LawGrids logoLAWGRIDS.ORG

Form FOR NOTICE OF COMMENCEMENT OF WORK, The Punjab Urban Planning and Development Building Rules, 2021: FORM FOR NOTICE OF COMMENCEMENT OF WORK

The Punjab Urban Planning and Development Building Rules, 2021 - Form FOR NOTICE OF COMMENCEMENT OF WORK

Text of form FOR NOTICE OF COMMENCEMENT OF WORK

FORM FOR NOTICE OF COMMENCEMENT OF WORK

FORM FOR NOTICE OF COMMENCEMENT OF WORK To, ____________________, ____________________, Sir, I/ we hereby give notice that the erection/ re-erection/ addition/ alteration of the building on plot no.______, block no.______, street/ road and in colony/ Sector no.______, shall be commenced on ____________ (date) as per your permission granted vide memo no._____________ dated ____________ under the supervision of _____________________ Architect (Registration No._______________)/ Engineer, and in accordance with the plans sanctioned. Date: ______________ Place: ______________ Signature of Applicant/Owner Name of the Applicant_____________ Permanent Address_______________ Temporary Address _______________ Telephone No. ___________________ Mobile No. ______________________ E-mail address ___________________ PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2456 Annexure 6 FORM-‘F’ [see rule 14] NOTICE OF COMPLETION AND PART COMPLETION From _______________ To The Competent Authority Sir, 1/we hereby given you notice that the building apart of the building described below and sanctioned with your order no____________dated ________ has been completed on ______________________________________________________ in all respect according to the provision of the The Punjab Regional and Town Planning and Development Act 1995 and rules made thereunder and sanctioned plans and suggested modification has carried out. Completion Certificate from the Architect or Civil Engineer who supervised the construction of the building and a completion certificate from the registered plumber are submitted herewith. Kindly permit me/us to convey the building as required by rule 14 of the Punjab Urban Planning and Development Building Rules, 2021. DESCRIPTION OF BUILDING Area ________________________________ Site no________House no._______________ Khasra no.___________,Village___________ Signature of the Applicant PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2457 Annexure 7 FORM-‘G’ [see rule 14] COMPLETION CERTIFICATE BY ARCHITECT AND ENGINEER I do here by certify that the following work ____________________________ (insert full particulars of work) has been supervised by me and has been completed to my satisfaction in accordance with the provisions of the Punjab Regional and Town Planning and Development Act, 1995 (P.A. No.11 of 1995) and the rules made thereunder and sanctioned plans. The workmanship and all the material used for construction meet the specifications laid down in the National Building Code of India, 2016 as amended from time to time. That no provision of the Punjab Regional and Town Planning and Development Act, 1995 (P.A. No. 11 of 1995) and the rules made thereunder and no requisition made, condition prescribed or under issued thereunder has been transgressed in the course of the work. Area ________________________________ Site no________House no.______________ Khasra no.___________,Village___________ Particulars of the work___________________ Signature of Architect: Complete Address___________________ E-mail:____________________________ Mobile no._________________________ Signature of Engineer Complete Address___________________ E-mail:____________________________ Mobile no._________________________ Note: In case of buildings more than 15 metres height (including stilt), the supervision of building shall be undertaken by both i.e. the Architect and the Engineer. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2458 Annexure 8 FORM-‘H’ [see rules 14((2)) and (3)and 44(5)] COMPLETION CERTIFICATE FROM COMPETENT AUTHORITY From The Competent Authority, To____________________________ Memorandum No. __________________________ Dated: Whereas____________has given Notice of completion of the building described below; I hereby:- (1) Grant permission for the completion and/or use of the said building; Or (2) Refuse permission for the completion and/or use of the said building for reasons given below:- Description of building Area _______________________________ Site no________House no.______________ Khasrano.___________,Village__________ Competent Authority PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2459 Annexure 9 FORM-‘I’ [see rule 23 (1)] NOTICE OF PERMISSION TO OCCUPY From _______________ To Competent Authority Sir, 1/we hereby given you notice that the building apart of the building described below and sanctioned with your order no____________Dated ________ has been completed on ______________________________________________________ in all respect according to the provision of the The Punjab Regional and Town Planning and Development Act 1995 and rules made thereunder and sanctioned plans and suggested modification has carried out. Completion Certificate issued with your order no_____Dated____ are attached herewith. Kindly permit me/us to occupy the building as required by The Punjab Urban Planning and Development Building Rules, 2021. DESCRIPTION OF BUILDING Area ________________________________ Site no________House no.______________ Khasrano.