Regulation 136, Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023.: Deviations
Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. - Regulation 136
Text of regulation 136
Deviations
136. Deviations. – (1) The Central Government or the State Government, as the case may be, by an order in writing,
allow deviations in respect of matters referred in these regulations except regulation 32.
(2) The Electrical Inspector or the Electrical Inspector of mines may, by an order in writing, and reasons to be
[भाग III—खण्ड 4] भारतकाराजपत्र:असाधारण 147
recorded allow deviation in respect of matters referred in regulations 14 to 19, regulation 30, sub-regulations (2),
(3) and (5) of regulation 37, sub-regulation (3) of regulation 38, clauses (i) to (iv) of regulation 39, clause (xii)
of regulation 43, regulation 45, sub-regulation (2) of regulation 46, regulations 48, regulations 54 to 56,
regulations 59 to 63, regulation 67, regulation 74, regulation 77, regulations 81 to 94, regulation 104, sub-
regulations (6), (8) and (10) of regulation 109, regulation 116 and regulations 119 to 135 on case to case basis.
Explanation. – Every order allowing the deviations by the Electrical Inspector or the Electrical Inspector of
Mines under sub-regulation (2) shall be placed before the Central or State Government which shall have the final
decision.
Schedule I
Handling of electric supply lines and apparatus
[See sub-regulation (3) of regulation (21)]
Part-I
Precautions to be observed: -
(1) Hotline maintenance trained personnel only shall be designated to do work on line.
(2) Work permit shall be taken from the terminal substations at each end of the line.
(3) Work shall be performed with proper planning and prior understanding and clarity.
(4) Favourable climatic condition for hotline operations is sunny weather. If the weather forecasts rain or
thunderstorms work will not begin.
(5) Organisation of work shall be discussed among the members and responsibility of each team member fixed.
(6) Before going to the work site, all equipment and tools shall be inspected and checked for correct operation.
(7) Auto re-closure shall be in `OFF‟ position for the line at both ends.
(8) The work procedure shall be discussed with the team member at the tower location and the responsibility of each
member shall be properly defined.
(9) The land in close vicinity to the tower/poles shall be cleared to provide a site area for the required tools.
(10) All cleaned hot sticks, strain carrier and other assemblies shall be kept on the hotline tool rack to avoid ground
contact.
(11) Helmet, safety shoes and safety belt shall compulsorily be used.
(12) All hot sticks and ladders shall be cleaned and checked for integrity by the hot sticks tester.
(13) All linemen in the hotline team shall be equipped with personal protective equipment during the work.
(14) No live-line team members on the tower and conductor shall wear any metallic chain, wristwatch or ring to
avoid any circulating current.
(15) The team of linemen shall wear conductive socks, boots, helmets and hand gloves. The `hot-end‟ lineman shall
wear complete bare hand suit.
(16) Tarpaulin sheet should be laid on the work area.
(17) A light vehicle shall be kept nearby during entire work period.
Tools normally required for hot line maintenance operation: -
The following tools conforming to the relevant standards or equivalent specifications shall be used in on-line working:
(1) Wire tongs;
(2) Wire tongs saddle;
(3) Tie sticks;
(4) Strain link sticks;
(5) Roller link sticks;
(6) Suspension link sticks;
(7) Auxiliary arms;
(8) Strain carrier;
148 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
(9) Gin poles;
(10) Cum-a-along clamp;
(11) Safety equipment like conductor guards, X-arm guards, insulator covers, hand gloves and the like; and
(12) Hot sticks.
Safe Working Distance: -
The following safe working distances shall be observed for hot line maintenance operations:
Phase to Phase Safe Clearance
kV Metre
11
33
66
110
132
220
400
0.61
0.71
0.91
1.02
1.07
1.52
2.13
Handling electric supply lines and apparatus for carrying out shutdown work or testing
[See sub-regulation (3) of regulation (21)]
Part-II
Precautions to be observed: -
(1) Before commencement of any shutdown work or testing in an electric supply line or apparatus, the Engineer or
Supervisor in-charge of the work or testing shall identify the possible hazards, such as; electrocution, flash over, fall
of person from height, fall of objects from height, failure of tools and plants, fire, and the like, that may be
encountered while carrying out the work or testing near charged area and take necessary precaution to protect the
working personnel.
