FORM FOR REFUSAL OF OCCUPANCY CERTIFICATE
FORM FOR REFUSAL OF OCCUPANCY CERTIFICATE
Office No. Date
To,
i) Owner:
ii) Architect, Licensed Engineer, Structural Engineer / Supervisor
Sir,
The part / full development work / erection re-erection / or alteration in of building / part building
No _________________ Plot No……… Revenue S.No.……./ Gat No........./ Khasara No........ / City
Survey No……./Final Plot No........., Mouje ……completed under the supervision of
___________________________________________ Architect, Licensed Engineer / Supervisor, / License
No___________ is not allowed to be occupy because of the following reasons -
1. The construction carried out by you does not conform to the sanctioned plans.
2. -----------------------------------------------------------------------------------------------------------
3. -----------------------------------------------------------------------------------------------------------
A set of completion plan is retained with the Authority and remaining sets are regretfully returned
herewith.
Encl : As above.
Office Stamp Yours faithfully,
Authority or an officer appointed by him
Letter No. --------
Date : -----------.
O.C. REJECTED
UDCPR-2020
359
APPENDIX 'J'
FORM OF INDEMNITY FOR PART OCCUPANCY CERTIFICATE
(On Stamp Paper)
(Of such value as decided by the Authority.)
To,
The Authority,
---------------------------
Subject:-
Sir,
While thanking you for letting me occupy a portion of the above building before acceptance of the
Completion Certificate of the whole building for the plans approved in communication
No_______________, dated___________ I hereby indemnify the Authority against any risk, damage and
danger which may occur to occupants and users of the said portion of the building and also undertake to
take necessary security measures for their safety. This undertaking will be binding on me /us, our heirs,
administrators and our assignees.
Yours faithfully,
Signature and name of Owner
Witness:
Address:
Date:
UDCPR-2020
360
APPENDIX 'K'
APPROVALS OF BUILDING PERMISSION BASED ON RISK BASED CATEGORIZATION
Sr.
No.
Parameters to be
considered for Risk
Base
Risk Category
Low Risk Category Moderate Risk Category
1 Plot area Building on a Plot Area upto 150
sq.m.
Buildings on a Plot Area more than
150 Sq.m. and upto 300 sq.m.
2 Plot status Plot should be from sanctioned
layout released for construction or
regularised under Gunthewari Act,
if plot is from congested area /
gaothan it should have undivided
original City Survey Number/
original Property Card Number/
Independent 7/12 abstract.
(Plot should not be from un-
authorised sub-division.)
Plot should be from sanctioned
layout released for construction or
regularised under Gunthewari Act,
if plot is from congested area /
gaothan it should have undivided
original City Survey Number/
original Property Card Number/
Independent 7/12 abstract.
(Plot should not be from un-
authorised sub-division.)
3 Buildability of Plot Plot should be buildable in view of
the provisions in Regulation No.3.1.
Plot should be buildable in view of
the provisions in Regulation
No.3.1.
4 Zone in Development
Plan
Residential or Commercial Zone or
in a zone wherein Residential
development is allowed.
Residential or Commercial Zone or
in a zone wherein Residential
development is allowed.
5 Type of Building Residential or Residential with shop
on ground floor.
Residential or Residential with
shop on ground floor or mixed use.
6 Front, side and rear
open spaces, access,
parking and other
requirements.
As per the provisions of UDCPR. As per the provisions UDCPR.
7 Storeys allowed. G. F. + 2 or Stilt + 3 floors. G.F. + 2 or Stilt + 3 floors.
8 FSI Construction should be within basic
FSI + Premium FSI along with
ancillary area FSI thereon
Construction should be within basic
FSI + Premium FSI along with
ancillary area FSI thereon
9 Submission of
Application for
approval.
Applicant shall submit the
intimation letter as per Appendix-K-
1 along with
i) Ownership document.
ii) Copy of approved layout
showing plot/ measurement plan
of plot.
iii) Building plan showing periphery
Applicant shall submit the
application as per UDCPR and all
required document shall be certified
and signed by the licensed personal.
The licensed personal shall also
submit the certificate stating that
the proposal is strictly in
accordance with the provisions of
UDCPR-2020
361
of construction (P-line) floor
wise and details of property, FSI
calculation as mentioned in
Proforma-I with the signature of
owner and licensed personal.
iv) Copy of receipt of development
charges including labour cess
paid to Authority, if any
v) The certificate of licensed
personal stating that the
proposal is strictly in accordance
with the provisions of UDCPR.
No more details shall be necessary.
UDCPR.
10 Issue of
Commencement
Certificate/ Approval.
The receipt of application along
with the required documents and
fees/ charges mentioned in 9 above,
by the authority shall be treated as
permission for development.
After receipt of the application, the
Demand Note regarding payment of
Development Charges and other
Charges based on the proposed
Plans/ Drawing submitted, shall be
given by the concerned Engineer of
the authority within 10 days. After
the receipt of payment, the
Authority shall issue
Commencement Certificate within
10 days from receipt of such plans
without any scrutiny, solely based
on the certificate of the licensed
personal.
11 Plinth Checking Plinth Checking shall not be
required.
Plinth Checking shall not be
required.
12 Occupation
Certificate.
After completion of the work, the
owner shall intimate to the
Authority about the occupation of
the building.