___________,Village___________ Signature of the Applicant PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2460 Annexure 10 FORM-‘J’ [see rules 23(2)] PERMISSION FOR OCCUPANCY OR USE OF THE BUILDING From The Competent Authority, To____________________________ Memorandum No. __________________________ Dated: Whereas has given Notice of completion of the building described below; I hereby:- (1) Grant permission for the occupation and/or use of the said building; Or (2) Refuse permission for the occupation and/or use of the said building for reasons given below:- Description of building Area ________________________________ Site no________House no.______________ Khasra no.___________,Village___________ Competent Authority PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2461 Annexure 11 FORM-‘K’ [see rule 44(1)] Application For Water Connection To The Competent Authority Sir, I/We want to have a water connection in my/our …….......... I/We have read the Punjab Urban Planning and Development Building Rules, 2021 and do undertake to abide by them. The particulars are given below:- 1. Name of Area ……….. Road……… Building/Plot/ House No. ……………. 2. Name of owner ………………. Son of …………………………… 3. Name of applicant ……………………. Son of ……………………. 4. Size of ferrule ……………… Number of taps required………………… 5. Name of registered Plumber through whom the work executed ………………. Instructions :- The application should be entertained either from the owner or such person who has been authorized to do so by the owner who would be held responsible for the payment of water charges etc. Date……………. Signature of applicant …….............…… Father's name …………………….......... Address ………………….…………........ PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2462 Annexure 12 FORM-‘L’ [see rule 45] Application For Sewerage Connection To The Competent Authority Sir, I/We want to have a sewerage connection in my/our …….. I/We have read the Punjab Urban Planning and Development Authority (Building) Rules, 2021 and do undertake to abide by them. The particulars are given below:- 1. Name of Area ……….. Road……… Building/ House No. ……………. 2. Name of owner ………………. Son of …………………………… 3. Name of applicant ……………………. Son of ……………………. 4. Number of seat………………… Size of line …………………....... 5. Name of registered Plumber through whom the work executed ………………. Instructions:- The application should be entertained either from the owner or such person who has been authorized to do so by the owner who would be held responsible for the payment of water charges etc. Date……………. Signature of applicant ……..............….. Father's name …………………….......... Address ……………………………........ PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2463 Annexure 13 [see rule 14(1)] Qualification and Competence of Technical Personnel for Preparations of Schemes for Building Permit and Supervision General Building/Development work for which permission is sought, shall be planned, designed and supervised by registered professionals. The registered professionals for carrying out the various activities shall be: Architect, Engineer, Structural engineer, Town planner, Landscape architect, Urban designer, Supervisor. Requirements of registration/license for these professionals by the Authority or by the body governing such profession and constituted under a statute, as applicable to practice within the local body’s jurisdiction, are given in items 1 to 7 of the following table: (items 8-10 Plumber, Electrician and Fire Consultant may not need registration) Serial Professional Qualification Competence/Function Role/Responsibilities Num- ber 1 Architect Registered with The registered architect a. The architect valid shall be competent to should need to help the membership of carry out the work client to bring together the Council of related to the building/ a team to give specific Architecture, development permit as services such as that of India as given below: a structural engineer, prescribed under services of high rise/ quantity surveyor, Architect’s Act special buildings. builder, mechanical/ 1972. a. Prepare and sign all electrical engineers, plans, sub-division/ etc. layout plans and b. During the information connected construction stage, the with building permit architect should be except engineering visiting site periodically b. Issuing certificate for inspections to of supervision and ensure that in general, completion of all the work being carried buildings pertaining to out on site is architectural aspects. incompliance with PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2464 c. Preparation of sub- architectural design division/ layout plan and specifications. and related inform- Some projects may ation connected with require the services of development permit. resident architect (s) on d. Issuing certificate building project site. of supervision for development permit 2 Engineer Graduate in Civil The registered engineer a. Engineers are very Engineering from shall be competent to important members of recognized Indian carry out the work the design team whose or foreign related to the building/ responsibilities are to university. development permit as assist in the overall Registered with given below: design of the project membership a. Prepare and sign all within the scope of (Civil) of the building plans (all types their specialist fields. Institution of of buildings), structural b. Engineers such as Engineers, India. drawings and service geotechnical, plans and information structural, connected with building c. electrical, permit; mechanical, and will so b. Preparation of structural on, will carry out drawings, details and various analyses and calculations of buildings calculations before on plot up to 500 m2 arriving at the optimal and up to 5 storeys or design solution for a 15 m in height, all specific building. service plans d. During project c. Issuing certificate of execution stage, supervision and engineers should visit completion of all the site periodically for buildings pertaining inspections to ensure including structure and that in general, the Serial Professional Qualification Competence/Function Role/Responsibilities Num- ber PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2465 building services. work being carried out is in compliance with their engineering drawings, schedules and specifications. They must also be available to modify or re-design their individual aspects as may become necessary. 