Form FOR NOTICE OF COMMENCEMENT OF WORK, The Punjab Urban Planning and Development Building Rules, 2021: FORM FOR NOTICE OF COMMENCEMENT OF WORK
The Punjab Urban Planning and Development Building Rules, 2021 - Form FOR NOTICE OF COMMENCEMENT OF WORK
Text of form FOR NOTICE OF COMMENCEMENT OF WORK
FORM FOR NOTICE OF COMMENCEMENT OF WORK
FORM FOR NOTICE OF COMMENCEMENT OF WORK
To,
____________________,
____________________,
Sir,
I/ we hereby give notice that the erection/ re-erection/ addition/ alteration of the building
on plot no.______, block no.______, street/ road and in colony/ Sector no.______, shall
be commenced on ____________ (date) as per your permission granted vide memo
no._____________ dated ____________ under the supervision of
_____________________ Architect (Registration No._______________)/ Engineer, and
in accordance with the plans sanctioned.
Date: ______________
Place: ______________
Signature of Applicant/Owner
Name of the Applicant_____________
Permanent Address_______________
Temporary Address _______________
Telephone No. ___________________
Mobile No. ______________________
E-mail address ___________________
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2456
Annexure 6
FORM-‘F’
[see rule 14]
NOTICE OF COMPLETION AND PART COMPLETION
From _______________
To The
Competent Authority
Sir,
1/we hereby given you notice that the building apart of the building described below and
sanctioned with your order no____________dated ________ has been completed on
______________________________________________________ in all respect according
to the provision of the The Punjab Regional and Town Planning and Development Act
1995 and rules made thereunder and sanctioned plans and suggested modification has
carried out.
Completion Certificate from the Architect or Civil Engineer who supervised the construction
of the building and a completion certificate from the registered plumber are submitted
herewith.
Kindly permit me/us to convey the building as required by rule 14 of the Punjab Urban
Planning and Development Building Rules, 2021.
DESCRIPTION OF BUILDING
Area ________________________________
Site no________House no._______________
Khasra no.___________,Village___________
Signature of the Applicant
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2457
Annexure 7
FORM-‘G’
[see rule 14]
COMPLETION CERTIFICATE BY ARCHITECT AND ENGINEER
I do here by certify that the following work ____________________________ (insert full
particulars of work) has been supervised by me and has been completed to my satisfaction
in accordance with the provisions of the Punjab Regional and Town Planning and
Development Act, 1995 (P.A. No.11 of 1995) and the rules made thereunder and sanctioned
plans. The workmanship and all the material used for construction meet the specifications
laid down in the National Building Code of India, 2016 as amended from time to time.
That no provision of the Punjab Regional and Town Planning and Development Act,
1995 (P.A. No. 11 of 1995) and the rules made thereunder and no requisition made,
condition prescribed or under issued thereunder has been transgressed in the course of the
work.
Area ________________________________
Site no________House no.______________
Khasra no.___________,Village___________
Particulars of the work___________________
Signature of Architect:
Complete Address___________________
E-mail:____________________________
Mobile no._________________________
Signature of Engineer
Complete Address___________________
E-mail:____________________________
Mobile no._________________________
Note: In case of buildings more than 15 metres height (including stilt), the supervision
of building shall be undertaken by both i.e. the Architect and the Engineer.
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2458
Annexure 8
FORM-‘H’
[see rules 14((2)) and (3)and 44(5)]
COMPLETION CERTIFICATE FROM COMPETENT AUTHORITY
From
The Competent Authority,
To____________________________
Memorandum No. __________________________
Dated:
Whereas____________has given Notice of completion of the building described below;
I hereby:-
(1) Grant permission for the completion and/or use of the said building; Or
(2) Refuse permission for the completion and/or use of the said building for reasons
given below:-
Description of building
Area _______________________________
Site no________House no.______________
Khasrano.___________,Village__________
Competent Authority
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2459
Annexure 9
FORM-‘I’
[see rule 23 (1)]
NOTICE OF PERMISSION TO OCCUPY
From _______________
To
Competent Authority
Sir,
1/we hereby given you notice that the building apart of the building described below and
sanctioned with your order no____________Dated ________ has been completed on
______________________________________________________ in all respect according
to the provision of the The Punjab Regional and Town Planning and Development Act
1995 and rules made thereunder and sanctioned plans and suggested modification has
carried out.
Completion Certificate issued with your order no_____Dated____ are attached herewith.
Kindly permit me/us to occupy the building as required by The Punjab Urban Planning
and Development Building Rules, 2021.
