Regulation 30, The Chhattisgarh Real Estate Regulatatory Authority (General) Regulations, 2020: Power to remove difficulties
The Chhattisgarh Real Estate Regulatatory Authority (General) Regulations, 2020 - Regulation 30
Text of regulation 30
Power to remove difficulties
30. Power to remove difficulties.- If any dif{iculty arises in giving effect to
any of the provisions of the Regulations, the Authority may, by general
or special order, do anything not being inconsistent with the
provisions of the Act or Rules, which appears to be necessary or
expedient for the purpose of removing the difficulties.
By order and in the name of the Governor of Chhattisgarh,
BHOSKAR VILAS SANDIPAN, Joint Secretary.
302 (40) d*qrr6 {qqd, ft<io o crd zozo
AITNEIrURE.l
ARCHITECT'S CERTIFICATE
(To be submitted at the time of Registration and quarter update of the project)
(for the period ti11_)
To,
The
Certificate No.
(Name and Address of Promoter),
of C onstruction / Development
(Project Name).
Tehsil
Subject: - Certificate of Percentage of Completion
work in
Ref: CGRERA Registration No.
Sir,
I/We
Architect
Work
for certifying
of the
have undertaken assignment as
Percentage of Completion of Construction/Development
Project,' situated at Village
District
admeasuring sq.mtr. area being developed
by (Promoter's Name).
1. Following technical professionals have been appointed by the Promoter:-
(i) M/s/Shri/Smt as Land Surveyor/Architect;
as Structural Consultant;(ii) M/s /Shri / Smt
(iiil M/s/Shri / Smt as Mechanical, Electrical,
Plumbing Consultant;
(iv) M/s /Shri / Smt as Head Site-Supervisor;
Based on Site Inspection, with respect to the aforesaid Real Estate Project, I
certify that as on the date of this certificate, the Percentage of Work done, for
the Real Estate Project (Project Name), is as per Table-A
herein below. The percentage of the work executed with respect to each of the
activity of the entire phase is detailed in Table-B.
Certificate No.
Table A
Sr.
No.
Tasks /Activity Total
Area
Work
Done
Area
Percentage
of work
done
1. Excavation
2. number of Basement(s)
and Plinth
3. Stilt Floor
4. number of Slabs of
Super Structure
5* Internal task/activities to each of the
Flat/ Premises -
u*€rr6 {rqq*, frqi6 o qrd zozo 302 (41)
(i) Internal walls, Internal Plaster,
(ii) Floorings within Flats/ Premises,
(iii) Doors and Windows
(iv) Paintins of internal walls
6. Sanitary Fittings within the Flat
/Premises, Electrical Fittings within
the Flat/Premises
7. Staircases, Lifts Wells and Lobbies at
each Floor level connecting Staircases
and Lifts, Overhead and Underground
Water Tanks
8. The external plumbing and external
plaster, external painting, elevation,
completion of terraces with
wateroroofins of the Buildins/ Wins-
9. Installation of Lifts, Water Pumps,
Fire Fighting Fittings and Equipment,
Electrical fittings to Common Areas,
Electro Mechanical equipments,
Compliance to conditions of
environmental NOCs (if any),
Finishing to entrance lobby, plinth
protection, paving of areas
appurtenant to Building, Compound
Wall and all other requirements as
may be required to obtain Occupation
/ Comoletion Certificate
*Note - Separate work done percentage should be mentioned for each of the
sub heading in row no. 5
TABLE-B
Internal & Enternal Development lllorks in Respect of the entire Project
s.
No
Common areas and
Facilities, Amenities
Proposed
lYes/Nol
Percentage of
Work done
Details
1. Internal Roads &Footpaths
2. Water Sunr:lv Line
3. Sewerage (chamber, lines,
Septic Tank)
4. Sewage Treatment Plant
(STP)
5. Storm Water Drains
6. Landscaping & Tree
Plantins
7. Street Liehtine
8. Community Buildings/ Club
House
9. Solid Waste management &
Disposal
10. Water conservation, Rain
water harvesting
11. Energv Manasement/ Sub-
302 (421 6*sIT€{rqqd, frcifi o fld zozo
station
12. Fire protection and fire
safety requirements
13. Open area (Park)
14. Boundarv WaIl & Main Gate
15. Security Service
16. Others (As per Brochure)
{Option to Add more)
TABLE C
Percentage
of work
done
Overall percentage of construction/
development completed as per Table-
A and Table-B.
