Application Fee

12. Application Fee. - (1). Any applicant under sub rule (1), sub rule (2) or sub rule (6) of rule 11 shall deposit such amount of fee as decided by State Ground Water Management and Regulatory Authority. 8 (2) The application fee referred to in sub-rule (1) shall be paid online and shall be deposited in Ground Water fund, created by State Government. CHAPTER – IV Grant of Authorization/No-objection Procedure, time limits, format, fee and other provisions, terms and conditions for the grant of Authorization/ No-objection certificate for users in Non- notified areas. 13 (1) Any future or existing user, under sub clause (1) of rule 6, who does not have No Objection Certificate issued by Central Ground Water Authority or by Ground Water Department, Uttar Pradesh shall make, in Form 8(A), an application to the District Ground Water Management Council for issuance of grant of Authorization/ No-objection certificate. (2) Form 8(A) shall be downloaded free of cost from the online web portal www.upgwdonline.in. (3) Such forms as are not duly filled or not enclosed with documents specified in Form 8(A) shall be liable to be rejected. Procedure for renewal of No- objection Certificate. 14 (1) Any existing Commercial or Industrial or Infrastructural or bulk user, who has sunk a well for extracting or using ground water in notified or non-notified area, and have valid No Objection Certificate issued by the Central Ground Water Authority or the Ground Water Department before the date of commencement of the Act, and desires to continue extraction of ground water, shall make an application in Form 8(B). (2) A user, having pre-existing right of ground water, shall apply for renewal of No-objection after one year from the date of commencement of the Act or on the expiry of the validity of existing No-objection Certificate, whichever is earlier. Disposal of application for grant of Authorization/ No-objection certificate by District Ground Water Management Council 15 (1) On receipt of the application under rule, 13, if, the District Ground Water Management Council considers that the application is for issuance of grant of Authorization/ No-objection certificate under section 14, it may grant Authorization/ No-objection certificate in Form 8(C) to the user and if the concerned District Ground Water Management Council is not satisfied with the case, it shall refuse to issue certificate of grant of Authorization/ No- objection and shall intimate accordingly to the user in Form 8(D). (2) Application as received above shall be disposed by District Council in accordance to the provisions of rules within thirty days of receiving of application, otherwise it shall deemed to be issued. In case it is found that the NOC issued as above in not in accordance to the provisions of Rule/ Act, State Ground Water Management and Regulatory Authority shall take appropriate action by fixing the responsibility of the person found guilty. (3) Authorization/ No-objection certificate, issued under sub rule(1) shall be valid for a period of five years. In case of violation 9 of any of the condition of the No objection certificate or change in ground water status of the area, State Ground Water Management and Regulatory Authority shall have the right to either cancel the NOC or impose restrictions as the Authority find appropriate. (4) On receipt of the application under rule, 14, District Ground Water Management Council shall forward the application to Ground Water Department for technical comments. On recommendation of Ground Water Department, District Ground Water Management Council, may renew Authorization/ No- objection certificate in Form 8(E) for such period as may be recommended by Ground Water Department. (5) Users, whose application for grant of Authorization/ No- objection have been rejected under sub rule (1), may prefer an appeal to State Ground Water Management and Regulatory Authority within thirty days from the date of receiving of the order. (6) Any decision taken by the concerned District Ground Water Management Council, under this rule regarding grant or refusal of certificate of Authorization/No-objection Certificate shall be intimated to the user by registered post with due acknowledgement and electronically, within a period of thirty days from the date of the receipt of such application. Provided that the user may receive the copy of the intimation by hand from the office of the concerned District Ground Water Management Council Registers for certificate of Authorization/ No-objection Certificate. 