DESCRIPTION OF BUILDING
Area ________________________________
Site no________House no.______________
Khasrano.___________,Village___________
Signature of the Applicant
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2460
Annexure 10
FORM-‘J’
[see rules 23(2)]
PERMISSION FOR OCCUPANCY OR USE OF THE BUILDING
From
The Competent Authority,
To____________________________
Memorandum No. __________________________
Dated:
Whereas has given Notice of completion of the building described below;
I hereby:-
(1) Grant permission for the occupation and/or use of the said building; Or
(2) Refuse permission for the occupation and/or use of the said building for reasons
given below:-
Description of building
Area ________________________________
Site no________House no.______________
Khasra no.___________,Village___________
Competent Authority
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2461
Annexure 11
FORM-‘K’
[see rule 44(1)]
Application For Water Connection
To
The Competent Authority
Sir,
I/We want to have a water connection in my/our …….......... I/We have read the Punjab
Urban Planning and Development Building Rules, 2021 and do undertake to abide by
them.
The particulars are given below:-
1. Name of Area ……….. Road……… Building/Plot/ House No. …………….
2. Name of owner ………………. Son of ……………………………
3. Name of applicant ……………………. Son of …………………….
4. Size of ferrule ……………… Number of taps required…………………
5. Name of registered Plumber through whom the work executed ……………….
Instructions :-
The application should be entertained either from the owner or such person who has been
authorized to do so by the owner who would be held responsible for the payment of water
charges etc.
Date…………….
Signature of applicant …….............……
Father's name ……………………..........
Address ………………….…………........
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2462
Annexure 12
FORM-‘L’
[see rule 45]
Application For Sewerage Connection
To
The Competent Authority
Sir,
I/We want to have a sewerage connection in my/our …….. I/We have read the Punjab
Urban Planning and Development Authority (Building) Rules, 2021 and do undertake to
abide by them.
The particulars are given below:-
1. Name of Area ……….. Road……… Building/ House No. …………….
2. Name of owner ………………. Son of ……………………………
3. Name of applicant ……………………. Son of …………………….
4. Number of seat………………… Size of line ………………….......
5. Name of registered Plumber through whom the work executed ……………….
Instructions:-
The application should be entertained either from the owner or such person who has been
authorized to do so by the owner who would be held responsible for the payment of water
charges etc.
Date…………….
Signature of applicant ……..............…..
Father's name ……………………..........
Address ……………………………........
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2463
Annexure 13
[see rule 14(1)]
Qualification and Competence of Technical Personnel for Preparations of
Schemes for Building Permit and Supervision
General
Building/Development work for which permission is sought, shall be planned, designed
and supervised by registered professionals. The registered professionals for carrying out
the various activities shall be:
Architect, Engineer, Structural engineer, Town planner, Landscape architect, Urban
designer, Supervisor. Requirements of registration/license for these professionals by the
Authority or by the body governing such profession and constituted under a statute, as
applicable to practice within the local body’s jurisdiction, are given in items 1 to 7 of the
following table:
(items 8-10 Plumber, Electrician and Fire Consultant may not need registration)
Serial Professional Qualification Competence/Function Role/Responsibilities
Num-
ber
1 Architect Registered with The registered architect a. The architect
valid shall be competent to should need to help the
membership of carry out the work client to bring together
the Council of related to the building/ a team to give specific
Architecture, development permit as services such as that of
India as given below: a structural engineer,
prescribed under services of high rise/ quantity surveyor,
Architect’s Act special buildings. builder, mechanical/
1972. a. Prepare and sign all electrical engineers,
plans, sub-division/ etc.
layout plans and b. During the
information connected construction stage, the
with building permit architect should be
except engineering visiting site periodically
b. Issuing certificate for inspections to
of supervision and ensure that in general,
completion of all the work being carried
buildings pertaining to out on site is
architectural aspects. incompliance with
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2464
c. Preparation of sub- architectural design
division/ layout plan and specifications.
and related inform- Some projects may
ation connected with require the services of
development permit. resident architect (s) on
d. Issuing certificate building project site.
of supervision for
development permit
2 Engineer Graduate in Civil The registered engineer a. Engineers are very
Engineering from shall be competent to important members of
recognized Indian carry out the work the design team whose
or foreign related to the building/ responsibilities are to
university. development permit as assist in the overall
Registered with given below: design of the project
membership a. Prepare and sign all within the scope of
(Civil) of the building plans (all types their specialist fields.
Institution of of buildings), structural b. Engineers such as
Engineers, India. drawings and service geotechnical,
plans and information structural,
connected with building c. electrical,
permit; mechanical, and will so
b. Preparation of structural on, will carry out
drawings, details and various analyses and
calculations of buildings calculations before
on plot up to 500 m2 arriving at the optimal
and up to 5 storeys or design solution for a
15 m in height, all specific building.
service plans d. During project
c. Issuing certificate of execution stage,
supervision and engineers should visit
completion of all the site periodically for
buildings pertaining inspections to ensure
including structure and that in general, the
Serial Professional Qualification Competence/Function Role/Responsibilities
Num-
ber
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2465
building services. work being carried out
is in compliance with
their engineering
drawings, schedules
and specifications.