Signature and Name of the Architect
(License No.............)
Certificate No.
GUIDANCI NOTE FOR THE ARCHITECT AT THE TIME OF ISSUE OF THIS
CERTIFICATE:
(1) The Architect should be a member of council of Architecture and could
be preferably the one appointed by the promoter for representing before
the Competent Authority for getting the approval and sanctions for the
project.
(2) There should be proper agreement between
Architect for the supervision and the services to
Estate Project.
(3) The Architect should visit the site and verify
completed as per the approved plans
(a) The Architect must use his professional knowledge, skill and experience
in providing the information in this certificate.
(5) The Architect shall be held responsible and accountable for any wrong
information in the certificate. The Architect shall be liable for any penal
action under Real Estate (Regulation and Development) Act, 2OL6
including recommendation to the council of Architecture to initiate
necessary disciplinary action including revocation of membership for
issue of wrong certificate.
(6) This certificate has to be issued on the letter head of the Architect,
affixing the stamp of the Architect, along with Architect's signature on
each page.
(7) The Architect shall not be in the list of Defaulter Architect of the
Council of Architect at the time of issue in this certificate.
the Promoter and the
be provided for the Real
that the work has been
Bdlq:rd ttqqd, frqi+ o qFf, zozo 302 143)
AI{NEXURE.2
ENGINEER'S CERTIFICATE
(To be submitted at the time of Registration and quarter update of the project)
(for the period till_)
Certificate No.
To,
The
Subject: Certificate of Cost Incurred for Development of
Project Name)
Ref: CGRERA Project Registration No.
Sir,
l/ We have undertaken assignment
estimated cost of the
Tehsil
(Name and Address of Promoter),
Project, situated
District
certi$ring
Village
for
at
admeasuring sq.mtr. area, being developed by
(Promoter Name).
1. Following technical professionals have been appointed by thePromoter :-
(i) M/s /Shri/Smt as Land Surveyor/Architect;
(ii) M/s /Shri / Smt as Structural Consultant;
(iii) M/s /Shri / Smt as Mechanical, Electrical,
Plumbing Consultant;
(iv) M/s /Shri / Smt as Quantity Surveyorn
I have estimated the cost of the project for completion, to obtain
occupation certificate/ Completion Certificate. My estimated cost
calculations are based on the Drawings/plans made available to me for
the project by the Promoter and the Schedule of items and quantity
for ttre entire work as calculated by me and the site inspection
carried out by me.
I certify that the cost of the civil, Mechanical, Electrical, plumbing and
allied works for the aforesaid Project, as completed on the date of this
certificate is as given in Table-A and Table-B below:
Certificate No.
TABLE-A
(Apartme nts/ Buildings Construction)
2.
3.
Sr. No Particulars Amounts
1 Total Estimated cost of the
buildings/apartments/ wings as on
date
Rs. /-
2 Cost incurred as on (based
on the Estimated cost )
Rs. t-
3 Work done in Percentage
(as Percentage of the estimated cost )
4 Balance Cost to be Incurred
(Based on Estimated Cost)
t-Rs.
302 (44) , fuio oqrdzozo
Sr. No Particulars Amounts
1 Total Estimated cost of the Internal and
External Development Works including
amenities and Facilities in the layout as
on date
Rs. t-
2 Cost incurred as on
(based on the Estimated cost )
Rs. /-
3 Work done in Percentage
{as Percentase of the estimated cost )
4 Balance Cost to be Incurred
(Based on Estimated Cost)
Rs. /-
TABLE-B
(External Development)
TABLE-C
(Overall Cost Incurred, Table-A + Table-Bl
Place: , o" r, I'.' .':
Signature & Name of the Engineer
(License No.............)
Certificate No.
GUIDAI{CE NOTE:
(l) There should be proper agreement between the promoter and the
engineer for the supervision of the work.
(2) Th; complete details of quantity survey should be maintained and
verified by the engineer.
(3) Quantity survey should be done by office of Engineer.
( ) The estimated cost includes all labor, material, equipment and
machinery required to carry out entire work-
(5) The Engineer needs to find out the complete quantity of the material
received in the site and its utilization in the project.
(6) The rates of the material to work out the cost may be taken from the
purchase bills.
(7) The Engineer needs to get satisfied about the quantity of the material
and the labor cost incurred in the project.