3 Structural Graduate in Civil a. The registered Engineer engineering from structural engineer recognized Indian shall be competent or foreign university, to prepare the structural or Corporate design, calculations and Member (Civil) of details for all buildings Institution of and undertake their Engineers (India), supervision. minimum three b. In case of buildings years experience having special in structural structural features, as engineering practice decided by the with designing and Authority, they shall field work. be designed only by NOTE : Structural engineers. The three years’ experience shall be relaxed to two years in the case of post-graduate degree of recognized Indian or foreign Serial Professional Qualification Competence/Function Role/Responsibilities Num- ber PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2466 university in the branch of structural engineering. In case of doctorate in structural engineering, the experience required would be one year. 4 Town Graduate or The registered town a. Town planner is Planner Post-graduate planner shall be competent responsible for the degree in Town to carry out the work orderliness in the and country related to the development developmental planning with valid permit as given below: layout to show the Associate a. Preparation of plans various land use. Membership of for land sub-division/ b. During the execution the Institute of layout and related stage, Town Town Planners, information connected Planners will also India. with development ensure that the permit for all areas. orderliness in the b. Issuing of certificate layout is not of supervision for distorted and that development of land the approval given is of all areas. also adhered to NOTE: strictly. However, for land layouts c. Town planners also for development permit carry out Site above five hectare in area, Analysis Report for landscape architect shall building projects. also be associated, and for land development infrastructural services for roads, water supplies, sewerage/drainage, electrification, etc, the Serial Professional Qualification Competence/Function Role/Responsibilities Num- ber PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2467 registered engineers for utility services shall be associated. 5 Landscape Bachelor or The registered landscape Architect Master’s degree in architect shall be landscape competent to carry out architecture or the work related to equivalent from landscape design for recognized Indian building/development or foreign permit for land areas five university hectares and above. In case of metro-cities, this limit of land area shall be two hectares and above. NOTE For smaller areas below the limits indicated above, association of landscape architect may also be considered from the point of view of desired landscape development. 6 Urban Master’s degree The registered urban Designer in Urban designer shall be competent Design or to carry out the work equivalent from related to urban design recognized Indian for city areas more than or foreign five hectares and campus university. area more than two hectares. He/She shall also be competent to carry out the work of urban renewal for all blighted/ congested areas. Serial Professional Qualification Competence/Function Role/Responsibilities Num- ber PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2468 NOTE: For smaller areas below the limits indicated above, association of urban designer may be considered from the point of view of desired urban design. 7 Supervisor Diploma in Civil The registered supervisor The role of the engineering/ shall be competent to supervisor on site is to Architectural carry out the work inspect quality of Assistantship from related to the building materials and the recognized institute permit as given below: workmanship to with 2yrs working All plans and related in ensure that they all experience or formation connected comply with drawings Civil Craftsmanship with building permit for and specifications. from residential buildings on I.T.I with 5yrs plot up to 100 m2 and up experience under a to two storeys or 7.5 m in qualified Architect/ height; and Civil Engineer for Issuing certificate of building supervision for buildings construction and as per (a). supervision. 8 Plumber licensed by the A plumber shall be concerned competent to do the Authority through following jobs: examination of Execution/supervision of candidates- sanitary works up to 500 Certificate of sqmt plot size and 4 training from ITI, storeyed buildings. with min. 2yrs experience of execution of sanitary and Serial Professional Qualification Competence/Function Role/Responsibilities Num- ber PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2469 plumbing works under any govt. Dept./Local body or a qualified Architect/ Engineer. Knowledge of working drawings and dimensioned sketches. 