16. Every District Ground Water Management council shall maintain separate register for issuing certificate of Authorization/No-objection Certificate. Application Fee for grant of Authorization/ No-objection 17. (1). A Commercial or Industrial or Infrastructural or bulk user shall deposit such amount of fee as may be decided by the State Ground Water Management and Regulatory Authority for filing application for obtaining certificate of Authorization/No-objection Certificate for sinking a new well referred to in sub-rule (1) of rule 13. The State Ground Water Management and Regulatory Authority 10 Certificate and Fee for ground water extraction/dra wl. may review the amount of fee for different category of users of ground water time to time. (2). After grant of authorization on an application referred to in sub- rule (1) of rule 13, an annual amount of fee for ground water extraction, as provided under section 16 of the Act shall be deposited annually by such user. Amount of fee for ground water extraction shall be determined by the State Ground Water Management and Regulatory Authority. The State Ground Water Management and Regulatory Authority may review the amount of fee of extraction for different category of users of ground water, time to time. (3) The fee referred to in sub-rule (1) and sub rule (2) shall be paidin such manner as prescribed in form 8(A) and shall be deposited in Ground Water fund. CHAPTER – V Identification and Demarcation of Notified areas Procedure for Demarcation of Notified Areas and Issuance of Notification for the purpose of Act 18. Identification and demarcation of areas to be declared as Notified Areas, - in the manner - (1) Rural Areas: Under the provisions of the Act, for the purpose of demarcation of the Notified Areas, the over-exploited and critical blocks shall be considered. The Ground Water Department, therefore, shall identify and prepare the district wise list of blocks categorized as over-exploited and critical blocks, based on the latest ground water resource assessment report. (2) Urban Areas: In the Urban sector, as provided in the Act, the stressed areas where ground water levels have depleted to critical/alarming levels shall be considered for the purpose of declaring such areas as Notified Areas. The Ground Water Department shall identify and delineate those urban areas as stressed, where ground water levels have recorded a significant decline of more than 20 cm per year during the last five years. (3) The Ground Water Department shall submit the list of over- exploited and critical blocks and the stressed urban areas to the State Ground Water Management and Regulatory Authority for notifying the said areas, as provided in the Act. 19. Issuance of Notification, - (1) The State Ground Water Management and Regulatory Authority shall have necessary consultations on the inputs provided 11 by the Ground Water Department related to Over-exploited and Critical blocks categorized as per the latest Ground Water Resource Assessment and the Stressed Urban areas identified by the Department on the basis of analysis of ground water depletion. (2) The Authority, thereafter, shall advice the State Government to declare by Notification such areas as Notified Areas for the purpose of implementation of different provisions of the Act. On the basis of recommendation of Ground Water Department, the State Ground Water Management and Regulatory Authority shall also advice State Government to discontinue or redesign such Government schemes which are directly dependent on ground water extraction. (3) The State Government shall duly consider the recommendation and advice of the State Authority for declaration of such areas as Notified Areas by Notification, in the Gazette. (4) The notification referred to in sub rule (3)shall be uploaded on the websites of all concerned departments And shall also be published in two widely circulated newspapers in the area. CHAPTER – VI FIXING LIMIT OF ABSTRACTION OF GROUND WATER FOR COMMERCIAL, INDUSTRIAL, INFRASTRUCTURAL OR BULK USERS Process forfixing of limit for abstraction of Ground Water for Commercial, Industrial, Infrastructural or Bulk users of ground water 20. (1) For fixing ground water abstraction limit for all the existing Commercial, Industrial, Infrastructural or Bulk users of ground water, the Ground Water Department, in consultation with stake holders, shall submit a proposal to the State Ground Water Management and Regulatory Authority within one year from the date of commencement of these rules. (2) On the basis of proposal submitted by Ground Water Department, State Ground Water Management and Regulatory Authority shall fix ground water abstraction limits for all the Commercial, Industrial, Infrastructural or Bulk users of ground water. (3) Ground water abstraction limits fixed under sub rule (2) shall be written in the registration or authorization certificate/ No-objection certificate for wells of existing Commercial, Industrial, 12 Infrastructural or Bulk users of ground water in Notified as well as Non-notified areas and for all the new Commercial, Industrial, Infrastructural or Bulk users of ground water in Non-notified areas, as the case may be, for the purpose of Section 15. CHAPTER – VII Demarcation and Declaration of Ground Water Quality Sensitive Zones Process for Demarcation and Declaration of Ground WaterQuality Sensitive Zones. 