(S) Engineer needs to keep all the working papers at the time of issue of this
certificate.
(9) The Engineer needs to visit the site, veri$r ttre records maintained at the
site or any other records which will satisfy for the use of material to the
project including the estimated quantity of the material which normally
goes in completing the work.
Sr. no. Particular Amount lRupeesl
1 Total Estimated Cost, [Table ,{(1)+1251"
B {1)l
Rs. t-
2 Total Cost Incurred [Table A(2)+f2ble B
(211
Rs. t-
3 Total Work done in Percentage[as per
Table A(3) &Table B (3)l
4 The Balance cost to ComPlete the
ProiectlTable A{4)+Table B (4)l
Rs. t-
Bdtrtrd irEnrrd, Qiii{ 5 r I td 2o2o 302 (4s)
(10)The Engineer shall be held responsible and accountable for €rny wrong
information in the certificate. The Engineer shall be liable for any penal
action under Real Estate (Regulation and Development) Act, 2OL6
including recommendation to the Competent Authority to initiate
necessary disciplinary action including revocation of his/her
empanelment with the Competent Authority for issue of wrong
certificate.
(ll)A11 components of work with specifications are indicative and not
exhaustive.
(I2)This certificate has to be issued on the letterhead of tJle Engineer,
affixing the stamp of the Engineer, along with Engineer's signature on
each page.
(13) The Engineers should have the qualification as prescribed in the Act.
.E
302 146) Bffisrra rtqqd, ftqi6 c qrd zozo
ANNEXURE,S
CHARTERED ACCOUNTANT'S CERTIFICATE
(To be submitted at the time of registration and quarter update of the project)
(for the period till _)
Name of the Promoter :
Name of the Project :
CGRERA Registration No.
A1l fi res 1n Rs. Lakh
(2)
Acquisition Cost of Land or Development
Rights, lease Premium, lease rent,
interest cost incurred or payable on Land
Cost (including legal cost).
Amount of Premium paid or payable to
obtain FAR, additional FAR, and any
other charges (including diversion
charges) to Competent Authority.
Amounts payable to State Government or
Competent Authority or any other
Statutory Authority of the State or
Central Government, towards stamp
duty, transfer charges, registration fees
etc; (if not included in (a) above
Sub-Total of LAND COST
Development Cost/ Cost of
Construction :
(a) Total Cost
certified by
Annexure-2)
of Construction as
Engineer (As per
Certificate No.:
(ii) Actual Cost of construction
incurred as per the books of
accounts as verified by the CA
Note : (for adding to total cost of
construction incurred, Minimum of
(i) or (ii) is to be considered)
(iiil On-site
development of entire project
excluding cost of construction as
per (ii) above, i.e. salaries,
consultants fees, site overhead
Enfurrdrrqrd, fraim e qrd zozo toz (tt\
Sr.
No. Particulars
Amount
lRs.l
Estimated Incurred
(1) (21 (3) (41
development works, cost of
services (including water,
electricity, sewerage, drainage,
layout roads etc.), cost of
machineries and equipment
including its hire and maintenance
costs, consumables etc. A11 costs
direcfly incurred to complete the
construction of the entire phase of
the proiect reeistered.
(b) Payment of Taxes, cess, fees, charges,
premiums, interest etc to any statutory
Authority.
Proiect Clearance Fees
(a) Fees paid to RERA
(b) Fees paid to T&CP Dept.
(c) Fees paid to Local Authority
(Municipal/ Panchayat)
(d) Consultant/Architect Fees (directly
attributable to project)
(e) Any other (specify)
(c) Interest payable to financial institutions,
scheduled banks, non-banking financial
institution (NBFC) or money lenders on
construction funding or money borrowed
for construction ;
Sub-Total of Development Cost
2. Total Estimated Cost of the Real
Estate Project
[1(i) + l(iif] of Estimated column
3. Total Cost Incurred of the Real Estate
Project
[1(i) + l(iif] of Incurred Column
4. 7o completion of Construction Work
(as per Project Architect's Certificate)
Certificate No.: dated:
5. Proportion of the Cost incurred on
Land and Construction Cost to the
Total Estimated Cost in percentage.
(i.e. x 1OO)
302 (48) , fr<io cqrd zozo
This certificate is being issued on specific request of
(Promoter's Name) for CG-RERA compliairce. The
certificate is based on the information/records/documents/books of accounts
of the Promoter and is true to the best of my knowledge and belief.
