LawGrids logoLAWGRIDS.ORG

Form 1B, The West Bengal Ground Water Resources (Management, Control and Regulation) (Amendment) Rules, 2022: Form 1B

The West Bengal Ground Water Resources (Management, Control and Regulation) (Amendment) Rules, 2022 - Form 1B

Text of form 1B

Form 1B

Form 1B (See rule 8) (U/S 7(2) of the West Bengal Ground Water Resources (Management Control and Regulation) Act, 2005 Issued to : : - Book No.: ey Application Form SI. No. [Constituted under section 7 of the West Bengal Ground Water Resources (Management, Control & Regulation) Act, 2005] APPLICATION FOR GROUND WATER ABSTRACTION (MINING PROJECTS) AND OTHER USES 1 General Information 2 Name of the Mine/Mining project : 3 Location details : (attach site plan, approved mining plan, topo sketch of the surroundings 10 km radius outside) Village/Town Block: Mouza: JLNo.: District : State :. 4 Communication address : i. Complete Postal Address i. Phone/Mobile No. ii. E-mail address ; iv. Fax No. 5 Salient features of the activity: (Open cast/ underground) 6 |) Land use details of the surroundings (10 km radius —outside) 7 Land use details of the project area Total land area : (sq m) Rooftop area of buildings/sheds : (sqm) Road/paved area : (sqm) Greenbelt area : (sq m) Open land : (sq m) Ownership of the land : (Enclose documents of ownership/lease) 8 Topography of the area : (a) Regional (b) Project area 9 Drainage in the'area (River/Naiaz, etc.) : (a) Regional ~ (b) . Project area 14 THE KOLKATA GAZETTE, EXTRAORDINARY, OCTOBER 14, 2022 {10 | Source of availability of surface water—furnish details tou Average Annual rainfall in the area : . mm 12 Townships/villages within 10 km radius of the project : -1 13 | Whether the ground water table will be intersected by the activity-if so . (a) At what depth (m bgl) Pre-monsoon ~ Post-monsoon Minimum Maximum a_(b) Maximum depth proposed to dewater (m bgl) (c) Ground water flow direction (attach map) (d) Any Other information 14 | Total Water Requirement for various purpose to be mentioned — use -wise 1S | Quantum of ground water proposed to be pumped out from mine m?/day © m/year .ee ee (TW/BW/DW/DCBiete.) b. Dimension of Structure c. Number of pumps proposed to installed d. HP of the pumps €. __Operational hours/day hours/dayf. Operational days/year days/year6 | Popes uliztonofpunped wir taseatachdeait) c. Greenbelt development es) pedd.- Suppression of dust ree rod ieee saaa See3 re a)17 | Monitoring of ground water regime (attach map and details) Saisa. Location details of the wells/Piezometers (Latitude, Longitude, Reduced Level ) |_b. Number of wells/ Piezometers monitored at present c. Attach details of GW level of Observation wells/ Piezometers (at least for One Year) d. | Number of wells/ Piezometers proposed to monitor €. Number of Monitoring well/ Piezometers proposed to construct in the surroundings f. General Quality of GW in the area & surroundings (attach reports) g. Any other item THE KOLKATA GAZETTE, EXTRAORDIN«RY, OCTOBER 14, 2022 15 18. Whether it is proposed to pump/ pumping ground water outside the mine pit for domestic or other uses (if so; give details) 3 Details of existing and/or proposed ground water abstraction structures : 3 Particulars Existing structure Proposed structure Type of structure (dug well, tube well, bore well, dug cum bore well, others) Year of construction Depth (meter) Diameter (in mm) Depth to water level (meters below ground level) Discharge (m?/hour) Operational hours/day Operational days/year Mode of lift and Horse Power of pump Whether fitted with water meter or not 19. Ground water availability report (please enclose a comprehensive report/note on ground water condition and groundwater quality in and around 5 km of the area) 20. Details of rain water harvesting and artificial recharge measures for ground water recharge in the area. If the firm has proposed to take up rain water harvesting and recharge outside the premises, then provide NOC from the concern authority/agency where the harvesting measures are proposed, if already implemented, details may be furnished. (Attach report on comprehensive & feasible Rain water harvesting/recharge proposal). 21. Copy ofrefer all letter seeking NOC from State Water Investigation Directorate (SWID), from Central Pollution Control Board/State Pollution Control Board/Bureau of Indian Standards/Ministry of Environment and Forests/ other Central/State Agencies shall be annexed. 