They must also be
available to modify or
re-design their
individual aspects as
may become
necessary.
3 Structural Graduate in Civil a. The registered
Engineer engineering from structural engineer
recognized Indian shall be competent
or foreign university, to prepare the structural
or Corporate design, calculations and
Member (Civil) of details for all buildings
Institution of and undertake their
Engineers (India), supervision.
minimum three b. In case of buildings
years experience having special
in structural structural features, as
engineering practice decided by the
with designing and Authority, they shall
field work. be designed only by
NOTE : Structural engineers.
The three years’
experience shall
be relaxed to two
years in the case
of post-graduate
degree of
recognized Indian
or foreign
Serial Professional Qualification Competence/Function Role/Responsibilities
Num-
ber
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2466
university in the
branch of structural
engineering. In case
of doctorate in
structural
engineering, the
experience required
would be one year.
4 Town Graduate or The registered town a. Town planner is
Planner Post-graduate planner shall be competent responsible for the
degree in Town to carry out the work orderliness in the
and country related to the development developmental
planning with valid permit as given below: layout to show the
Associate a. Preparation of plans various land use.
Membership of for land sub-division/ b. During the execution
the Institute of layout and related stage, Town
Town Planners, information connected Planners will also
India. with development ensure that the
permit for all areas. orderliness in the
b. Issuing of certificate layout is not
of supervision for distorted and that
development of land the approval given is
of all areas. also adhered to
NOTE: strictly.
However, for land layouts c. Town planners also
for development permit carry out Site
above five hectare in area, Analysis Report for
landscape architect shall building projects.
also be associated, and for
land development
infrastructural services for
roads, water supplies,
sewerage/drainage,
electrification, etc, the
Serial Professional Qualification Competence/Function Role/Responsibilities
Num-
ber
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2467
registered engineers for
utility services shall be
associated.
5 Landscape Bachelor or The registered landscape
Architect Master’s degree in architect shall be
landscape competent to carry out
architecture or the work related to
equivalent from landscape design for
recognized Indian building/development
or foreign permit for land areas five
university hectares and above. In
case of metro-cities, this
limit of land area shall be
two hectares and above.
NOTE
For smaller areas below
the limits indicated above,
association of landscape
architect may also be
considered from the
point of view of desired
landscape development.
6 Urban Master’s degree The registered urban
Designer in Urban designer shall be competent
Design or to carry out the work
equivalent from related to urban design
recognized Indian for city areas more than
or foreign five hectares and campus
university. area more than two
hectares. He/She shall also
be competent to carry out
the work of urban
renewal for all blighted/
congested areas.
Serial Professional Qualification Competence/Function Role/Responsibilities
Num-
ber
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2468
NOTE:
For smaller areas below
the limits indicated above,
association of urban
designer may be considered
from the point of view of
desired urban design.
7 Supervisor Diploma in Civil The registered supervisor The role of the
engineering/ shall be competent to supervisor on site is to
Architectural carry out the work inspect quality of
Assistantship from related to the building materials and the
recognized institute permit as given below: workmanship to
with 2yrs working All plans and related in ensure that they all
experience or formation connected comply with drawings
Civil Craftsmanship with building permit for and specifications.
from residential buildings on
I.T.I with 5yrs plot up to 100 m2 and up
experience under a to two storeys or 7.5 m in
qualified Architect/ height; and
Civil Engineer for Issuing certificate of
building supervision for buildings
construction and as per (a).
supervision.
8 Plumber licensed by the A plumber shall be
concerned competent to do the
Authority through following jobs:
examination of Execution/supervision of
candidates- sanitary works up to 500
Certificate of sqmt plot size and 4
training from ITI, storeyed buildings.
with min. 2yrs
experience of
execution of
sanitary and
Serial Professional Qualification Competence/Function Role/Responsibilities
Num-
ber
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2469
plumbing works
under any govt.
Dept./Local body
or a qualified
Architect/ Engineer.
Knowledge of
working drawings
and dimensioned
sketches.
9 Electrician As prescribed by
the concerned
electricity company
10 Fire As prescribed by
Consultant Chief Fire Officer,
Town/City Fire
Service.
Serial Professional Qualification Competence/Function Role/Responsibilities
Num-
ber
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2470
Annexure 14
Environmental Conditions for Buildings and Constructions
(CATEGORY '1': 5,000 to less than 20,000 Square meters)
Medium Serial Environmental conditions
Number
Topography and 1 • The natural drain system should be maintained for natural
drainage ensuring unrestricted flow of water. No construction shall
be allowed to obstruct the natural drainage through the
site. No construction is allowed on wetland and water
bodies. Check dams, bio- swales, landscape, and other
sustainable urban drainage systems (SUDS) are allowed
for maintaining the drainage pattern and to harvest rain
water.
