Municipal Corporation shall be dealt with separately and not be linked to grant of
approval or building permission to the slum rehabilitation projects.
xiv) A Slum Rehabilitation Project shall be considered preferably when submitted through a
proposed or registered co-operative housing society of hutment dwellers on site. The said
society shall include all the eligible hutment on site while submitting the S.R. Scheme
and give an undertaking to that effect to SRA.
xv) Where 51% percent or more of the eligible hutment-dwellers in a slum and stretch of
road or pavement contiguous to it at one place agree to join a rehabilitation scheme, it
may be considered for approval, subject to submission of irrecoverable written
agreements of eligible hutment-dwellers before LOI. Provided that nothing contained
herein shall apply to Slum Rehabilitation Projects undertaken by the State Government or
Public authority or as the case may be a Govt. Company as defined in Sec. 617 of the
Companies Act 1956 and being owned & controlled by the State Government
xvi) In respect of those eligible hutment-dwellers on site who do not join the Project willingly
the following steps shall be taken:
a) Provision for all of them shall be made in the rehabilitation component of the
scheme.
b) The details of the tenement that would be given to them by way of allotment by
drawing lots for them on the same basis as for those who have joined the Project,
will be communicated to them in writing by the Managing Committee of the Co-
operative Housing Society if it is registered, or the developer. In case of dispute,
decision of the CEO, SRA shall be final and binding on all the parties concerned.
c) The transit tenement that would be allotted to them or rent payable would also be
UDCPR-2020
284
indicated along with those who have joined the Project.
d) If they do not join the scheme within 15 days after the approval has been given to
the Slum Rehabilitation Project on that site, then action under the relevant
provision including Sections 33, 33(A) and 38 of the Slum Act, as amended from
time to time, shall be taken and their hutments will be removed, and it shall be
ensured that no obstruction is caused to the scheme of the majority of persons who
have joined the scheme willingly.
e) After this action under the foregoing clause is initiated, they will not be eligible for
transit tenement along with the others, and they will not be eligible for the
reconstructed tenement by lots, but they will still be entitled only to what is
available after others have chosen which may be on the same or some other site.
f) If they do not join till the building permission to the Project is given, they will
completely lose the right to any built-up tenement, and their tenement shall be
taken over by the SRA, and used for the purpose of accommodating pavement-
dwellers and other slum dwellers who cannot be accommodated in-situ etc.
xvii) The Managing Committee of the proposed as well as registered Co-operative housing
society of hutment dwellers shall have women to the extent of one-third of the total
strength of actual members on the committee at any time.
xviii) Restriction on Transfer of Tenements; the tenement obtained under this scheme cannot be
sold/leased/assigned or transferred (except to legal heir) in any manner for a period of ten
years from the date of allotment/possession of the tenement. In case of breach of
conditions, except transfer to legal heir, the tenement will be taken over by SRA.
14.7.7 Building Permission for Slum Rehabilitation Project
i) The proposal for each Slum Rehabilitation Project shall be submitted to the SRA with all
the necessary documents, no-objection certificates, and the plans as may be decided by
the SRA from time to time.
ii) Approval to the Project shall be given by the SRA within a period of 60 days from the
date of submission of all relevant documents. In the event of failure by SRA to do so, the
said approval shall be deemed to have been given, provided the Project is in accordance
with the provisions of these Regulations.
iii) The SRA while giving the approval may lay down terms and conditions as may be
necessary.
iv) The SRA shall adopt the procedure laid down in the MR & TP Act, 1966 for giving
building permission to any Slum Rehabilitation Project under this Scheme.
v) On compliance with the terms and conditions, the building permission shall be given, in
accordance with the provisions under section 45 of the MR & TP Act, 1966 to the Project
under the SRS, first to the Rehabilitation component and thereafter to the free-sale
component subject to the provisions in clause below.
vi) Correlation between Rehabilitation and free-sale components: Building permission, for
10 percent of BUA of both the rehab and free-sale components may be given
simultaneously and thereafter proportionately or as may be decided by the CEO, SRA.
vii) Where the Project is being implemented directly by an NGO approved by SRA, CEO
(SRA) may sanction 20 percent of the free-sale component without waiting for any
expenditure on the rehabilitation component. The approval for remaining part of free-sale
component will be given only after at least 30 percent of rehabilitation component is
UDCPR-2020
285
completed on site.
viii) As soon as the approval is given to the Project, the NOC for building permission of the
landowning authority shall be given in respect of that slum located on lands belonging to
any department, undertaking, agency of the State Govt. including MHADA, or any local
self-Government such as the Municipal Corporation within 60 days after the intimation
of such approval to the Project is communicated. In the event of its refusal to grant NOC,
reasons thereof shall be stated and in the event of its not being given within the period, it
shall be deemed to have been given’.
ix) Occupation certificate shall not be held up only for want of lease documents to be
executed, in all slum rehabilitation projects taken up on lands belonging to any
department, undertaking, agency of the State Govt., including MHADA, and any local
self-Government such as the Municipal Corporation.
14.7.8 Rehabilitation and Free-Sale Component
i) FSI for rehabilitation of eligible slum/pavement-dwellers includes the FSI for the rehab
component, and for the free-sale component. The ratio between the two components shall
be as laid down herein below.
ii) Built up area (BUA) for rehabilitation component shall mean total construction area of
rehabilitation component, excluding what is set down in Regulation 14.7.9 (vi) of these
Regulations, but including areas under staircases, passages, anganwadi, health center /
outpost, community hall /gymnasium / fitness center, skill development center, women
entrepreneurship center, yuva kendra/ library, Balwadi/s society office, religious
structures as permitted under Government Home Department Resolution dt.05/05/2011
and 18/11/2015, other social infrastructure like School, Dispensary, Gymnasium run by
Public Authority or Charitable Trust, 5 percent incentive commercial areas for the Co-
operative society, and the further 5 percent incentive commercial area for the NGO,
Govt./Public Authority/Govt. Company wherever eligible.
iii) The incentive FSI/BUA shall depend on size of the scheme and rate of developed land
and rate of construction as per ASR of year in which LOI is sanctioned.
Basic Ratio
(LR/RC*)
Incentive as per scheme
Upto 0.40
ha
More than
0.40 ha
upto 1 ha
More than
1 ha upto 5
ha
More than
5 ha upto
10 ha
For more
than 10 ha
Above 2.00 1.20 1.35 1.50 1.65 1.80
Above 1.50 and
upto 2.00
1.35 1.50 1.65 1.80 1.95
Above 1.00 and
upto 1.50
1.50 1.65 1.80 1.95 2.10
Above 0.50 and
upto 1.00
1.65 1.80 1.95 2.10 2.25
Upto 0.50 1.80 1.95 2.10 2.25 2.40
RC is the rate of construction in respect of RCC Construction and LR is the Land Rate of open Land.
FSI to be sanctioned on a Slum Rehabilitation scheme site may exceed 3.00
UDCPR-2020
286
iv) FSI that can be sanctioned on any slum site shall be 3.00 or sum of rehabilitation FSI plus
incentive FSI whichever is more with Minimum Tenement Density of 500 per Net
Hectare. CEO, SRA may insist for tenements for project affected persons or other
purposes. In such cases, minimum tenement density may exceed 650 tenements per net
hectare. The computation of FSI shall be done for both rehab and free-sale components in
the normal manner, that is giving the benefit of what is set down in Regulation No. 14.7.9
(vi). While the areas referred in sub Regulations No.14.7.11 (vi) and 14.7.13 (ii) of this
Regulation shall not be included for computation of FSI, and the said areas shall be
included for computation of the rehab component. In all cases where permissible in-situ
FSI cannot be utilised in situ the difference between permissible FSI and that can be
constructed in-situ, will be made available in the form of TDR in accordance with the
provisions of Regulation 11.2.
v) Notwithstanding the provisions in (iv) above, the slum dweller society/NGO/Developer
undertaking the scheme may opt to claim TDR in lieu of sale component available for the
scheme, on account of constraints such as height restrictions, uneconomical site
conditions, etc.; if the full permissible FSI cannot be used on the same site, TDR may be
allowed as may be necessary without consuming permissible FSI on the same site.
However, TDR may be allowed only when the frame work for one complete building in
rehab component is constructed or when 10% of the rehab component has been
constructed on site and the said TDR will not exceed 50 percent of the construction of
rehab component at any point of time till the total rehab component has been completed.
On completion of the total rehab component balance TDR will be allowed.
vi) The rehabilitation component shall mean all residential tenements as well as non-
residential built-up premises given free of cost in accordance with the provisions of the
SRS outlined in this Regulation excluding what is set down in Regulation 14.7.9 (vi) and
including anganwadi, health centre / outpost, community hall /gymnasium / fitness
centre, skill development centre, women entrepreneurship centre, yuva kendra /library
existing eligible religious structure, school, dispensary, gymnasium run by Public
Authority or charitable trust etc. as per provision of 14.7.13 (i) &(ii) but excluding built-
up area given for buildable DP reservations.
vii) Notwithstanding anything contained in this regulation, if rehabilitation project of a slum
located on land belonging to public authority and needed for a vital public purpose and
where eligible slum dwellers which cannot be accommodated in the in-situ SRS of land
under non-buildable reservations, is taken up on an unencumbered plot, TDR as per
Regulation No.11.2 for the area of the land spared for this purpose shall be sanctioned to
the owner of the said unencumbered plot and the TDR in lieu of cost of construction of
BUA as per Regulation No. 11.2 shall be permissible. For the purpose of this regulation
BUA shall be as per Regulation No. 14.7.8 (ii) of this Regulation. Following conditions
shall be applicable for such scheme.
a) The Rehabilitation Project is approved by the SRA.
b) The tenements so constructed in execution of the Project are offered to slum
dwellers located on land belonging to Govt. or Public Authority and needed for
vital public purpose and within 270 days from the date of issue of LOI the Agency
shall identify the slum dwellers.
UDCPR-2020
287
c) If the Agency fails to identify the slum dwellers needed to be shifted for a vital
public purpose, as above, then the tenements so constructed shall be offered;
i) To the slum dwellers located on land belonging to Government or Public
Authority within a distance of 2 km. from the land on which the Project is
undertaken, or
ii) To the slum dwellers located anywhere in the Corporation limit on lands
belonging to Govt. or Public Authority,
d) Further provided that in all above cases the relocation of. slum dwellers in any case
will be undertaken not with reference to individuals but reference to assembly of
slum dwellers for the purpose of releasing the plot of land wholly from slums and
not only the patches of land.
Provided further that, these provisions are also applicable to lands belonging to or
leased out to or leased out by a Public Authority, a Statutory Authority, a Public
Sector undertaking or any Department of Government of India and a Joint Venture
with any of them, subject to payment of premium for infrastructure development as
applicable under Regulation No. 14.7.14 (ii) of this Regulation.
e) No sale component shall be permissible.
f) In case of slums on municipal lands, there will be as option to exercise the powers
of CEO, SRA by the Municipal Commissioner with the prior approval of the
Government.
viii) All non-residential built-up areas shall be included in the computation of minimum
density but on the scale of 20.90 sq. m of carpet area being one tenement.
Provided further that in case of slum redevelopment where there are no eligible
commercial slum dwellers and where it is possible to provide commercial tenements on
ground floor, then in such cases commercial PAP tenements of size of carpet area 20.90
sq.m (225 sq.ft.) or of required size shall be provided as decided by CEO(SRA) and same
shall be handed over free of cost to SRA.’
Provided if SRS is undertaken by a Federation, Co-Op. Housing society consisting of
members who are serving or retired State Govt. Employees/Employees of the State Govt.
Undertakings/Employees of local bodies of State Government for providing housing to
its members, such tenements which are generated over and above the tenements to be
provided to the existing eligible hutment dwellers, shall be handed over back to the said
Federation/Co.-operative Housing Society for providing housing to its above mentioned
members and subject to further additional terms and conditions as would be imposed by
the CEO, SRA to ensure adequate membership of class III and class IV employees.
ix) Any land declared as slum rehabilitation area or on which slum rehabilitation project has
been sanctioned, if it is spread on part or parts of C.S. Nos. or CTS Nos. or S.Nos. or F.P.
Nos. shall be treated as natural amalgamation/subdivision/s of that C.S. or CTS or S. No.
or F.P. No. for which no separate approval for amalgamation/subdivision of land would
be necessary.
x) Boundaries and the Slum Rehabilitation Area shall be declared by the competent authority
after actual measurement of plot area on site and the same shall be adopted for planning
purpose for calculation of density and floor space index.
UDCPR-2020
288
xi) The CEO, SRA may if required, adjust the boundary of the plot declared as slum
rehabilitation area so as to suit the building design and provide proper access to these
Scheme. Provided further that the encumbered area under D P Road/Sanctioned Regular
line road abutting the SRS shall be included in the scheme to be developed.
xii) After approval is given to the Slum Rehabilitation scheme, the area may be further
subdivided if necessary to earmark separate plots for the rehab component and the free
sale component. The Plot area and the built-up area in terms of square meters on the said
plot shall be separately mentioned in the lease agreements and Record of Rights.
xiii)The CTSO/SLR, of the district on payment of such fees as may be decided by the Govt.
ensure that the City Survey sheet and property cards are corrected accordingly and fresh
property cards are opened for each of the plots giving details regarding the area of the
plots and the total area of the floors of the built-up property and TDR given that is, the
FSI used on that plot.
14.7.9 Temporary Transit Camps
i) The multi-storeyed temporary transit camp shall be provided on the site itself or outside
the SRA project site on portion of plot which is not designated/reserved for public
purpose or not affected by road widening and is preferably close to the site.
ii) The eligible slum dwellers shall be shifted to temporary transit camp or on rent as may be
mutually decided between the proposed society and developer.
ii) The area of temporary transit tenements shall be excluded from the computation of FSI,
but the safety of the structure shall be ensured by a license structural consultants. The
minimum area of individual transit tenement shall be14.5 sq.m.
iv) Such building permission shall be given within 15 days from the date of application and
after approval to the project by Slum Rehabilitation Authority, failing which it shall be
deemed to be given.
v) On any nearby vacant site without any reservation in the DP construction of temporary
transit tenements made of light material with the consent of the landowners, shall be
allowed upto an FSI of 3.0 and this shall be applicable. Temporary shall mean made of
detachable material such as tubular/prefabricated light structures.
vi) In all such cases where the temporary transit camp is erected, the condition shall be that
the structures shall be demolished by the Developer/Society/NGO within 30 days of
granting Occupation Certificate to the rehab buildings and the site should be brought
back to the original state. Till the transit camps are fully demolished, development rights
for the free sale area shall not be permitted to be used beyond 75% of the total admissible
free sale area permissible under this Regulation.
14.7.10 Commercial / Office / Shop / Economic Activity Free of Cost
i) The eligible existing area under commercial/office/economic activity shall be computed
on actual measurement/inspection, and/or on the basis of official documents such as
License under the Shops and Establishment Act, Electricity bills, Photo pass etc.
ii) In the rehabilitation component, the BUA for commercial/office/shop/economic activity
that existed prior to the date as decided by the Government subject to the provisions in
the sub-regulation below shall be given. Where a person has both residential and
UDCPR-2020
289
commercial premises without common wall between residential and commercial
premises, for commercial/office/shop/economic activity in the slum/ pavement, he shall
be considered eligible for a residential/Commercial unit including BUA for
commercial/office/shop/economic activity, both free of cost and carpet area of such unit
shall not exceed 27.88 sq.m.
iii) BUA for commercial/office/shop/economic activity upto 20.90 sq.m. (225 sq.ft.) carpet
area or actual area whichever is less, shall be provided to the eligible person free of cost
as part of the rehabilitation project. Any area in excess of 20.90 sq.m. to the extent of
existing area may, if required, be sold on preferential basis at the rate for commercial area
in the free-sale component.
For this purpose, “carpet area” as per (i) and (ii) above means the net usable floor area
within a tenement excluding that covered by the walls or any other areas specifically
exempted from floor space index computation as per prevailing Regulation.
iv) Such area may be allowed on any side of the plot abutting 3.0 m. wide pathway and
deriving access from 3.0 m. wide pathway/open space. Back-to-back shopping on ground
floor shall also be allowed for the purpose of rehabilitation. After exhausting these
provisions, it may be allowed on the first floor to the extent necessary.
v) All activities which were previously existing shall be allowed to be relocated regardless
of the non-conforming nature of the activities, except those which are hazardous and
highly polluting, and except in cases where the alternative accommodation has already
been allotted elsewhere by the Municipal Corporation.
vi) Convenience shopping in the free-sale component shall be permitted along the layout
roads. The CEO, SRA may add to alter or amend the said list for convenience shopping.
vii) Incentive Commercial Areas for Society and NGO
a) The scheme, when undertaken by a Co-operative Housing Society of slum dwellers,
may provide an additional 5 per cent built-up area on the rehabilitation area free of
cost for commercial purpose. This area will be at the disposal of the Co-operative
Housing Society of the hutment-dwellers. The corpus amount shall not be spent,
but the income from the property/corpus alone shall be used by the Society for
maintenance of the building and premises, and such other purposes as may be laid
down by the SRA.
b) Where the scheme is undertaken by a Non-Government Organization Govt. or
Public Authority or Govt. Company another additional 5 per cent BUA on the
rehabilitation area may be given free of cost for commercial purpose. This area
shall be at the disposal of the Non-Governmental Organization Govt. or Public
Authority or Govt. Company in consultation with the cooperative housing society.
14.7.11 Relaxation in Building and Other Requirements
i) Separate kitchen shall not be necessary. Cooking space (alcove) shall be allowed without
any minimum size restrictions. Where a kitchen is provided, the minimum area shall be 5
sq.m. provided the width shall be at least 1.5 m.
ii) There shall be no size restriction for bath or water closet unit. Moreover, for bathroom,
water closet or kitchen, there shall be no stipulation of one wall abutting open space, etc.
as long as artificial light & ventilation through any means are provided.
