LawGrids logoLAWGRIDS.ORG

Regulation 30, The Chhattisgarh Real Estate Regulatatory Authority (General) Regulations, 2020: Power to remove difficulties

The Chhattisgarh Real Estate Regulatatory Authority (General) Regulations, 2020 - Regulation 30

Text of regulation 30

Power to remove difficulties

30. Power to remove difficulties.- If any dif{iculty arises in giving effect to any of the provisions of the Regulations, the Authority may, by general or special order, do anything not being inconsistent with the provisions of the Act or Rules, which appears to be necessary or expedient for the purpose of removing the difficulties. By order and in the name of the Governor of Chhattisgarh, BHOSKAR VILAS SANDIPAN, Joint Secretary. 302 (40) d*qrr6 {qqd, ft<io o crd zozo AITNEIrURE.l ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration and quarter update of the project) (for the period ti11_) To, The Certificate No. (Name and Address of Promoter), of C onstruction / Development (Project Name). Tehsil Subject: - Certificate of Percentage of Completion work in Ref: CGRERA Registration No. Sir, I/We Architect Work for certifying of the have undertaken assignment as Percentage of Completion of Construction/Development Project,' situated at Village District admeasuring sq.mtr. area being developed by (Promoter's Name). 1. Following technical professionals have been appointed by the Promoter:- (i) M/s/Shri/Smt as Land Surveyor/Architect; as Structural Consultant;(ii) M/s /Shri / Smt (iiil M/s/Shri / Smt as Mechanical, Electrical, Plumbing Consultant; (iv) M/s /Shri / Smt as Head Site-Supervisor; Based on Site Inspection, with respect to the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done, for the Real Estate Project (Project Name), is as per Table-A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table-B. Certificate No. Table A Sr. No. Tasks /Activity Total Area Work Done Area Percentage of work done 1. Excavation 2. number of Basement(s) and Plinth 3. Stilt Floor 4. number of Slabs of Super Structure 5* Internal task/activities to each of the Flat/ Premises - u*€rr6 {rqq*, frqi6 o qrd zozo 302 (41) (i) Internal walls, Internal Plaster, (ii) Floorings within Flats/ Premises, (iii) Doors and Windows (iv) Paintins of internal walls 6. Sanitary Fittings within the Flat /Premises, Electrical Fittings within the Flat/Premises 7. Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 8. The external plumbing and external plaster, external painting, elevation, completion of terraces with wateroroofins of the Buildins/ Wins- 9. Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment, Electrical fittings to Common Areas, Electro Mechanical equipments, Compliance to conditions of environmental NOCs (if any), Finishing to entrance lobby, plinth protection, paving of areas appurtenant to Building, Compound Wall and all other requirements as may be required to obtain Occupation / Comoletion Certificate *Note - Separate work done percentage should be mentioned for each of the sub heading in row no. 5 TABLE-B Internal & Enternal Development lllorks in Respect of the entire Project s. No Common areas and Facilities, Amenities Proposed lYes/Nol Percentage of Work done Details 1. Internal Roads &Footpaths 2. Water Sunr:lv Line 3. Sewerage (chamber, lines, Septic Tank) 4. Sewage Treatment Plant (STP) 5. Storm Water Drains 6. Landscaping & Tree Plantins 7. Street Liehtine 8. Community Buildings/ Club House 9. Solid Waste management & Disposal 10. Water conservation, Rain water harvesting 11. Energv Manasement/ Sub- 302 (421 6*sIT€{rqqd, frcifi o fld zozo station 12. Fire protection and fire safety requirements 13. Open area (Park) 14. Boundarv WaIl & Main Gate 15. Security Service 16. Others (As per Brochure) {Option to Add more) TABLE C Percentage of work done Overall percentage of construction/ development completed as per Table- A and Table-B. Signature and Name of the Architect (License No.............) Certificate No. GUIDANCI NOTE FOR THE ARCHITECT AT THE TIME OF ISSUE OF THIS CERTIFICATE: (1) The Architect should be a member of council of Architecture and could be preferably the one appointed by the promoter for representing before the Competent Authority for getting the approval and sanctions for the project. (2) There should be proper