Water Conservation, 2 • Use of water efficient appliances should be promoted
Rain Water with low flow fixtures or sensors.
Harvesting and • A rain water harvesting plan needs to be designed where
Ground Water the recharge bores (minimum one recharge bore per 5,000
Recharge square meters of built up area) is recommended. Other
provisions of rain water harvesting as per rule no. 40 of
these rules shall be followed.
• Storage and reuse of rainwater harvested should be
promoted.
• In areas where ground water recharge is not feasible,
the rain water should be harvested and stored for reuse.
• The ground water shall not be withdrawn without
approval from the Competent Authority and as per
notification issued vide Memo No. PUDA/CA/2013/
1713-16 dated 27.02.2013; the underground water for
construction of development works in the notified areas
shall not be used.
• All recharge should be limited to shallow aquifer.
2 (a) At least 20 percent of the open spaces as required by the
local building bye-laws shall be pervious. Use of Grass
pavers, paver blocks with at least 50 percent opening,
landscape etc. would be considered as pervious surface.
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2471
Waste 3 • Solid waste: Separate wet and dry bins must be provided
Management in each unit and at the ground level for facilitating
segregation of waste.
• Sewage: Onsite sewage treatment of capacity of treating
100 percent waste water to be installed. Treated waste
water shall be reused on site for landscape, flushing,
cooling tower, and other end-uses. Excess treated water
shall be discharged as per CPCB norms. Natural treatment
systems shall be promoted.
• Sludge from the onsite sewage treatment, including septic
tanks, shall be collected, conveyed and disposed as per
the Ministry of Urban Development, Central Public
Health and Environmental Engineering Organization
(CPHEEO) Manual on Sewerage and Sewage Treatment
Systems, 2013.
• The provisions of The Solid Waste (Management) Rules
2016 and The E-waste (Management) Rules 2016, and
The Plastics Waste (Management) Rules 2016 shall be
followed.
Energy 4 • The provisions of Punjab Energy Conservation Building
Code shall be applicable to the buildings/areas in
accordance with the notification issued vide notification
no. 18/04/16 HG 1/1856 dated: 24-06-2016 or as
amended from time to time.
• Rooftop Solar Photovoltaic installation shall be as per
the provisions laid down in rule no. 37 & 38 of these
rules.
• Solar water heating shall be provided to meet 20 percent
of the hot water demand of the commercial and
institutional building or as per the requirement of these
rules, whichever is higher. Residential buildings are also
recommended to meet its hot water demand from solar
water heaters, as far as possible.
Medium Serial Environmental conditions
Number
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2472
Air Quality 5 • Provisions of “Action Plan for Monitoring of and Noise
and Noise Construction/ Demolition Activity of Buildings within the
State of Punjab” dated 01.03.2017 shall be applicable.
• All demolition and construction waste shall be managed
as per the provisions of the Construction and Demolition
Waste Rules 2016.
• For indoor air quality the ventilation provisions as per
the National Building Code of India of India, 2016.
5(a) The location of the Diesel Generator (DG) set and exhaust
pipe height shall be as per the provisions of the CPCB
norms.
Green Cover 6 • Every plot having area more than 60 sq.mt. but upto
100 sq.mt. shall plant at least one tree in the setbacks of
plot. However, for bigger plots, one tree for every
additional 100 sq.mt. of plot area shall be mandatory.
• The existing trees will be counted for this purpose.
Preference should be given to planting native species.
• Compensatory Plantation for felled/transplanted trees in
the ratio 1:3 within the premises under consideration.
• Choice of species for plantation in site shall be as per
Section 8 of the Urban Green Guidelines, 2014.
(Category'2': 20,000 to less than 50,000 Square meters)
Medium S. no. Environmental conditions
Topography and 1 • The natural drain system should be maintained for ensuring
natural drainage unrestricted flow of water. No construction shall be allowed
to obstruct the natural drainage through the site. No
construction is allowed on wetland and water bodies. Check
dams, bio- swales, landscape, and other sustainable urban
drainage systems (SUDS) are allowed for maintaining the
drainage pattern and to harvest rain water.
• Buildings shall be designed to follow the natural topography as
much as possible. Minimum cutting and filling should be done.
Medium Serial Environmental conditions
Number
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2473
Water 2 • A complete plan for rain water harvesting, water efficiency
Conservation, Rain and conservation should be prepared.
Water Harvesting • Use of water efficient appliances should be promoted with
and Ground Water low flow fixtures or sensors.
Recharge • A rain water harvesting plan needs to be designed where
the recharge bores of minimum one recharge bore per 5,000
square meters of built up area and storage capacity of
minimum one day of total fresh water requirement shall be
provided. Other provisions of rain water harvesting as per
rule no. 40 of these rules shall be followed.
