Notification No. 11/2017/545/XXXVI-03-2017-29(Sa)-14 T.C. Date 16 June, 2017
Notification - The Boilers Act, 2025
- Kind: Notification
- Under: The Boilers Act, 2025
Text of this notification
8 TR TR AWERT T, 16 5, 2017
THE Governor is pleased to order the publication of the following English translation of
notification no. 11/2017/545/XXXV1-03-2017-29(Sa)-14T.C., dated June 16, 2017 for general
information:
No. 11/2017/545/XXXV1-03-2017-29(Sa)- 14T.C.
Dated Lucknow, June 16,2017
WHEREAS the State Government having regard to the material, design or construction of the
boilers and to the need of rapid industrialization of the state, is satisfied that it is necessary so to do:
'NOW, THEREFORE in exercise of the powers conferred by sub-section (3) of section 34 of the
Boilers” Act, 1923 {Act no.5 of 1923) the State Government hereby exempts all such boilers having the
safe guard system for protection against over pressure, low water level, flame failure etc. to prevent the
accidents of boilers as per the provisions of the Act, Rules and Regulations framed thereunder in the whole
of the state from the operation of the provision of sub-section (5} of section 8, sub section (1) of section 10,
section 12, section 13 of the said Act, subject to cfinditions and restrictions, specified in the Schedule
below.
SCHEDULE
1. The boiler and the Boiler Component shall be inspected every Year by the owner as per the
technical provisions of the Indian Boiler Regulations, 1950 by Third Party Inspection Agency authorized
by Central Boiler Board Government of India, Department of Industrial Policy and Promotion, Ministry of
Commerce and Industry, Udyog Bhavan, New Delhi. .
The objective of this self-Certification/Third Party Inspection system is to enhance "ease of doing
business"without compromising on the safety, health, social security and welfare of the workers under
Indian Boilers Act, 1923.
(a) This Self-Certification/Third Party Inspection shall be optional and any employer/entrepreneur
can opt for this Self-Certification/Third Party Inspection by applying online to the Director of Boilers, U.P.
in the prescribed proforma given in Annexure-I along with details as per Annexure-I1 and an Undertaking
as prescribed in Annexure-H1. Any discrepancy in the application or enclosures shall be communicated to
the applicant within 30 days from the receipt of the application in the office of Director of Boilers, U.P. In
case no discrepancy is so communicated, the applicant shall deem to have been enrolied under the above
Self-Certification/Third Party Inspéection. .
(b) After being enrolled for the said Self-Certification/Third Party Inspection, the concerned
employer/entrepreneur shall file the Self-Certification Return in the profom;a given in Annexure-IV along
with the required documentsand information. The return shall be filed online within 30 days of the Boiler
inspection.
(c) Factual information given in the prescribed return shall be the same as on the date of filing the
Return. The undertaking to abide by all the laws as applicable to the employer/entrepreneur shall be valid
for a period of next one year. ’
Once opted for the Self-Certification/Third Party Inspection, the same shall be valid for five years
and the employer/entrepreneur shall file annual return as prescribed. After the successful compliance under
the Self-Certification/Third Party Inspection for five years, the empioyer/entrepreneur shall have option
either to remain covered under the Self-Certification/ Third Party Inspection or opt out of this. The option
must be exercised in writing to be made before the Director of Boilers, U.P. .
128 R.P.H. Shram-3 data-6 2017
FER 29 IRV OIS, 16 S, 2017 9
(d) In case any entrepreneur or employer withdraws prematurely from the Self-Certification/Third
Party Inspection i.e. before 5 Years or fails to follow the terms and conditions of the Self-Certification/
Third Party Inspection or fails to file return in time under this Self-Certification/Third Party lnspeétion or
fails to abide by any undertaking given by him or violation of any law is detected further necessary action
as per the law will be initiated and he will cease to continue under the Self-Certification/Third Party
Inspection. However, there will be no bar on fresh inclusion in the Self-Certification/Third . Party
Inspection if applied afresh. In case the return is not filed within 30 days of boiler inspection, by the boiler
owner then a show cause will be sent by e-mail to boiler owner on the registered e-maif address thereof to ’
furnish return within the extended of 30 days wit‘h a late payment of Rs. 5000/- to be paid by the
" Government Treasury Challan. After expiry of this extended period it will be deemed to have opted out of
Self-Certification/ Third Party Inspection.