UDCPR-2020
290
iii) In water closet flushing system shall be provided with minimum seat size of 0.46 m. (18
inches).
iv) A septic tank filter bed shall be permitted with a capacity of 150 litters per capita, where
the municipal services are likely to be available within 4-5 years.
v) In the rehabilitation component, lift shall not be insisted upon, upto ground plus five
floors.
vi) Notwithstanding anything contained in this regulation areas of common passages not
exceeding 2.0 m. in width provided in rehabilitation component to give access shall not
be counted towards FSI even while computing FSI on site.
vii) Where the location of the plot abuts a nallah, the marginal open space along the nallah
shall not be insisted upon beyond 3m. from the edge of the trained nallah provided at
least on one side of nallah, marginal open space of 6 m. is provided.
viii) The distance between any two rehab/composite buildings shall be as follows,
a) For building with height up to 40 m. – Min 6m.
b) For building with height above 40 m upto 50 m. – Min. 7.50 m.
c) For building with height above 50 m upto 70 m. – Min. 9.00 m.
d) For building with height above 70 m. – Min. 12.00 m.
ix) A composite building shall contain at least 50 percent of the built-up area as
rehabilitation components.
x) Wherever more than the minimum front and marginal spaces have been provided, such
additional area provided may be considered as part of the amenity open space in the
project comprising both rehabilitation and free sale components, and without charging
any premium.
xi) Even if the amenity space is reduced to make the project viable a minimum of at least 8%
of amenity open space shall be maintained at ground level.
xii) Between the dimensions prescribed for the pathway and marginal distances, the larger of
the two shall prevail. The pathway shall act as access wherever necessary. The building
shall be permitted to touch pathways.
xiii) The means of access shall be normally governed by the provisions of Regulation No.3.2.
However, in the project, wherever the design of the buildings in the same land requires
relaxation, it may be given. Access through existing pathways including the roads
maintained under relevant section of the MMC Act, 1949 but not less than 3.6 m. in
width, shall be considered adequate for any slum rehabilitation project, containing
buildings having height up to 24 m. including stilts.
xiv) Premium shall not be charged for exclusion of staircase and lift-well etc.
xv) All relaxations outlined hereinabove shall be given to the rehabilitation component, and
also to the composite buildings in the project. Premium shall not be charged for all or
any of the relaxations given hereinabove. Provided that if any further relaxation in open
spaces is granted by Chief Executive Officer then the same shall be subject to compliance
of CFO requirement and recovery of premium at the rate 2.5% of ASR. . In case of Slum
Rehabilitation Schemes under this regulation, the amount of premium shall be computed
as per the ASR rate prevailing at the time of issue of IOA and the same shall be
UDCPR-2020
291
recovered at the time of grant of full occupation permission to the respective building.
All other redevelopment schemes shall be governed by their respective regulations.
xvi) Relaxations for the free sale component–Relaxation contained in sub Regulation No. (viii)
above, as well as other necessary relaxation shall be given to the free sale components on
payment of premium at the rate of 2.5% of Ready Reckoner Rate or 10% of normal
premium whichever is more.
xvii) In order to make the SRS viable, the CEO of SRA shall be competent to make any
relaxation wherever necessary for reasons to be recorded in writing.
xviii) For rehabilitation tenements, car parking at the rate mentioned in these Regulation shall be
provided or one parking spaces per tenement for two-wheeler shall be provided. The
above parking spaces may be provided in any combination.
14.7.12 Slums and Development Plan Reservations:
Slums situated in lands falling under various reservations/zones in the DP shall be developed in
accordance with the following provisions.
i) Slums in any zone shall be allowed to be redeveloped in-situ without going through the
process of change of zone. In the free-sale component in any zone, in addition to
residential uses, all the uses permitted for the original zone shall be permitted. For
industrial uses, the segregating distance shall be maintained from the existing industrial
unit.
a) Any plot/layout having area under non-buildable/open space reservations admeasuring
up to 500 sq.m. shall be cleared by shifting the slum-dwellers from that site.
b) Where the area of site having non-buildable/open space reservation, is more than 500
sq.m. such sites may be allowed to be developed for slum redevelopment subject to
condition that the ground area of the land so used shall not be more than 65% of
the reservation and leaving 35% rendered clear thereafter for the reservation.
ii) Existing slum structures on lands reserved for Municipal School/ Primary and secondary
school or a Higher Education may be developed subject to the following:-
a) In case of land reserved for Municipal School, Primary and secondary school in the
DP, a building for accommodating such number of students as may be decided by
the Municipal Commissioner, nor in any case for less than 500 students, shall be
constructed by the owner or developer at his cost according to the size, design,
specification and conditions prescribed by the Municipal Commissioner. The built-
up area occupied by the constructed building shall be excluded for the purpose of
FSI computation, and where it is intended for a Municipal School, the building or
part thereof intended for the school use shall be handed over free of cost and
charge to the Corporation. Thereafter, the land may be allowed to be redeveloped
with the full permissible FSI of the plot according to this Regulation
b )In the case of lands affected by the designation or reservation of a Higher Education
in the DP, a building for accommodating such number of students as may be
decided by the Municipal Commissioner, not in any case for less than 800
students, shall be constructed by the owner or developer at his cost according to
the size , design, specification and conditions prescribed by the Municipal
Commissioner, the built-up area occupied by the constructed building shall be
UDCPR-2020
292
excluded for the purpose of FSI computation. The constructed building shall be
handed over to the Corporation free of cost and charge and the Authority may hand
over the same or part thereof intended for the School use to a recognized and
registered educational institution for operation and maintenance on terms decided
by him. Thereafter the land may be allowed to be redeveloped with full permissible
FSI of the plot according to this Regulation.
c) In case area under reservation of Municipal School/ Primary and secondary school or
a Higher Education is spread on adjoining plot and the plot under development,
then in such cases Commissioner with special permission may insist upon
construction of Municipal School or a Higher Education in proportion to the area
under reservation affecting the plot under development. Requirements of Play
Ground as per these regulations may not be insisted for (i) above.
iii) For other buildable reservations excluding Municipal School or a Higher Education on
lands under slum built-up area equal to 25 percent of the area under that reservation in
that plot, shall be demanded free of cost by the Slum Rehabilitation Authority for the
Municipal Corporation or for any other appropriate Authority.
iv) In case of the plot reserved for the Parking Lot 125% built up area as per zonal basic
permissible FSI of such reserved area shall be handed over to the Municipal Corporation.
The developer/owner shall be entitled for the Built up Area (BUA) in lieu of cost of
construction against handing over of built up amenity.
v) Existing slum structures on lands reserved for Rehabilitation & Resettlement shall be
treated as sites for development of slum structures and shall be allowed for
redevelopment according to this Regulation.
vi) Slum Rehabilitation Permissible on Town Planning Scheme Plots :-
Slum Rehabilitation scheme can be taken up on the final plots of the Town Planning
Scheme, as per these regulations and further as per conditions given below.
a) Such slum should be notified slum.
b) If the owner of a final plot in the Town Planning Scheme has already accepted or
accepts the possession of the plot along with encroachments and has developed /
develops the remaining vacant plot with full permissible FSI of the entire Final Plot
retaining encroachments on his plot, then the slum rehabilitation scheme on encroached
plot shall be developed as follows :-
i) The Slum Rehabilitation Scheme shall be entitled for FSI as per these regulations.
ii) The owner of Final plot can develop the slum rehabilitation scheme subject to
condition that in-situ FSI of the scheme shall be reduced to the extent of the FSI of such
encroached plot already utilized in the remaining vacant plot.
iii) The owner shall demarcate the area in his plot which is occupied by the slum
encroachments and transfer such land in the name of the Authority. The Authority on its
own or through the Co-Op Housing of Hutment dwellers may initiate Slum
Rehabilitation Scheme on the encroached area of Final Plot. Further, the Authority shall
record the number of tenements, names of occupiers, area occupied of the time of
granting permission.
UDCPR-2020
293
14.7.13 Anganwadi, Health Centre / Outpost, Community Hall /Gymnasium / Fitness Centre, Skill
Development Centre, Women Entrepreneurship Centre, Yuva Kendra / Library Society
Office, and Religious Structures:
i) There shall be Balwadi, Welfare hall and any of two amenities mentioned above. There
shall be health Centre/ outpost, Anganwadi, skill development centre, women
entrepreneurship centre, yuva kendra / library of size 27.88sq.m. for every multiple or
part of 250 hutment dwellers. In case of misuse, it shall be taken over by the SRA which
will be competent to allot the same to some other organization /institution for public use.
Balwadi shall also be provided for on a similar scale. An office for the Co-operative
housing society shall be also constructed for every 100 rehab tenements in accordance
with these Regulations. However, if the number of rehab tenements exceeds 100 then for
every 100 rehab tenements such additional society office shall be constructed. There shall
be a community hall for rehab bldg. of the Project as a part of the rehabilitation
component. The area of such hall shall be 2% of rehab built up area of all the buildings or
200 sq.m. whichever is less.
Religious structures existing prior to redevelopment, if allowed in accordance with the
guidelines issued by Government from time to time as part of redevelopment shall not
exceed the area that existed prior to redevelopment. Other social infrastructure like
School, Dispensary and Gymnasium run by Public Authority or Charitable Trust that
existed prior to the redevelopment shall be allowed without increase in existing area.
However, it is provided that in the slum rehabilitation project of less than 250 hutments,
there shall be Balwadi, Welfare hall and any of two amenities mentioned above, as
decided by co-operative housing society of slum dwellers, of size of 27.88 sq.m. and
office for the Co-operative housing society in accordance with these Regulations. CEO,
SRA may permit accumulation of the amenities mentioned above but ensure that it shall
serve equitably to the rehab area.
ii) All the areas underlying Anganwadi, health centre / outpost, community hall /gymnasium
/ fitness centre, skill development centre, women entrepreneurship centre, yuva kendra /
library community hall/s, society office, balwadi/s, religious structure/s, social
infrastructure like School, Dispensary, Gymnasium run by Public Authority or Charitable
Trust, the commercial areas given by way of incentives to the co-operative society and
the non-government organisation shall be free of cost and shall form part of rehabilitation
component and it is on this basis the free-sale component will be computed.
iii) Anganwadi, health centre/ outpost, community hall /gymnasium / fitness centre, skill
development centre, women entrepreneurship centre, yuva kendra / library society office,
Balwadi/s and religious structures, social infrastructure like School, Dispensary and
Gymnasium run by Public Authority or Charitable Trust in the rehab component shall not
be counted towards the FSI even while computing permissible FSI on site.
14.7.14 Payments to be made to SRA and Instalments:
i) An amount of Rs.40,000/- or such an amount as may be decided by the Planning
Authority from time to time per tenement including the welfare hall and balwadi in the
rehab component as well as in the case of permanent transit camp tenements will have to
be deposited by the owner/developer/society with the Slum Rehabilitation Authority, in
UDCPR-2020
294
accordance with the time-schedule for such payment as may be laid down by the CEO,
SRA. However, by the time of completion of construction for occupation of tenements by
the hutment dwellers, the total amount at the rate of Rs.40,000/- per tenement completed
should have been deposited in full. The building permission for the last 25 percent of the
free-sale component would be given only after all the required amount is deposited in full
with SRA.
ii) An amount at the rate of 2% of ready reckoner rate as prevailing on the date of issue of
LOI per sq.m. such an amount as may be decided by GOM from time to time shall be
paid by the Owner/Developer/Society/NGO for the BUA over and above the Zonal
(basic) FSI, for the rehabilitation and free-sale components. This amount shall be paid to
the SRA in accordance with the time-schedule for such payment as may be laid down by
the CEO, SRA provided the instalments shall not exceed beyond the completion of
construction. This amount shall be used for Schemes to be prepared for the improvement
of infrastructure in slum or slum rehabilitation areas. These infrastructural charges shall
be in addition to development charges levied as per section 124 of MR&TP Act 1966.
Provided that out of amount so recovered as Infrastructural charges, 90% amount will go
to Municipal Corporation and 10% amount will remain with SRA
14.7.15 Conversion of Old Project into New Project:
i) Projects, where LOI has been granted, shall be treated as per the provisions existing on
the date of LOI. In case such a project comes up for revised LOI or change of developer
or any other change, including recording and resubmission without change in slum
boundary, these regulations shall apply. Provided further that for amalgamation of
schemes being sought and for schemes that have been sanctioned under different
regulations (earlier as well as current one), FSI calculations shall apply as per these
regulations.
ii) Exceptions
a) Schemes approved prior to coming into force of these Regulations:-
The slum rehab schemes where LOI has been issued by SRA prior to the date of
coming into force of these Regulations and which is valid may continue to be
governed by the regulation applicable prior to these Regulations.
b) Wherever the S.R. Scheme sanctioned by CEO (SRA) is under progress on
reservations shall be valid & continue.
iii) In case of conversion of old SRD Scheme to new S.R.Scheme on land owned by Govt.
Semi Govt. undertaking and local bodies, the developer shall pay the premium at the rate
of Twenty Five percent of land value as per the ASR in proportionate to difference of FSI
sanctioned in old SRD Scheme and new S.R.Scheme. Payment of premium shall not be
applicable to those schemes wherein lease already executed by concerned authorities.
14.7.16
Provision relating to Permanent Transit Camp Tenements for Slum Rehabilitation Scheme
implemented on open plot / non-slum plot.
Total FSI on plot area may be allowed to be exceeded upto 4 for construction of Transit Camp
tenements for SRA.
i) The FSI and distribution of additional FSI for the construction of Transit Camp
UDCPR-2020
295
Tenements shall be as shown below –
Minimum
Road
Width
Total
Permissible
FSI
Zonal
FSI
Additional
FSI
RSI for transit
tenements for
SRA of total
additional FSI
% FSI for
sale
component of
total add FSI
Below
9.00 m.
upto 3.00 1.00 upto 2.00 50% 50%
9.00 m.
and above
upto 4.00 1.00 upto 3.00 50% 50%
ii) Such schemes shall not be permissible on lands reserved in the Development Plan and
Zone in which Residential development is not permissible.
iii) Transit tenements for SRA out of additional FSI could be used for construction of Transit
Camp of tenements having carpet area of 27.88 sq.m. Ground floor shall be used for
commercial tenement having carpet area of 20.90 sq.m. (225sq.ft.) for project affected
commercial tenements and same shall be handed over free of cost to SRA. Alternatively,
residential tenements can be used for Government Staff Quarters etc.
iv) Provision of Anganwadi, Health Centre / Outpost, Community Hall / Gymnasium / Fitness
Centre, Skill Development Centre, Women Entrepreneurship Centre, Yuva Kendra /
Library, Society Office, Balwadi, shall be as per Regulation No. 6.14.4 of this DCR to
these transit camps 25% of basic FSI shall be exclusively used for the purpose of shops
along layout road for use of residential occupants of layout.
v) Additional FSI over and above basic FSI may be released in co-relation to the BUA of the
tenements that are required to be handed over free of cost to SRA / Authority as the case
may be. Alternatively, TDR in lieu of unconsumed sale component of additional FSI, as
per this Regulation, may be permitted for Permanent Transit Camp (PTC) for which SRA
will be the Planning Authority.
vi) Only after the Transit Camps are handed over free of cost to the SRA, the Occupation
Certificate, water connection, power connection etc. for the other portion shall be given
by the Appropriate Authority.
vii) Clubbing - The entire rehabilitation components including base FSI may be categorised as
rental housing and permanent transit component as applicable and the corresponding sale
components from the additional FSI amongst two or more schemes under this regulation
can be permitted to be interchanged. A developer / developers making an application
under this regulation may club more than one plot belonging to single or multiple owners
and offer permanent transit component on a single plot while shifting sale component as
well as base FSI of the plot to other plot agree and make a joint application. However,
clubbing shall be allowed only if it leads to an independent plot / building / wing as the
case may be with permanent transit component being handed over to Authority.
The developer shall have to pay premium equal to 40% of unearned income calculated with the
rates of construction as well as sale given in ASR of the year of payment. The unearned
income shall be computed by calculating valuation of sale component awarded in lieu of
component for Authority after deducting cost of construction of sale as well as
Authority's component and the cost incurred to various authorities towards statutory
UDCPR-2020
296
payments relating to Authority as well as sale component. In case there is shifting of
base FSI within plots in clubbing scheme, difference of land valued in ASR shall be
taken into account while finalising unearned income, and this difference shall be
calculated as 100% towards premium.
Such clubbing can be allowed for the schemes falling within the distance of 5Km.
The premium shall be paid to the Authority in two stages 50% at the time IOA and 50% at
the time of issuing C.C. for the incentive FSI, or the developer has to surrender
equivalent sale FSI in form of constructed BUA to the extent of premium in the scheme
to be valued at ASR rate of sale in the year of such surrender of built-up area.
Note - Out of the total premium amount so collected under rehabilitation scheme under this
these Regulations, 2/3 shall be kept in a separate account to be utilized as shelter fund for
the State of Maharashtra and 1/3 shall be deposited at the District Office of the Town
Planning Department.
14.8 URBAN RENEWAL SCHEME
Urban Renewal Scheme (URS) shall be applicable for all Corporation as given below.
14.8.1 Urban Renewal Scheme (URS) for Municipal Corporation Area.
i) “Urban Renewal Scheme” (URS) means any scheme for redevelopment of a cluster or
clusters of buildings and structures in Municipal Corporation Area, over a minimum area
of 10,000 sq.m., in non-congested area and 4000 sq.m. in congested area, bounded by
existing distinguishing physical boundaries such as roads, nallahs, railway lines etc.
accessible by an existing or proposed D P road which is at least 18 m. wide and identified
for urban renewal:-
However, in specific cases, in which URS is not bounded by roads, nallahs and railway
lines, then the boundary of the cluster can be decided/ finalised by Municipal
Commissioner, in consultation with High Power Committee (H.P.C.)
In case of demonstrable hardship such as natural sub division by roads, nallahs, river,
railway lines, the area of the cluster can be allowed up to an area of 8000 sq.m. in non-
congested area which shall be allowed by Municipal Commissioner in consultation with
H.P.C.