9 Electrician As prescribed by the concerned electricity company 10 Fire As prescribed by Consultant Chief Fire Officer, Town/City Fire Service. Serial Professional Qualification Competence/Function Role/Responsibilities Num- ber PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2470 Annexure 14 Environmental Conditions for Buildings and Constructions (CATEGORY '1': 5,000 to less than 20,000 Square meters) Medium Serial Environmental conditions Number Topography and 1 • The natural drain system should be maintained for natural drainage ensuring unrestricted flow of water. No construction shall be allowed to obstruct the natural drainage through the site. No construction is allowed on wetland and water bodies. Check dams, bio- swales, landscape, and other sustainable urban drainage systems (SUDS) are allowed for maintaining the drainage pattern and to harvest rain water. Water Conservation, 2 • Use of water efficient appliances should be promoted Rain Water with low flow fixtures or sensors. Harvesting and • A rain water harvesting plan needs to be designed where Ground Water the recharge bores (minimum one recharge bore per 5,000 Recharge square meters of built up area) is recommended. Other provisions of rain water harvesting as per rule no. 40 of these rules shall be followed. • Storage and reuse of rainwater harvested should be promoted. • In areas where ground water recharge is not feasible, the rain water should be harvested and stored for reuse. • The ground water shall not be withdrawn without approval from the Competent Authority and as per notification issued vide Memo No. PUDA/CA/2013/ 1713-16 dated 27.02.2013; the underground water for construction of development works in the notified areas shall not be used. • All recharge should be limited to shallow aquifer. 2 (a) At least 20 percent of the open spaces as required by the local building bye-laws shall be pervious. Use of Grass pavers, paver blocks with at least 50 percent opening, landscape etc. would be considered as pervious surface. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2471 Waste 3 • Solid waste: Separate wet and dry bins must be provided Management in each unit and at the ground level for facilitating segregation of waste. • Sewage: Onsite sewage treatment of capacity of treating 100 percent waste water to be installed. Treated waste water shall be reused on site for landscape, flushing, cooling tower, and other end-uses. Excess treated water shall be discharged as per CPCB norms. Natural treatment systems shall be promoted. • Sludge from the onsite sewage treatment, including septic tanks, shall be collected, conveyed and disposed as per the Ministry of Urban Development, Central Public Health and Environmental Engineering Organization (CPHEEO) Manual on Sewerage and Sewage Treatment Systems, 2013. • The provisions of The Solid Waste (Management) Rules 2016 and The E-waste (Management) Rules 2016, and The Plastics Waste (Management) Rules 2016 shall be followed. Energy 4 • The provisions of Punjab Energy Conservation Building Code shall be applicable to the buildings/areas in accordance with the notification issued vide notification no. 18/04/16 HG 1/1856 dated: 24-06-2016 or as amended from time to time. • Rooftop Solar Photovoltaic installation shall be as per the provisions laid down in rule no. 37 & 38 of these rules. • Solar water heating shall be provided to meet 20 percent of the hot water demand of the commercial and institutional building or as per the requirement of these rules, whichever is higher. Residential buildings are also recommended to meet its hot water demand from solar water heaters, as far as possible. Medium Serial Environmental conditions Number PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2472 Air Quality 5 • Provisions of “Action Plan for Monitoring of and Noise and Noise Construction/ Demolition Activity of Buildings within the State of Punjab” dated 01.03.2017 shall be applicable. • All demolition and construction waste shall be managed as per the provisions of the Construction and Demolition Waste Rules 2016. • For indoor air quality the ventilation provisions as per the National Building Code of India of India, 2016. 5(a) The location of the Diesel Generator (DG) set and exhaust pipe height shall be as per the provisions of the CPCB norms. Green Cover 6 • Every plot having area more than 60 sq.mt. but upto 100 sq.mt. shall plant at least one tree in the setbacks of plot. However, for bigger plots, one tree for every additional 100 sq.mt. of plot area shall be mandatory. • The existing trees will be counted for this purpose. Preference should be given to planting native species. • Compensatory Plantation for felled/transplanted trees in the ratio 1:3 within the premises under consideration. • Choice of species for plantation in site shall be as per Section 8 of the Urban Green Guidelines, 2014. (Category'2': 20,000 to less than 50,000 Square meters) Medium S. no. Environmental conditions Topography and 1 • The natural drain system should be maintained for ensuring natural drainage unrestricted flow of water. No construction shall be allowed to obstruct the natural drainage through the site. No construction is allowed on wetland and water bodies. Check dams, bio- swales, landscape, and other sustainable urban drainage systems (SUDS) are allowed for maintaining the drainage pattern and to harvest rain water. • Buildings shall be designed to follow the natural topography as much as possible. Minimum cutting and filling should be done. Medium Serial Environmental conditions Number PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2473 Water 2 • A complete plan for rain water harvesting, water efficiency Conservation, Rain and conservation should be prepared. Water Harvesting • Use of water efficient appliances should be promoted with and Ground Water low flow fixtures or sensors. Recharge • A rain water harvesting plan needs to be designed where the recharge bores of minimum one recharge bore per 5,000 square meters of built up area and storage capacity of minimum one day of total fresh water requirement shall be provided. Other provisions of rain water harvesting as per rule no. 40 of these rules shall be followed. • In areas where ground water recharge is not feasible, the rain water should be harvested and stored for reuse. • The ground water shall not be withdrawn without approval from the Competent Authority and as per notification issued vide Memo No. PUDA/CA/2013/1713-16 dated 27.02.2013; the underground water for construction of development works in the notified areas shall not be used. • All recharge should be limited to shallow aquifer. 