agreement between Architect for the supervision and the services to Estate Project. (3) The Architect should visit the site and verify completed as per the approved plans (a) The Architect must use his professional knowledge, skill and experience in providing the information in this certificate. (5) The Architect shall be held responsible and accountable for any wrong information in the certificate. The Architect shall be liable for any penal action under Real Estate (Regulation and Development) Act, 2OL6 including recommendation to the council of Architecture to initiate necessary disciplinary action including revocation of membership for issue of wrong certificate. (6) This certificate has to be issued on the letter head of the Architect, affixing the stamp of the Architect, along with Architect's signature on each page. (7) The Architect shall not be in the list of Defaulter Architect of the Council of Architect at the time of issue in this certificate. the Promoter and the be provided for the Real that the work has been Bdlq:rd ttqqd, frqi+ o qFf, zozo 302 143) AI{NEXURE.2 ENGINEER'S CERTIFICATE (To be submitted at the time of Registration and quarter update of the project) (for the period till_) Certificate No. To, The Subject: Certificate of Cost Incurred for Development of Project Name) Ref: CGRERA Project Registration No. Sir, l/ We have undertaken assignment estimated cost of the Tehsil (Name and Address of Promoter), Project, situated District certi$ring Village for at admeasuring sq.mtr. area, being developed by (Promoter Name). 1. Following technical professionals have been appointed by thePromoter :- (i) M/s /Shri/Smt as Land Surveyor/Architect; (ii) M/s /Shri / Smt as Structural Consultant; (iii) M/s /Shri / Smt as Mechanical, Electrical, Plumbing Consultant; (iv) M/s /Shri / Smt as Quantity Surveyorn I have estimated the cost of the project for completion, to obtain occupation certificate/ Completion Certificate. My estimated cost calculations are based on the Drawings/plans made available to me for the project by the Promoter and the Schedule of items and quantity for ttre entire work as calculated by me and the site inspection carried out by me. I certify that the cost of the civil, Mechanical, Electrical, plumbing and allied works for the aforesaid Project, as completed on the date of this certificate is as given in Table-A and Table-B below: Certificate No. TABLE-A (Apartme nts/ Buildings Construction) 2. 3. Sr. No Particulars Amounts 1 Total Estimated cost of the buildings/apartments/ wings as on date Rs. /- 2 Cost incurred as on (based on the Estimated cost ) Rs. t- 3 Work done in Percentage (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred (Based on Estimated Cost) t-Rs. 302 (44) , fuio oqrdzozo Sr. No Particulars Amounts 1 Total Estimated cost of the Internal and External Development Works including amenities and Facilities in the layout as on date Rs. t- 2 Cost incurred as on (based on the Estimated cost ) Rs. /- 3 Work done in Percentage {as Percentase of the estimated cost ) 4 Balance Cost to be Incurred (Based on Estimated Cost) Rs. /- TABLE-B (External Development) TABLE-C (Overall Cost Incurred, Table-A + Table-Bl Place: , o" r, I'.' .': Signature & Name of the Engineer (License No.............) Certificate No. GUIDAI{CE NOTE: (l) There should be proper agreement between the promoter and the engineer for the supervision of the work. (2) Th; complete details of quantity survey should be maintained and verified by the engineer. (3) Quantity survey should be done by office of Engineer. ( ) The estimated cost includes all labor, material, equipment and machinery required to carry out entire work- (5) The Engineer needs to find out the complete quantity of the material received in the site and its utilization in the project. (6) The rates of the material to work out the cost may be taken from the purchase bills. (7) The Engineer needs to get satisfied about the quantity of the material and the labor cost incurred in the project. (S) Engineer needs to keep all the working papers at the time of issue of this certificate. (9) The Engineer needs to visit the site, veri$r ttre records maintained at the site or any other records which will satisfy for the use of material to the project including the