• In areas where ground water recharge is not feasible, the
rain water should be harvested and stored for reuse.
• The ground water shall not be withdrawn without approval
from the Competent Authority and as per notification issued
vide Memo No. PUDA/CA/2013/1713-16 dated
27.02.2013; the underground water for construction of
development works in the notified areas shall not be used.
• All recharge should be limited to shallow aquifer.
2 (a) At least 20 percent of the open spaces as required by the local
building bye-laws shall be pervious. Use of Grass pavers, paver
blocks with at least 50 percent opening, landscape etc. would
be considered as pervious surface.
Waste Management 3 • Solid waste: Separate wet and dry bins must be provided in
each unit and at the ground level for facilitating segregation
of waste.
• Sewage: Onsite sewage treatment of capacity of treating
100 percent waste water to be installed. Treated waste water
shall be reused on site for landscape, flushing, cooling tower,
and other end-uses. Excess treated water shall be discharged
as per CPCB norms. Natural treatment systems shall be
promoted.
• Sludge from the onsite sewage treatment, including septic
tanks, shall be collected, conveyed and disposed as per the
Ministry of Urban Development, Central Public Health and
Environmental Engineering Organization (CPHEEO)
Manual on Sewerage and Sewage Treatment Systems, 2013.
Medium Serial Environmental conditions
Number
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2474
• The provisions of The Solid Waste (Management) Rules
2016 and The E-waste (Management) Rules 2016, and
The Plastics Waste (Management) Rules 2016 shall be
followed.
3 (a) All non-biodegradable waste shall be handed over to authorized
recyclers for which a written tie up must be done with the
authorized recyclers.
3 (b) Organic waste compost/ Vermiculture pit with a minimum
capacity of 0.3 kg/person/day must be installed.
Energy 4 • The provisions of Punjab Energy Conservation Building
Code shall be applicable to the buildings/areas in accordance
with the notification issued vide notification no. 18/4/16
HG 1/1856 dated: 24-6-2016 or as amended from time to time.
• Rooftop Solar Photovoltaic installation shall be as per the
provisions laid down in these rules.
• Solar water heating shall be provided to meet 20 percent of
the hot water demand of the commercial and institutional
building or as per the requirement of these rules, whichever
is higher. Residential buildings are also recommended to
meet its hot water demand from solar water heaters, as far
as possible.
4 (a) • Use of environment friendly materials in bricks, blocks and
other construction materials, shall be required for at least
20 percent of the construction material quantity. These
include flyash bricks, hollow bricks, AACs, Fly Ash Lime
Gypsum blocks, compressed earth blocks, and other
environment friendly materials.
• Fly ash should be used as building material in the construction
as per the provisions of the Fly Ash Notification of
September, 1999 as amended from time to time.
Air Quality and 5 • Provisions of “Action Plan for Monitoring of Construction
Noise /Demolition Activity of Buildings within the State of Punjab”
dated 01.03.2017 shall be applicable.
• All demolition and construction waste shall be managed as
per the provisions of the Construction and Demolition Waste
Rules 2016.
Medium S. no. Environmental conditions
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2475
• For indoor air quality the ventilation provisions as per the
National Building Code of India, 2016 as amended from
time to time.
5 (a) The location of the Diesel Generator (DG) set and exhaust
pipe height shall be as per the provisions of the CPCB
norms.
Green Cover 6 • Every plot having area more than 60 sq.mt. but upto 100
sq.mt. shall plant at least one tree in the setbacks of plot.
However, for bigger plots, one tree for every additional
100 sq.mt. of plot area shall be mandatory.
• The existing trees will be counted for this purpose. Preference
should be given to planting native species.
• Compensatory Plantation for felled/transplanted trees in the
ratio 1:3 within the premises under consideration.
• Choice of species for plantation in site shall be as per Section
8 of the Urban Green Guidelines, 2014.
Top Soil 7 • Topsoil should be stripped to a depth of 20 cm from the
preservation areas proposed for buildings, roads, paved areas, and and
reuse external services.
• It should be stockpiled appropriately in designated areas
and reapplied during plantation of the proposed vegetation
on site.
Transport 8 • A comprehensive mobility plan, as per MoUD best practices
guidelines (URDPFI), shall be prepared to include
motorized, non-motorized, public, and private networks.
• Road should be designed with due consideration for
environment, and safety of users. The road system can be
designed with these basic criteria.
1. Hierarchy of roads with proper segregation of vehicular
and pedestrian traffic.
2. Traffic calming measures.
3. Proper design of entry and exit points.
4. Parking norms as per local regulation.
Medium S. no. Environmental conditions
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2476
(Category '3': 50000 to 150000 sq.mt.)
Medium S. no. Environmental conditions
Topography and 1 • The natural drain system should be maintained for natural
drainage ensuring unrestricted flow of water.