Place:
Signature of the Chartered Accountant
(Membership No. ...................)
NOTE-I- Cost of land shall be valued as per the Collector's guideline value as
on the date of commencement of the project, or the cost of
acquisition whichever is more.
NOTE-2- To be given as part of CA Certificate (Annexure 3) for quarterly
updation
(Rs. In Lakhs)
Sl.No Particulars As per certilicate
given for last
quarter
During the
quarter
Total
1. Total estimated Land Cost as
per clause 1 (i)
2. Total estimated development
cost as per clause 1 (ii)
J. Total Estimated Cost of the
project as per clause 2
4. Total Cost incurred as per
clause 3
5. Percentage of completion as
per clause 4
6. Proportion of cost incurred
total estimated project cost
per clause 5
to
AS
Advance from Customers
Sl.No Particulars Amount received
as per certificate
given for last
quarter
Amount
Received
during the
quarter
Total
Amount
1. Advance received from
customers
, ftqi6 oqtd zozo roz (le)
!:JDRA Designated Account of the Project
Name of the Bank:
Branch:
Account Number
Sl.No Particulars Amount in Rs.
1. Opening Balance in the designated account
of the project at the start of the reported
quarter.
2. (Add): Deposits in the designated account of
the project during the reported quarter.
3. (Less): Withdrawals from tlle designated
account of the project during the reported
quarter.
4. Closing Balance in the designated account of
the project at the end of the reported quarter.
GUIDAI{CE NOTE F.OR THE CA:
(1) The Chartered Accountant should be a "Practicing Chartered
Accountant".
(2) The statutory auditor doing annual audit and the CA issuing certificate
for project registration and withdrawal from CG-RERA Designated
Accounts, should be different entities.
(3) The CA shall be held responsible and accountable for any wrong
information in the certificate. The CA shall be liable for any penal action
under Real Estate (Regulation and Development) Act, 2016 including
recommendation to the ICAI to initiate necessary disciplinary action
including revocation of membership.
(a) This Certifrcate should be issued on the letterhead of the CA, affixing his
stamp/seal, along with CA's signature on each page. The CA shall also
mention the membership number below his signature.
302 (so) Edlqrra rrqqd, frci*. o crd zozo
ANNE](IIRE.4
ARCHITECT'S CERTIFICATE
(To be submitted at the time of withdrawal from RERA Designated Account)
Certificate No.
(Name and Address of Promoter),
To,
The
Subject:- Certificate of
work in
Ref: CGRERA Registration No.
Sir,
I/We
Percentage of Completion of Construction/ Development
(Project Name).
Architect
Work
for certifying
of the
have undertaken assignment as
Percentage of Completion of Construction/ Development
Project, situated at Village
District
sq.mtr.
Name).
being developed
(Promoter's
to each of the
Tehsil
ad
by
1.
measuring
Following technical professionals have been appointed by the Promoter :
as Land Surveyor/Architect;
as Structural Consultant;
(i) M/s/Shri/Smt
(ii) M/s /Shri / Smt
(iii) M/s /Shri / Smt as Mechanical, Electrical,
Plumbing Consultant;
(i") M/s /Shri / Smt as Head Site-Supervisor;
Based on Site Inspection, with respect to the aforesaid Reai Estate project, I
certify that as on ttre date of this certificate, tl:e Percentage of Work done, for
the Real Estate Project (Project Name), is as per Table-A
herein below. The percentage of tle work executed with respect
activity of the entire phase is detailed in Table-B.
Certificate No.
TABLE A
Sr.
No
Tasks /Activity Total
Area
Work
Done
Area
Percentage
of work
done
1. Excavation
2. number of
Basement(s) and Plinth
3. Stilt Floor
4. number of Slabs of
Super Structure
5* Internal task/activities to each of the
Flat/ Premises -
(v) Internal walls, Internal Plaster,
(vi) Floorings within Flats/ Premises,
(vii)Doors and Windows
(.riii) Painting of internal walls
6. Sanitary Fittings within the
Flat/Premises, Electrical Fittings
within the Flat/ Premises
udsrrq rrqrd, frtia 6 qtd 2o2o 302 (sl)
7. Staircases, Lifts Wells and Lobbies at
each Floor level connecting Staircases
and Lifts, Overhead and Underground
Water Tanks
8. The external plumbing and external
plaster, elevation, completion of
terraces with waterproofing of the
Building/ Wins,
9. Installation of Lifts, Water Pumps,
Fire Fighting Fittings and Equipment,
Electrical fittings to Common Areas,
Electro - Mechanical equipments,
Compliance to conditions of
environmental NOCs (if any), Finishing
to entrance lobby, plinth
protection, paving of areas
appurtenant to Building,
Compound Wall and all other
requirements as may be required to
Obtain Occupation /Completion
Certificate
*Note - Separate work done percentage should be mentioned for each of the
sub heading in row no. 5
TABLE-B
Internal and External Development Works in Respect of the entire Project
s.