2 (a) At least 20 percent of the open spaces as required by the local building bye-laws shall be pervious. Use of Grass pavers, paver blocks with at least 50 percent opening, landscape etc. would be considered as pervious surface. Waste Management 3 • Solid waste: Separate wet and dry bins must be provided in each unit and at the ground level for facilitating segregation of waste. • Sewage: Onsite sewage treatment of capacity of treating 100 percent waste water to be installed. Treated waste water shall be reused on site for landscape, flushing, cooling tower, and other end-uses. Excess treated water shall be discharged as per CPCB norms. Natural treatment systems shall be promoted. • Sludge from the onsite sewage treatment, including septic tanks, shall be collected, conveyed and disposed as per the Ministry of Urban Development, Central Public Health and Environmental Engineering Organization (CPHEEO) Manual on Sewerage and Sewage Treatment Systems, 2013. Medium Serial Environmental conditions Number PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2474 • The provisions of The Solid Waste (Management) Rules 2016 and The E-waste (Management) Rules 2016, and The Plastics Waste (Management) Rules 2016 shall be followed. 3 (a) All non-biodegradable waste shall be handed over to authorized recyclers for which a written tie up must be done with the authorized recyclers. 3 (b) Organic waste compost/ Vermiculture pit with a minimum capacity of 0.3 kg/person/day must be installed. Energy 4 • The provisions of Punjab Energy Conservation Building Code shall be applicable to the buildings/areas in accordance with the notification issued vide notification no. 18/4/16 HG 1/1856 dated: 24-6-2016 or as amended from time to time. • Rooftop Solar Photovoltaic installation shall be as per the provisions laid down in these rules. • Solar water heating shall be provided to meet 20 percent of the hot water demand of the commercial and institutional building or as per the requirement of these rules, whichever is higher. Residential buildings are also recommended to meet its hot water demand from solar water heaters, as far as possible. 4 (a) • Use of environment friendly materials in bricks, blocks and other construction materials, shall be required for at least 20 percent of the construction material quantity. These include flyash bricks, hollow bricks, AACs, Fly Ash Lime Gypsum blocks, compressed earth blocks, and other environment friendly materials. • Fly ash should be used as building material in the construction as per the provisions of the Fly Ash Notification of September, 1999 as amended from time to time. Air Quality and 5 • Provisions of “Action Plan for Monitoring of Construction Noise /Demolition Activity of Buildings within the State of Punjab” dated 01.03.2017 shall be applicable. • All demolition and construction waste shall be managed as per the provisions of the Construction and Demolition Waste Rules 2016. Medium S. no. Environmental conditions PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2475 • For indoor air quality the ventilation provisions as per the National Building Code of India, 2016 as amended from time to time. 5 (a) The location of the Diesel Generator (DG) set and exhaust pipe height shall be as per the provisions of the CPCB norms. Green Cover 6 • Every plot having area more than 60 sq.mt. but upto 100 sq.mt. shall plant at least one tree in the setbacks of plot. However, for bigger plots, one tree for every additional 100 sq.mt. of plot area shall be mandatory. • The existing trees will be counted for this purpose. Preference should be given to planting native species. • Compensatory Plantation for felled/transplanted trees in the ratio 1:3 within the premises under consideration. • Choice of species for plantation in site shall be as per Section 8 of the Urban Green Guidelines, 2014. Top Soil 7 • Topsoil should be stripped to a depth of 20 cm from the preservation areas proposed for buildings, roads, paved areas, and and reuse external services. • It should be stockpiled appropriately in designated areas and reapplied during plantation of the proposed vegetation on site. Transport 8 • A comprehensive mobility plan, as per MoUD best practices guidelines (URDPFI), shall be prepared to include motorized, non-motorized, public, and private networks. • Road should be designed with due consideration for environment, and safety of users. The road system can be designed with these basic criteria. 1. Hierarchy of roads with proper segregation of vehicular and pedestrian traffic. 2. Traffic calming measures. 3. Proper design of entry and exit points. 