(e) Under the above Self-Certification/Third Party Inspestion, the application for inclusion under
the Self-Certification/Third Party Inspection shall be made in triplicate as per Annexure-I addressed to the
Director of Boilers, U.P., with a copy to concerned Assistant/Dy. Director of Boiler, similarly, the retum to
be filed in Annexure-IV shall also be filed in triplicate complete in all respect of which two copies shall be
sent to the Director of Boiler along with relevant documents and a copy of the same shall also be sent to
the Assistant/Dy. Director of Boiler concemed. . -
(D The inspection of the boiler and the boiler, components shall be carried out as per the
provisions of the said Act, Rules and Regulations framed there under by the competent person as defined
under clause (cb) of section 2 of the Indian Boiler Act, 1923, recognized from time to time under
Regulation 4) of the Indian Boiler Regulation, 1950.
{g) Boiler Owner (after receipt of inspection report) and competent person shall submit inspection
report carried out by them to the Director of Boilers Uttar Pradesh within fiftecn days of the date of
inspection as per provision of the szid Act, rules and regulations framed there under and preferably on their
web-site. It is clarified that on receipt of inspection report, it will be duly pasted in Memorandum of
Inspection Book by the competent person.
(h) Not more than 20 percent of the units covered under this System shall be picked up randomly
for inspection in a year which shall be carried out only once regarding the implementation of all the laws to
which this Scheme applies. Once inspected, thé same unit is not likely to be inspected in the same year or
in the remaining period of Self-Certification/Third Party Inspection provided that no specific violation of
terms, conditions, undertaking given and laws by the employer/entrepreneur is brought to notice. However,
on specific complaint, only the Director of Boiler himselffherself shall be competent to order inSpemion at
any time. »
A random inspection list of units shall be prepared by Director of Boilers, U.P. and normally the
inspection of those units will take place in a year where specifically ordered by the Director of Boilers
himselffherself. ’
2. The Competent Person and Boiler Owner shall follow instructions and guidelines of the
Director of Boilers, U.P. and shall be liable to punishment and responsible for any act omission or.
commission committed against the provisions of the said Act, Rules and Regulations framed there under.
3. Report of daily chemical analysis for feed water and blow down water should be submitted.
online monthly to the competent person for scrutiny and to the Director of Boilers, U.P. for information.
128 R.P.H. Shram data-6
10 TR TR IR TSIE, 16 T, 2017
4. Working pressure of the boiler shall not exceed to that as specified in the last certificate issued
or allotted by Director of Boilers, U.P. as per the provisions of the said Act, Rules and Regulations framed
thereunder. :
S. The boiler shall be stopped immediately if any accident occure to the beiler or boiler
component during the use and the Director of Boilers, U.P. shall be informed immediately as per the
provisions of the said Act, Rules and kegulalions framed thercunder.
6. The Boiler Owner will comply with the provisions laid down in said Act. Rules, regulations
framed there under if any repair, addition, alteration or renewal in any Boiler or Boiler components needed.
7. The Boiler shall be attended compulsorily by qualified Boiler Operation Engincer (s) andfor
Boiler Attendant (s) in each shift as per the provisions of the said Act, Rules and Regulations framed
thereunder. )
8. This notification shall be applicable to such boilers having the safe guard system for protection
against over pressure, low water level, flame failure etc. for prevention of accidents of boilers as pcf the
provisions of the said Act, Rules and Regulations framed thereunder and the provisions of these safe
guards shall have to be certified by the owner of the boiler and the Competent person.