(2) The Engineer or Supervisor in-charge of the work shall, before commencement of any work, brief the entire
working group or gang regarding the hazards that may be encountered and the necessary precautions to be taken by
them.
(3) The Engineer or Supervisor in-charge of the work shall obtain proper permit-to-work from the concerned
Operation In-charge(s) and ensure that the electric supply line or apparatus or section is isolated from all sources of
energy, de-energised and earthed.
(4) The Engineer or Supervisor in-charge of the work shall ensure that adequate and appropriate local earths are
fixed at the zone of working, and the earthing rods remain connected to the isolated section of the electric supply line
or apparatus or section till all men and materials have been moved away to safe zone and permit to work is returned
on completion of the work.
(5) If the local earths are required to be removed for any testing purpose, the same shall be done only when all the
working personnel are in the safe zone, on the ground or on the tower, and in the presence of the Engineer or
Supervisor. If the working personnel are required to go up or approach the conductor(s) subsequently for any work,
such as removal of test leads, tightening or adjustment, they shall be permitted to proceed only after re-fixing the local
earths, as required.
(6) The Engineer or Supervisor in-charge of the work shall positively confirm by suitable means that the electric
supply line or apparatus or section is totally dead before giving clearance for the working personnel to approach the
same.
(7) The Engineer or Supervisor in-charge of the work shall, while carrying out the shutdown work or testing,
ensure that working personnel are maintaining safe distance from the adjacent charged electric supply line or
apparatus or section, and also, no objects, such as tools and plants, ladders, cranes, man-lifts, and the like, are moved,
so as to infringe the safe distance, endangering the working personnel.
(8) Mobile cranes, derricks, man lifts and wheel mounted ladders shall be effectively earthed when being moved or
[भाग III—खण्ड 4] भारतकाराजपत्र:असाधारण 149
operated in close proximity with energised apparatus or section.
(9) Portable ladders and poles shall be carried only in the horizontal position when being moved in close proximity
with energised lines or equipment or area.
Further Precautions to be observed: -
(1) Adequate and effective supervision shall be ensured by the owner as well as the contractor for all activities
while working or testing on electric supply lines and apparatus when any shutdown work or testing is done near
charged electric supply line or apparatus or section.
(2) Lone worker shall never be allowed to work on electric supply lines, equipment and apparatus or while testing.
(3) Sufficient supervisory personnel shall be deployed for close monitoring while various type of works are under
progress at the same or different locations. Supervising work shall never be delegated to the sub-contractors'
personnel.
(4) The deployed Supervising Personnel shall not leave the working spot when shutdown work at height or testing
is in the progress, as the working personnel may not be aware of the consequences of unsafe practices. No other work,
which requires them to move out of the location, shall be undertaken by Supervising personnel, when shutdown work
or testing is in the progress.
(5) Wherever shutdown activities are required to be carried out for more than one day on any electric supply lines,
apparatus or section, earthing provided at the said work site shall be inspected by the Engineer or Supervisor everyday
morning for their healthiness, fitness and proper tightening, before giving clearance for the working personnel to
climb the tower or structure to resume the work.
Handling high voltage direct current apparatus for carrying out shutdown work or testing
[See sub-regulation (3) of regulation (21)]
Part-III
Precautions to be observed: -
(1) The Engineer or Supervisor in-charge of the work shall obtain proper Permit-To-Work (PTW) from the
concerned Operation In-charge(s) and ensure that the electric supply line or apparatus or section is isolated from all
sources of energy, de-energised and earthed.