22. Have you applied earlier for ground water clearance from State Water Investigation Directorate /(DLA or CLA), if SO, give details thereof with status : 23. Details of payment of Application fee : a. Amount of Application Fee (if applicable) paid in Rs. b. Voucher No. and date c. Name of Treasury /Sub-Treasury / P.S.U. Bank where Application Fee has been paid P. Name of Bank Branch (if payment has been made in a Bank) e. Details of Online payment (if payment has been made through online mode) : Undertaking It is to certify that the details and information furnished above are true to the best of my knowledge and belief and I am aware that if any part of the data/information submitted is found to be false or misleading at any stage the application will be rejected out rightly. Date : Place: woe fag tat i gee Name & Signature of the Applicant* - Te - (With of cial sexi) oh 16 E THE KOLKATA GAZETTE, EXTRAORDINARY, OCTOBER 14, 2022. - * In case signed by any authorized signatory, the details of the signatory with the authorization shall be enclosed. ‘ @ Incomplete/ partially filled applications and failure to annex all necessary documents pees ed i in as ate: case may be, shall make the application liable to be rejected. ® Project il has to submit the application in wsuch manner as determined by the State ci NOTE: 1.- Separate application form should be submitted for each individual dewatering structure. 2. The application form should be completed in all respect before submission. Incomplete application is liable for rejection. Any correction / alteration in the entry shall be duly authenticated. 3. In case any of the particulars / information is found to be incorrect at any stage of verification / scrutiny, the application is liable for rejection. - 4. In case any of the particulars / information is found to be incorrect at any stage even after issue of the permit, the permit is liable for cancellation. Please write N.A. against those items which are not applicable. Please attach the following documents along with the application : a. Mining plan approved by the concerned Govt. Agency / Department b. Environmental Clearance (EC) from MOEF c. Any Land Records — d. Site Map/ Plan for the dewatering wells e Report of the Ground water Quality of that location from SWID/ any Govt. Laboratory /NABL accredited laboratories for basic parameters (cations and anions), heavy metals, pesticides/ organic compounds for all projects. f. Identity proof of applicant (Aadhaar/ Voter ID/ Pan Card) g. A comprehensive report containing the following points : i. Format of the Report on ground water conditions (for mining projects) ii Introduction iti. Project description iv. Background v. Objectives and scope | ‘vi. Regional setting vil. Location vit. Land use ix. Climate x. Topography and drainage xi. Geology—Regional and Local xii. General Hydrogeology (aquifer types, aquifer depth, zone tapped etc.) xiii. Ground water condition (In core and buffer zones) xiv. Spatial and temporal variations in water levels Ground water quality (Shallow and deep aquifer) ‘" xv. Impact of ground water extraction on local ground water 3 xvi. Hydrograph of water level/piezometer in monitoring wells xvil. Trend analysis of historical water levels Flow net analysis (ground water flow direction) xviii. Year-wise/ bench-wise mine dewatering coniputation as per approved mine plan XIX, Conclusions : h. Any other documents, as the Authority may find relevant. fy Par] | THE KOLKATA GAZETTE, EXTRAORDINARY, OCTOBER 14, 2022 es Form 1C : [See Rule 8] APPLICATION FOR OBTAIN ING PERMIT FOR SINKIN GOFNEW TUBE WELL UNDER“KMC AREA [OTHER THAN INDUSTRY]. | [U/S 7(2)of the West Bengal Ground Water Resources (Management Control and Regulation) Act,2005] KMC Building Plan Case No.-----------~----- ---(CAF1) BOOK NO.: 0.000000... APPLICATION FORM SL.NO.1. Particulars about the applicant : (a) Name of the applicant : (b) Name of the Company/Developer : (c) Communication address of the applicant : (d) Aadhaar of the applicant : (e) Contact No. : (f) E-mailID: 2. Particulars of the proposed Tube well : (a) Assessee No. *[Attach up to date property tax receipt] : (b) Name of owner : (c) Address of the proposed Tube well : (d) WardNo.: (e) Borough No.: (f) Lat/Long details i (g) Total Requirement of water inKLD: Note : DPR to be attached if total requirement is more than 100 KLD for any project :(h) Total No. of Tube wells applying for : 3. Technical specifications of the proposed Tube well : (a) Approx. depth of the Tube well in metre : (b) Purpose of the Tube well (Domestic/Commercial/Infrastructure) : (c) Assembly size of the Tube well : (d) Approx strainer length of the Tube well in metre : (e) Operational device : | (f) H.