4. Parking norms as per local regulation. Medium S. no. Environmental conditions PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2476 (Category '3': 50000 to 150000 sq.mt.) Medium S. no. Environmental conditions Topography and 1 • The natural drain system should be maintained for natural drainage ensuring unrestricted flow of water. • No construction shall be allowed to obstruct the natural drainage through the site. No construction is allowed on wetland and water bodies. Check dams, bio-swales, landscape, and other sustainable urban drainage systems (SUDS) are allowed for maintaining the drainage pattern and to harvest rain water. • Buildings shall be designed to follow the natural topography as much as possible. • Minimum cutting and filling should be done. Water 2 • A complete plan for rain water harvesting, water efficiency Conservation, and conservation should be prepared. Rain Water • Use of water efficient appliances should be promoted. Harvesting and Low flow fixtures or sensors are used to promote water Ground Water conservation. Recharge • A rain water harvesting plan needs to be designed where the recharge bores of minimum one recharge bore per 5,000 square meters of built up area and storage capacity of minimum one day of total fresh water requirement shall be provided. Other provisions of rain water harvesting as per rule no. 40 of these rules shall be followed. • In areas where ground water recharge is not feasible, the rain water should be harvested and stored for reuse. • The ground water shall not be withdrawn without approval from the Competent Authority and as per notification issued vide Memo No. PUDA/CA/2013/1713-16 dated 27.02.2013, the underground water for construction of development works in the notified areas shall not be used. • All recharge should be limited to shallow aquifer. 2 (a) At least 20 percent of the open spaces as required by the local building bye-laws shall be pervious. Use of Grass pavers, paver blocks with at least 50 percent opening, landscape etc. would be considered as pervious surface. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2477 2 (b) Separation of grey and black water should be done by the use of dual plumbing system. In case of single stack system separate recirculation lines for flushing by giving dual plumbing system be done. Solid Waste 3 • Solid waste: Separate wet and dry bins must be provided Management in each unit and at the ground level for facilitating segregation of waste. • The provisions of The Solid Waste (Management) Rules 2016 and The E-waste (Management) Rules 2016, and The Plastics Waste (Management) Rules 2016 shall be followed. 3 (a) All non-biodegradable waste shall be handed over to authorized recyclers for which a written tie up must be done with the authorized recyclers. 3 (b) Organic waste composter/Vermiculture pit with a minimum capacity of 0.3 kg/person/day must be installed. Sewage Treatment 4 • Onsite sewage treatment of capacity of treating 100 Plant percent waste water to be installed. Treated waste water shall be reused on site for landscape, flushing, cooling tower, and other end-uses. Excess treated water shall be discharged as per CPCB norms. • Natural treatment systems shall be promoted. • Sludge from the onsite sewage treatment, including septic tanks, shall be collected, conveyed and disposed as per the Ministry of Urban Development, Central Public Health and Environmental Engineering Organization (CPHEEO) Manual on Sewerage and Sewage Treatment Systems, 2013. Energy 5 • The provisions of Punjab Energy Conservation Building Code shall be applicable to the buildings/areas in accordance with the notification issued vide notification no. 18/04/16 HG 1/1856 dated: 24-06-2016 or as amended from time to time. • Rooftop Solar Photovoltaic installation shall be as per the provisions laid down in these rules. Medium S. no. Environmental conditions PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2478 • Solar water heating shall be provided to meet 20 percent of the hot water demand of the commercial and institutional building or as per the requirement of these rules, whichever is higher. Residential buildings are also recommended to meet its hot water demand from solar water heaters, as far as possible. 5 (a) • Use of environment friendly materials in bricks, blocks and other construction materials, shall be required for at least 20 percent of the construction material quantity. These include flyash bricks, hollow bricks, AACs, Fly Ash Lime Gypsum blocks, compressed earth blocks, and other environment friendly materials. • Fly ash should be used as building material in the construction as per the provisions of the Fly Ash Notification of September, 1999 as amended from time to time. Air Quality 6 • Provisions of “Action Plan for Monitoring of and Noise and Noise Construction /Demolition Activity of Buildings within the State of Punjab” dated 01.03.2017 shall be applicable. • All demolition and construction waste shall be managed as per the provisions of the Construction and Demolition Waste Rules 2016. • For indoor air quality the ventilation provisions as per the National Building Code of India, 2016 as amended from time to time. 6 (a) The location of the Diesel Generator (DG) set and exhaust pipe height shall be as per the provisions of the CPCB norms. Green Cover 7 • Every plot having area more than 60 sq.mt. but upto 100 sq.mt. shall plant at least one tree in the setbacks of plot. However, for bigger plots, one tree for every additional 100 sq.mt. of plot area shall be mandatory. • The existing trees will be counted for this purpose. Preference should be given to planting native species. • Compensatory Plantation for felled/transplanted trees in the ratio 1:3 within the premises under consideration. Medium S. no. Environmental conditions PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2479 • Choice of species for plantation in site shall be as per Section 8 of the Urban Green Guidelines, 2014. Top Soil 8 • Topsoil should be stripped to a depth of 20 cm from the preservation areas proposed for buildings, roads, paved areas, and and reuse external services. • It should be stockpiled appropriately in designated areas and reapplied during plantation of the proposed vegetation on site. Transport 9 • A comprehensive mobility plan, as per MoUD best practices guidelines (URDPFI), shall be prepared to include motorized, non-motorized, public, and private networks. • Road should be designed with due consideration for environment, and safety of users. The road system can be designed with these basic criteria. 