Form AT, Uttar Pradesh Electricity Regulatory Commission (Verification of Generating Plants and Captive Consumers) Regulation, 2022: FORMAT
Uttar Pradesh Electricity Regulatory Commission (Verification of Generating Plants and Captive Consumers) Regulation, 2022 - Form AT
Text of form AT
FORMAT
FORMAT
[To be submitted by the Captive Generating Plant]
“CERTIFICATE ON “OWNERSHIP” AS PER RULE 3 OF ELECTRICITY RULES, 2005”
We hereby certify that the Equity Share Capital with voting rights of _______________ (Name of company)
having constitution as Single captive user/ Partnership firm/LLP/AoP/SPV having its registered Office
at ___________ satisfy the requirements under Rule 3 of the Electricity Rules 2005 for qualifying as a
Captive Generation Plant with reference to “Ownership” criteria. The detailed breakup of the issued,
subscribed and paid-up equity share capital, including percentage of holding in Equity Share Capital with
voting rights of the Company held by captive user vis-a-vis other users have been tabulated below.
Equity Share Capital Captive user(s)/others with Voting rights as on ……………………….
Sl.
No.
Class of
Share
holder
Captive
user(s)/
others
Class of
Equity
shares
No. of
Equity
Shares
Value per
Equity
Share
Amount of
Equity
Share
Capital
Percentage
holding in
Equity
Share
capital
No. of
Voting
Rights
Percentage
holding in
Voting
Rights
Percentage
holding in
Equity Share
Capital with
Voting Rights
Total
Please find attached the following:
Annexure
1. Copy of the latest audited balance sheet of the Captive User.
(a) Copy of the Share Certificate for the above.
(b) Copy of the SH-4 Certificate.
Place:
Date:
Signature of Chartered Accountant/Company Secretary:
Name in Block letters:
Membership No.:
Name of firm:
Firm Registration number:
mÙkj izns'k vlk/kkj.k xtV] 26 fnlEcj] 2022 bZ0 19
[To be submitted by THE GENERATOR WHICH IS A LIMITED LIABILITY
PARTNERSHIP FIRM]
CERTIFICATE ON ‘OWNERSHIP’ AS PER RULE 3 OF ELECTRICITY RULES, 2005
FOR WHEELING UNDER CAPTIVE CATEGORY
We hereby certify that M/s. ________________, a Partnership Firm having its Registered Office at
___________ satisfy the requirements under Rule 3 of Electricity Rules, 2005 for qualifying as a Captive
Generation Plant with reference to “Ownership” criteria as per the Partnership Deed dated ______________
with reference to HT.SC No._________________ of ______________ E.D.C. We confirm that the captive
consumers are holding proprietary interests and control over the Captive Generation Plant.
The detailed breakup of the ownership of each partner in the Partnership Firm has been tabulated
below in Table A. Further, specific breakup of the proprietary interest and control in relation to Captive
Generation Plant held by captive user vis-à-vis other users has been tabulated below in Table B.
TABLE A:
Ownership of the Captive Generation Plant of the Partnership Firm as on ……….
Sl.
No.
Name of the
partner
Capital
contribution
% of capital
contribution
Profit
sharing
Ratio
Whether Control
Proportionate to Capital
Contribution?
Remarks on
control
pattern*
TOTAL
* Please provide remarks in the relevant column whether control is proportionate to the capital
contribution. Further annex the Partnership Deed of the verification of above details.
TABLE B:
Ownership of the Captive Generation Plant of the Partnership Firm as on ……….
Type of Owner % of proprietary
interest in the
Captive
Generating Plant
Whether Control
Proportionate to
Proprietary
interest?
Remarks on control
pattern*
Captive User HT. SC. NO. EDC
Others
TOTAL
20 mÙkj izns'k vlk/kkj.k xtV] 26 fnlEcj] 2022 bZ0
[To be submitted by the Captive users (also owners) of the Limited Liability
Partnership Firm]
Auditor’s Certificate
I hereby certify that Captive User Name, a company incorporated under Companies Act, 2013 (or
earlier Act) and having its registered office at _________________ with HT. SC.No.______ at
______________ EDC is a partner with capital contribution of Rs.______ with controlling interest of
___________percentage in Captive Power Generator Firm Name which owns a Generating Plant with
Capacity __________ under HT.SC. No.______________at ______________EDC as on date.
Please find attached the following:
Annexure
1. Copy of the latest audited balance sheet of the Captive User.
2. Copy of the latest partnership deed.
Signature : ....................................................
Name in Block letters : ................................
Membership No. : ........................................
Name of the Firm : ......................................
Firm Registration No. : ...............................
Name of the Partner : _________________
Membership No. : ____________________
By the Order of the Commission,
SANJAY KUMAR SINGH,
Secretary,
U. P. Electricity Regulatory Commission.
ih0,l0;w0ih0&26 vlk/kkj.k xtV&06-02-2023&152 izfr;ka ¼Mh0Vh0ih0@vkQlsV½A
Previous and next
Questions people ask
Is form AT of Uttar Pradesh Electricity Regulatory Commission (Verification of Generating Plants and Captive Consumers) Regulation, 2022 still in force?
No repeal of Uttar Pradesh Electricity Regulatory Commission (Verification of Generating Plants and Captive Consumers) Regulation, 2022 is recorded.