estimated quantity of the material which normally goes in completing the work. Sr. no. Particular Amount lRupeesl 1 Total Estimated Cost, [Table ,{(1)+1251" B {1)l Rs. t- 2 Total Cost Incurred [Table A(2)+f2ble B (211 Rs. t- 3 Total Work done in Percentage[as per Table A(3) &Table B (3)l 4 The Balance cost to ComPlete the ProiectlTable A{4)+Table B (4)l Rs. t- Bdtrtrd irEnrrd, Qiii{ 5 r I td 2o2o 302 (4s) (10)The Engineer shall be held responsible and accountable for €rny wrong information in the certificate. The Engineer shall be liable for any penal action under Real Estate (Regulation and Development) Act, 2OL6 including recommendation to the Competent Authority to initiate necessary disciplinary action including revocation of his/her empanelment with the Competent Authority for issue of wrong certificate. (ll)A11 components of work with specifications are indicative and not exhaustive. (I2)This certificate has to be issued on the letterhead of tJle Engineer, affixing the stamp of the Engineer, along with Engineer's signature on each page. (13) The Engineers should have the qualification as prescribed in the Act. .E 302 146) Bffisrra rtqqd, ftqi6 c qrd zozo ANNEXURE,S CHARTERED ACCOUNTANT'S CERTIFICATE (To be submitted at the time of registration and quarter update of the project) (for the period till _) Name of the Promoter : Name of the Project : CGRERA Registration No. A1l fi res 1n Rs. Lakh (2) Acquisition Cost of Land or Development Rights, lease Premium, lease rent, interest cost incurred or payable on Land Cost (including legal cost). Amount of Premium paid or payable to obtain FAR, additional FAR, and any other charges (including diversion charges) to Competent Authority. Amounts payable to State Government or Competent Authority or any other Statutory Authority of the State or Central Government, towards stamp duty, transfer charges, registration fees etc; (if not included in (a) above Sub-Total of LAND COST Development Cost/ Cost of Construction : (a) Total Cost certified by Annexure-2) of Construction as Engineer (As per Certificate No.: (ii) Actual Cost of construction incurred as per the books of accounts as verified by the CA Note : (for adding to total cost of construction incurred, Minimum of (i) or (ii) is to be considered) (iiil On-site development of entire project excluding cost of construction as per (ii) above, i.e. salaries, consultants fees, site overhead Enfurrdrrqrd, fraim e qrd zozo toz (tt\ Sr. No. Particulars Amount lRs.l Estimated Incurred (1) (21 (3) (41 development works, cost of services (including water, electricity, sewerage, drainage, layout roads etc.), cost of machineries and equipment including its hire and maintenance costs, consumables etc. A11 costs direcfly incurred to complete the construction of the entire phase of the proiect reeistered. (b) Payment of Taxes, cess, fees, charges, premiums, interest etc to any statutory Authority. Proiect Clearance Fees (a) Fees paid to RERA (b) Fees paid to T&CP Dept. (c) Fees paid to Local Authority (Municipal/ Panchayat) (d) Consultant/Architect Fees (directly attributable to project) (e) Any other (specify) (c) Interest payable to financial institutions, scheduled banks, non-banking financial institution (NBFC) or money lenders on construction funding or money borrowed for construction ; Sub-Total of Development Cost 2. Total Estimated Cost of the Real Estate Project [1(i) + l(iif] of Estimated column 3. Total Cost Incurred of the Real Estate Project [1(i) + l(iif] of Incurred Column 4. 7o completion of Construction Work (as per Project Architect's Certificate) Certificate No.: dated: 5. Proportion of the Cost incurred on Land and Construction Cost to the Total Estimated Cost in percentage. (i.e. x 1OO) 302 (48) , fr<io cqrd zozo This certificate is being issued on specific request of (Promoter's Name) for CG-RERA compliairce. The certificate is based on the information/records/documents/books of accounts of the Promoter and is true to the best of my knowledge and belief. Place: Signature of the Chartered Accountant (Membership No. ...................) NOTE-I- Cost of land shall be valued as per the Collector's guideline value as on the date of commencement of the project, or the cost of acquisition whichever is more. NOTE-2- To be given as part of