21. Demarcation of Ground Water Quality Sensitive Zone, - (1)To collect, evaluate and analyze ground water quality data and related information for the purpose of generating an overview of the problem, the Ground Water Department shall hold technical consultations with the expert bodies such as Central Ground Water Board, Uttar Pradesh Jal Nigam, Central and State Pollution Control Boards, Indian Institute of Toxicological Research, National Institute of Hydrology, IITs and also those Institutions, which have conducted area specific ground water quality studies, for providing the existing data, reports and information on ground water quality for both rural and urban segments of Uttar Pradesh. (2) Based on the evaluation, analysis and mapping of such available data, the Ground Water Department shall proceed to generate and develop a comprehensive quality data base for the entire state. Subsequently, the department shall identify those areas which are found affected with poor ground water quality along with risk of pollution hazards on drinking and irrigation water supplies. Such areas shall be demarcated and mapped as Ground Water Quality Sensitive Zones. (3)The department shall prepare a detailed district wise list of such Ground Water Quality Sensitive Zones with their GPS locations. (4) The complete information on ground water quality for the entire state shall be submitted to the State Ground Water Management and Regulatory Authority for onward action, with the objective to ensure protection of ground water quality in such delineated zones through appropriate measures for prevention and control of pollution and finding safe quality areas for potable water supplies. (5) State Ground Water Management and Regulatory Authority shall take immediate action and will issue directions to concerned departments to change or redesign their existing policies or 13 schemes to ensure protection of ground water quality in such delineated zones. All concerned departments shall have to change or redesign their existing policies or schemes in such delineated zones. (6) After issuance of direction in sub rule (5), if District Ground Water Management Council finds that any particular scheme of any department is responsible for pollution of ground water in that district, the Council in such cases shall immediately take action in consonance with the provision of the Act and also shall submit a case to State Ground Water Management and Regulatory Authority. Issuance of Notification for Ground Water Quality Sensitive Zone, - 22 (1) The State Ground Water Management and Regulatory Authority shall, after having necessary technical consultations on the information provided by the Ground Water Department regarding ground water quality of the state, recommend and advice the State Government to declare by Notification such areas as Ground Water Quality Sensitive Zones for the purpose of the Act. (2) The State Government shall duly consider the advice and recommendation of the State Authority for declaration of Ground Water Quality Sensitive Zones in the State and issue a Notification, both in Hindi as well as English language under the sub section (1) of the section 24. The notification shall also contain the directions of the State Government for the notified area. (3) The Notification shall be published in the Gazette and Subsequently as Public Notice in at least three daily regional newspapers through the Information Directorate, U.P. (4) Apart from the publication in the newspapers, the Notification shall also be uploaded on the websites of all concerned departments for wide circulation. CHAPTER – VIII PROCESS FOR FIXING STANDARDS OF TREATED WASTE WATER AND 14 PROCEDURE FOR INSTALLATION OF TREATMENT PLANT Process for fixing standards of treated waste water. 23. (1)On the direction of the State Ground Water Management and Regulatory Authority, the Ground Water Department, in consultation with Central Ground Water Board, Central and State Pollution Control Boards, Uttar Pradesh Jal Nigam shall submit a proposal to it for approval of standards for treated waste within such time as may be directed by the said Authority. (2) On the basis of proposal submitted by Ground Water Department, State Ground Water Management and Regulatory Authority shall approve standards for treated waste water. (3) State Ground Water Management and Regulatory Authority shall issue direction to each District Ground Water Management Council for compliance of approved standard while granting No- objection to user of ground water. Procedure for installation of treatment plant. 24.(1) The State Ground Water Management and Regulatory Authority shall ensure through District Ground Water Management Councils that all Commercial, Industrial, Infrastructural or Bulk users of ground water that pollute ground water or surface water, will install treatment plants within a period of two years from the date of commencement of these rules. (2) Each District Ground Water Management Council shall conduct physical verification of all Industries in the district thereof, within a period of one year from the date of commencement of these rules. (3) On the basis of report of physical verification, the District Ground Water Management Council shall prepare a list of those industries, which have not constructed appropriate treatment plant. (4) List of each district as prepared under sub rule (3) shall be