• No construction shall be allowed to obstruct the natural
drainage through the site. No construction is allowed on
wetland and water bodies. Check dams, bio-swales,
landscape, and other sustainable urban drainage systems
(SUDS) are allowed for maintaining the drainage pattern
and to harvest rain water.
• Buildings shall be designed to follow the natural
topography as much as possible.
• Minimum cutting and filling should be done.
Water 2 • A complete plan for rain water harvesting, water efficiency
Conservation, and conservation should be prepared.
Rain Water • Use of water efficient appliances should be promoted.
Harvesting and Low flow fixtures or sensors are used to promote water
Ground Water conservation.
Recharge • A rain water harvesting plan needs to be designed where
the recharge bores of minimum one recharge bore per
5,000 square meters of built up area and storage capacity
of minimum one day of total fresh water requirement
shall be provided. Other provisions of rain water
harvesting as per rule no. 40 of these rules shall be
followed.
• In areas where ground water recharge is not feasible, the
rain water should be harvested and stored for reuse.
• The ground water shall not be withdrawn without approval
from the Competent Authority and as per notification
issued vide Memo No. PUDA/CA/2013/1713-16 dated
27.02.2013, the underground water for construction of
development works in the notified areas shall not be used.
• All recharge should be limited to shallow aquifer.
2 (a) At least 20 percent of the open spaces as required by the
local building bye-laws shall be pervious. Use of Grass
pavers, paver blocks with at least 50 percent opening,
landscape etc. would be considered as pervious surface.
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2477
2 (b) Separation of grey and black water should be done by
the use of dual plumbing system. In case of single stack
system separate recirculation lines for flushing by giving
dual plumbing system be done.
Solid Waste 3 • Solid waste: Separate wet and dry bins must be provided
Management in each unit and at the ground level for facilitating
segregation of waste.
• The provisions of The Solid Waste (Management) Rules
2016 and The E-waste (Management) Rules 2016, and
The Plastics Waste (Management) Rules 2016 shall be
followed.
3 (a) All non-biodegradable waste shall be handed over to
authorized recyclers for which a written tie up must be
done with the authorized recyclers.
3 (b) Organic waste composter/Vermiculture pit with a
minimum capacity of 0.3 kg/person/day must be installed.
Sewage Treatment 4 • Onsite sewage treatment of capacity of treating 100
Plant percent waste water to be installed. Treated waste water
shall be reused on site for landscape, flushing, cooling
tower, and other end-uses. Excess treated water shall be
discharged as per CPCB norms.
• Natural treatment systems shall be promoted.
• Sludge from the onsite sewage treatment, including septic
tanks, shall be collected, conveyed and disposed as per
the Ministry of Urban Development, Central Public
Health and Environmental Engineering Organization
(CPHEEO) Manual on Sewerage and Sewage Treatment
Systems, 2013.
Energy 5 • The provisions of Punjab Energy Conservation Building
Code shall be applicable to the buildings/areas in
accordance with the notification issued vide notification
no. 18/04/16 HG 1/1856 dated: 24-06-2016 or as
amended from time to time.
• Rooftop Solar Photovoltaic installation shall be as per
the provisions laid down in these rules.
Medium S. no. Environmental conditions
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2478
• Solar water heating shall be provided to meet 20 percent
of the hot water demand of the commercial and
institutional building or as per the requirement of these
rules, whichever is higher. Residential buildings are also
recommended to meet its hot water demand from solar
water heaters, as far as possible.
5 (a) • Use of environment friendly materials in bricks, blocks
and other construction materials, shall be required for at
least 20 percent of the construction material quantity.
These include flyash bricks, hollow bricks, AACs, Fly
Ash Lime Gypsum blocks, compressed earth blocks,
and other environment friendly materials.
• Fly ash should be used as building material in the
construction as per the provisions of the Fly Ash
Notification of September, 1999 as amended from time
to time.
Air Quality 6 • Provisions of “Action Plan for Monitoring of and Noise
and Noise Construction /Demolition Activity of Buildings within the
State of Punjab” dated 01.03.2017 shall be applicable.
• All demolition and construction waste shall be managed
as per the provisions of the Construction and Demolition
Waste Rules 2016.
• For indoor air quality the ventilation provisions as per
the National Building Code of India, 2016 as amended
from time to time.
6 (a) The location of the Diesel Generator (DG) set and
exhaust pipe height shall be as per the provisions of the
CPCB norms.
Green Cover 7 • Every plot having area more than 60 sq.mt. but upto
100 sq.mt. shall plant at least one tree in the setbacks of
plot. However, for bigger plots, one tree for every
additional 100 sq.mt. of plot area shall be mandatory.
• The existing trees will be counted for this purpose.
Preference should be given to planting native species.
• Compensatory Plantation for felled/transplanted trees in
the ratio 1:3 within the premises under consideration.