CA Certificate (Annexure 3) for quarterly updation (Rs. In Lakhs) Sl.No Particulars As per certilicate given for last quarter During the quarter Total 1. Total estimated Land Cost as per clause 1 (i) 2. Total estimated development cost as per clause 1 (ii) J. Total Estimated Cost of the project as per clause 2 4. Total Cost incurred as per clause 3 5. Percentage of completion as per clause 4 6. Proportion of cost incurred total estimated project cost per clause 5 to AS Advance from Customers Sl.No Particulars Amount received as per certificate given for last quarter Amount Received during the quarter Total Amount 1. Advance received from customers , ftqi6 oqtd zozo roz (le) !:JDRA Designated Account of the Project Name of the Bank: Branch: Account Number Sl.No Particulars Amount in Rs. 1. Opening Balance in the designated account of the project at the start of the reported quarter. 2. (Add): Deposits in the designated account of the project during the reported quarter. 3. (Less): Withdrawals from tlle designated account of the project during the reported quarter. 4. Closing Balance in the designated account of the project at the end of the reported quarter. GUIDAI{CE NOTE F.OR THE CA: (1) The Chartered Accountant should be a "Practicing Chartered Accountant". (2) The statutory auditor doing annual audit and the CA issuing certificate for project registration and withdrawal from CG-RERA Designated Accounts, should be different entities. (3) The CA shall be held responsible and accountable for any wrong information in the certificate. The CA shall be liable for any penal action under Real Estate (Regulation and Development) Act, 2016 including recommendation to the ICAI to initiate necessary disciplinary action including revocation of membership. (a) This Certifrcate should be issued on the letterhead of the CA, affixing his stamp/seal, along with CA's signature on each page. The CA shall also mention the membership number below his signature. 302 (so) Edlqrra rrqqd, frci*. o crd zozo ANNE](IIRE.4 ARCHITECT'S CERTIFICATE (To be submitted at the time of withdrawal from RERA Designated Account) Certificate No. (Name and Address of Promoter), To, The Subject:- Certificate of work in Ref: CGRERA Registration No. Sir, I/We Percentage of Completion of Construction/ Development (Project Name). Architect Work for certifying of the have undertaken assignment as Percentage of Completion of Construction/ Development Project, situated at Village District sq.mtr. Name). being developed (Promoter's to each of the Tehsil ad by 1. measuring Following technical professionals have been appointed by the Promoter : as Land Surveyor/Architect; as Structural Consultant; (i) M/s/Shri/Smt (ii) M/s /Shri / Smt (iii) M/s /Shri / Smt as Mechanical, Electrical, Plumbing Consultant; (i") M/s /Shri / Smt as Head Site-Supervisor; Based on Site Inspection, with respect to the aforesaid Reai Estate project, I certify that as on ttre date of this certificate, tl:e Percentage of Work done, for the Real Estate Project (Project Name), is as per Table-A herein below. The percentage of tle work executed with respect activity of the entire phase is detailed in Table-B. Certificate No. TABLE A Sr. No Tasks /Activity Total Area Work Done Area Percentage of work done 1. Excavation 2. number of Basement(s) and Plinth 3. Stilt Floor 4. number of Slabs of Super Structure 5* Internal task/activities to each of the Flat/ Premises - (v) Internal walls, Internal Plaster, (vi) Floorings within Flats/ Premises, (vii)Doors and Windows (.riii) Painting of internal walls 6. Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/ Premises udsrrq rrqrd, frtia 6 qtd 2o2o 302 (sl) 7. Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 8. The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/ Wins, 9. Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment, Electrical fittings to Common Areas, Electro - Mechanical equipments, Compliance to conditions of environmental NOCs (if any), Finishing to entrance lobby, plinth protection, paving of areas appurtenant to Building, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate *Note - Separate work done percentage should be mentioned for each of the sub heading in row no. 5 TABLE-B Internal and External Development Works in Respect of the entire Project s. No Common areas and Facilities, Amenities Proposed lYeslNol Percentage of Work done Details 1. Internal Roads & Foot paths 2. Water Supplv Line 3. Sewerage (chamber, lines, Septic Tank) 4. Sewage Treatment Plant (STP) 5. Storm Water Drains 6. Landscaping & Tree Plantins 7. Street Liehtins 8. Community Buildings/ Club House 9. Solid Waste management and Disposal 10. Water conservation, Rain water harvesting 11. Energr Management/ Sub- station t2_ Fire protection and fire safetv requirements 13. Open area (Park) 302 1s2) EdslrE rtqrd, frci6 o md zozo L4. Boundary Wall and main gate 15. Security Service 16. Others (As per Brochure) (Option to Add more) TABLE.C Overall Signature and Name of the Architect (License No.............) Certificate No._ GUIDAITCE NOTE FOR THE ARCHITECT AT THE TIME OF ISSUE OF THIS CERTIFICATE : (3) .(41 (s) (1) (21 (6) The Architect should be a member of council of Architecture and could be preferably the one appointed by the promoter for representing before the Competent Authority for getting the approval and sanctions for the project. There should be proper agreement between The promoter and rhe Architect for the supervision and the services to be provided for the Real Estate Project. The Architect should visit the site and verify that the work has been completed as the per the approved plans 'The Architect must use his professional knowledge, skill and experience in providing the information in this certificate. The Architect shall be held responsible and accountable for any wr-ong information in the certificate. The Architect shall be liable for any penal action under Real Estate (Regulation and Development) Act, 2016 including recommendation to the council of Architecture to initiate necessary disciplinary action including revocation of membership for issue of wrong certificate. This certificate has to be issued on tl:e letterhead of the Architect, affixing the stamp of the Architect, along with Architect's signature on each page. The Architect should not be in the list of Defaulter Archrtect of the council of Architect at the time of issue in this certificate. of the work ted Sr. No. Particular Total Area Work Done Area Percentage of work done 1. Overall percentage of construction/ development completed as per Table-A and Table-B. Place: (7) ' fu-5 6 ql=t- "20 302 (s3) .J:. ANNEXTIRE.S ENGINEER'S CERTIFICATE (To be submitted at the time of withdrawal from RERA Designated Account) Certificate No. To, The (Name & Address of Promoter), Subject: Certifrcate of Cost Incurred for Development of (Project Name) Ref: CGRERA Project Registration No. Sir, Il We have undertaken assignment for certifying estimated cost of the Project, situated at Village Tehsil District admeasuring sq.mtr. area, being developed by (Promoter Name). 1. Following technical professionals have been appointed by the Promoter :- (i) M/s /Shri/Smt as Land Surveyor/Architect; as Structural Consultant;(ii) M/s /Shri / Smt (iii) M/s /Shri / Smt as Mechanical, Electrical, Plumbing Consultant; (M M/s /Shri / Smt as Quantity Surveyor* ' 2. I have estimated the cost of the project for completion, to obtain Occupation Certificate/ Completion Certificate. My estimated cost calculations are based on the Drawings/plans made available to me for the project by the Promoter and the Schedule of items and quantity for the entire work as calculated by me and the site inspection carried out by me. 3. I certify that the Cost of the Civil, Mechanical, Electrical, Plumbing and allied works for the aforesaid Project, as completed on the date of this certificate is as given in Table-A and Table-B below: Certificate No. 302 (s4) fu{lqqT, frqi6 rrnd zozo TABLE.A (Apartments/Buildings Construction) TABLE-B (External Development) Sr. No Particulars Rs. (in Lakhs) As on {As per last Certificatel Rs. ( in Lakhs) From Total (Rs. in Lakhs) As on the date of certificateTo 1 Total Estimated cost of the buildings/ apartments/ drg" 2 Cost incurred based on the Estimate cost ) 3 Work done in Percentage (a" Percentage of tJle estimated cost ) 4 Balance Cost to be Incurred (Based on Estimated Cost) Sr. No Particulars Rs. ( in LakhsI As on (As per last Certificate) Rs. ( in Lakhs) From Total (Rs. in Lakhs| As on the date of certificateTo 1 Total Estimated cost of