1. Hierarchy of roads with proper segregation of vehicular and pedestrian traffic. 2. Traffic calming measures. 3. Proper design of entry and exit points. 4. Parking norms as per local regulation. Environment 10 An environmental management plan (EMP) shall be prepared Management and implemented to ensure compliance with the Plan environmental conditions specified in item number 1 to 9 above. A dedicated Environment Monitoring Cell with defined functions and responsibility shall be put in place to implement the EMP. The environmental cell shall ensure that the environment infrastructure like Sewage Treatment Plant, Landscaping, Rain Water Harvesting, Energy efficiency and conservation, water efficiency and conservation, solid waste management, renewable energy etc. are kept operational and meet the required standards. The environmental cell shall also keep the record of environment monitoring and those related to the environment infrastructure. Medium S. no. Environmental conditions PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2480 Annexure 15 Serial Conditions to be checked Category of Number the Project 1 The project proponent shall get it certified from the approved Category 1, 2 consultant of the PPCB/Qualified Building Environment and 3 Auditor regarding installation of sewage treatment plant (STP) and adequacy of disposal system and shall ensure that the treated sewage shall conform to the norms and standards prescribed by Punjab Pollution Control Board or any other statutory authority for such discharges. 2 The project proponent shall adopt only the authorized mode of Category 1, 2 disposal and shall not use any illegal mode of disposal for treated and 3 wastewater. 3 The project proponent shall form Environment Monitoring Category 3 Committee for supervising and monitoring the environment related conditions of the building permission. 4 The project proponent shall make provisions for the housing Category 1, 2 of construction labour within the site with all necessary and 3 infrastructure and facilities such as fuel for cooking, mobile toilets, mobile STP, Safe drinking water and medical health care etc. The housing may be in the form to temporary structure and it shall be removed after the completion of the project. 5 The project proponent shall comply with the Construction and Category 1, 2 Demolition Rules, 2016. and 3 6 The project proponent shall provide dual plumbing line for use Category 2 of the treated wastewater for flushing purpose and shall provide and 3 other measures like providing fixtures for showers, toilet flushing and drinking of low flow either by use of aerators or pressure reducing devices or sensor based control, for conservation of groundwater. 7 The project proponent shall use only treated wastewater for Category 1, 2 construction purpose and to reduce the water demand during and 3 construction, the project proponent shall make use of premixed concrete, curing agents and other best practices referred 8 The project proponent shall hire vehicles of good condition Category 1, 2 for bringing construction material to the site of the project and 3 and ensure that all these vehicles shall conform to applicable air, noise and emission standards and shall only be operated during non-peak hours. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2481 9 The project proponent shall ensure that ambient noise levels Category 1, 2 shall conform to prescribed standards both during day and and 3 night times. The ambient air and noise quality should be closely monitored during construction and operation phase. 10 The project proponent shall make provision of the budget for Category 2 carrying out long lasting and public utility activities under the and 3 corporate social responsibility with the advice of District Administration. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2482 Annexure 16 (1) Environmental Cell at the level of Development Authority: An Environmental Cell shall be setup at the development authority level to support compliance and monitoring of environmental conditions in buildings. The Cell shall also provide assistance in environmental planning and capacity building within their jurisdiction. The responsibility of this cell would be monitoring the implementation of this notification and providing an oversight to the Third-Party Auditing process. The cell will operate under the development authority. (2) Constitution of the cell: The cell will comprise of at least 3 dedicated experts in following fields: 1. Waste management (solid and liquid) 2. Water conservation and management 3. Resource efficiency including Building materials 4. Energy Efficiency and renewable energy 5. Environmental planning including air quality management. 