(2) Before commencement of any shutdown work or testing of high voltage direct current apparatus, the Engineer
or Supervisor in-charge of the work or testing shall identify the possible hazards, such as; electrocution, flash over,
fall of person from height, fall of objects from height, failure of tools and plants, fire, and the like, that may be
encountered while carrying out the work or testing near charged area and take necessary precaution to protect the
working personnel.
(3) The Engineer or Supervisor in-charge of the work shall, before commencement of any work, brief the entire
working group or gang of the hazards that may be encountered and the necessary precautions to be taken by them.
(4) Attach warning labels to all neighboring installation parts (to be removed after the works have been carried
out).
(5) The Engineer or Supervisor in-charge of the work shall allow access to the valve hall, DC Filter Area, AC
Filter Area and DC hall (if any) only when the apparatus therein are completely de-energised and effectively earthed.
(6) The work on AC/DC filter bank shall only begin after earthing the entire capacitor bank.
(7) There shall be at least ten minute time gap between earthing the entire capacitor bank and starting the work on
bank. There after unit must be short circuited.
(8) The de-energised bushing shall be checked for stored charge by touching all the surfaces of both indoor and
outdoor side composite insulators and all other parts of the bushing using a proper test instrument.
(9) The gas pressure inside high voltage direct current through wall bushing shall be reduced to a level prescribed
by the manufacturer before starting any work or handling of the bushing.
Handling Gas Insulated Switchgear (GIS) apparatus for carrying out shutdown work or testing
[See sub-regulation (3) of regulation (21)]
Part-IV
Precautions to be observed: -
150 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
(1) The Engineer or Supervisor in-charge of the work shall obtain proper Permit-To-Work from the concerned
Operation In-charge(s) and ensure that the electric supply line or apparatus or section is isolated from all sources of
energy, de-energised and earthed.
(2) Operation, maintenance and repair must be carried out by trained and certified personnel only.
(3) Before commencement of any shutdown work or testing of gas insulated switchgear apparatus, the Engineer or
Supervisor in-charge of the work or testing shall identify the possible hazards, such as; electrocution, flash over, fall
of person from height, fall of objects from height, failure of Tools and Plants, fire, and the like, that may be
encountered while carrying out the work or testing near charged area and take necessary precaution to protect the
working personnel.
(4) The Engineer or Supervisor in-charge of the work shall, before commencement of any work, brief the entire
working group or gang of the hazards that may be encountered and the necessary precautions to be taken by them.
(5) Wear hearing protection during operation.
(6) Take care while touching the enclosure at any time as enclosures may heat up to the temperature of 70°C.
(7) Observe the procedures for storage, transportation, and the use of filling equipment.
(8) Wear the personal protective equipment: respirator mask (self-contained breathing equipment if necessary),
protective overall, protective gloves, safety shoes, safety glasses.
(9) Attach warning labels to all neighboring installation parts (to be removed after the works have been carried
out).
(10) Provide proper electrical clearance as required by interlocking rules. Mark e.g. main circuits and control
circuits with appropriate tags.
(11) Block off neighboring live parts with screens, insulating mats or spacer grids in order to prevent unintended
contacts.
(12) While working on any compartment in gas insulated switchgear, the immediate adjacent compartment(s) must
be also depressurised for safety of the working person.
(13) SF6 gas becomes contaminated and contains poisonous substances after events such as arc faults. Hence,
handling of SF6 in such cases must be done using proper PPEs and by a trained personnel, preferably from the original
equipment manufacturer.
(14) The switchgear installation shall not be operated if the density of SF6 gas indicated at the density monitors is
not in the operating range.
(15) Do not remove any protective covers if an assembly is energized.
(16) The Engineer or Supervisor in-charge of the work shall ensure that adequate and appropriate local earths are
fixed at the zone of working, and the earthing rods remain connected to the isolated section of the electric supply line
or apparatus or section till all men and materials have been moved away to safe zone and Permit-To-Work is returned
on completion of the work.
Schedule II
Forms of Inspection Report
[See regulation (32) and (45)]
Previous and next
Questions people ask
Is regulation 136 of Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. still in force?
No repeal of Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. is recorded.