The State Government may, &t any time, modify or withdraw this notiticaticn.
By order,
RAJENDRA KUMAR TIWARI,
Upper Mukhya Sachiv.
128 RP.H Shram-3 data-6 2017
—
—
TR YR AR TIE, 16 S, 2017 1n
(ACCOMPANIMENT OF GOVERNMENT NOTIFICATION NO -
Dated - of Labour Department)
ANNEXURE-1*
from K
S E——
To,
The Director of Boilers
Sarvodaynagar, G.T. Road,
Knapfir, Uttar Pradesh.
Website-www.uplabour.gov.in ., ' .
Subject : ‘Application for permission to be covered under Self-Certification/Third Party
Inspection for
....Under Indian Boller Act. 1923 Boiller Registry No....
Sir,
Reference Govt. of U:P. Labour Department Notification Ne... .
regarding Self Certification/Third Party Inspection of Department of Laboux u.p.
/We have gone through the above said Self-Certification/Third Parly Inspection and have
understood the same. [/We wish to be covered under the said Self-Certification/Third Party Inspection. As
such I/We request you kindly issue me/us necessaty approval for the same. The necessary informat
ion and
other documenis as required under the Self-Certification/Third" Party Inspection are enclosed: /We
undertake o abide by all terms and conditions of the Self-cestification/Third Party Jnspecuon It is also
certified that I/We am/are competent & duly authorized to make any statement or provide any information
to any Central/State Government agency on behaif of this establisment/ enterprise,
Kindly issue the necessary approval atthe earliest.
. Yours faithfully,
(Name, Signature & Address of the Boiler Owner)
Reg.-E-Mail Address.....
Reg. Mobile Number .
Enc: (1) Annexure I1 (List of documents)
(2) Annexure 111 (Undertaking)
Acknowledgement Slip
This is to acknowlege that an application regarding Self-Certification/Third Party Inspection
under Indian Act, 1923 has been received by the undersigned from M/s ...
(Ful address in capital and the 'same has been entered in the office receipt register at
Sr. No........Dt. any further correspondence in future in this regard may be done by
stating this Sr, No. '
Authorized Signatory N
For Director of Boilers, Uttar Prades,
Kanpur.
128 RP.IL. Shram data-6
12 TR YA IR TSI, 16 57, 2017
(ACCOMPANIMENT OF GOVERNMENT NOTIFICATION NO ------mmeennnen
Dated -of Labour Department)
ANNEXURE-II
LIST OF DOCUMENTS TO BE ATTACHED WITH ANNEXURE
1 | Name & Address of Boiler Owner :- :
2 | Boiler Registration Number :-
3 | Date on which Boiler certificatc expires {Attach
copy):-
4 | Brief description of Boilers:-
Date of registration:-
Boiler Heating Surface Area (m?) :
Boiler Working Pressure (kg/cm?):
5 | Uses of Boiler/day whether Continuous (24 hrs)mon
continucus, please specify:-
6 | Whether Boiler operated by qualified Boiler
Attendants/Boiler Operation Engineers or not (Attach
Photocoy of Boiler Attendants/Boiler Operration
Engineers Certificate):-
- 7 | Details of repair/Addtion/alteration, If any:-
8 | Details of Boiler accidents whichever took place in
the past, If any:- N
9 | Whether safety vaives are blowing satisfactorily at or
below design pressure:-
A 10 | Whether high and low water level alarm is in good
condition:-
11} When Boiler was last opened for internal andfor
external cleaning (give detail):-
12 | Please specify Quality of Boiler feed water, give
recent test result:~
13 | Whether Remnant Life Assessment (RLA) Test is
required or not, if required, date on which last RLA
Test was carried out (give delails) :-
14 | Details of Inspection Fee deposited by Treasury
Challan (Attach photo copy):-
15 | Whether last certificate was carrying any remark
(Please Specify):-
16 | Desired Date for inspection, if any:-
17 | Whether 10 Days' Notice is needed, if not how many
days' notice is needed :-
NOTE : In case any of the above is not being attached/provided, Pleacse give specific reason Incomplete
application will not be considered.