submitted to the State Ground Water Management and Regulatory Authority. (5) The State Ground Water Management and Regulatory Authority shall direct the industries referred to in sub rule (4) that the industries which have not installed appropriate treatment plants shall install the said plant within a period of six months from the date issuance of the direction. (6) After end of six-month period of direction under sub rule (5), 15 each District Ground Water Management Council shall again conduct physical verification of all Industries in concerning districts in two months period. On the basis of report of physical verification, District Ground Water Management Council shall again prepare a list of those industries, which have not complied to the direction issued by State Ground Water Management and Regulatory Authority under sub rule (5). (7) List of each district as prepared under sub rule (6) shall again be submitted to State Ground Water Management and Regulatory Authority. (8) State Ground Water Management and Regulatory Authority shall take action against such user of ground water, who still fails to set up treatment plant within the said period, by: (i) issue order for construction of necessary treatment plant at such user’s cost by the agency identified by the State Ground Water Management and Regulatory Authority; (ii) direct District Ground Water Management Council of concerning district to issue order for start of prosecution under the provisions of sub-section (2) of section 39 of the Act. Procedure for restrictions for discharging untreated effluent into ground water or surface water. 25. (1) State Ground Water Management and Regulatory Authority shall monitor through Appropriate Authorities that,- (a)no Government department/ undertaking/ Corporation, etc. discharge untreated effluent into ground water or surface water. (b)no untreated nala or sewer. etc are directly discharged into rivers/ ponds/ lakes or any groundwater or surface water. (2) Each District Ground Water Management Council shall conduct physical verification for process of effluent discharge adopted by such Government bodies as provided under sub rule (1), within a period of one year from the date of commencement of these rules. (3) On the basis of report of physical verification, District Ground Water Management Council shall prepare a list of the Government bodies referred to in sub rule (1), which have not adopted appropriate process for treating effluent and are directly 16 discharging untreated effluent into ground water or surface water. (4) List of each district as prepared under sub rule (3) shall be submitted to State Ground Water Management and Regulatory Authority. (5) The State Ground Water Management and Regulatory Authority shall issue such instructions to Government bodies referred to in sub rule (4), so as to ensure: (a) the construction of appropriate treatment plants within one yearfrom the date of issuance of the said instruction, or (b)to make functional the existing treatment plants within six monthsfrom the date of issuance of the said instruction. (6) At the end of period specified under sub rule (5), each District Ground Water Management Council shall again conduct physical verification of those Government departments/ undertakings/ Corporations/ bodies, etc. which have not yet adopted appropriate process for treating effluent and are still directly discharging untreated effluent into ground water or surface water, within two months. (7) List of those Government bodies, who have not complied to the advisory issued by State Ground Water Management and Regulatory Authority under sub rule (6) shall be submitted to State Ground Water Management and Regulatory Authority for action. CHAPTER – IX RAIN WATER HARVESTING Process of imposing provisions for rain water harvesting. 26. (1) Appropriate Authorities shall ensure that Rain Water Harvesting Structures have been properly constructed by all users having plot area of 300 square meters or more. Installation of rain water harvesting structures shall be made compulsory for different users in phases, described hereunder. Provided that-; Installation of Rain Water Harvesting Structures shall be compulsory for every such user, who have submersible pump or any similar ground water extracting device for extraction of ground water in his or her premises. (2) In first phase, every Government Department/ Semi- 17 Government Department/ Authorities/ Aided Institutions/ Public Sector Undertaking (either fully or partially funded by Government), Private Institutions or Organizations, having plot area of 300 square meters or more, or who are extracting ground water through submersible pumps or similar devices, shall also ensure that Rain Water Harvesting Structures have been properly constructed in their premises within a period of two years from the date of commencement of the Act. (3) In second phase (after one year of first phase), every user other than those mentioned in sub rule (2), having plot area of 300 square meters or more, or who are extracting ground water through submersible pumps or similar devices, shall