LawGrids logoLAWGRIDS.ORG

Form AT, Uttar Pradesh Electricity Regulatory Commission (Verification of Generating Plants and Captive Consumers) Regulation, 2022: FORMAT

Uttar Pradesh Electricity Regulatory Commission (Verification of Generating Plants and Captive Consumers) Regulation, 2022 - Form AT

Text of form AT

FORMAT

FORMAT [To be submitted by the Captive Generating Plant] “CERTIFICATE ON “OWNERSHIP” AS PER RULE 3 OF ELECTRICITY RULES, 2005” We hereby certify that the Equity Share Capital with voting rights of _______________ (Name of company) having constitution as Single captive user/ Partnership firm/LLP/AoP/SPV having its registered Office at ___________ satisfy the requirements under Rule 3 of the Electricity Rules 2005 for qualifying as a Captive Generation Plant with reference to “Ownership” criteria. The detailed breakup of the issued, subscribed and paid-up equity share capital, including percentage of holding in Equity Share Capital with voting rights of the Company held by captive user vis-a-vis other users have been tabulated below. Equity Share Capital Captive user(s)/others with Voting rights as on ………………………. Sl. No. Class of Share holder Captive user(s)/ others Class of Equity shares No. of Equity Shares Value per Equity Share Amount of Equity Share Capital Percentage holding in Equity Share capital No. of Voting Rights Percentage holding in Voting Rights Percentage holding in Equity Share Capital with Voting Rights Total Please find attached the following: Annexure 1. Copy of the latest audited balance sheet of the Captive User. (a) Copy of the Share Certificate for the above. (b) Copy of the SH-4 Certificate. Place: Date: Signature of Chartered Accountant/Company Secretary: Name in Block letters: Membership No.: Name of firm: Firm Registration number: mÙkj izns'k vlk/kkj.k xtV] 26 fnlEcj] 2022 bZ0 19 [To be submitted by THE GENERATOR WHICH IS A LIMITED LIABILITY PARTNERSHIP FIRM] CERTIFICATE ON ‘OWNERSHIP’ AS PER RULE 3 OF ELECTRICITY RULES, 2005 FOR WHEELING UNDER CAPTIVE CATEGORY We hereby certify that M/s. ________________, a Partnership Firm having its Registered Office at ___________ satisfy the requirements under Rule 3 of Electricity Rules, 2005 for qualifying as a Captive Generation Plant with reference to “Ownership” criteria as per the Partnership Deed dated ______________ with reference to HT.SC No._________________ of ______________ E.D.C. We confirm that the captive consumers are holding proprietary interests and control over the Captive Generation Plant. The detailed breakup of the ownership of each partner in the Partnership Firm has been tabulated below in Table A. Further, specific breakup of the proprietary interest and control in relation to Captive Generation Plant held by captive user vis-à-vis other users has been tabulated below in Table B. TABLE A: Ownership of the Captive Generation Plant of the Partnership Firm as on ………. Sl. No. Name of the partner Capital contribution % of capital contribution Profit sharing Ratio Whether Control Proportionate to Capital Contribution? Remarks on control pattern* TOTAL * Please provide remarks in the relevant column whether control is proportionate to the capital contribution. Further annex the Partnership Deed of the verification of above details. TABLE B: Ownership of the Captive Generation Plant of the Partnership Firm as on ………. Type of Owner % of proprietary interest in the Captive Generating Plant Whether Control Proportionate to Proprietary interest? Remarks on control pattern* Captive User HT. SC. NO. EDC Others TOTAL 20 mÙkj izns'k vlk/kkj.k xtV] 26 fnlEcj] 2022 bZ0 [To be submitted by the Captive users (also owners) of the Limited Liability Partnership Firm] Auditor’s Certificate I hereby certify that Captive User Name, a company incorporated under Companies Act, 2013 (or earlier Act) and having its registered office at _________________ with HT. SC.No.______ at ______________ EDC is a partner with capital contribution of Rs.______ with controlling interest of ___________percentage in Captive Power Generator Firm Name which owns a Generating Plant with Capacity __________ under HT.SC. No.______________at ______________EDC as on date. Please find attached the following: Annexure 1. Copy of the latest audited balance sheet of the Captive User. 2. Copy of the latest partnership deed. Signature : .................................................... Name in Block letters : ................................ Membership No. : ........................................ Name of the Firm : ...................................... Firm Registration No. : ............................... Name of the Partner : _________________ Membership No. : ____________________ By the Order of the Commission, SANJAY KUMAR SINGH, Secretary, U. P. Electricity Regulatory Commission. ih0,l0;w0ih0&26 vlk/kkj.k xtV&06-02-2023&152 izfr;ka ¼Mh0Vh0ih0@vkQlsV½A

Previous and next

All provisions of Uttar Pradesh Electricity Regulatory Commission (Verification of Generating Plants and Captive Consumers) Regulation, 2022

Questions people ask

Is form AT of Uttar Pradesh Electricity Regulatory Commission (Verification of Generating Plants and Captive Consumers) Regulation, 2022 still in force?

No repeal of Uttar Pradesh Electricity Regulatory Commission (Verification of Generating Plants and Captive Consumers) Regulation, 2022 is recorded.