However no forest land shall be included in such URS.
ii) Such URs may be :-
a) Under the Development Plan (DP), where the DP contains such well-defined
Clusters ; or
b) Under the Urban Renewal Plan (URP) for the concerned area, prepared and
notified by the Commissioner, who may revise the same, as and when required ; or
c) By the Promoter of the Urban Renewal Scheme over a cluster or clusters of
buildings, where such clusters are not shown on the DP and the URP is yet to be
prepared. If such plans are submitted and approved, these shall mean to be URP
within the meaning of this Regulation.
iii) Building Age Criteria for URC shall be as under :—
The Urban Renewal Cluster (URC) may consist of a mix of structures of different
UDCPR-2020
297
characteristics such as –
a) Unauthorized buildings which are at least 30 years of age ;
b) Authorized dilapidated buildings, as determined by the Committee specified in
Regulation of Redevelopment of Dilapidated Buildings;
c) Authorized buildings which are at least 30 years of age;
d) Buildings belonging to the Central Government, the State Government, Semi-
Government Organizations and Municipal Corporations, as well as Institutional
Buildings, Office Buildings, tenanted Municipal Buildings, Staff Quarter Buildings
of Municipal Corporation , that are at least 30 years of age with prior consent of
the respective Authority ;
e) Any land belonging to the State Government, any Semi-Government Organization,
Municipal Corporation and MHADA (either vacant or built upon) which falls
within the area of the proposed Urban Renewal Scheme including that which has
been given on lease or granted on the tenure of Occupant Class II, provided that if
built upon, these building shall be at least 30 years of age ;
f) Any other buildings which may be less than 30 years of age but which by reasons
of dis-repair or because of structural / sanitary defects, are unfit for human
habitation or by reasons of their bad or sub-optimal configuration or the
narrowness of streets are dangerous or injurious to the health or safety of the
inhabitants of the area, as certified by the Committee specified in Regulation of
Redevelopment of Dilapidated Buildings;
g) Slum areas declared as slums under section 4 of the Maharashtra Slum Areas
(Improvement, Clearance and Redevelopment) Act, 1971 or slums on Public lands
prior to 1st January 1995 or such other reference date notified by the Government.
However such slum area shall be maximum 25% of cluster area;
In case of Ulhasnagar Municipal Corporation, minimum area shall be 4000 sq.m.
for non-congested and congested area.
h) The lands belonging to MIDC can be included in the URS after obtaining
necessary clearance from Industries Department.
Explanation–1. - Age of a building shall be as on the 1stof January of the year in which URC
involving such building, complete in all respect is submitted to the Commissioner or prepared
and notified by the Commissioner and shall be calculated from the date of occupation certificate
or, where such occupation certificate is not available, from the date of assessment as per the
property tax record in respect of such building, available with the Municipal Corporation.
Explanation–2.—Whenever any authorized building, more than 30 years of age, is included in
a URC, the same shall not be done without evaluation of its state of dis-repair by Municipal
Corporation and if such building is found in a state of disrepair, only after giving the
owner/occupier(s) thereof, a notice of three months to cause any repairs needed. At the end of
three months, if such building is found to be habitable and safe, such building shall be treated at
par with authorized buildings which are less than 30 years of age. If at the end of three month,
such building is found and certified by the Committee specified in Regulation of
Redevelopment of Dilapidated Buildings as dilapidated and unsafe for habitation, such building
shall be included in the URC without the requirement of consents.
UDCPR-2020
298
Explanation–3.—If some authorized buildings which are less than 30 years of age or buildings
which are developed or in the process of development, under the different provisions of the
DCR, are required to be included in the URC for the purpose of wholesome planning, they may
be so included, provided the area under such buildings does not exceed 40% of the total area of
URC. If any such building is included in the URC without the requisite consent of 70% of all
title holders of such building, the Commissioner shall retain such building while designing/
sanctioning URS and area of such building shall be excluded from calculation of FSI under this
Regulation.
However, the area under slum mentioned in Regulation No.14.8.1(iii)(G) and area under
authorised structure mentioned above shall not be more than 50% in aggregate.
Explanation 4.—When any private land owner / developer submits such scheme will be given
priority while implementation.
14.8.2 Eligibility for Urban Renewal Cluster (URC)–
i) For Buildings outside Slums -Every occupant of every building falling under a URC on
the date of sanction of this Regulation (hereinafter referred to as the cut-off date), shall be
eligible for rehabilitation and relocation under the Scheme, in accordance with the
provisions of Regulation No. 14.8.4 and 14.8.5, subject to the ineligibility criteria
mentioned herein below.
a) No new Tenancy, occupancy or any other right created after the cut-off date shall be
taken into account in any illegal or unauthorized construction. No unauthorized
construction made after the cut-off date in any existing building or in the form of
new building shall be considered while doing computation of existing FSI or
liability of rehabilitation on the URC.
b) Any occupant, who has been allotted any subsidized housing in the Mumbai
Metropolitan Region by any public or semi-public authority in the past, shall not
be eligible for subsidized rehabilitation under a URC as mentioned in Regulation
No. 14.8.5. For this, a self-declaration in the form of Registered Affidavit shall be
considered sufficient which, if ever found to be false, shall render the concerned
allottee liable for eviction and prosecution as per law.
c) Subject to the forgoing provisions, only the actual occupants fulfilling the eligibility
criteria mentioned under this Regulation shall be held eligible for rehabilitation,
and any person, other than the actual occupant, claiming rights as owner/ promoter/
developer/lessee over any land/ building/ structure included in the URC, shall have
no right whatsoever to rehabilitation under the URC in the reconstructed tenements
against such land/building/structure. In case of an unoccupied building or a
building occupied illegally, no one shall have right whatsoever to rehabilitation
under the URC, against such building/structure.
ii) Slum Areas - Whenever a Slum area or part thereof is included in a URC, eligibility of the
hutment dwellers of such slum area rehabilitation under the URC, shall be governed by
corresponding provisions of Slum Rehabilitation Scheme. Eligibility of any hutment
dweller of a Slum area included in the URC shall be certified by the Competent
Authorities as notified under the Maharashtra Slum Areas (Improvement, Clearance and
Redevelopment Act, 1971). For slum dwellers not covered under Slum Rehabilitation
UDCPR-2020
299
Scheme, the eligibility for rehab area shall be the same as under Slum Rehabilitation
Scheme.
14.8.3 Determination of eligibility and requirement of Rehabilitation and Relocation areas under
URS
i) Municipal Commissioner shall initiate the process for determination of eligibility and
requirement of alternative area of Rehabilitation and relocation of each occupant under
any URS, along with determination of rights over lands falling under the Urban Renewal
Cluster(s) and the consideration thereof.
ii) Municipal Commissioner shall designate officer(s), not below the rank of Assistant
Municipal Commissioner, who shall be called Authorized Officer(s) and shall cause to be
done the survey required for the purpose mentioned in Clause (i) above and declare and
publish the list of buildings/ structures and their owners/lessees, occupants/ tenants etc.,
for inviting suggestions and objections along with relevant records, within one month of
such publication for determination of entitled area and the consideration to be offered to
the owners/ lessees and other right-holders as well as eligibility and admissible area for
the occupants, in accordance with the provisions in this Regulation. Authorized
Officer(s) shall, after due enquiry and hearing, finalize the said list(s) and cause the same
to be published. Appeal against any decision leading to finalization of the said list shall
lie with an officer not below the rank of Deputy Municipal Commissioner who is
authorized in this regard by the Municipal Commissioner, in writing.
14.8.4 Entitlement of Rehabilitation
i) All the eligible occupants of the building(s)/slums undergoing redevelopment under a
URC shall be rehabilitated in the redeveloped building(s) :
Provided that the Municipal Commissioner may also rehabilitate, in the rehabilitation
buildings of the URC, one or more persons declared eligible for allotment of tenement
under any other Scheme or Project of the Government or Corporation, Project Affected
Persons, outside the area of URC.
ii) Each eligible residential occupant, other than occupants of Slums included in URC, shall
be rehabilitated on a carpet area equivalent to the area occupied by such occupant in the
old building. However in case of residential occupants, such carpet area shall not be less
than 30sq.m. and in case of commercial, such carpet area shall be as per actual area in
possession.
And further the residential occupants belonging to authorised buildings shall be entitled
additional 25% of the eligible area.
iii) Any occupant of a slum structure included in URC, either residential or commercial,
whether eligible under Slum Rehabilitation Scheme or not but eligible under this
Regulation, shall be entitled for a carpet area as prescribed in Slum Rehabilitation
Scheme.
iv) All the eligible occupants shall be rehabilitated in the redeveloped buildings of URC as far
as possible. However at the request of or with the consent of an occupant, he may be
allotted alternative rehabilitation in a location outside URC, up to the extent of his
eligibility, at the discretion of the Municipal Commissioner. Request or consent under
this provision shall however be irrevocable.
UDCPR-2020
300
Explanation - Though Commissioner shall endeavour to make provision for rehabilitation
areas as per the entitlement of each and every eligible occupant, whenever such area, whether
for residential user or non-residential user, within a range of 10% of the individual entitlement
of any occupant, is not available in the URC, he shall be entitled for rehabilitation in an
available tenement of immediately next higher area, subject to the allottee paying for the
differential area.
If the beneficiary refuses to pay the specified amount towards such differential area, he will be
entitled for an available rehabilitation tenement of immediately lower area, without any
consideration towards such reduction in area.
14.8.5 Terms of Allotment of Rehabilitation Tenements
i) Allotment of rehabilitation tenements for owners belonging to authorised buildings shall
be free of cost and without any consideration for the original area and additional 25%
area over and above the eligible area Shall be allowed for the occupants of the authorised
buildings, free of Cost.
If any non-residential unit holder demands residential unit against his non-residential
previous holding, such request may be considered by Commissioner in consultation with
HPC. However to consider such request shall not be obligatory on the part of the
Commissioner.
Allotment of rehabilitation tenements to occupants belonging to unauthorized / illegal
buildings and slums shall be at a consideration in accordance with the following Table
No. 14 X:—
Table No. 14 X
Minimum Carpet Area of
Rehab Tenement
Type of Rehab
Tenement
Consideration (i.e. Amount payable
by the Allottee to Municipal
Corporation)
(1) (2) (3)
For Slum Area
27.88sq. m. Residential Zero Payment if eligible under Slum
Rehabilitation Scheme Or else
Construction Cost as per ASR rates or
as per any policy decided by the
Government of Maharashtra under the
Slum Act, 1971.
For Non-Slum Area
30 sq.m. Residential Free of Cost
>30 sq.m but less than or equal
to 50 sq.m.
Residential Upto 30 sq.m. as above. Beyond 30
sq.m. at Construction Cost as per ASR
rates.
>50 sq.m. Residential Up to 50 sq.m. as above. Beyond 50
sq.m. at Full Market Rate as per ASR.
UDCPR-2020
301
Non-Residential/ Commercial
Area
16.75 sq.m. Non -
Residential/
commercial Area
Free if eligible under Slum
Rehabilitation Scheme. Or else,
Construction Cost as per ASR rates.
>16.75 sq.m. but less than or
equal to 40 sq.m.
—do—— Upto 16.75 sq.m. as above and beyond
16.75 sq.m. at 100% of Construction
Cost as per ASR rates
>40 sq.m. —do—— Upto 40 sq.m. as above and Beyond
40 sq.m. at 100% of market rate as per
ASR.
Note for Thane Corporation Area - The erstwhile structures within the gaothans which
subsequently merged with the Municipal Corporation in 1982 will be considered as
protected and legal structures.
ii) If an eligible occupant finds it financially unaffordable to pay the amounts as mentioned
herein, Commissioner may allot him a tenement of immediately lower area. If any
eligible beneficiary finds it financially unaffordable to pay even the amount required for
the minimum area, or fails to make payment as per the Schedule of payment given by the
Commissioner, the Commissioner may allot him a tenement of minimum area on hire-
cum-purchase basis, till such allottee pays the requisite amount in one or more
instalments or through EMI payments. Rent in such cases would be decided by Municipal
Commissioner and EMI shall be calculated for such number of years at such rate of
interest as may be fixed by Municipal Commissioner.
iii) Any existing amenity in the URC on the date of coming into force of this regulation
which is under control of a private person/ organization and Charitable Trust/ religious
organization shall be entitled for an area equal to the existing area of such amenity,
subject to the following :—
a) for an amenity being used for non-residential activities and under the control of
private person(s)/ organization(s), allotment of equivalent area under URS shall be
at 50% of ASR Rate for commercial area up to 40 Sq. Meters and at 100% of ASR
Rate for commercial area above 40 sq.m.;
b) for an amenity being used for non – residential and in control of any Charitable Trust
or religious organization for purpose of raising fund for public welfare activities,
such allotment shall be free for area up to 40 Sq. meters and at 50% of ASR Rate
for construction above 40 Sq. Meters.
c) for an amenity having users like (e.g. Educational / Health-care facility etc.) and
under control of private person(s)/ organization(s) such allotment shall be at 25 %
of ASR Rate for constructed area up to 40 Sq. Meters and at 50% of ASR Rate for
constructed area above 40 Sq. Meters.
iv) Process of Allotment to Beneficiaries and Conditions thereof :—
a) Process of allotment of tenements to beneficiaries, lease conditions including those
pertaining to transfer, formation of co-operative housing societies and policy of
maintenance of common amenities of buildings and layout as well as policy
UDCPR-2020
302
regarding any other relevant matter shall be as determined by Corporation from
time to time.
b) Allotment of land shall be on lease for the period of 30 years, which shall be
renewable for further period of 30 years at a time. However, Allotment of
rehabilitation tenements for owners and beneficiaries shall be on ownership basis.
This provision of lease shall not apply for the authorised building constructed on
private land.
c) Rehabilitation tenements allotted to beneficiaries shall not be transferable for first
fifteen years, except with prior permission of Commissioner, who may grant such
permission in case of hardship, on payment of premium as below :
i) For the transfer of Rehabilitation tenements allotted to Occupants belonging
to the authorised buildings, no premium shall be charged
ii) For carpet area less than 30.00 Sq.m. premium shall be 10% of the
differential amount calculated as per clause (iv) below;
iii) For the transfer of Residential and non-residential Rehabilitation tenements
other than those covered under (a) and (b) above, premium shall be 25% of
differential amount calculated as per explanation below;
iv) Differential amount for the purpose of clause (ii) and (iii) shall be equal to
difference in the Annual Statement of Rates (ASR) valuation in the year of
transfer and the original consideration paid for the allotment of a Tenement
brought forward to the year of transfer through capital inflation index.
Provided that, In case of unauthorized transfer of any Rehabilitation
tenement, the Commissioner may regularize the transfer by charging double
the premium as mentioned above, with 12% interest from the date of
transfer.
Provided further that, If the transferee refuses to pay the premium demanded
within 3 months of demand, the Commissioner shall initiate process of
vacating the premises, though in cases of willingness but hardship,
Commissioner may grant instalments with 12% interest rate.
14.8.6 The permissible FSI for URC
i) Total Permissible Global FSI over the area of a URC shall be double the value required
for the rehabilitation of occupants as per their eligibility under this Regulation, or 4.00
whichever is higher. FSI shall be calculated over the gross area of the URC. Deducting
area falling in CRZ and Forest areas if any. However, if the area in CRZ-II is upto 25%
of the URC then the FSI shall be allowed to be used in non CRZ area however no FSI
shall be allowed for the area from CRZ-I. Out of the construction area allowed as per
Global FSI, FSI that cannot be actually utilized in URC, due to constraints imposed by
different provisions of UDCPR, or otherwise, shall be converted into Urban Renewal
TDR (URT) which shall be utilisable on a receiving plot.
ii) The URT may be released by the Commissioner in stages to be decided by him but URT
released at any point of time shall never exceed construction done in URC with respect to
buildings where Occupation Certificates have been granted and 50% of construction done
in URC with respect to buildings where Occupation Certificates are not granted.
UDCPR-2020
303
iii) The FSI for an Urban Renewal Scheme in CRZ area shall be governed by the MOEF
Notifications issued from time to time, and the same shall be taken into account while
computing permissible FSI as per Clause (i) above.
Plot area, considered after deducting the area of URC falling in CRZ/ Forest area and
area under unbuildable reservations, etc. shall be primarily used for rehabilitation of
existing occupants and development of buildable reservations and public amenities with
required FSI. After the said development, if there are any eligible occupants left who
could not be rehabilitated due to inability to construct the requisite area for rehabilitation
and relocation, owing to constraints imposed by UDCPR, shall be rehabilitated in any
nearby URS or in the PAP tenements available with the Corporation; as per the policy
guidelines decided by the Corporation.
iv) If after construction of rehabilitation tenements and other areas of entitlement as per the
provisions of this Regulation, there is still some building potential left as per the ceiling
of 4.0 FSI, construction can be done for free sale, either in independent buildings, or on
sub-plots or in composite buildings or in undivided plots along with rehabilitation
component.
v) When the FSI available in URC in case less than 4.0 then50 %of the difference in FSI
shall be constructed in the form of EWS/LIG tenements and shall be handed over to the
Commissioner. Commissioner may use these tenements preferably for transit
accommodation, PAP tenements or staff quarters. However if tenements are not needed
for above purpose then Municipal Commissioner shall after realisation of proceeds from
disposal of these tenements, deposit such proceeds in Shelter Fund setup under this
Regulation.
14.8.7 Development of Reservations contemplated in Development Plan falling in the area of
URC
i) All the reservations in the Development plan falling in the area of URC shall be provided
and may be rearranged / relocated, under URS as follows :—
a) Redevelopment / reconstruction in any zone shall be allowed to be undertaken
without going through the process of change of zone. However, for the industrial
user, the existing segregating distance shall be maintained from the existing
industrial unit.
b) Any land under non-buildable reservations, admeasuring only upto 500 sq.mt. may
be cleared by shifting the existing tenants from that site.
c) If the area under a non-buildable reservation is more than 500 sq.mt. minimum
50% of the area under reservation shall be developed for the same purpose and
handed over to Municipal Corporation, subject to minimum of 500 sq.mt. and
remaining land shall be allowed for development.
d) For the reservation of parking lot on a land included in URC, built up area equivalent
to zonal permissible FSI for the area under reservation in that plot shall be made
available free of cost to the Corporation or to any other Appropriate Authority.