the Internal and External Development Works including amenities and Facilities in the layout 2 Cost incurred (based on the Estimated cost ) 3 Work done in Percentage (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred (Based on Estimated Cost) , ftFriqi 6 nrd 2o2o 302 (ss) Sr. No Particulars Rs. ( in Lakhsf As on (As per l,ast Certificatef R.s. ( in Lakhs! From Total [Rs. in Lakhsf As on the date of certificateTo 1 Total Estimated Cost, lTable A(1)+Table B (1)l 2 Total Cost Incurred tTable A(2)+Table B (2)l 3 Total Work done in Percentage [as per Table A{3) &TableB(3)l 4 The Balance cost to Complete the Project lTable A(4)+Table B (a)l TABLE.C (Overall Cost Incurred, Table-A + Table-Bl Place: Signature & Name of the Engineer (License No.............) Certificate No. Sr. No Particulars Rs. { in Lakhsf As on (As per last Certificate) Rs. ( in Lakhs) From Total (Rs. in LakhsI As on the date of certificateTo 1 GUIDAI{CE NOTE: (l) There should be proper agreement between the promoter and the engineer for the supervision of the work. (2) The complete details of quantity survey should be maintained and verified by the engineer. (3) Quantity survey should be done by office of Engineer. (a) The estimated cost includes all labor, material, equipment and machinery required to carry out entire work. 302 (s6) Bdsrr€ {qqd, frqi6 r rnd zozo (5) The Engineer needs to find out the complete quantity of the material received in the site and its utilization in the project. (6) The rates of the material to work out the cost may be taken from the purchase bills. (7) The Engineer needs to get satisfied about the quantity of the material and the labor cost incurred in the project. (8) Engineer needs to keep all the working papers at the time of issue of this certificate. (9) The Engineer needs to visit the site, veriflr the records maintained at the site or any other records which will satisfy for the use of material to the project including the estimated quantity of the material which normally goes in completing the work. (10)The Engineer shall be held responsible and accountable for any wrong information in the certificate. The Engineer shall be liable for any penal action under Real Estate (Regulation and Development) Act, 2016 including recommendation to the Competent Authority to initiate necessary disciplinary action including revocation of his/her empanelment with the competent Authority for issue of wrong certificate. (ll)A11 components of work with specifications are indicative and not exhaustive. (I2)This certificate has to be issued on the letterhead of the Engineer, affixing the stamp of the Engineer, along with Engineer's signature on each page. (13) The Engineers should have the qualification as prescribed in the Act. s*sr€lTqqd, ftcifi oqrd zozo 302 ls7) AI{NEXIIRE.6 CHARTERED ACCOUNTANT'S CERTIFICATE (To be submitted at the time of Withdrawal from RERA Designated Account) Name of the Promoter: Name of the Project: CGRERA Registration No. A11 fi res 1n Rs. (2) Acquisition Cost of Land, lease Premium, lease rent, interest cost incurred or payable on Land Cost (including legal Amount of Premium paid or payable to obtain FAR, additional FAR, and any other charges (including diversion charges) to Competent Authority. Amounts payable to State Government or Competent Authority or any other Statutory Authority of the State or Central Government, towards stamp duty, transfer charges, registration fees etc; [if not included in (a) above] Sub-Total of LAND COST Development Cost/ Cost of Construction: Total Cost of Construction as certified by Engineer (As per Annexure-2) Certificate No:- dated:_ (iil Actual Cost of construction incurred as per the books of accounts as verified by the CA Note: (for adding to total cost of construction incurred, Minimum of (i) or (ii) is to be considered) (iii) On-site expenditure for development of entire project excluding cost of construction as per (iil

Previous and next

All provisions of The Chhattisgarh Real Estate Regulatatory Authority (General) Regulations, 2020

Questions people ask

Is regulation 30 of the Chhattisgarh Real Estate Regulatatory Authority (General) Regulations, 2020 still in force?

No repeal of the Chhattisgarh Real Estate Regulatatory Authority (General) Regulations, 2020 is recorded.