Medium S. no. Environmental conditions
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2479
• Choice of species for plantation in site shall be as per
Section 8 of the Urban Green Guidelines, 2014.
Top Soil 8 • Topsoil should be stripped to a depth of 20 cm from the
preservation areas proposed for buildings, roads, paved areas, and
and reuse external services.
• It should be stockpiled appropriately in designated areas
and reapplied during plantation of the proposed vegetation
on site.
Transport 9 • A comprehensive mobility plan, as per MoUD best
practices guidelines (URDPFI), shall be prepared to
include motorized, non-motorized, public, and private
networks.
• Road should be designed with due consideration for
environment, and safety of users. The road system can
be designed with these basic criteria.
1. Hierarchy of roads with proper segregation of vehicular
and pedestrian traffic.
2. Traffic calming measures.
3. Proper design of entry and exit points.
4. Parking norms as per local regulation.
Environment 10 An environmental management plan (EMP) shall be prepared
Management and implemented to ensure compliance with the
Plan environmental conditions specified in item number 1 to 9
above. A dedicated Environment Monitoring Cell with defined
functions and responsibility shall be put in place to implement
the EMP. The environmental cell shall ensure that the
environment infrastructure like Sewage Treatment Plant,
Landscaping, Rain Water Harvesting, Energy efficiency and
conservation, water efficiency and conservation, solid waste
management, renewable energy etc. are kept operational and
meet the required standards. The environmental cell shall
also keep the record of environment monitoring and those
related to the environment infrastructure.
Medium S. no. Environmental conditions
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2480
Annexure 15
Serial Conditions to be checked Category of
Number the Project
1 The project proponent shall get it certified from the approved Category 1, 2
consultant of the PPCB/Qualified Building Environment and 3
Auditor regarding installation of sewage treatment plant (STP)
and adequacy of disposal system and shall ensure that the treated
sewage shall conform to the norms and standards prescribed by
Punjab Pollution Control Board or any other statutory authority
for such discharges.
2 The project proponent shall adopt only the authorized mode of Category 1, 2
disposal and shall not use any illegal mode of disposal for treated and 3
wastewater.
3 The project proponent shall form Environment Monitoring Category 3
Committee for supervising and monitoring the environment
related conditions of the building permission.
4 The project proponent shall make provisions for the housing Category 1, 2
of construction labour within the site with all necessary and 3
infrastructure and facilities such as fuel for cooking, mobile
toilets, mobile STP, Safe drinking water and medical health care
etc. The housing may be in the form to temporary structure
and it shall be removed after the completion of the project.
5 The project proponent shall comply with the Construction and Category 1, 2
Demolition Rules, 2016. and 3
6 The project proponent shall provide dual plumbing line for use Category 2
of the treated wastewater for flushing purpose and shall provide and 3
other measures like providing fixtures for showers, toilet flushing
and drinking of low flow either by use of aerators or pressure
reducing devices or sensor based control, for conservation of
groundwater.
7 The project proponent shall use only treated wastewater for Category 1, 2
construction purpose and to reduce the water demand during and 3
construction, the project proponent shall make use of premixed
concrete, curing agents and other best practices referred
8 The project proponent shall hire vehicles of good condition Category 1, 2
for bringing construction material to the site of the project and 3
and ensure that all these vehicles shall conform to applicable air,
noise and emission standards and shall only be operated during
non-peak hours.
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2481
9 The project proponent shall ensure that ambient noise levels Category 1, 2
shall conform to prescribed standards both during day and and 3
night times. The ambient air and noise quality should be closely
monitored during construction and operation phase.
10 The project proponent shall make provision of the budget for Category 2
carrying out long lasting and public utility activities under the and 3
corporate social responsibility with the advice of District
Administration.
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2482
Annexure 16
(1) Environmental Cell at the level of Development Authority:
An Environmental Cell shall be setup at the development authority level to support
compliance and monitoring of environmental conditions in buildings. The Cell shall
also provide assistance in environmental planning and capacity building within their
jurisdiction. The responsibility of this cell would be monitoring the implementation
of this notification and providing an oversight to the Third-Party Auditing process.
The cell will operate under the development authority.
(2) Constitution of the cell:
The cell will comprise of at least 3 dedicated experts in following fields:
1. Waste management (solid and liquid)
2. Water conservation and management
3. Resource efficiency including Building materials
4. Energy Efficiency and renewable energy
5. Environmental planning including air quality management.
6. Transport planning and management.
The Cell shall induct at least two outside experts as per the requirements and
background of dedicated experts. Existing environmental cells at the level of local
authority can be co-opted and trained for this Cell.
(3) Financial Support:
An additional fee may be charged along with processing fee for building permission
for integrating environmental conditions and it’s monitoring. The local authority can
fix and revise this additional fee from time to time. The amount of this fee shall be
deposited in a separate bank account, and used for meeting the requirement of
salary / emoluments of experts and running the system of online application,
verifications and the Environmental Cell.