also ensure that Rain Water Harvesting Structures have been properly constructed in their premises,withinone yearof end of first phase. (4) After installation of Rain Water Harvesting Structures, every user shall inform online on web portal www.upgwdonline.in. (5) If such user under sub rule (2) and sub rule (3), fails to do so, he or she or concerning body shall be punished in such manner and with such punishment as may be determined by the State Ground Water Management and Regulatory Authority. (6) Besides punishment referred to in sub rule (5), submersible pump or any other ground water extracting device shall immediately be disconnected, sealed and seized by the Municipal Water Management Committee. (7) Area-specific design of Rain Water Harvesting Structures and quantum of recharge shall be decided by State Ground Water Management and Regulatory Authority. Such designs shall also be made available online. (8) Ground Water Department shall also circulate list of competent technical persons, who shall provide necessary technical assistance for installation of appropriate Rain Water Harvesting Structures. (9) Appropriate Authorities shall organise training programs for demonstrating rain water harvesting techniques. Appropriate 18 Authorities shall also invite different non-government organisations to participate in such training programs. (10) Appropriate Authorities shall also conduct awareness campaign to sensitize different users for rain water harvesting. (11) State Ground Water Management and Regulatory Authority shall also ensure that all concerning Institutions like ‘All India Council of Technical Institution’, ‘Medical Council of India’, University Grants Commission, or similar bodies shall include installation of appropriate rain water harvesting structure into their building norms while issuing No Objection Certificate. (12) District Ground Water Management Council shall also issue direction to concerning implementing department to rejuvenate the defunct wells for water harvesting work. (13) Appropriate Authorities shall also issue direction to concerning implementing department to take appropriate actions for water harvesting, viz., reuse the surplus drawl water of hand pumps, etc.in urban and rural areas. CHAPTER – X COMPOUNDING OF OFFENCES Process of Compounding of offence. 27. The application for compounding of an offence shall be made in the form appended as appendix (B) to these rules. CHAPTER – XI GRIEVANCE REDRESSAL Process of Grievance Redressal 28.(1) Any aggrieved person may submit his or her grievance with sufficient justification online at web portal www.upgwdonline.in on issues referred to in sub-section (2) of section 43 of the Act. (2) The District Ground Water Grievance Redressal Officer may if require issue notice to the alleged user to submit his or her explanation within a period of thirty days from the receipt of grievance application. (3) The alleged person shall submit his or her explanation to District Ground Water Grievance Redressal Officer, within a period of thirty days of receiving notice. 19 (4) District Groundwater Grievance Redressal Officer shall decide the grievance and communicate his or her decision to the aggrieved person within thirty days of receiving of explanation of alleged user. (5) The aggrieved person may prefer an appeal against the decision of the District Ground Water Grievance Redressal Officer to the State Ground Water Management and Regulation Authority within thirty days from the date of receipt of the decision of the District Ground Water Grievance Redressal Officer. CHAPTER – XII MISCELLANEOUS Other provisions. 29. (1) District Ground Water Management Council shall identity such existing Government schemes which either encourage excessive ground water drawl or have adverse impact on water quality of that area. (2)District Ground Water Management Council shall submit proposal for revisiting such schemes to State Ground Water Management and Regulatory Authority. (3) State Ground Water Management and Regulatory Authority shall take immediate action and will issue directions to concerned departments to change or redesign their existing policies or schemes. All concerned departments shall have to change or redesign their existing policies or schemes in such delineated zones. 30. Anything, which has not been provided in these rules shall be put before State Ground Water Management and Regulatory Authority. Decisions, in such cases shall be taken in consonance with the provisions of Act, and communicated accordingly. 20 (Anurag Srivastava) Principal Secretary Appendix (A) [See rule 4] (Qualification of non-official members of Appropriate Authorities) S. No. Members referred to in Rule 3 Qualification 1. Members of Gram Panchayat Ground Water Sub Committee, referred to in clause (e) of sub- section (2) of section 3. Block Development officer of respective block shall nominate one representative from Minor irrigation department and one representative from Agriculture Department. 