@
(Name, Signature, Contact no. & E-Mail ID of Boiler Owner)
128 R P H. Shram-3 data-6 2017
—
n
T TR AR T, 16 T, 2017 . 13
(ACCOMPANIMENT OF GOVERNMENT NOTIFICATION NO
" Dated -seememeen-. —-of Labour Department)
ANNEXURE-III
Undertaking,
(To be filled by the Boiler Owner on a Nun‘-ludigisl Stamp Paper of Rs 20/-)
...and Owner of Boiler Registry No. of
...hereby states as under:
That I have applied for grant of coverage of unit by the name of... ... situated at
.under the Self: (complete address of the unit).
Certification/Third Piny Inspection of Labour Department, Government of Uttar Pradesh as notified vide
Notification No..... ......Dated...
1. That 1 have gone through the FScheme and have fully understood the contents of this Self-
Certification/Third Party Inspection and undertake to abide by name,
2. That it is declared that I/we are complying ‘and will continue to comply with all provisions if
» Indian Boiler Act, 1923, Rules & Regulations framed thereunder which are covered under
this Self-Certification/Third Party Inspection. '
. i
3. That [ agree to accept the penalty prescribed under law in case of violation detected in the
unit under any labour law covered under the Self-Certification/Third Party Inspection after
filing of the return unider the Self-Certification/Third Party Inspection.
PLACE :
DATE:
DEPONENT
VERIFICATION
1/We the above named deponent/s do hereby further solemnly affirm that the contents given above
are true and correct to my knowledge.
PLACE :
DATE :
DEPONENT
128 R.? H. Shram data-6
14 TR W IR TS, 16 I, 2017
ANNEXURE-IV
FORM FOR SELF CERTIFICATION AND CONSOLII?ATED ANNUAL RETURN TO BE
SUBMITTED BY AN EMPLOYER FOR COMPLIANCE OF INDIAN BOILER ACT, 1923
(To be submitted on the stamp paper of Rs. 20/-)
"1, Mr./Mrs/Mis: ...hereby certify that | am Boiler Owner of Boiler
Registry No...... .of the factory/establishment whose identification and general details arc as
follows. 1, hereby certify that the status of comliance of following Indian Boiler Act, 1923 and annual
informations of my enterprise during the year..... ....is as under :--
Exemption/Self Certification under The [ndian Boilers Act, 1923
A Registry number of the Boiler/Economiser :
B Name of owner :
Address where Boiler/Economiser installed :
C Information of Competent Person reporting fitness of Boiler/Economiser :
Full Name
- ' Address:
TelNo: Fax No. E-Mail ID :
Competent Person certificate No.:-
No. & date & validity of certificate of Issuing Authority :
- Details of endorsement of Uttat Pradesh Boiler Dircctorate (if any)
D Detail of modification/repair/alteration (if any)
E Certificate of Co—mpetcnl Person :
1 have inspected the above Boiler/Economiser as per provisicn of Indian Boiler Act,
1923 and Rules & Regulations framed thereunder on ... ...at the
request of Boiler owner as required under Notification No. .
dated .. ..of Govemnment of Uttar Pradesh. 1 bereby cemfy
that the Boiler/ Economiser registry no..
kg/em® approved by the Director of Boilers, U.P. for 12 months ie.
. is fit for further use at the pressure
from ...
Name & Signature of Boiler Owner Name & Signature of Competent Person
ogengodio—godio 128 WSTTF—~2017—(445)~599 vl (?fio/ao /HEAT) |
Rogogofio—godo 35 W0 s—2017—(446)-300 SRYT (0 / &0 / ) |
128 R.P.H. Shram-3 data-6 2017