Licensed personal shall submit the
completion certificate in Appendix
- H to the Authority. The licensed
personal shall not issue the
completion certificate unless the
construction is completed strictly as
per plan. The Authority shall issue
the occupation certificate within 10
days after site inspection.
13 Other Stipulations. ---- Any deficiency of documents or
payments as per UDCPR shall
amount to unauthorised
construction and shall be liable for
action under the provisions of the
Act.
UDCPR-2020
362
Note - The above procedure for permission shall not bar the owner to obtain development permission as
per provisions of this UDCPR, if he so desires.
UDCPR-2020
363
APPENDIX 'K-1'
FORM FOR PERMISSION OF CONSTRUCTION OF BUILDING ON A PLOT
UPTO 150 SQ.M.
Application for permission for development under Section 18/44of The Maharashtra Regional and
Town Planning Act, 1966 read with any other Act governing the Planning Authority, if any.
From _________________
(Name of the owner)
To,
The Authority
(Name of the Authority )
Sir,
I intend to carry out the under mentioned development in the site/plot of land, on Plot No………
Revenue S.No.……./ Gat No........./ Khasara No........ / City Survey No……./Final Plot No........., Mouje
……situated at Road / Street ………… Society ………….in accordance with Section 18/44of the Maharashtra
Regional and Town Planning Act, 1966.
I forward herewith the following plans and statements, signed by me (Name in block letters)
…………..and the Architect / Licensed Engineer / Supervisor (License No………….), who has prepared the
plans.
i) Key Plan (Location Plan) and Site Plan (to be shown on the plan)
ii) A building plan showing the periphery of construction line (P-line) floor wise. No details of internal
room sizes and other details including section / elevation are to be shown. The height of building shall be
mentioned. Existing structure to be retained/ to be demolished, if any, shall be shown;
iii) Copy of sanctioned layout plan, if any;
iv) An extract of record of rights, property register card (any other document showing ownership of land to
be specified)
v) Attested copy of receipt of payment of Charges;(give details of proposed Area, FSI, Charges.)
vi) Copy of latest property tax receipt;
Please treat this intimation as permission for development.
Signature of Owner
Name of Owner
Address of Owner
Contact No. Dated ___________
The above mentioned P-line plans are prepared by me.
Signature of the Architect /
Licensed Engineer / Supervisor.
Name
License No.
Contact No.
Dated
UDCPR-2020
364
APPENDIX - 'L'
HERITAGE LISTCARD (TOWN & REGION)
Location Pin/ MH 09 Heritage listing of the city
Photo w.r.t. Landmark (min.
4 side black and white
photos)
Site photo (black and
white)
Card No.
Grade
Zone
Zone reference
Geological co-ordinate
Village / CTS / Survey / Plot No.
Postal Address
GTS R.L. Survey
A Name of the Property
i) Name
ii) Historic name
iii) Built in/ Age
B Built Form
i) Number of floors
C Area (sq.)
i) Plot Area
ii) Built-up area
D Approach
i) Access
ii) Distance from Rly. Station
E Ownership
i) Past owner (s)
ii) Present owner (s)
iii) Lease status
F Uses
i) Past uses
ii) Present uses
UDCPR-2020
365
G Listing criteria and reference
i) Historic/Archaeological Significance
ii) Value for architectural, historical or
cultural reasons
iii) Architectural
iv) Historical
v) Cultural
vi) The date and/or period and/or design
and/or unique use of the building or
artefact
vii) Period
viii) Design
ix) Use
x) Relevance to social or economic
history
xi) Association with well-known persons
or events.
xii) A building or groups of buildings
and/or areas of a distinct architectural
design and/or style, historic period or
way of life having sociological
interest and/or community value.
xiii) The unique value of a building or
architectural features or artefact
and/or being part of a chain of
architectural development that would
be broken if it is lost.
xiv) Its value as a part of a group of
buildings.
xv) Representing forms of technological
development.
xvi) Vistas of natural/scenic beauty or
interest, including water front areas,
distinctive and/or planned lines of
sight, street line, skyline or
topographical features.
UDCPR-2020
366
xvii) Special details related to services like
sanitation, plumbing, water supply
system, drainage system, electrical,
wind scoops, rainwater harvesting,
etc.
xviii) Open spaces sometimes integrally
planned with their associated areas
having a distinctive way of life and
for which they have the potential to
be areas of recreation.
ix) Industrial sites of historical interest
xx) Archaeological sites
xxi) Natural heritage sites
xxii) Sites of scenic beauty
xxiii) Architectural Description (As- Built
drawings)
xxiv) Ecological Significance
xxv) Final grade
xxvi) Lister/ reviewer
H Architectural Systems in the Structure with Images/ Photos
i) Foundation and Plinth
ii) Walls
iii) Floor
iv) Roof
v) Openings
vi) Steps
vii) Decorative elements/Interiors
Previous and next
All provisions of UNIFIED DEVELOPMENT CONTROL AND PROMOTION REGULATIONS FOR MAHARASHTRA STATE..
Questions people ask
Is form FOR REFUSAL OF OCCUPANCY CERTIFICATE of UNIFIED DEVELOPMENT CONTROL AND PROMOTION REGULATIONS FOR MAHARASHTRA STATE.. still in force?
No repeal of UNIFIED DEVELOPMENT CONTROL AND PROMOTION REGULATIONS FOR MAHARASHTRA STATE.. is recorded.