Such built up area to be handed over shall be free of FSI.
e) For other buildable reservations on land, built up area equal to 60% of the zonal
permissible FSI under such reservations or existing built up area of the amenity
whichever is more, on that plot shall be made available free of FSI and free of cost
UDCPR-2020
304
to the Municipal Corporation or to the Appropriate Authority. The reservations of
compatible nature can be preferably constructed in one or more separate blocks,
depending on the area and nature of such reservations and Municipal
Commissioner may permit composite development of reservations in case of such
reservations. However, if the HPC/Planning Authority requires built-up area under
any designation /reservation in excess of the zonal permissible FSI, then such
excess area shall be considered as rehabilitation FSI and incentive FSI as
admissible under this Regulation shall be permissible :
Provided that in case of development of reservations of PH/HDH & HD under the
Urban Renewal Scheme, built-up area equal to 30% of the zonal permissible FSI
shall be handed over to the Municipal Corporation free of FSI and free of cost, in
addition to the rehabilitation of the existing tenements or users if any.
f) Where a proposed Development Plan Road or Regular line of street passes through the
Urban Renewal Scheme area, the entire FSI admissible under this Regulation for
the area of the road may be given in the same Scheme.
g) Built up area required for development of public amenities/ reservations shall not be
counted while computing permissible FSI under URS. If URS includes areas
falling under CRZ and Forest, subject to NOCs of the concerned Authority, these
areas may be considered against the compulsory open space to be kept as per DCR.
h) The multiuser mix user in High rise or composite building for public purpose
amenities shall be permitted.
ii) If the area under non-buildable reservation except Play Ground in the URS area is more
than 2000 Sq.m. minimum 50% of the area of such reservation or 2000 Sq.m. whichever
is more shall be developed for the said purpose.
14.8.8 Preparation and Approval of URS
i) Subject to the provisions of Development Plan and the URP prepared and notified by the
Commissioner, the Commissioner may prepare detailed plan, for one or more URCs
contained therein, showing proposals for development/ reconstruction of cluster of
buildings and/or structures, which in the opinion of the Commissioner should be
developed or redeveloped under a URS. Such plan shall include —
(a) Plan for overall development/Redevelopment of specific areas for urban renewal.
(b) Strategies and plan for dealing satisfactorily with areas of bad layout, obsolete
development and slum areas and relocation and rehabilitation of population.
(c) Open spaces, gardens, playgrounds and recreation areas.
(d) Area or areas required for making the implementation of such plan for Urban
Renewal viable.
ii) After preparation of detailed plans of URC(s), the Commissioner shall place the same for
approval of a High Power Committee (HPC) constituted under this Regulation as
follows-
UDCPR-2020
305
Municipal Commissioner - Chairman
Collector - Member
Joint Director Town Planning of the Division - Member
DCP (Traffic) - Member
Chief Officer, MHADA - Member
Joint Director / Deputy Director /Assistant Director
Town Planning of the Corporation
- Member Secretary
After approval of detailed plans of URC(s) as aforesaid, the Commissioner shall proceed
to select an Implementation Agency for executing URS in the manner described herein.
Proposal to finalise Implementation Agency shall be put to HPC which will forward the
same with the recommendations to the State Government for final approval.
iii) Entitlement for consideration under URS :
Anyone having any legal rights over any parcel of land falling under URS shall, after
establishment of his rights, be offered consideration for such land as per the following
provisions which, if declined by any rights holder (s), shall give liberty to the
Commissioner to initiate process of acquisition of such rights under appropriate law.
Implementation of URS shall be regarded as a public purpose.
iv) Consideration for Land falling under URS.
a) Person(s) having legal rights in any land required for URS under this Regulation
shall be offered monetary compensation for constructed area or TDR for the
entitled area as provided hereinafter.
b) Basis for determination of entitled area towards consideration under URS Scheme
shall be as follows :—
i) Person(s) in legal possession and ownership of unencumbered land: - Entitled
area collectively against this parcel of land shall be equivalent to the area of
the land.
ii)Person(s) in legal possession and ownership of encumbered land where
authorized buildings have consumed FSI less than the permissible FSI :-If
liability of rehabilitation of the occupants of the building(s)/Structure(s) on
the land in question is being taken on URS, entitled area collectively against
such parcel of land shall be 25% of the area of encumbered land plus
difference of FSI available on such parcel land and the encumbrance; if the
occupants of the building(s) are being independently rehabilitated/
compensated by the person(s)/rights holders in legal possession and
ownership of the land, and not being rehabilitated in URS, entitled area
collectively against such parcel of land towards consideration shall be equal
to FSI available on the vacated land area :
Provided where the area of rehab is less than the component of free sale, the
component for free sale could be enhance upto 30% by the Municipal
Commissioner in consultation with HPC.
iii) Person(s) in possession and ownership of authorized encumbered land where
UDCPR-2020
306
buildings have consumed FSI more than permissible FSI :- If liability of
rehabilitation of the occupants of the building(s)/Structure(s) in question is
on the land being taken on URS, entitled area collectively against such
parcel of land shall be 25% of land area, if the occupants of the building(s)/
Structure(s) are being independently rehabilitated / compensated by the
person(s)/rights holder (s ) ; in possession and ownership of the land, and
not being rehabilitated in URS, entitled area collectively against such parcel
of land towards consideration shall be equal to FSI available on the vacated
land area.
iv) Person(s) having right over unauthorisedly encumbered land:- Entitled area
collectively against this parcel of land shall be calculated at 50% of entitled
area calculated as per clause (ii) and (iii) above, except when occupant(s) of
building(s) are being rehabilitated/ compensated by such Person(s) and are
not being rehabilitated in URS, entitled area towards consideration shall be
equal to FSI/TDR available on the vacated land area.
c) Consideration for Acquisition of land under URP
i) Consideration for any land required to be procured for URP shall be either in
terms of payment due for entitled area collectively against that parcel of
land, as calculated in Regulation No. 14.8.8 (iv) (b) above as per ASR, along
with 100% solatium, as applicable for the year of possession, along with
12% annual compounded interest from date of possession to date of
payment, or in terms of TDR equivalent to the entitled area or in terms of
equivalent area constructed in URS. Concerned person(s) shall have option
to choose from amongst these three modes of consideration. The option once
chosen shall be registered and shall be irrevocable.
ii) Once consideration as above, has been accepted by a person having any interest
in the land on which any unauthorised construction exists or existed, the
Commissioner may consider such person eligible for Compounding of any
offence under relevant provisions of MRTP Act with respect to the
concerned land/ plot.
iii) Wherever any person having demonstrable legal rights over any area falling
under URP rejects the consideration being offered, the Commissioner shall
forward the proposal for Land Acquisition under “Right to Fair
Compensation and Transparency in Land Acquisition, Rehabilitation and
Resettlement Act, 2013”. In such an eventuality, the Commissioner may
move the competent authority for advance possession of the land(s) so as to
ensure smooth implementation of URS and shall pay requisite advance, rent
etc. under the “Right to Fair Compensation and Transparency in Land
Acquisition, Rehabilitation and Resettlement Act, 2013”, as determined by
the Competent Authority. If, however there is any dispute only about
apportionment of consideration among person(s) having demonstrable legal
rights over any land falling under URS, the Commissioner shall ask the
disputing parties to approach Competent Civil Court to get their disputes
resolved and to settle apportionment of consideration as offered under this
Regulation. Till the final decision in this regard is received, in order to
UDCPR-2020
307
ensure that URS does not get delayed and adversely affect other parties to
the URS; the Commissioner shall cause an area, equivalent to the entitled
area corresponding to such land, to be constructed as part of URS and in
case the claimant(s) of ownership finally declared eligible by the Competent
Court decide upon an option other than constructed area and exercise such
other option, as mentioned in Regulation No.14.8.8(iv)(b),the Commissioner
shall pay consideration as per such option exercised and such reserved
constructed area in URS shall vest with the Corporation.
iv) In any proposed URC, any open plot is included and if the concerned owner is
not willing to participate in URC, the compensation payable shall be as per
Land Acquisition, Rehabilitation and Resettlement Act.
v) In case of buildings or lands belonging to the Central Govt., the State
Government, Semi-Government Organizations and Municipal Corporation
or MHADA or any Local Government or any Corporation or Company
owned by the Central/State Government or any Local Government
(hereinafter collectively referred to as Public Authority), prior consent of
such Public Authority shall have to be obtained for their inclusion in the
URS. For such lands or buildings, the Commissioner may either offer
Market Price, to be decided by mutual consent, subject to ratification by the
Municipal Corporation, or may offer constructed area, in-situ or ex-situ, in a
composite or independent building or may, alternatively, offer equivalent
TDR as per TDR regulations or may offer an exchange of suitable land as
per mutual consent, subject to ratification by the Municipal Corporation and
thereafter such land(s)/building(s) shall vest with the Municipal Corporation
and shall form the part of URS.
14.8.9 Planning for Rehabilitation and Free Sale Plots in URS
i) Net area of URC shall be calculated after deducting the area under CRZ and Forest, if
any. Out of total net area of the URC, maximum of 50% area in terms of one or more
plots, to be called Free Sale Plots, shall be carved out for raising resources to cover the
cost of construction of rehabilitation component and development of all the reservations
and amenities. While carving out Free Sale Plots, due weight-age shall be given to the
fact that the higher is the percentage of these plots in terms of area, the more dense is the
Rehabilitation Area, and in exceptional cases, Commissioner may reduce these Free Sale
Plots to zero. The percentage of the free sale plot may be enhanced upto 50% subject to
approval by the HPC by considering 100% in-situ Rehabilitation with consumption of
minimum FSI of 2.5 and if net plot area excluding Recreation Ground area is more than
8000 Sq.mt. under URS. Constructed area available on this Free Sale Plot collectively
shall be equal to that available over the whole URC minus that required for rehabilitation
and relocation. If Free Sale Plots, are more than one, the Commissioner may distribute
the available free sale construction area under URS over such plots, as he may deem fit.
Such Free Sale Plots shall be deemed to belong to C1/C2 Zone for the purposes of
permissible users thereon.
ii) After the development of reservations, any occupants who could not be settled due to
non-buildability of required construction area for rehabilitation and relocation, owing to
UDCPR-2020
308
constraints impose by DCR, shall be rehabilitated in the nearby URS or PAP tenements
available with the Corporation; as per policy guidelines decided by the Corporation.
iii) Two or more contiguous URCs having different densities may be permitted to get clubbed
for implementation purpose sharing the densities in order to ensure balanced
development increasing the viability of clusters.
14.8.10 Selection of Implementation Agency
If an owner or group of owners or proposed co-op. Hsg. Society of occupants or federation of
occupants, either directly or through a Power of Attorney Holder, collectively owning more than
70% of the area of URC or a part thereof, come forward for implementation of URS as per the
Detailed Plan prepared by the Commissioner for such URC, within 3 months of declaration of
the detailed plans of URC, or within such extended period as may be granted by the
Commissioner, they may be selected as Implementation Agency for implementation of URS on
such URC. In such a case, an Infrastructural charges at the rate of 10% of construction cost as
per prevailing ASR to be received by the Corporation. In case owners/ stakeholders owning
more than 70%51% of whole or part area of URS as mentioned above fail to come together,
selection of an implementation agency for the URS shall be done through a transparent bid
process.
14.8.11 URS by Private Promoters/ MHADA/ Co-operative Housing Societies
i) Whenever there is no URP made by Commissioner or wherever there is no URS floated
by the Commissioner over one or more URCs falling under URP made by Commissioner,
any Private Promoter, MHADA, Co-operative Housing Society, federation of occupants
etc. may approach Commissioner with consent of owners / stakeholers of 51% of any
area requiring Urban Renewal, for implementation of URS thereon and Commissioner
may, after satisfying himself that conditions mentioned herein, which make an area fit for
redevelopment under URS are met, decide to implement URS thereon and, subject to
other conditions and processes mentioned in this Regulation, appoint such applicant as
implementation agency at the Base Premium.
ii) In case where there are some owners (pertaining to less than 30% area) who have not
given their consent to the Private Promoter, MHADA, Co-operative Housing Societies
etc. for URS, who are appointed as per Clause (i) above by Commissioner as
Implementing Agency, the Commissioner shall offer remaining owners and right holders
consideration for their rights as mentioned in the provisions for URS being designed and
implemented by Commissioner, and if these considerations are rejected by these
dissenting owners or right holders the Commissioner shall forward proposals for Land
Acquisition to competent authority. In such cases, if final compensation is in terms of
money, the same shall be recovered from the Implementation Agency and if final
compensation is in terms of TDR, market value of such plots as per ASR rates shall be
recovered from the Implementation Agency, in addition to the Base Premium
iii) A Surcharge on Development undertaken by the promoter/Developer at the rate of 100%
of Development charge shall be leviable, which may be paid in stages in proportionate
with the progress of work. This surcharge shall not be applicable to the construction
within basic FSI, the built up area to be handed over to Municipal Corporation or any
Public Authority in lieu of any reservation and also to the amenity areas to be handed
over to the Municipal Corporations per the requirement indicated by the Municipal
UDCPR-2020
309
Corporation or the High Power Committee.
Explanation 1.—In case of inclusion of a Slum in URS, any person/ agency having consent of
more than 51%eligible Slum dwellers shall be construed to be appropriate person/ agency to
deal with the issues regarding the whole area of Slum for the purposes of this sub-section only.
i.e. for the purposes of decision about Implementation Agency.
14.8.12 Transit Camps - For smooth implementation of the URS, construction of temporary transit
camps may be permitted on the same land or a land situated elsewhere as given here-under :
i) Irrespective of its land-use classification under Development Plan, construction of temporary
transit tenements made of light detachable material such as tubular/ prefabricated light
structures shall be allowed upto an FSI of 4.0 on any nearby vacant site without any
reservation in the Development Plan, with the consent of the land-owner.
ii) The temporary transit camp shall be provided on or close to the site of URS itself.
However in exceptional circumstances to be recorded in writing, construction of
Temporary Transit Camps may be permitted on the area of open space required to be kept
in accordance with Regulation No. 3.4.
iii) Multi-storeyed temporary transit tenements may be allowed to be constructed with 4.00
FSI on the site of URS.
iv) The area of temporary transit tenements shall be excluded from the computation of FSI,
but structural safety of such tenements shall be ensured.
v) Building permission for Temporary Transit Tenements shall be given within 45 days
from the date of application but only after approval to the URS, failing which such
permission shall be deemed to have been granted.
vi) If a site, reserved in Development Plan for any public purpose is vacant or partly
encumbered, or it happens to be the unused portion of such public purpose for which
such site is reserved, and there is no other option for locating temporary transit
tenements, then such site or unused portion may be utilized for building temporary transit
tenements, with the permission of Commissioner, on payment of such rent and subject to
such conditions/ as the Commissioner may prescribe.
vii) Temporary transit camp erected, under this Regulation shall have to be demolished by the
Developer within 30 days from grant of Occupation Certificate to the Rehabilitation
buildings and the land there under shall be brought back to the original state.
14.8.13 Non-conforming activities.—All activities which are existing shall be allowed to be re-
accommodated regardless of the non-conforming nature of such activities, excepting those
which are hazardous and highly polluting and those where alternative accommodation has
already been provided elsewhere by the Promoter/Developer/Municipal Corporation.
14.8.14 Relaxation in Building and other requirements.—
i) The calculation of FSI for all purposes shall be on gross area i.e. without deducting any
percentage for recreational open space. This shall not affect the requirement of physical
open space in terms of keeping aside the said recreational open space on site as per the
UDCPR.
ii) The provisions in UDCPR relating to balcony shall apply to the URS with the
modification that there shall be no restriction on Zone and balcony shall not reduce
UDCPR-2020
310
marginal open space to less than 3.00 meters However, at ground level, clear margin of
minimum 4.5 mtr shall be maintained. Enclosed balcony shall be included while
calculating the entitled area.
iii) Front and marginal open spaces: For a building in the Rehabilitation Component or
composite building having height upto 24.0 m., front and marginal open space shall be
4.5 mtr and for buildings having height more than 24.0 m., the same shall be 6.00m.
iv) Notwithstanding the provisions in UDCPR, where the plot abuts a DP Road having width
of 18.0mt and above, the front marginal open space shall not be insisted upon beyond 4.5
mtr, provided such road is not a Highway.
v) Where the plot abuts a trained nallah, the marginal open space along the nallah shall not
be insisted upon beyond 4.5 mtr from the edge of the trained nallah Or as per requirement
of SWD Department of, whichever is greater.
vi) The distance between any two rehabilitation buildings shall not be less than 6.00 mt.
vii) If the height of a building in URS is more than 25 mtr, 6 mtr wide marginal open space or
marginal open space as per the requirement of CFO, , whichever is greater, shall be
considered.
viii) A Composite building shall contain at least 50 percent of the built up area as
Rehabilitation Component.
ix) The means of access shall be normally governed by the provisions of UDCPR. However,
in the URS, wherever the design of the buildings up to 24 m. height in the same land
requires some relaxation, the same may be given by the Commissioner; buildings having
height exceeding 24 m. Shall be permissible only on access having width of 9 m. or
more.
x) Even if the recreational open space is reduced to make the URS viable, a minimum of at
least 10 percent of the area of URC shall be provided as recreational open space. In
addition to this, 10 percent of URC area shall be earmarked for amenity space which can
be adjusted against the DP reservation(excluding roads), if any provided the area of such
reservation exceeds 25% of the area of the URP.
xi) Amenities not available in the periphery of 400m. from boundaries of URC shall be
developed on Amenity Plot, subject to the minimum area specified for such amenities
under this Regulation and handed over free of cost to the Corporation without any
consideration.
xii) Area to be excluded from computation of FSI shall be as per these Regulations
(UDCPR).
xiii) In order to make the URS viable, the Municipal Commissioner shall be competent to
sanction any relaxation in the parking requirements and marginal open spaces, except for
front marginal open spaces, wherever required on account of bonafide demonstrable
hardship and for reasons to be recorded in writing, which shall not affect general safety
and fire safety requirements.
xiv) All relaxations outlined hereinabove shall be admissible only to buildings in the
Rehabilitation Component of URS and also to the composite buildings therein. Premium
at the concessional rate shall be charged by the Municipal Commissioner for all or any of
the relaxations given hereinabove or for any other mentioned in UDCPR.
