Regulation 65, Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023.: Erection or alteration of buildings, structures, flood banks and elevation of roads
Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. - Regulation 65
Text of regulation 65
Erection or alteration of buildings, structures, flood banks and elevation of roads
65. Erection or alteration of buildings, structures, flood banks and elevation of roads. – (1) If at any time
subsequent to the erection of an overhead line, whether covered with insulating material or not or underground
cable, any person proposes to erect a new building or structure or flood bank or to raise any road level or to
carry out any other type of work whether permanent or temporary or to make in or upon any building, or
structure or flood bank or road, any permanent or temporary addition or alteration, such person and the
contractor whom he employs to carry out the erection, addition or alteration, shall give intimation in writing of
his intention to do so, to the supplier or owner and to the Electrical Inspector and shall furnish therewith a scale
drawing showing the proposed building, structure, flood bank, road or any addition or alteration and scaffolding
thereof required during the construction.
(2) On receipt of such intimation, the supplier or owner shall examine,-
(a) whether the overhead line or underground cable under reference was laid in accordance with the
provisions of these regulations and any other law for the time being in force;
(b) whether it is technically feasible;
(c) whether it meets the requirement of right of way; and
(d) whether such person was liable to pay the cost of alteration of the overhead line or underground
cable and if so, issue a notice within a period of thirty days to such person together with an estimate of
the cost of the expenditure likely to be incurred to alter the overhead line or underground cable and
require him to deposit, within thirty days of the receipt of the notice, with the supplier or owner, the
amount of the estimated cost.
(3) If such person disputes the cost of alteration of the overhead line or underground cable estimated by the
supplier or owner or even the responsibility to pay such cost, the dispute may be referred to the Electrical
Inspector who shall after hearing both parties decide upon the issue in accordance with sub-regulation (4).
(4) The Electrical Inspector shall estimate the cost of alteration of overhead line or underground cable on the
following basis, namely: –
(a) the cost of material used for the alteration after accounting for the depreciated cost of the material of the
[भाग III—खण्ड 4] भारतकाराजपत्र:असाधारण 127
existing line or underground cable;
(b) the wages of labour employed in the alteration; and
(c) the supervision charge to the extent of fifteen per cent of the wages mentioned in clause (b) and charges
incurred by the owner or supplier or consumer in complying with the provisions of section 67 of the Act, in
respect of alterations.
(5) Any addition or alteration to the building or structure shall be allowed only after the deposit of such
estimated cost to the supplier or owner.
(6) No work upon such building, structure, flood bank, road and addition or alteration thereto shall commence or
continue until the Electrical Inspector certifies that regulations 60, 62 , 63, 66 and regulation 79 have not been
contravened either during or after the construction:
Provided that the Electrical Inspector may, if he is satisfied that the overhead line or underground cable
has been so guarded as to secure the protection of persons or property from injury, certify within fifteen days that
the work may be executed prior to the alteration of the overhead line or underground cable or in the case of
temporary addition or alteration, without alteration of the overhead line or underground cable.
(7) The supplier or owner shall, on receipt of such deposit, alter the overhead line or underground cable in such a
way that it does not contravene the regulations 60, 62, 63 and 79 either during or after such construction within
two months from the date of such deposit or within such longer period as the Electrical Inspector may permit for
reasons to be recorded in writing.
Previous and next
Questions people ask
Is regulation 65 of Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. still in force?
No repeal of Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. is recorded.