-P. of the Pump : (g) Rate of withdrawal in m/hour : (h) Running hour of the cperatianag device per day : (i) Distance of the proposed tube well from nearby tube well (in meters) : [If existing any]i. From the nearest shallow tube well fitted with submersible pump : i. Front the nearest deep tube well - ii, From the nearest drinking water tube well : wee 4.° Propoved number of heads/users of the tube well ‘xe driehkite & domestic purpose : 5... Whether KMC water supply existing/applied for supply within the project, if yes, provide details : 18 — . THE KOLKATA GAZETTE, EXTRAORDINARY, pie g: 14,2022 . tiege > ny a. If water supply committed, please specify the amount : b. Water supply denied, give reasons : 6. General Information in Case of Tiiedsunmotite / Commercial Sector only: - (i) - Salient features : . a Residential Housing / Township : b. Commercial activity (Malls, Cinema, Theaters, Multiplexes etc.) : c. Other Infrastructure use : d. Purpose of ground water use : e.. No. Dwelling Units: _ f. No. Commercial units : (ii) Land use details of the existing /proposed unit premises : a Ownership of the land.: Enclose documents of ownership/ lease b. Total land area/ Area of the project : sqm c. Roof top area of buildings/ sheds : sqm d. Road/ paved area: _ sqm e. Open area: sq m *Note : Copy of EC/PCB clearance should be attached if total Project area is more than 20,000 Sq mt. and above. (iii) Details of water requirement/ recycled water usage : (Please enclose flowchart of activities and requirement of water at each stage in DPR) a. Total Ground Water requirement : . m?/day b. Total Surface Water requirement : m?/day c. Proposed/existing water supply from KMC : m?/day d. Total Recycled/Treated water generation/ usage : m?/day (iv) Details of rain water harvesting and artificial recharge measures for ground water recharge within project area. (Attach report on comprehensive & feasible rain water harvesting / recharge Proposal) 7. Copy of all references seeking permission from State Water Investigation Directorate (SWID), from Central Pollution Control Board/State Pollution Control Board/Bureau of Indian Standards/Ministry of Environment and Forests/other Central/State Agencies shall be annexed. 8. Details of payment of Application Fee : (For Offline mode of Applications) a. Amount of Application Fee paid : b. Voucher No. and date : c. Name of Treasury/ Sub-Treasury/ P.S.U bank/ Any other mode, where Application Fee has been paid : d. Name of Bank Branch (If payment has been made in a Bank)— Undertaking It is to-certify that the details and information furnished above are true to the best of my knowledge and belief and I am aware that if any part of the data/information submitted is found to be false or misleading at any stage the application will be rejected out rightly.. ‘Signature of the Applicant / User with officia] Seal Plaes : 4. Incase any of the particulars / information is found to be incorrect at any stage even after issue -of the permit, the permit is liable for cancellation. Please write N.A. against those items which are not applicable.6. Please attach the Following documents as asked by CLA along with applications :i. KMC Property Tax receipt in the name of the applicant.i In case of Multiple Ownership premises KMC Property Tax of the applicant to be submitted along with notarized No objection from other owners. it. In case of registered association Property Tax in the name of Secretary/ President or Equivalent, who is also iv. KMC approved valid building Sanction Plan in case of new construction. Proposed well. ‘Vi. Copy of Environmental Clearance for project area above 20,000 sq.m with proposal for rain water harvesting within the premises as per Model Building by laws.Vii. Detailed Project Report along with requirement of water as per latest National Building Code in practice takingvill. Copy of Identity Proof of Owner/ Signing authority,ix. Any other documents as asked by CLA along with the application.

Previous and next

All provisions of The West Bengal Ground Water Resources (Management, Control and Regulation) (Amendment) Rules, 2022

Questions people ask

Is form 1B of the West Bengal Ground Water Resources (Management, Control and Regulation) (Amendment) Rules, 2022 still in force?

No repeal of the West Bengal Ground Water Resources (Management, Control and Regulation) (Amendment) Rules, 2022 is recorded.