UDCPR-2020
311
xv) The parking in the URS shall be provided as per the provisions of UDCPR.
xvi) Any aspect of development under URS, which is not specified under this Regulation shall
be governed by the relevant provisions of the UDCPR.
xvii) In order to facilitate redevelopment and to decongest the redeveloped area in the URC,
the Commissioner may insist on additional road width, over and above that prescribed in
the sanctioned D.P. or the width of the existing roads.
xviii) Provisions of Public amenities and roads under the URS shall be considered at par with
reservations and the roads in the Development Plan.
xix) Portion of URC falling under No Development Zone, Buffer Zone, CRZ- I & III and
Private Forest shall form a part of the required Recreational Area in the URS.
14.8.15 The approving/sanctioning authority for the building plans under the URS shall be the
Municipal Commissioner as per the MRTP Act, 1966, even if the URS partly consists of
declared slums or slums on Municipal / Govt. lands, existing prior to 1st January1995 or such
other reference date as may be notified by the Government.
14.8.16 Religious structures existing on the site of URS prior to redevelopment, if allowed to be
redeveloped in accordance with the guidelines issued by the Government from time to time;
following such redevelopment, shall not have area exceeding their area prior to redevelopment.
14.8.17 Heritage buildings of Grade-I and II may be included in the area of Urban Renewal Cluster, but
have to be kept as they are, along with land appurtenant, but shall not be considered for FSI
under this Regulation. As regards such Heritage Structures, the Promoter / Developer shall have
to contribute Heritage Cess at 5% of ASR Rates on the basis of built-up area of the Heritage
structure. Existing provisions under these Development Control Regulations shall apply to
Heritage Buildings of Grade-III. However, before granting the approval for such buildings, the
HPC shall consult the Heritage Committee appointed for that purpose.
14.8.18 If HPC approves areas for amenities such as Fire Stations/ Hospitals/ Police Stations/ Schools,
etc. other than reservations/ designations as per Development Plan, such amenities shall be
handed over to the concerned Authority, free of cost and the built up area of such amenity shall
be considered as rehabilitation F.S.I. and incentive FSI as admissible under this Regulation shall
be permissible.
The decision of HPC shall be appealable, as if, it is an appeal under section 47 of the MRTP
Act, 1966.
14.8.19 Formation of Co-operative Housing Societies, and their Federations for buildings in URS:
Commissioner shall cause formation of Co-operative Housing Society for each and every
building, either separately or collectively as he may deem fit and shall cause to be deposited
25% of the amount of consideration received from the allottees of such building, in a “Building
Maintenance Fund” to be utilised by the Co-operative Housing Society of the allottees of such
Building, as per the guidelines framed by the Corporation. In addition, the Commissioner shall
cause to be deposited 25% of the amount of consideration received from the allottees of each
and every rehabilitation and relocation in URC building, in another Maintenance Fund called
“URC Maintenance Fund” to be set up, by the Commissioner, for the dedicated use of
maintenance of common facilities/ amenities in the URC by the Corporation. The utilisation of
the URC maintenance Fund shall be in accordance with the guidelines framed by the
UDCPR-2020
312
Corporation.
14.8.20 Formation of Shelter Fund:
Commissioner shall cause to be deposited 50% of amount of consideration received from the
allottees and amount received from bidding process in a separate fund to be named as “Shelter
Fund”, which may be used as per the policy to be formulated by the Corporation for payment of
consideration for acquisition of land falling under URC, providing financial assistance to
beneficiaries under URC, procurement of land for creation of affordable Housing, and
promoting affordable housing in the city limits.
14.9 DEVELOPMENT OF TOURISM AND HOSPITALITY SERVICES UNDER
COMMUNITY NATURE CONSERVANCY AROUND WILD LIFE SANCTUARIES
AND NATIONAL PARKS.
14.9.1 Applicability- These regulations shall apply to the privately owned (not applicable to forest
land) lands falling in Agriculture/ No Development Zone situated within 5 km distance from the
boundaries of wildlife sanctuaries and national parks in the State of Maharashtra. The provisions
of existing Regional Plans / Development Plans will prevail over these regulations, wherever
lands are earmarked for urbanisable zones in such plans.
14.9.2 Regulation- For the lands situated within 5 km distance (or up to a limit of notified eco-
sensitive zone, whichever is more) from the boundaries of wildlife sanctuaries and national
parks, if the land owner applies for development permission, for development of eco-tourism,
nature tourism, adventure tourism, same may be allowed; provided the land under consideration
has minimum area of one hectare in contiguous manner.
i) Permissible users and built up area-
The users permissible in Agricultural Zone/ No Development Zone area shall be as follows:-
a) Agriculture, Farming, development of wild animal shelters, plantation and allied uses.
b) Tourist homes, Resorts, Hotels etc. with Rooms/ suites, support areas for reception,
kitchen, utility services etc. along with ancillary structures like covered parking,
Watchman’s quarter, guard cabin, landscape elements, and only one observation
tower per tourist resort up to the height of 15 m. with platform area up to 10 sq.mt.
in permanent/ semi-permanent structural components.
ii) The norms for buildings shall be as follows-
a) The construction activities shall be as per Zonal Master Plan / Regional Plan /
Development Plan of the concerned protected area.
b) The maximum permissible total built up area shall not exceed 10% of gross area with
only G+1 structure having height not more than 9 m. and it should blend with
surrounding.
c) The Fencing/ fortification may be permissible for only 10% of total land area around
built up structures in the form of chain link without masonry walls thereby keeping
the remaining area free for movement of wildlife.
d) Tourism infrastructure must conform to environment friendly, low height, aesthetic
architecture, natural cross ventilation; no use of asbestos, no air pollution,
minimum outdoor lighting and merging with the surrounding landscape. They
UDCPR-2020
313
should generate at least 50% of their total energy and fuel requirement from non-
conventional energy sources like solar and biogas, etc.
e) The owner shall establish effective sewage disposal and recycling system during the
construction and operational phase of the development. No sewage shall be
allowed to be discharged into natural stream.
If in cases, where lack of compliance is observed, the concerned authority should issue a
notice to the resort owner/ operator for corrective action within 15 days, failing to
do so or having not been satisfied with the action taken or reply/ justification
received, any decision to shut down the unit may be taken, by the respective
authority.
f) The owner shall establish effective systems for collection, segregation, composting and
/or reuse of different types of solid waste collected during the construction and
operational phase of the development.
g) The plastic components used within the area shall be recycled; failing which the resort
shall be closed down within 48 hours.
h) Natural streams/ slopes/ terrain shall be kept as it is, except for the built-up area.
i) On the area other than 10% area, only local trees shall be planted and only natural
vegetation shall be allowed.
j) For the development of such type already taken place, Condition no. (c) above shall be
applicable retrospectively to the extent of restricting the fencing and keeping the
remaining area free for movement of wildlife.
k) While allowing such development, principles given in the National Tiger Conservation
Authority, New Delhi Notification No.15-31/2012-NTCA, dated 15/10/2012
published in the Gazette of India Ext. pt. III S-4 dated 08/11/2012 and Government
of Maharashtra as amended time to time shall be used as guidelines.
l) All regulations prescribed in Eco-Sensitive zone Notification of concerned National
Park/ Wildlife Sanctuary should be strictly followed and all clearances required
should be taken.
14.10 INTEGRATED INFORMATION TECHNOLOGY TOWNSHIP (IITP)
Integrated Information Technology Township (IITP) shall be allowed in Residential,
Commercial, Public Semi-public, Industrial and Agricultural Zone in Development Plan and
Regional Plan areas and shall be governed by the provisions mentioned herein below.
14.10.1 Area Requirement
Any suitable area in Regional plan or Development plan having access by means of an existing
road or a proposed Regional plan/Development Plan road having a minimum width of 18.0 m.
can be identified for the purpose of development as Integrated IT Township. The area notified
under the Integrated IT Township shall be one continuous, unbroken and uninterrupted and in
any case shall not be less than 10 Ha. (25 acres) at one place.
(Explanation- If such minimum 10Ha. (25Acre) area proposed to be developed under a
Integrated IT Township is divided by one or more water courses (such as nallahs, canal,
etc.)existing or proposed roads of any width or railways, etc. then such area shall be considered
UDCPR-2020
314
to be continuous, unbroken and uninterrupted, subject to the condition that the developer shall
construct necessary connecting roads or bridges as per site requirements at his own cost with
due permission from concerned authorities.)The area under any Integrated IT Township shall
not include the area under notified forest, water bodies like river, creek, canal, reservoir, tribal
lands, lands falling within the belt of500 m. from the High Flood Line (HFL) of major lakes,
lands in the command area of irrigation projects, land falling within the belt of 200 m. from the
historical monuments and places of Archeological importance, Archeological monuments,
heritage precincts and places, any restricted areas, notified national parks, gaothan areas or
congested areas, Defense areas, Cantonment areas, truck terminus especially earmarked on
Development plan, area under Eco-sensitive Zone, other environmentally sensitive areas,
Quarry Zone, notified areas of Special Economic Zone (SEZ) and designated airport areas.
However, such Integrated IT Township may include private land under Hill-Top and Hill-Slope
Zone, whether earmarked on Regional plan/Development plan or not and private land in A
forestation Zone. Provided that, the area of lands in such Hill-Top and Hill-Slope Zone and a
forestation Zone shall not exceed 40 percent of the gross area of the project and such area shall
be shown towards 50% area to be kept permanently open where no development activity shall
be permissible under such project. The said areas shall be developed for tree plantation as per
the norms specified. However, for the purpose of calculation of Floor Space Index (FSI), such
areas shall be excluded.
14.10.2 Planning Considerations
The project has to be an integrated project. The Integrated IT Township should necessarily
provide land for following users:-
1. Information Technology (Industrial)
2. Residential
3. Commercial
4. Educational
5. Amenity Spaces
6. Health Facilities
7. Parks, Gardens & Playgrounds
8. Public Utilities
9. Transport and Communication
14.10.3 General Norms for Different Land Use
Out of the total area notified as "Integrated IT Township" 60% FSI shall be used for IT/ ITES
activities and 40% FSI for the development of residential and commercial activities provided
that 20% area shall be kept for Park / Play Ground / Garden of total IITP.
Residential and commercial activities shall include malls, cinema, theaters, public auditorium
and multiplexes, showrooms for all types of merchandise, hospitals, nursing homes, schools and
colleges, training institutes and hostels related to them, hotels. The development of entire
township, i.e., 60% area for IT/ITES and 40% other area can take place simultaneously but the
developer will have to ensure that sale / lease of both areas is proportionate. To ensure this
occupation certificate for commercial, residential and support services shall be given only after
the development of infrastructure facilities on the area earmarked for IT/ITE activities and
UDCPR-2020
315
occupation certificate is granted by the Authority and after 1/3rd area kept for IT/ ITES activity
is occupied.
14.10.4 FSI In integrated I.T. Township
The maximum permissible FSI on the gross area of the notified Integrated IT Township shall
vary as follows:-
For Integrated IT Township located in Pune, Pimpri-Chinchwad, Greater Mumbai, Thane, Navi
Mumbai, Kalyan-Dombivali, Mira-Bhayandar, Ulhasnagar, Nagpur Municipal Corporations and
Ambarnath Municipal Council limits the permissible FSI shall be 2.5. For rest of the areas in the
State, the permissible FSI shall be 2.00. For land in Agricultural zone in all areas, it shall be
1.00. The premium chargeable shall be as in para. 5 (ii) of Annexure-I Maharashtra's
Information Technology/ Information Technology Enabled Services Policy (IT/ITES) - 2015
issued by Industries, Energy &Labour Department vide Government Resolution No. ITP-2013/
(CR-265)/Ind-2, dated 25th August, 2015 as amended from time to time. Floating of FSI shall
not be permissible from the area of IT /IT use to the area of Support Activities or vice versa, but
floating of FSI shall be permitted within the respective areas of IT / ITES and Support Activities
separately.
14.10.5 i) Provisions of these DCPR as well as provisions of MOEF and CRZ notification, wherever
applicable, issued & as amended from time to time shall be applicable mutatis-mutandis to
the Integrated IT Township except those expressly provided in these Regulations.
ii) In the event the Integrated IT Township contains sites reserved for public purposes (buildable
reservations) in Regional plan/Development plan, for which the Appropriate Authority is
any department of State Govt./Central Govt. or any Government undertaking, the
developer shall construct the amenity as per requirement of the concerned department and
handover the constructed amenity free of cost to that Department. Upon such handing over
the constructed amenity the developer would be entitled to utilise additional floor space
over and above the FSI permissible within the Integrated IT Township (equivalent to the
built up area of the constructed amenity) anywhere within the Integrated IT Township.
iii)In every Integrated IT Township proposal the Structural Designer of developer has to submit
declaration with project report to the Authority about the construction of buildings below:
`I have confirmed that the proposed construction in the scheme is as per norms as specified by
Bureau of Indian Standard for the resistance of earthquake, fire safety &natural
calamities'.
iv) In Integrated IT Township being developed in Residential and other zones mentioned above
and Agricultural/Green Zone/ No Development Zone, trees at rate of minimum 100 trees
per Ha. And200 trees per Ha. respectively shall be planted and maintained by the
developer.
14.10.6 Infrastructure Facilities
The entire onsite infrastructure in the Integrated IT Township along with access road shall be
provided and maintained by the developer. However, it would be obligatory on the part of the
developer to provide all basic infrastructures on at least 75%area under the Integrated IT
Township within 3 years from the date of sanction of development proposals by the Authority;
failing which bank guarantee submitted by the project proponent/s shall be forfeited.
UDCPR-2020
316
The Project Proponent/s shall submit a bank guarantee of an amount equal to the15% of
estimated development cost required for development of the basic infrastructure such as roads,
water supply, drainage & garbage disposal, installations for power supply, fire brigade station &
fire engines. Such development cost be worked out as per respective phases taking into
consideration the phased program for development of infrastructure with amenities under
project as submitted. Certificate regarding estimated development cost shall be produced by the
respective Architect of the project.
14.10.7 Water Supply
The developer shall be required to develop the source for drinking water (excluding the
groundwater source) or secure firm commitment from any water supply Authority for meeting
the daily water requirement of minimum 140 liters per capita per day, exclusive of requirement
of water for firefighting and gardening. The storage capacity of the same shall be at least 1.5
times of the actual required quantity as determined by expected population (Resident and
Floating) and other uses. The developer would be required to develop proper internal
distribution and maintenance systems and shall specially undertake rain water harvesting,
groundwater recharging and waste water recycling projects within the Integrated IT Township.
14.10.8 Drainage and Garbage Disposal
The developer shall make suitable and environment friendly arrangements for the disposal and
treatment of sewage and solid waste as per requirements of Maharashtra Pollution Control
Board. Recycling of grey water for gardening shall be undertaken by the developer.
The developer shall develop eco-friendly garbage disposal system by adopting the recycling and
bio-degradation system in consultation with Maharashtra Pollution Control Board.
14.10.9 Power
The developer shall ensure continuous and good quality power supply to the Integrated IT
Township area. The developer may draw the power from existing supply system or may go in
for arrangement of captive power generation with the approval from concerned Authorities. If
the power is drawn from an existing supply system, the developer shall before commencement
of development, procure a firm commitment of power for the entire Integrated IT Township
from the power supply company.
14.10.10 Environment
The development contemplated in Integrated IT Township shall not cause damage to ecology. In
no case, it shall involve topographical changes, changes in alignment of cross-section of existing
water course, if any in the scheme are or adjustment to scheme area. Environmental clearance
shall be obtained from the Ministry of Environment and Forest, Government of India as per
directions issued by the MoEF's Notification dated 7th July, 2004 and as amended from time to
time. The Integrated IT Township shall provide at least20% of the total area as park/ garden/
playground, with proper landscaping and open uses designated in the Integrated IT Township
shall be duly developed by owner / developer. This amenity shall be open to general public
without any restriction or discrimination.
14.10.11 Special Concession
a) N.A. Permission: Non-agriculture permission will be automatic. As soon as the scheme is
approved, lands under such Integrated IT Townships area shall be deemed to have been
UDCPR-2020
317
converted into non-agriculture and no separate permission is required.
b) Grant of Government Land: Any Government land falling under Integrated IT Township area
shall be leased out to the developer at the prevailing market rate on usual terms conditions,
without any subsidy.
c) Relaxation from Mumbai Tenancy and Agriculture Land Act: The condition that only the
agriculturist will be eligible to buy the agriculture land shall not be applicable in
Integrated IT Township area.
d) Ceiling of agriculture land: - There shall be no ceiling limit for holding agriculture land to be
purchased by the owner / developer for Integrated IT Township project.
e) Exemption from Urban Land (Ceiling and Regulation) Act, 1976: Integrated IT Township
projects will be exempted from the purview of Urban Land (Ceiling and Regulation) Act,
1976.
14.10.12 Sale Permission
It would be obligatory on the part of the developer firstly to provide for basic infrastructure and
as such no permission for sale of plot/ flat shall be allowed unless the basic infrastructure is
provided by the developer to the satisfaction of the Authority. In case the development is
provided in phases & sale permission is expected after completion of phase-wise basic
infrastructure, such permission may be granted by the Authority. Before granting such sale
permission, developer has to submit undertaking about the basic infrastructure to be provided
and completed phase wise. The plots earmarked for amenities, facilities and utilities shall also
be simultaneously developed phase-wise along with IT/support services development.
14.10.13 Implementation and Completion
Development of any notified Integrated IT Township shall be completed within 5 years from the
date of final sanction to the layout plan of the area.