2. Members of Block Panchayat Ground Water Management Committee referred to in clause (e) of sub-section (2) of section 4. District Magistrate of respective district shall nominate one representative from Minor irrigation department and one representative from Agriculture Department. 3. I. Two members of Municipal Water Management Committee referred to in sub clause (c) of sub-section (2) of section-5. District Magistrate shall nominate two members having field knowledge of water resources in the state of Uttar Pradesh. 21 II. Two members of Municipal Water Management Committee referred to in sub clause (d) of sub-section (2) of section-5. District Magistrate shall nominate two members of Resident Welfare Associations/ Social Groups. III. Three members of Municipal Water Management Committee referred to in sub clause (e) of sub-section (2) of section-5. District Magistrate of respective district shall nominate one representative from Ground Water Department, one representative from Minor Irrigation department and one representative from Agriculture Department. 4. I. One subject expert as member of District Ground water Management Council mentioned in clause (c) of sub-section (2) of section-6. District Magistrate shall nominate one subject expert having Masters degree in Earth Sciences or Graduate in Civil/ Mechanical Engineering as well as minimum ten years of experience in ground water management in the state of Uttar Pradesh. II. One member referred to in clause (d) of sub section (2) of section-6. District Magistrate shall nominate one eminent person from Public/Non- Government Organization/ Social Sector. 5. I. Three subject experts as members of State Ground Water Management and Regulatory Authority referred to in serial number 16 of sub- section (2) of section-7. State Government shall nominate three subject experts as,- I. One Environmental Expert, having Masters degree in Earth Sciences/ Environmental science as well as minimum fifteen years of experience in ground water management or pollution control; II. One Ground Water Chemist, having Masters degree in Chemistry as well as minimum 22 fifteen years of experience in the field of testing, analysis and interpretation of ground water quality; III. One Ground Water Expert, having Masters Degree in Earth sciences or Graduate Degree in Civil/ Mechanical Engineering as well as minimum fifteen years of experience in the field of ground water exploration and management related to different hydrogeological conditions of Uttar Pradesh. II. One eminent person from Public/Non- Government Organization/Social Sector referred to in serial number 17 of sub section (2) of section-7. State Government shall nominate one eminent person from Public/Non- Government Organization/Social Sector. 23 Appendix (B) [See rule 27] (Format of Applicationfor Compounding of an Offence) S.No. Particulars Remarks 1 Name of the applicant 2 Offences committed u/s * 3 Status of case (i.e. whether contemplated/pending in Court/convicted/acquitted 4 Particulars of offences along-with justification for compounding (separate sheet) 5 Whether the applicant has paid the amount of penalty and any other sum due relating to the offence? 6 Whether the applicant undertakes to pay the compounding charges as shall be intimated by the compounding officer? 7 Whether similar offences in the case of the applicant have been compounded earlier. If yes, how many times? 8 Whether the application is for compounding of first offence referred to in Section 41? 9 Whether the applicant was convicted by a court of law for the offence sought to be compounded 24 DECLARATION BY THE APPLICANT I do hereby declare that the particulars furnished herein above are correct and true. I understand that in case any of the information and particulars is found to be in correct at any stage of scrutiny and investigation or thereafter, my application is liable to be rejected Icancelled. Note: 1. Separate application form should be filled for every offence. 2. The application form should be completed in all respect before submission. Incomplete applications are liable for rejection. Any correctionIalteration shall be duly authenticated. 3. In case any of the particulars/information is found to be incorrect at any stage of verificationIscrutiny, the application is liable for rejection. 6. Please attach the following documents along with the application: (a) Document showing proof of ownership of land; (b) Photocopy of Aadhaar card / voter IDIration card Iany other proof of identification (c) Notice issued by District Ground Water Management Council against offence committed by the applicant. 7. The compounding Officer reserves the right to ask for any other document(s) from the owner applicant for examination of the merit of the case. Place Signature…………………… Date Current address……………………… …… * Offence for which compounding is sought I agree I agree  25

Previous and next

All provisions of THE UTTAR PRADESH GROUND WATER (MANAGEMENT AND REGULATION RULES, 2020

Questions people ask

Is rule 12 of THE UTTAR PRADESH GROUND WATER (MANAGEMENT AND REGULATION RULES, 2020 still in force?

No repeal of the UTTAR PRADESH GROUND WATER (MANAGEMENT AND REGULATION RULES, 2020 is recorded.