6. Transport planning and management. The Cell shall induct at least two outside experts as per the requirements and background of dedicated experts. Existing environmental cells at the level of local authority can be co-opted and trained for this Cell. (3) Financial Support: An additional fee may be charged along with processing fee for building permission for integrating environmental conditions and it’s monitoring. The local authority can fix and revise this additional fee from time to time. The amount of this fee shall be deposited in a separate bank account, and used for meeting the requirement of salary / emoluments of experts and running the system of online application, verifications and the Environmental Cell. (4) Functions of the Cell: The cell shall be responsible for assessing and appraising the environmental concerns of the area under their jurisdiction where building activities are proposed. The Cell can evolve and propose additional environmental conditions as per requirements. These conditions may be area specific and shall be notified in advance from time to time. These additional conditions shall be approved following a due consultation Serial Conditions to be checked Category of Number the Project PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2483 process. These environmental conditions will be integrated in building permissions by the sanctioning authority. Develop and maintain an online system for application and payment of fees. The Cell shall maintain an online database of all applications received, projects approved, the compliance audit report, random inspections made. The Cell shall maintain a portal for public disclosure of project details including self-certification and compliance audit reports filed by the Qualified Building Environment Auditors for public scrutiny of compliance of environmental conditions by the project. Monitoring the work of Environmental Audit process carried by the Qualified Building Auditors. The Cell shall review the applications; finalize the additional environmental conditions if required within 30 days of the submission of the application to the local authority. The Cell shall adopt risk based random selection of projects for verifying on site for certification of Qualified Building Auditors, compliance of environmental conditions and five yearly audit report. The Cell shall recommend to the local authority for financial penalty for non- compliance of environmental conditions by the project proponent. The Cell shall recommend to the accrediting body and the local authority against any Qualified Building Environment Auditor, if any lapse is found in their work. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2484 Annexure 17 (1) Accreditation of Environmental Auditors (Qualified Building Auditors) The Ministry of Environment, Forest and Climate Change (MoEFCC), through qualified agencies shall accredit the Qualified Building Environment Auditors (QBEAs). The Qualified Building Environment Auditors could be a firm / organization or an individual expert, who fulfils the requirements. The Ministry will implement this process of accreditation through Quality Council of India (QCI), National Productivity Council or any other organization identified by the Government. The organizations like Indian Green Building Council, Bureau of Energy Efficiency etc. can also be associated in the process of accreditation, training, and renewal. The environmental consultants accredited by the QCI for building sector will be qualified as QBEAs. The QBEAs will meet the following criteria. The accrediting agency can improvise on these criteria. (2) Qualifications of the Auditor: Education: Architect (Degree or Diploma), Town Planners (Degree), Civil Engineer / Mechanical Engineer (Degree or Diploma), PG in Environmental Science or any other qualification as per the scheme of the accreditation. (3) Training: Mandatory training to be given by the accreditation body or their approved training providers. This will be as per the scheme of the accreditation. (4) Experience: At least three years of work experience in the related field or building sector Environment Impact Assessment consultants accredited by Quality Council of India or any other experience criteria as per the scheme of the accreditation. (5) Infrastructure and equipment: As per the scheme of the accreditation (6) Renewal: The accreditation will be valid for 5 years and will be renewed as per the process developed under the accreditation scheme. Accountability/Complaint redressal mechanism: Any complaints regarding the quality of the work of Qualified Building Environment Auditors shall be made to the accreditation body. The accreditation body shall evaluate the complaint and take appropriate action including black listing or cancellation of the accreditation with wide public notice. This will be in addition to the action at the level of local authority for penalty and blacklisting. The Ministry can also take such action in case of specific complaint or feedback. PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2485 Annexure 18 Form-‘M’ [see rule 47] FORM OF APPLICATION FOR REGISTRATION AS PLUMBER From___________ To The Authorized Officer, Punjab Urban Planning and Development Authority. Sir, I apply for registration to practise as plumber to enable me to submit building plans and supervise buildings construction in the . I hold necessary qualifications enabling me for getting registration with the Punjab Urban Planning and Development Authority. Copies of certificates/ testimonials duly attested by a gazetted officer are enclosed herewith. A demand draft No.________Amounting to Rs.__________In favour of_________ (Indicate designation of Authorized Officer is enclosed here with as registration fee for the period of . Yours faithfully, Place: Name__________________ Dated: Full Address_____________ PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA) 2486 Annexure 19 FORM-‘N’ [see rule 48]

Previous and next

All provisions of The Punjab Urban Planning and Development Building Rules, 2021

Questions people ask

Is form FOR NOTICE OF COMMENCEMENT OF WORK of the Punjab Urban Planning and Development Building Rules, 2021 still in force?

No repeal of the Punjab Urban Planning and Development Building Rules, 2021 is recorded.