14.10.14 Interpretation
If any question or dispute arises with regard to interpretation of any of these regulations, the
matter shall be referred to the State Government. The Government after considering the matter
and if necessary, after giving hearing to the parties, shall give a decision on the interpretation of
the provisions of the Regulations. The decision of Government on the interpretation of these
regulations shall be final and binding on all concerned.
14.11 INTEGRATED LOGISTIC PARK (ILP)
Integrated Logistic Parkshall be allowed in Commercial, Industrial and Agricultural Zone in
Development Plan and Regional Plan areas and shall be governed by the provisions mentioned
herein below.
14.11.1 Eligibility for establishment of Logistic Park
Private land owner or developer appointed by him or any Company with legal entity may apply
for permission for Integrated Logistic Park.
14.11.2 Activities Constituting Logistic Park
A logistic Park can include the following activities. (The list is indicative)
UDCPR-2020
318
i) Logistic Services.
a) Cargo aggregation/ segregation.
b) Sorting, grading, packaging/ repackaging, tagging/ labelling.
c) Distribution/ Consumer Distribution.
d) Inter-model transfer of material and container.
e) Open and closed storage for transit period.
f) Custom bonded warehouse.
g) Container freight station.
h) Container terminals.
i) Material handling equipment facilities for efficient movement and distribution of
Semi-finished or finished products.
ii) Infrastructure
a) Internal roads
b) Power line
c) Communication facilities
d) Internal Public Transportation System
e) Water distribution and water augmentation facilities
f) Sewage and drainage lines
g) Effluent treatment and disposal facilities
h) Fire Tenders arrangements - Parking
iii) Business and commercial facilities
a) Dormitories
b) Guest Houses
c) Canteen
d) Medical Centre
e) Petrol Pump
f) Banking and finance
g) Office Space
h) Hotel
i) Restaurants
j) Hospital/Dispensary
k) Administration office
iv) Common Facilities
a) Weigh Bridge
b) Skill Development center
c) Computer center
d) Sub contract exchange
e) Container freight station
f) Production Inspection Centre
g) Repair workshop for vehicles & production machinery in the park.
The list of permissible activities as revise by the department of Industries,
Government of Maharashtra, from time to time, shall be applicable.
UDCPR-2020
319
14.11.3 Procedure for Development of Logistic Parks
Private land owner or developer appointed by him may apply to the Authority for development
of Logistic Park under this Regulation. After sanction of permission by the Authority for setting
up Logistic Park, such area shall be deemed to be converted for industrial use in the respective
Development Plan or Regional Plan and shall be available for development of Logistic Park.
However, in case of land in Agricultural zone, the premium shall be charged at the rate of 15%
of land value as per ASR, without considering guideline therein.
14.11.4 Integrated Logistics Park (ILP) :-
An “Integrated logistic park” will be defined as one that is spread over a minimum of 5 acres of
land and having minimum 15 meters wide access road. A minimum of 70% of the total area of
‘Integrated Logistic Park’ shall be used for providing logistic services, and remaining area shall
be permitted for support services and common facilities. Floating of FSI shall not be permissible
from the area of industrial zone to the area of support services or vice versa, but floating of FSI
shall be permitted within the respective areas of industrial zone and support activity zone
separately. The Integrated Logistics Park shall provide following minimum infrastructure and
common facilities.
i) Infrastructure :
a) Internal roads
b) Power line
c) Communication facilities
d) Water distribution and water augmentation facilities
e) Sewage and drainage lines
f) Effluent treatment & disposal facilities
g) Fire tender arrangements h. Parking
ii) Common facilities:
a) Dormitories
b) Canteen
c) Medical Centre
d) Weigh Bridge
The parking and other essential services mentioned in Regulation No 14.11.2 (ii) will be free of
FSI. The letter of Intent for development of an Integrated Logistics Park shall be issued by
Directorate of Industries. The development in the said Logistics Park shall be completed within
5 years from date of issue of Letter of Intent (LOI). The extension to time limit upto a minimum
of one year at a time and not more than 3 times may be granted on merits. Directorate of
Industries will be the registering agency for all Integrated logistic parks. The procedure adopted
for issue of letter of intent and registration would be in line with that adopted under the
Integrated Industrial Area. The developer of Integrated Logistics Park will have to develop the
infrastructure and create and maintain the facilities. Such facilities can be hired/leased/rented or
put to own use by the Developer.
14.11.5 Logistics Park (LP)
Logistics park/building with a minimum of 20000 sq. feet Built up Area with basic FSI will be
designated as Logistics Park (LP). The 80% of the total area of ‘Logistic Park’ should be used
UDCPR-2020
320
for providing logistic services and up to 20% of the total area will be permitted for support
services and common facilities mentioned in Regulation No.14.11.2 (iii and iv). Logistics Parks
will be allowed applicable FSI in these Regulations. The letter of Intent for development of a
Logistics Park shall be issued by Directorate of Industries. The development in the said
Logistics Park shall be completed within 3 years from date of issue of Letter of Intent (LOI).
The extension to time limit upto a minimum of one year at a time and not more than 3 times
may be granted on merits. Directorate of Industries will be the registering agency for all logistic
parks. The procedure adopted for registration would be in line with that adopted under the
IT/ITES Policy 2015. The developer of Logistics Park will have to develop the infrastructure
and create and maintain the facilities. Such facilities can be hired/leased/rented or put to own
use by the Developer.
14.11.6 Upto 200% Additional FSI for Integrated Logistics Park & Logistics Park
For Integrated Logistic Parks & Logistic Parks, the FSI permissible for Industrial Zone as per
these regulations shall be applicable. Upto 200% of additional FSI shall be admissible over and
above the basic FSI for development of Integrated Logistic Park & Logistics Park with or
without premium as follows :-
Sr No. Location of Parks (As defined under PSI 2013) Premium
1 No industries district and Naxalism affected areas Nil
2 Areas other than PMC, TMC, Kalyan Dombivali, Mira
Bhayendar, Panvel, Ulhasnagar, Ambarnath, Navi
Mumbai Municipal Corporation, NID and Naxalism
Affected Areas
10%
3 PMC, TMC, Kalyan-Dombivali, Mira Bhayendar, Panvel,
Ulhasnagar, Ambarnath, Navi Mumbai Municipal
Corporation
15%
Note : However premium charged will be limited upto the demand made by the developer for
additional FSI.
14.11.7 Permissible Height
For Integrated Logistic Park & Logistics Park, height of building upto 24.mt. or as per
requirement shall be permitted.
14.12 INDUSTRIAL TOWNSHIP UNDER AEROSPACE AND DEFENSE
MANUFACTURING POLICY
Industrial Township under Aerospace and Defense Manufacturing Policy shall be permitted in
Commercial, Industrial and Agricultural Zone in Development Plan and Regional Plan areas.
Other stipulations for Industrial Township under Aerospace and Defense Manufacturing Policy-
2018, declared by the State Government in Industry, Energy Labour Department vide
Government Resolution No. Asangho2015/Pra.Kra.98/Udyog-2, dated 14/02/2018, shall be
applicable.
The FSI permissible for this Industrial Township shall be as per FSI permissible in Industrial
Zone. The lands which are included in Agricultural Zone in the Development or Regional Plan
shall be treated as included in Industrial Zone after the permission is granted for this Industrial
UDCPR-2020
321
Township.
Provided that upto 20% of total built up area of such Industrial Township may be used for
residential / commercial purpose / support activities.
Provided further that the Research and Development Institutions in such Industrial Township
shall be eligible for additional 0.50 FSI over permissible FSI as per these Regulations.
14.13 DEVELOPMENT OF INTEGRATED INDUSTRIAL AREA
The development of Integrated Industrial Area within the jurisdiction of Maharashtra Industrial
Development Corporation shall be allowed as per Urban Development Department’s
Notification No. TPB4314/20/CR-32/2014/UD-11, dated 1st August, 2015. The Principal
Regulation’s referred in the said notification shall be deemed to have reference to provisions of
UDCPR alongwith specific regulations related to MIDC mentioned in Chapter 10.
-*-*-*-*-*-
UDCPR-2020
322
UDCPR-2020
323
CHAPTER – 15
REGULATIONS FOR SPECIAL ACTIVITIES / PLANS
15.1 QUARRYING OPERATIONS
With the approval of the, Authority Mining or Quarrying operations may be permitted in
Agriculture Zone on following conditions:
1) The quarrying and mining operations shall be permitted outside CRZ and notified eco-
sensitive zone and heritage precinct but only at specific locations decided by the competent
authority. The development permission shall be granted subject to production of order to
carry out these activities from the revenue authority concerned under the Minor Minerals Act
and NOC of the MPCB.
2) The application for Development Permission of quarrying shall include:
a) Original 7/12 extract along with a location plan at 1:5000 scale of the quarry site and an
area upto 500 meters around the quarry site showing important natural and manmade
features and contours;
b) A site plan at 1:500 scale showing site boundaries, contours, all existing natural and
man-made features such as hills, water courses, trees and other important landscape
features, access roads, building and other structures;
c) Proposed excavation plan and cross sections at 1:500 or larger scale showing proposed
phasing; terracing; stepping; benching slopes; locations of process equipment; diversion
of water courses; impounding lake; storage areas for top soil, waste material, quarried
material; workers housing; landscaping including screen planting, mounding and
measures against visual intrusion etc.
d) A restoration plan including landscaping proposals, phasing and proposal for reuse of
the area after quarrying;
e) A report supplementing the excavation and restoration plans, costs and implementation
programme;
f) Scrutiny fee shall be paid by the owner;
g) Development Charge for the land under quarrying shall be paid by the owner, as per the
provisions of section 124B of the MR & TP Act 1966, at 0.50% of the rates of
developed land mentioned in the A.S.R. of the Registration Dept. of the year in which
permission is granted.
3) No quarrying shall commence until the excavation plan is also approved by the Director of
Geology and Mining, Government of Maharashtra.
4) The Restoration Plan approved by the Planning Authority shall be carried out in consultation
with concerned Conservator of Forest or District Forests Officer, and the Revenue Authority.
5) Natural gradient of slope should be maintained during quarrying operations. Slope of the
foot-wall side (Slope in the direction in which mining does not exist) should be properly
organized by planting adequate trees of suitable species so as to have soil binding vegetation.
6) In the case of murum quarrying, entire weathered soil or murum shall not be excavated
exposing hard rock; instead, a capping of at least half a meter be left so that it can support
UDCPR-2020
324
vegetation and plantation that be done later on. Similarly, these operations shall not cause
depression below the average ground level.
7) Water course, if any from a higher slope, should be properly diverted out of quarry area so
that minimum water flows into the quarry and is safely channelled out of any nearby human
settlement.
8) During quarrying operations, the water should be sprayed at least once in a day over the
roads at quarry sites and nearby area.
9) Kachha road leading to quarry site shall be invariably sprayed by water during the period
when trucks carry murum. In addition, in order to minimize dust pollution, measurers such
as adoption of hoods at transfer points, vulcanizing of conveyer belt joints, under belt
cleaning devices, apart from installation of dust extrication system for conveyance, shall be
adopted. The kachha road leading to the quarry shall have roadside plantation in order to
arrest the dust pollution.
10) No Quarrying and crushing shall be permitted if a highway or public road having width of
30m. or more, railway line or any human settlement is located within 200m. from the
quarrying site. However, for quarrying with blasting operations, the distance shall be at least
500 m.
11) Residences for labourers and related temporary structures should be constructed at least 500
meters away from the place of blasting as well as from the place of quarrying. Heavy
blasting by use of heavy machinery shall be prohibited
12) The development permission for quarrying shall be granted for period of 1 year and may be
revalidated every year for a maximum period of 3 years. After this fresh permission for
further quarrying will be necessary. In granting such fresh permission, the Authority shall
have regard to the applicant’s performance in observing the approved excavation and
restoration plans, and in carrying out the quarrying operations in accordance with these
guidelines.
15.2 ERECTION OF MOBILE TOWERS
Erection/ setting up Telecommunication Cell Sites/ Base Stations and installation of the
equipment for Telecommunication network shall be permissible as per the norms of Department
of Telecommunication / Information Technology or concerned Department of the Central/ State
Government.
15.3 PREPRATION OF LOCAL AREA PLAN
A local area plan is a plan for comprehensive development of particular area in city/ town, which
may consist of detail provisions than that of development plan addressing the local requirements
of the area. The Authority may prepare such plan consisting of planning requirement at micro
level, local area specific regulations, urban design etc. The local area plan shall be prepared by
following procedure similar to that of section 33 of the Maharashtra Regional and Town Planning
Act, 1966. After approval to this plan by the State Government, it shall come into force. In the
event of provisions of local area plan not consistent with UDCPR, the provisions of local area
plan shall prevail.
UDCPR-2020
326
UDCPR-2020
327
APPENDIX A-1: FORM FOR CONSTRUCTION OF BUILDING OR LAYOUT OF BUILDINGS
/GROUP HOUSING
Application for permission for development under Section 18/44/58/69 of The Maharashtra
Regional and Town Planning Act, 1966 read with any other Act governing the Planning Authority*,
if any.
From _________________ (Name of the owner)
To,
The Authority (Name of the Authority )
Sir,
I intend to carry out the under mentioned development in the site/plot of land, on Plot No………
Revenue S.No.……./ Gat No........./ Khasara No........ / City Survey No…………../ Final Plot No.........
Mauje …………situated at Road/ Street ………… Society ………….in accordance with Section
18/44/58/69 of the Maharashtra Regional and Town Planning Act, 1966 read with Section (*)----------- of
--------- Act.
I forward herewith the following plans and statements (Item i to x), wherever applicable, in
quadruplicate, signed by me (Name in block letters) …………..and the Architect/ Licensed Engineer/
Supervisor (License No………….), who has been engaged by me and has prepared the plans, designs
and a copy of other statements /documents as applicable.
i) Key Plan (Location Plan), (to be shown on first copy of the set of plans)
ii) Site Plan showing the surrounding land and existing access to the land proposed to be developed; (to
be shown on first copy of the set of plans)
iii) A detailed building plan showing the plan, section/s and elevation/s of the proposed development
work along with existing structure to be retained/ to be demolished, if any;
iv) Particulars of development in Form enclosed (excluding individual Residential building);
v) Copy of sanctioned layout plan if any;
vi) An extract of record of rights, property register card (any other document showing ownership of land
to be specified)
vii) In case of revised permission, document of consent as per Regulation No 2.2.3 (v).
viii) Attested copy of receipt of payment of scrutiny fees;
ix) Latest property tax receipt;
x) No Objection Certificate(s), wherever required.
I request that the proposed development/ construction may be approved and permission be accorded to me
to execute the work. I hereby undertake that I shall carry out the work according to the approved plan.
Signature of Owner
Name of Owner
Address of Owner.
Contact No.
Dated. ___________
UDCPR-2020
328
CERTIFICATE
The above mentioned Plans are prepared by me as per UDCPR.
Signature of the Architect /
Licensed Engineer / Supervisor.
Name.
License No.
Contact No.
Dated
(*) Name of the Act of the Planning Authority, if any, be mentioned.
UDCPR-2020
329
Form giving Particulars of Development
(Item iv of Appendix A-1)
1. (a) (i) Full Name of Applicant
(ii) Address of applicant
(iii) e-mail ID
(iv) Contact / Mobile No.
(i) Name and address of Architect/ licensed Engineer/
Supervisor.
(ii) No. and date of issue of License
2. (a) Is the plot of, a City Triangulation Survey Number,
Revenue Survey Number or Hissa Number of a Survey
Number or a Final Plot Number of a Town Planning Scheme
or a plot of an approved layout?
(b) Please state Sanction Number and Date of Sub-division/
Layout.
(c) Whether the land is situated in Congested Area (Core
Area) or Outside Congested Area?
3. (a) What is the total area of the plot according to the
i) Ownership document?
ii) Measurement plan ?
(b) Does it tally with the Revenue/CTS Record ? Yes / No
(c) What is the actual area available on site measured by
Architect/licensed Engineer/Supervisor?
(The permission shall be based on the area whichever is
minimum.)
(d) Minimum area of 3 (a) (i), (ii) and 3 (c) above
(e) Is there any deduction in the original area of the plot on
account of
i) D.P. Roads, or
ii) Reservation(s)
If so, are they correctly marked on the site plan?
Please state the total area of such deductions?
Yes / No Area -----------
Yes / No Area -----------
Yes / No
Total Area -----------
(f) Is there any water stream in the land? State the area of
such land.
Yes / No Area -----------
(g) What is the area remained for development after above
deduction(s)?
Area -----------
(h) What is the area proposed for recreational open space? Area ---------- sq.m.
(i) i) Whether amenity space as required under Regulation
No.3.5 is left? OR
ii) Whether amenity space as required under Regulation
No.4.8.1 is left? (applicable in case of I to R provision)
Yes / No Area -----------
Yes / No Area -----------
UDCPR-2020
330
(j) What is the net plot area as per Regulation No. 3.9 ?
(excluding (i) above)
Area -----------
4. Are all plans as required under Regulation No.2.2 enclosed? Yes / No
5. (a) In what zone does the plot fall?
(b) For what purpose the building is proposed? Is it
permissible according to the land use classification?
-------------
Yes / No
6. (a) Is road available as an approach to the land? What is the
average existing width of the road? (If the plot abuts on two
or more roads, the above information in respect of all roads
should be given)
Yes / No
Existing Width -----------
(b) Is the land fronting on D.P. road? If so, width of the D.P.
road
Yes / No
Width -----------
(c) Is the land fronting on National or State highway? If so, is
the Building line/ control line maintained? Please state the
distance.
(c)What is the height of the building above the average
ground level of the plot?
Height -----------
(d) Is it within permissible limit of height specified in
Regulation No.6.8?
Yes / No
(e) Is height approved by Chief Fire Officer/ Director of Fire
Services, M.S.? (In case of height more than 15 m.)
Yes / No
7. Is the land subject to restrictions of blue/ red flood line,
airport, railway, electric line, land fill sites, archaeology, etc.?