(4) Functions of the Cell:
The cell shall be responsible for assessing and appraising the environmental concerns
of the area under their jurisdiction where building activities are proposed. The Cell
can evolve and propose additional environmental conditions as per requirements.
These conditions may be area specific and shall be notified in advance from time to
time. These additional conditions shall be approved following a due consultation
Serial Conditions to be checked Category of
Number the Project
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2483
process. These environmental conditions will be integrated in building permissions
by the sanctioning authority.
Develop and maintain an online system for application and payment of fees. The
Cell shall maintain an online database of all applications received, projects approved,
the compliance audit report, random inspections made. The Cell shall maintain a
portal for public disclosure of project details including self-certification and compliance
audit reports filed by the Qualified Building Environment Auditors for public scrutiny
of compliance of environmental conditions by the project.
Monitoring the work of Environmental Audit process carried by the Qualified Building
Auditors.
The Cell shall review the applications; finalize the additional environmental conditions
if required within 30 days of the submission of the application to the local authority.
The Cell shall adopt risk based random selection of projects for verifying on site for
certification of Qualified Building Auditors, compliance of environmental conditions
and five yearly audit report.
The Cell shall recommend to the local authority for financial penalty for non-
compliance of environmental conditions by the project proponent.
The Cell shall recommend to the accrediting body and the local authority against any
Qualified Building Environment Auditor, if any lapse is found in their work.
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2484
Annexure 17
(1) Accreditation of Environmental Auditors (Qualified Building Auditors)
The Ministry of Environment, Forest and Climate Change (MoEFCC), through
qualified agencies shall accredit the Qualified Building Environment Auditors
(QBEAs). The Qualified Building Environment Auditors could be a firm / organization
or an individual expert, who fulfils the requirements. The Ministry will implement
this process of accreditation through Quality Council of India (QCI), National
Productivity Council or any other organization identified by the Government. The
organizations like Indian Green Building Council, Bureau of Energy Efficiency etc.
can also be associated in the process of accreditation, training, and renewal. The
environmental consultants accredited by the QCI for building sector will be qualified
as QBEAs. The QBEAs will meet the following criteria. The accrediting agency can
improvise on these criteria.
(2) Qualifications of the Auditor:
Education: Architect (Degree or Diploma), Town Planners (Degree), Civil Engineer
/ Mechanical Engineer (Degree or Diploma), PG in Environmental Science or any
other qualification as per the scheme of the accreditation.
(3) Training:
Mandatory training to be given by the accreditation body or their approved training
providers. This will be as per the scheme of the accreditation.
(4) Experience:
At least three years of work experience in the related field or building sector
Environment Impact Assessment consultants accredited by Quality Council of India
or any other experience criteria as per the scheme of the accreditation.
(5) Infrastructure and equipment:
As per the scheme of the accreditation
(6) Renewal:
The accreditation will be valid for 5 years and will be renewed as per the process
developed under the accreditation scheme.
Accountability/Complaint redressal mechanism: Any complaints regarding the quality
of the work of Qualified Building Environment Auditors shall be made to the
accreditation body. The accreditation body shall evaluate the complaint and take
appropriate action including black listing or cancellation of the accreditation with
wide public notice. This will be in addition to the action at the level of local authority
for penalty and blacklisting. The Ministry can also take such action in case of specific
complaint or feedback.
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2485
Annexure 18
Form-‘M’
[see rule 47]
FORM OF APPLICATION FOR REGISTRATION AS PLUMBER
From___________
To
The Authorized Officer,
Punjab Urban Planning and Development Authority.
Sir,
I apply for registration to practise as plumber to enable me to submit building plans and
supervise buildings construction in the .
I hold necessary qualifications enabling me for getting registration with the Punjab Urban
Planning and Development Authority. Copies of certificates/ testimonials duly attested by
a gazetted officer are enclosed herewith.
A demand draft No.________Amounting to Rs.__________In favour of_________
(Indicate designation of Authorized Officer is enclosed here with as registration fee for the
period of .
Yours faithfully,
Place: Name__________________
Dated: Full Address_____________
PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021
(BHDR 19, 1943 SAKA)
2486
Annexure 19
FORM-‘N’
[see rule 48]
Previous and next
← Form OF APPLICATIONFORM OF APPLICATIONForm OF REGISTRATION CERTIFICATE OF PLUMBERS →FORM OF REGISTRATION CERTIFICATE OF PLUMBERS
All provisions of The Punjab Urban Planning and Development Building Rules, 2021
Questions people ask
Is form FOR NOTICE OF COMMENCEMENT OF WORK of the Punjab Urban Planning and Development Building Rules, 2021 still in force?
No repeal of the Punjab Urban Planning and Development Building Rules, 2021 is recorded.