Please state the details along with ‘No objection certificate’,
if any.
Yes / No
--------
8. (a) If there are existing structures on the plot Yes / No
(i) Are they correctly marked and numbered on the site
plan?
Yes / No
(ii) Are those proposed to be demolished immediately and
hatched in yellow colour?
Yes / No
(iii)What is the plinth area and total floor area of all existing
structures to be retained?
(Please give details confirming to the plan submitted)
9. (a)Please state the total built up area on the basis of outer line
of construction (including balconies, double height terraces
and deducting voids) ( existing + proposed)
(b) What is the basic permissible F.S.I. of the zone according
to front road width?
(c) What is the premium FSI proposed to be utilised?
(d)What is the area of TDR proposed to be utilised?
(e) What is the additional FSI proposed to be utilised?
UDCPR-2020
331
(f)Please state the overall F.S.I. utilised in the proposal?
(g)Is carpet area of each apartment mentioned on the plan?
10. Whether area for inclusive housing is required as per
Regulation No. 3.8? Please state the details.
11. (a) What is the width of the front marginal distance (s)? If the
building abuts two or more roads, does the front marginal
distance comply with Regulation?
13. (a) What is : Permissible Proposed
(i) the front set-back (s) ?
(ii)the side marginal distance (s)?
(iii) the rear marginal distance (s)?
(vi) the distance between buildings?
14. (a)What are the dimensions of the inner or outer chowk?
(b) Is / are room (s) dependent for its light and ventilation on
the chowk? If so, are the dimensions of the chowk as
required?
15. (a)Whether use of every room / part mentioned on the plan?
(b)Whether every room derives light and ventilation required
under the regulations?
16. If the height of the building is more than 15 meter above the
average ground level, is provision for lifts made?
(a) If so, give details of lift.
Passenger
Capacity
No. of Lifts
(b) Details of Fire Lift.
Passenger
Capacity
No. of Lifts
17. (a) Does the building fall under purview of Special Building
Regulation No.2.2.8?
(b)If so, is fire escape staircase provided in addition to regular
staircase?
Yes / No
(c)Whether the ramps to the basement are provided leaving 6
m marginal distance for movement of fire fighting vehicle?
Yes / No.
(d) If podiums are proposed, does it allow the movement
of fire fighting vehicle properly?
Yes / No.
18. (a) What are the requirements of parking spaces under the
Regulation No. 8.0 ? How many are proposed?
Required Proposed
Car
Scooter
(b) (i) Are loading-unloading spaces necessary?
(ii) If so, what is the requirement?
UDCPR-2020
332
(iii) How many are proposed?
19. Is the sanitary arrangement provided as per the regulation?
20. Details of the source of water to be used in the construction ?
21. Distance from the sewer line. (if sewerage system is
available)
22. Please explain in detail in what respect the proposal does not
comply with the Unified Development Control and Promotion
Regulations and the reasons there for, attaching a separate
sheet if necessary.
I hereby declare that I am the Architect/ licensed Engineer/ Supervisor employed for the proposed
work and that the statements made in this form are true and correct to the best of my knowledge.
Date : / /
Signature of the Architect / licensed Engineer / Supervisor
employed.
UDCPR-2020
333
Form of Statement 1
(to be printed on plan)
[Sr. No. 8 (a) (iii)]
Existing Building to be retained
Existing
Building No.
Floor No. Plinth Area Total Floor Area of
Existing Building
Use / Occupancy of
Floors.
(1) (2) (3) (4) (5)
Form of Statement 2
(to be printed on plan)
[Sr. No. 9 (a) ]
Proposed Building
Building No. Floor No. Total Built-up Area of
floor, as per outer
construction line.
(1) (2) (3)
Total
Form of Statement 3
(to be printed on plan)
[Sr. No. 9 (g) ]
Area details of Apartment
Building No. Floor
No.
Apartment
No.
Carpet area of
apartment
Area of
Balcony
attached to
Apartment
Area of Double height
terraces attached to
flat.
1 2 3 4 5 6
Note : Above statements may vary, wherever required.
UDCPR-2020
334
Proforma – I: Area Statement
(At Right Hand top Corner of Plans)
PROPOSED ----------------- COMPLEX ON C.T.S. NO./PLOT NO. / S.NO. / GAT
NO. /F.P.NO.------- OF VILLAGE MAUJE -----
Drawing Sheet
No.: X/Y
Stamps of Approval of Plans:
AREA STATEMENT
1. Area of plot
(Minimum area of a, b, c to be considered)
(a) As per ownership document (7/12, CTS extract)
(b) as per measurement sheet
(c) as per site
2. Deductions for
(a) Proposed D.P./ D.P. Road widening Area/Service Road / Highway widening
(b) Any D.P. Reservation area
(Total a+b)
3. Balance area of plot (1-2)
4. Amenity Space (if applicable)
(a) Required -
(b) Adjustment of 2(b), if any -
(c) Balance Proposed -
5. Net Plot Area (3-4 (c))
6. Recreational Open space (if applicable)
a) (a) Required -
b) (b) Proposed -
7. Internal Road area
8. Plotable area (if applicable)
9. Built up area with reference to Basic F.S.I. as per front road width
(Sr. No. 5xbasic FSI)
10. Addition of FSI on payment of premium
(a)Maximum permissible premium FSI - based on road width / TOD Zone.
(b) Proposed FSI on payment of premium.
11. In-situ FSI / TDR loading
(a)In-situ area against D.P. road [2.0 x Sr. No. 2 (a)],if any
UDCPR-2020
335
(b)In-situ area against Amenity Space if handed over
[2.00 or1.85 x Sr. No. 4 (b)and /or(c)],
(c)TDR area
(d) Total in-situ / TDR loading proposed (11 (a)+(b)+(c))
12.Additional FSI area under Chapter No. 7
13. Total entitlement of FSI in the proposal
(a) [9 + 10(b)+11(d)] or 12 whichever is applicable.
(b) Ancillary Area FSI upto 60% or 80%with payment of charges.
(c) Total entitlement (a+b)
14. Maximum utilization limit of F.S.I. (building potential) Permissible as per Road
width {(as per Regulation No. 6.1 or 6.2 or 6.3 or 6.4 as applicable) x 1.6 or 1.8}
15. Total Built-up Area in proposal.(excluding area at Sr.No.17 b)
(a) Existing Built-up Area.
(b) Proposed Built-up Area (as per 'P-line')
(c) Total (a+b)
16. F.S.I. Consumed (15/13) (should not be more than serial No.14 above.)
17. Area for Inclusive Housing, if any
(a) Required (20% of Sr.No.5)
(b) Proposed
Certificate of Area:
Certified that the plot under reference was surveyed by me on__________ and the dimensions of
sides etc. of plot stated on plan are as measured on site and the area so worked out tallies with the area
stated in document of Ownership/ T.P. Scheme Records/ Land Records Department/City Survey records.
Signature
(Name of Architect/ Licensed Engineer/ Supervisor.)
Owner’s Declaration –
I/We undersigned hereby confirm that I/We would abide by plans approved by Authority / Collector. I/We
would execute the structure as per approved plans. Also I/We would execute the work under supervision of
proper technical person so as to ensure the quality and safety at the work site.
Owner (s) name and signature
Architect/ Licensed Engineer/ Supervisor name and signature
Job No. Drawing No. Scale Drawn by Checked by Registration No. of Architect/
License no. of Licensed
Engineer/ Supervisor
UDCPR-2020
336
APPENDIX A-2: FORM FOR SUB-DIVISION OF LAND AS PLOTTED LAYOUT
Application for permission for development under Section 18/44/58/69 of The Maharashtra
Regional and Town Planning Act, 1966 read with any other Act governing the Planning Authority,
if any.*
From _________________ (Name of the owner)
To,
The Authority,( Name of the Authority.)
Sir,
I intend to carry out the under mentioned development in the site/plot of land, bearing S.No./Gat
No./City Survey No/Final Plot No.……………………,Mouje …………………, situated at Road/ Street
……………………… in accordance with Section 18/44/58/69 of The Maharashtra Regional and Town
Planning Act, 1966 read with Section (*)----------- of --------- Act.
I forward herewith the following plans and statements (Item 1 to 7), wherever applicable, in
quadruplicate, signed by me (Name in block letters) …………………………… and the Architect /
Licensed Engineer / Supervisor (Registration/ License No……………………….), who has been engaged
by me and has prepared the plans, designs and a copy of other statements /documents as applicable.
(1) Key Plan (Location Plan);(to be shown on first copy of the set of plans)
(2) Site Plan showing the surrounding land and existing access to the land included in the layout;(to
be shown on first copy of the set of plans)
(3)A layout plan showing,
(i) sub-divisions of the land or plot with dimensions and area of each of the proposed sub-
divisions and its use according to prescribed regulations;
(ii) width of the proposed streets; and
(iii) dimensions and area of recreational open spaces provided in the layout.
(iv) dimensions and area of amenity space provided in the layout.
(4) An extract of record of rights, property register card (any other document showing ownership of
land to be specified)
(5) In case of revised permission, document of consent as per Regulation No 2.2.3 (v).
(6) Particulars of development in Form enclosed.
(7)Attested copy of Receipt for payment of scrutiny fees.
(8) No Objection Certificate, wherever required. I request that the proposed Sub-division / layout may
please be approved and permission accorded to me to execute the work.
Signature of Owner
Name of Owner
Address of Owner
Contact No.
Dated:
UDCPR-2020
337
CERTIFICATE
The above mentioned Plans are prepared by me as per UDCPR.
Signature of the Architect / Licensed
Engineer / Supervisor.
Name
License No.
Contact No.
Dated
(*) Name of the Act of the Planning Authority, if any, be mentioned.
UDCPR-2020
338
Form giving Particulars of Development
(Part of Appendix A-2, Item 6)
1. (a) (i) Full Name of Applicant
(ii) Address of applicant
(iii) e-mail ID
(iv) Mobile No.
(b) (i) Name and address of Architect/ licensed Engineer / Supervisor
employed.
(ii) No. and date of issue of License ( Registration No. in case of
Architect.)
2. (a) Is the plot of, a City Triangulation Survey Number, Revenue
Survey Number or Hissa Number of a Survey Number or a Final
Plot Number of a Town Planning Scheme?
Yes / No.
----------
(b) Whether the land is situated in Congested (core) Area or outside
Congested Area?
Yes / No.
3. (a) What is the total area of the plot according to the ownership
document and measurement plan?
Area --------
(b) Does it tally with the Revenue/CTS Record Yes / No.
(c) What is the actual area available on site measured by Architect/
licensed Engineer/ Supervisor?
(The permission shall be based on the area whichever is minimum.)
Area --------
(d) Is there any deduction in the original area of the plot on account
of D.P. Roads or reservation(s). If so, are they correctly marked
on the site plan? Please state the total area of such deductions?
Yes / No.
D.P. Road /
widening Area
--------
Reservation
Area ------
(e) Is there any water stream in the land? State the area of such land
and state whether it is excluded?
Yes / No.
Area --------
(e) What is the area remained for development after above
deduction(s)?
Area --------
(f) What is the area proposed for recreational open space? (For
minimum original holding as mentioned in Regulation No. 3.4)
Area --------
(g) Whether amenity space as required under Regulation No. 3.5 is
left? Please mention the area.
Yes / No.
Area --------
(h) What is the net plot area as per Regulation No. 3.9? Area --------
UDCPR-2020
339
4. Are all plans as required under Regulation No.2.2 enclosed? Yes / No.
5. (a) In what zone does the plot / land fall?
(b) For what purpose the layout is proposed? Is it permissible
according to the land use classification?
6. (a) Is road available as an approach to the land? What is the average
existing width of the road? (If the plot abuts on two or more roads, the
above information in respect of all roads should be given)
Yes / No.
Width ------m.
(b) Is the land fronting on D.P. road? If so, width of the D.P. road Yes / No.
Width ------m.
(c) Is the land fronting on National or State highway? If so, is the
Building line / control line maintained? Please state the distance.
Yes / No.
--------
7. Is the land subject to restrictions of blue / red flood line, airport,
railway, electric line, land fill sites, archaeology, etc.? Please state the
details along with ‘No objection certificate’, if any.
Yes / No.
8. Whether the internal roads proposed in the layout conform to the
Regulation No.3.3 ?
Yes / No.
9. Whether roads in the layout are co-ordinated with the roads in the
surrounding layout?
Yes / No.
10. Whether the area and dimensions of plots are proposed as per
prescribed regulations?
Yes / No.
11. Whether area for inclusive housing is required as per Regulation No.
3.8 ? Please state the details.
Yes / No.
I hereby declare that I am the Architect/ Licensed Engineer / Supervisor employed for the
proposed work and that the statements made in this form are true and correct to the best of
my knowledge.
Date : / /
Signature of the
Architect/ Licensed
Engineer/ Supervisor
employed.
UDCPR-2020
340
Area Statement
Area of Plot (Minimum area of a, b, c to be considered)
a) As per ownership document (7/12, CTS extract)
b) as per measurement sheet
(c) as per site
2. Deductions for
(a) Proposed D.P./ D.P. Road widening Area/Service Road / Highway widening
(b) Any D.P. Reservation area
(Total a+b)
3. Balance area of plot (1-2)
4. Amenity Space (if applicable)
(a) Required -
(b) Adjustment of 2(b), if any -
(c) Balance Proposed -
5. Net Plot Area (3-4 (c))
6. Recreational Open space ( if applicable)
(a) Required -
(b) Proposed -
7. Internal Road area
8. Service road and Highway widening
9. Plotable area
10. Pro-rata factor for FSI calculation on layout plots = (5/9)
11. Area for inclusive housing
(a) Required -
(b) Proposed -
Proforma - I: Area Statement
(At Right Hand top Corner of Plans)
Proposed -------------------------- Layout on C.T.S. No./ Plot No. / S.No. /Gat. No./
F.P.No.------- of Village Mauje -----
Drawing
Sheet No.:
X/Y
Stamps of Approval of Plans:
UDCPR-2020
341
Area Statement
Certificate of Area:
Certified that the plot under reference was surveyed by me on__________ and the dimensions of
sides etc. of plot stated on plan are as measured on site and the area so worked out tallies with the area stated
in document of Ownership/ T.P. Scheme Records/ Land Records Department/City Survey records.
Signature
(Name of Architect/Licensed Engineer/Supervisor.)
Owner (s) name and signature
Architect/ Licensed Engineer/ Supervisor name and signature
Statement of distribution of FSI on each plot
(to be printed at suitable place on plan)
Plot
No.
Plot
area
(sq.m.)
Corner
Rounding
area of
Road
(if any)
(sq.m.)
Remaining
Plot area
(b-c)
(sq.m.)
Pro-
Rata
FSI
factor
Built up
area on
pro-rata
basis
i.e.(d x e)
*
Front
Road
width
(m.)
Basic
FSI
Permissible
Built-up
area on
Basic FSI
(e x g)
(sq.m.)
(a) (b) (c) (d) (e) (f) (g) (h) (i)
* This factor may not be applied in case of individual plot, if quantum of FSI to be apportioned on various
plots is varied. In such case, column (e) shall read as "quantum of pro-rata FSI to be utilised" and total of
this column shall be equal to or less than the quantum at Sr. No. 5.
UDCPR-2020
342
APPENDIX 'B': FORM FOR SUPERVISION
To,
The Authority
(Name of the Authority)
Sir,
I hereby certify that the development/erection/re-erection/demolition or material alteration in/ or
Building No____________ on / in Plot No. ____________ in Block No.________________ situated at
Road / street ___________________ Revenue S.No.……./ Gat No........./ Khasara No........ / City Survey
No…………../ Final Plot No......... shall be carried out under my supervision and I certify that all the
materials (types and grade) and the workmanship of the work shall be generally in accordance with the
general specifications and that the work shall be carried out according to the sanctioned plans. I shall be
responsible for the execution of the work in all respects.
Date : Signature and name of the Architect or Licensed
Engineer/ Site Engineer /Supervisor. *
Registration/ License No.
* Strike out whichever is not applicable.
CERTIFICATE
** I hereby certify that the structural drawings for the above mentioned work are prepared by me / us
and work, as far as structural drawings are concerned, shall be carried under my supervision. I shall be
responsible for the execution of the work as far as structural drawings are concerned.
Signature and name of the Structural Engineer
/ Architect / Licensed Engineer. ***
Registration/ License No.
Date :
** Wherever applicable.
*** Strikeout whichever is not applicable.
UDCPR-2020
343
APPENDIX -C
QUALIFICATION, COMPETENCE, DUTIES AND RESPONSIBILITIES ETC. OF
LICENSED TECHNICAL PERSONNEL OR ARCHITECT FOR DEVELOPMENT
PERMISSION AND SUPERVISON.
C-1 GENERAL
C-1.1 The qualifications of the technical personnel and their competence to carry out different jobs for
development permission and supervision for the purpose of licensing by the Authority shall be as
given in Regulation No. C-2 to C-6. The procedure for licensing the technical personnel is given
in Regulation No.C-7. In the event, the services of the technical personal is discontinued by the
owner / developer or such technical personal resigns from the services, he shall forthwith intimate
to the authority and owner / developer shall immediately appoint another technical person on the
project.
C-2 ARCHITECT
C-2.1 Qualifications-
The minimum qualifications for an architect shall be the qualifications as provided for in the
Architects Act, 1972 and should be registered with the Council of Architecture with valid
membership. Such registered Architects shall not be required to again register their names with the
Authority. However, he shall submit the registration certificate to the. Authority.
C-2.2 Competence of Architect:
To carry out work related to development permission as given below and shall be entitled to
submit -
i) All plans and technical information connected with designs and plans of development
permission.
ii) Structural details and calculations for building on plot up to 500 sq.m. and up to 3 storeys or 11
m. height and
iii) Certificate of architectural supervision and completion for all buildings.
C-2.3 Duties and Responsibilities.
i) Design as per Client's requirements and site conditions.
ii) Prepare and submit plans as per the Regulations and shall be responsible for correctness of
the calculations and dimensions mentioned on the plan and shall be liable for consequences
arising thereof.
iii) Represent before the Authority for scrutiny of drawings.
iv) Prepare and issue working drawings details in conformity with approved plans.
v) Advice client to appoint Site Engineer/ Supervisor, in case he himself is not undertaking the
supervision work.
vi) Inform Authority about Commencement of work on site.
vii) To verify the work at obligatory stages of plinth completion, completion of RCC structure
and superstructure completion to ensure work progress in conformity of approved drawings
and dimensions.
viii) Inform Authority about reaching relevant stage of work where stage-wise approval from the
UDCPR-2020
344
authority is required.
ix) Issue completion / part completion certificate for submission to the authority.
x) Inform in writing to the Authority in case of violation by Client during the period of
appointment
xi) To assist and co-operate with the Authority and other officers in carrying out and enforcing
the provisions of Maharashtra Regional and Town Planning Act, 1966 and of any
regulations for the time being in force under the same.
xii) The above mentioned Architect's scope and responsibilities shall be similarly applicable for
Landscape/ Heritage & Conservation Consultant, if any.
C-3 ENGINEER
C-3.1 Qualifications-
i)The qualifications for Licensing Engineer shall be the corporate membership (Civil) of the
Institution of Engineers or such Degree or Diploma in Civil or Structural Engineering or
equivalent; or
ii) Diploma in Civil Engineering or Diploma in Architectural Assistance ship or equivalent
qualification, having experience of 10 years in the field of land and building planning.
C-3.2 Competence-
To carry out work related to development permission as given below and shall be entitled to
submit-
i) All plans and related information connected with development permission.
ii) Structural details and calculations for building on plot up to 500 sq.m. and up to 3 storeys or
11m. height, and
iii) Certificate of supervision and completion for all buildings.
C-3.3 Duties and Responsibilities.
Duties and Responsibilities of the Engineer shall be as mentioned in C-2.3 above within the
competency mentioned in Clause - C-3.2.
C-4 STRUCTURAL ENGINEER
C-4.1 Qualifications-
i) Graduate in Civil Engineering of recognised Indian or Foreign University and Chartered
Engineer or Associated Member in Civil Engineering Division of Institution of Engineers
(India) or equivalent Overseas Institution with minimum 3 years of experience of structural
engineering practice in designing and related field work; or
ii)Post graduate degree in structural engineering with 2 years' experience; or
iii) Doctorate in structural engineering with 1 year experience.
C-4.2 Competence –
The structural engineer shall be competent.
i) To prepare the structural design, calculations and details of all buildings and carry out
verification of reinforcement as per stages of work.
ii) To carry out structural audit/ structural condition survey of the existing/ old buildings.
UDCPR-2020
345
C-4.3 Duties and Responsibilities of Structural Engineer
i) All structural layouts and structural design related with plan and development on the basis of
details received from architect/ owner/ builder/ developer/ geo technical consultant.
ii)Wherever required, structural engineer shall avail the services/advice of Geotechnical Engineer.
iii) Provide lists of tests to be carried out at each stage of work and allow the further work only
after satisfying with the same.
iv) To verify the structural elements in compliance with structural drawings.
v) To document the site visit report mentioning therein the deviation / lapses, if any, in respect of
structural elements designed by him and inform the same to the site engineer, owner /
developer, architect / licensed personnel for rectification required.
vi) He shall be responsible for the adequacy of the structural design in compliance with BIS
code and plans received from architect/ owner/ builder/ developer.
vii) The structural engineer will advise owner/ builder/ developer to appoint formwork co-
coordinator (FWC) and same shall be employed by the owner/ builder/ developer for the
project.
viii) Certificate of structural design adequacy at the time of completion.
C-5 SUPERVISOR
C-5.1 Qualification
(a) For Supervisor 1 :-
i) Three years architectural assistantship or intermediate in architecture with two years
experience, or
ii) Diploma in Civil engineering or equivalent qualifications with two years experience. or
iii) Draftsman in Civil Engineering from ITI or equivalent qualifications with Ten years
experience out of which five year shall be under Architect/Engineer.
(b) For Supervisor - 2 :-
i) Draftsman in Civil Engineering from ITI or equivalent qualifications with five years
experience under Architect/ Engineer.
C-5.2 Competence
(a) For Supervisor-1: He shall be entitled to submit -
i) All plans and related information connected with development permission on plot up
to 500sq.m.; and
ii) Certificate of supervision of buildings on plot up to 500 sq.m. and completion thereof.
(b) For Supervisor-2 :He shall be entitled to submit -
i) All Plans and related information up to 200sq.m. built up area, and
ii) Certificate of supervision for limits at (i) above and completion thereof.
C-5.3 Duties and Responsibilities.
Duties and Responsibility of the Engineer shall be as mentioned in C-2.3 above within the
competency mentioned in Clause C-5.2.
UDCPR-2020
346
C-6 TOWN PLANNER
C-6.1 Qualification
Graduate or Post-graduate degree in Town and country planning, urban planning, planning,
regional planning or equivalent.
C-6.2 Competence
i) All plans and related information connected with development permission.
ii) Issuing certificates of supervision for development of all lands.
C-6.3 Duties and Responsibilities.
i) Design as per Client's requirements and site conditions.
ii) Prepare and submit plans as per the Regulations and shall be responsible for correctness of
the calculations and dimensions mentioned on the plan and shall be liable for consequences
arising thereof.
iii) Represent before the Authority for scrutiny of drawings.
iv) Advice client to appoint Site Engineer / Supervisor, in case he himself is not undertaking the
supervision work.
v) Inform Authority about Commencement of work on site.
vi) Inform Authority about reaching relevant stage of work where stage-wise approval from the
authority is required.
vii) Inform in writing to the Authority in case of violation by Client during the period of
appointment.
viii) To assist and co-operate with the Authority and other officers in carrying out and enforcing
the provisions of Maharashtra Regional and Town Planning Act, 1966 and of any
regulations for the time being in force under the same.
C-7. LICENSING-
C-7.1 Technical Personnel to be licensed:-
The Qualified technical personnel or group as given in regulations; No. C-2, C-3, C-4, C-5, C-6
shall be licensed with the Authority or District Offices of Town Planning Department and the
license shall be valid for three calendar years ending 31stDecember after which it shall be renewed
every three years. The technical person registered with the Authority shall be entitled to work
within Authority's jurisdiction and those registered with district offices shall be entitled to work
within jurisdiction of all Authorities as well as regional plan area of the respective district.
C-7.2 Fees for Licensing- The annual licensing fees shall be as follows:-
For Engineer, Structural Engineer and Town Planner. Rs.3000/- For three years.
For Supervisor (1) and For Supervisor (2) Rs.1500/- For three years. .
These fees shall be increased by 10% for every three years.
C-8 DUTIES AND RESPONSIBILITIES OF OTHER TECHNICAL PERSONS / Owner
C-8.1 SITE ENGINEER
C-
8.1.1
Qualifications:
The “Site Engineer” must hold a minimum diploma in Civil/ Construction Engineering /
Construction Management or any other equivalent qualification in the field of Civil Engineering.
UDCPR-2020
347
C-
8.1.2
Duties and Responsibilities
i) To carry out day to day supervision in order to ensure that the work on site is carried out in
accordance with the development permissions, approved plans, drawings given by Licensed
personnel/ Architect of the project, structural drawings given by structural engineer.
ii) Enforce construction methodology, Ensure the quality of work as per the specifications and
keep site records.
iii) To make necessary arrangement for the temporary structures/formwork/shuttering required
for the execution of the building as per the design and drawing with the help of owner/
developer.
iv) To organise the all activities related to construction and development in coordination with
Architect / Engineer / Structural Engineer and Owner/ Developer.
v) To take necessary measures to ensure the safety of workers on site.
C-8.2 GEOTECHNICAL ENGINEER.
C-
8.2.1
Qualifications:
i) Graduate in civil engineering or geotechnical engineering or Member of Civil Engineering
Division of Institution of Engineers (India), and with minimum 3 year experience in
geotechnical engineering practice in designing and field work., or
ii) Post graduate in civil engineering or geotechnical engineering with minimum 2 year
experience in geotechnical engineering practice in designing and field work. or
iii) Doctorate in civil engineering or geotechnical engineering with minimum 1 year experience
in geotechnical engineering practice in designing and field work.
C-
8.2.2
Duties and Responsibilities of Geotechnical Engineer
i) Geotechnical investigation by exploring necessary field tests and visual inspection, taking
samples and testing in certified/ authorized Laboratory.
ii) Prepare the Geotechnical Report certifying the Geotechnical conditions, advise on safe
bearing capacity, required depth for foundation, stability of excavated slopes and safety of
the adjoining structures to the Structural Engineer by considering all relevant affecting/
governing aspects.
iii) Certify the strata and sub soil conditions before laying the foundation.
C-8.3 OWNER / DEVELOPER
C-
8.3.1
Duties and Responsibilities.
i) The applicant owner/ developer shall be responsible for title of the property.
ii) The applicant owner/developer shall be responsible for truthfulness and validity of orders,
NOCs, certificates obtained by him.
iii) Communicate with the consultants on reaching various stages of work in order to facilitate
them to get clearances for further action.
iv) Appoint professional/ consultant/ supervisors/ site engineer/ technical personnel/ staff
required for carrying out the work.
v) Provide necessary resources as may be required by the professionals/ consultants/
supervisors/ technical personnel/Staff.
vi) Commence work at various stages only after obtaining required approval to the plans from
the Authority or clearances under the law.
UDCPR-2020
348
vii) To comply with any instructions, directions and orders by any Statutory Authority.
viii) Ensure that no work in violations of the sanctioned plan is carried out at any stage of the
work and even after Occupation certificate is obtained.
ix) To ensure overall safety during construction by engaging various technical persons, site engineer,
formwork coordinator etc.
C-8.4 DUTIES AND RESPONSIBILITIES OF THE OFFICERS OF THE AUTHORITY.
In addition to the duties and responsibilities assigned to the post of the officers of the Authority
dealing with the development permission, following duties shall also be performed.
i) The application of development permission shall be scrutinised and shall be disposed off
within the time limit specified in the Act/ DCPR or Right to Services Act.
ii) The concerned officer shall make site inspection/s as and when required.
iii) If any complaint is received in respect of any on-going work for which development
permission has been granted, he should take the cognizance of the said compliant and do the
needful within 15 days.
iv) On receipt of complaint, the officer of the Authority shall investigate thoroughly and do the
needful as per provisions of law and regulations. He shall not act arbitrarily on complaint
and issue stop work notice to on-going work.
C-8.5 TECHNICAL FACT FINDING COMMITTEE.
In case of any accident at site during construction on account of failure of any component of
building/ structure, the reason for the same shall be ascertained by the following technical fact
finding committee.
Committee for Planning Authority Area
Sr. No. Members Post
1 Collector of the concerned District Chairman
2 Deputy Commissioner of Police or Police Officer of the equivalent
rank.
Member
3 Assistant Director of Town Planning of the District. Member
4 Superintending Engineer of P.W.D. (Building Design Division) of
the State.
Member
5 Chief Fire Officer of the concerned Authority. In absence of such
officer at the Authority, representative of Director of Fire Services,
Maharashtra State.
Member
6 Representative of Labour Commissioner not below the rank of Class-
A officer.
Member
7 Representative of Indian Society of Structural Engineers of local/
nearby centre.
Member
8 Representative of Indian Institute of Architects of local/ nearby
centre.
Member.
9 Representative of CREDAI of the concerned district/ city. Member.
UDCPR-2020
349
10 In-charge Officer of the department of the concerned Authority,
granting the development permission.
Member
Secretary.
Committee for Regional Plan Area
Sr. No. Members Post
1 Divisional Commissioner of the Concerned Division. Chairman
2 Joint Director of Town Planning of the concerned Division. Member
3 Collector of the concerned District Member
4 Deputy Superintendent of Police or Police Officer of the equivalent
rank.
Member
5 Superintending Engineer of P.W.D. (Building Design Division) of the
State.
Member
6 Representative of Director of Fire Services, Maharashtra State. Member
7 Representative of Labour Commissioner not below the rank of Class-
A officer.
Member
8 Representative of Indian Society of Structural Engineers of local/
nearby centre.
Member
9 Representative of Indian Institute of Architects of local/ nearby centre. Member.
10 Representative of CREDAI of the concerned district/ city. Member.
11 Assistant Director of Town Planning/ Town Planner of the concerned
area.
Member
Secretary.
In case of accident mentioned above, the concerned Authority shall intimate to the concerned
committee along with relevant documents. The Committee shall convene the meeting of the
committee immediately and shall send the report of its primary findings within 3 working days to
the concerned Authority for further necessary action. The committee shall submit final report
within 10 working days if detailed investigations are required. The committee shall be at liberty to
take the help of experts, if required. It may give hearing to the concerned persons, if required.
-*-*-*-*-*-
UDCPR-2020
350
APPENDIX 'D-1'
FORM FOR SANCTION OF BUILDING PERMISSION AND COMMENCEMENT
CERTIFICATE
To,
----------------------------------------------
----------------------------------------------
----------------------------------------------
Sir,
With reference to your application No.__________________,dated ________________ for the
grant of sanction of Commencement Certificate under Section 18/44 of The Maharashtra Regional and
Town Planning Act, 1966 read with Section (*)----------- of --------- Act, to carry out development work /
Building on Plot No……… Revenue S.No.……./ Gat No........./ Khasara No........ / City Survey
No…………../Final Plot No.........Mauje___________________ situated at Road /Street_______________,
Society ___________, the Commencement Certificate/Building Permit is granted under Section 18/45 of
the said Act, subject to the following conditions:
1. The land vacated in consequence of the enforcement of the set-back rule shall form part of the public
street in future.
2. No new building or part thereof shall be occupied or allowed to be occupied or used or permitted to
be used by any person until occupancy certificate is granted.
3. The Commencement Certificate/ Building permit shall remain valid for a period of one year
commencing from the date of its issue unless the work is not commenced within the valid period.
4. This permission does not entitle you to develop the land which does not vest in you.
Office No.
Office Stamp
Date :
Yours faithfully,
Authority or an officer appointed by it
(*) Name of the Act of the Planning Authority, if any, be mentioned or concerned sentence be deleted.
(Specimen of Stamp of Approval to be marked on building plan)
** Name of the Municipal Corporation / Council / Nagar Panchayat / Collector shall be mentioned.
OFFICE OF THE **-----------------
Building Permit No. ----------------
--
Date : -----------------.
SANCTIONED.
Signature
of the Authority
UDCPR-2020
351
APPENDIX 'D-2'
FORM FOR TENTATIVE APPROVAL FOR DEMARCATION OF LAND /
SUB-DIVISION LAYOUT
To,
----------------------------------------------
Sir,
With reference to your application No ___________________,dated ________________ for the
land sub-division approval, under Section 18/44 of The Maharashtra Regional and Town Planning Act, 1966
read with Section (*)----------- of --------- Act, to carry out development work in respect of land bearing Plot
No……… Revenue S.No.……./ Gat No........./ Khasara No........ / City Survey No…………../ Final Plot
No........., Mauje ……it is to inform you that, land sub-division layout is hereby tentatively approved and
recommended for demarcation, subject to the following conditions:
1. You will get the land sub-division layout demarcated on the site by the Land Records Department and
submit the certified copy to that effect for final approval.
2. It shall be the responsibility of the owner to carry out all the development work including construction
of roads, sewer lines, water supply lines, culverts, bridges, street lighting, etc. and hand it over to the
Authority after developing them to the satisfaction of the Authority.
3. If you wish that the Authority has to carry out these development works, then you will have to deposit
the estimated expenses to the Authority in advance, as decided by the Authority.
4. You will have to handover the amenity space to the Authority before approval of final layout as per
Regulation No. 3.5. (applicable in case where owner is not allowed to develop)
5. This permission does not entitle you to develop the land which does not vest in you.
Office No. Yours faithfully,
Office Date
Authority or an officer appointed by it
Office Stamp
(*) Name of the Act of the Planning Authority, if any, be mentioned or concerned sentence be deleted.
(Specimen of Stamp of Approval to be marked on Layout plan)
** Name of the Municipal Corporation / Council / Nagar Panchayat / Collector shall be mentioned.
OFFICE OF THE **-----------------
Letter No. ------------------
Date : -----------------.
LAYOUT RECOMMENDED FOR
DEMARCATION.
Signature
of the Authority
UDCPR-2020
352
APPENDIX 'D-3'
FORM FOR FINAL APPROVAL TO THE LAND SUB-DIVISION / LAYOUT
To,
____________________________
____________________________
Sir,
With reference to your application No. ___________________,dated ________________ for the
land sub-division approval, under Section 18/44/69 of The Maharashtra Regional and Town Planning Act,
1966 read with Section (*)----------- of --------- Act, to carry out development work in respect of land bearing
Plot No……… Revenue S.No.……./ Gat No........./ Khasara No........ / City Survey No…………../ Final Plot
No........., Mauje…… the land sub-division layout is finally approved as demarcated, under Section 18/45/69
of the Maharashtra Regional & Town Planning Act, 1966, subject to the following conditions:
1. It shall be the responsibility of the owner to carry out all the development work including construction
of roads, sewer lines, water supply lines, culverts, bridges, street lighting, etc. and hand it over to the
Planning Authority /Collector after developing them to the satisfaction of the Authority.
2. If you wish that the Planning Authority /Collector should carry out these development works, then you
will have to deposit the estimated expenses to the Planning Authority /Collector in advance, as
decided by the Authority.
3. As per the undertaking submitted by you in respect of recreational open space as stipulated in
Regulation No.3.4, the said open space admeasuring ------- sq.m. stand vested in the name of plot
holders of the layout or society of the plot holders and you have no right of ownership or interest in
the said recreational open space.
4. This permission does not entitle you to develop the land which does not vest in you.
Previous and next
All provisions of UNIFIED DEVELOPMENT CONTROL AND PROMOTION REGULATIONS FOR MAHARASHTRA STATE..