No
Common areas and
Facilities, Amenities
Proposed
lYeslNol
Percentage of
Work done
Details
1. Internal Roads & Foot paths
2. Water Supplv Line
3. Sewerage (chamber, lines,
Septic Tank)
4. Sewage Treatment Plant
(STP)
5. Storm Water Drains
6. Landscaping & Tree
Plantins
7. Street Liehtins
8. Community Buildings/ Club
House
9. Solid Waste management
and Disposal
10. Water conservation, Rain
water harvesting
11. Energr Management/ Sub-
station
t2_ Fire protection and fire
safetv requirements
13. Open area (Park)
302 1s2) EdslrE rtqrd, frci6 o md zozo
L4. Boundary Wall and main
gate
15. Security Service
16. Others (As per Brochure)
(Option to Add more)
TABLE.C
Overall
Signature and Name of the Architect
(License No.............)
Certificate No._
GUIDAITCE NOTE FOR THE ARCHITECT AT THE TIME OF ISSUE OF THIS
CERTIFICATE :
(3)
.(41
(s)
(1)
(21
(6)
The Architect should be a member of council of Architecture and could
be preferably the one appointed by the promoter for representing before
the Competent Authority for getting the approval and sanctions for the
project.
There should be proper agreement between The promoter and rhe
Architect for the supervision and the services to be provided for the Real
Estate Project.
The Architect should visit the site and verify that the work has been
completed as the per the approved plans
'The Architect must use his professional knowledge, skill and experience
in providing the information in this certificate.
The Architect shall be held responsible and accountable for any wr-ong
information in the certificate. The Architect shall be liable for any penal
action under Real Estate (Regulation and Development) Act, 2016
including recommendation to the council of Architecture to initiate
necessary disciplinary action including revocation of membership for
issue of wrong certificate.
This certificate has to be issued on tl:e letterhead of the Architect,
affixing the stamp of the Architect, along with Architect's signature on
each page.
The Architect should not be in the list of Defaulter Archrtect of the
council of Architect at the time of issue in this certificate.
of the work ted
Sr.
No.
Particular Total
Area
Work
Done
Area
Percentage
of work
done
1. Overall percentage of
construction/ development
completed as per Table-A and
Table-B.
Place:
(7)
'
fu-5 6 ql=t-
"20
302 (s3)
.J:. ANNEXTIRE.S
ENGINEER'S CERTIFICATE
(To be submitted at the time of withdrawal from RERA Designated Account)
Certificate No.
To,
The (Name & Address of Promoter),
Subject: Certifrcate of Cost Incurred for Development of
(Project Name)
Ref: CGRERA Project Registration No.
Sir,
Il We have undertaken assignment for
certifying estimated cost of the Project, situated at
Village Tehsil District
admeasuring sq.mtr. area, being developed by
(Promoter Name).
1. Following technical professionals have been appointed by the Promoter :-
(i) M/s /Shri/Smt as Land Surveyor/Architect;
as Structural Consultant;(ii) M/s /Shri / Smt
(iii) M/s /Shri / Smt as Mechanical, Electrical,
Plumbing Consultant;
(M M/s /Shri / Smt as Quantity Surveyor*
' 2. I have estimated the cost of the project for completion, to obtain
Occupation Certificate/ Completion Certificate. My estimated cost
calculations are based on the Drawings/plans made available to me for
the project by the Promoter and the Schedule of items and
quantity for the entire work as calculated by me and the site
inspection carried out by me.
3. I certify that the Cost of the Civil, Mechanical, Electrical, Plumbing and
allied works for the aforesaid Project, as completed on the date of this
certificate is as given in Table-A and Table-B below:
Certificate No.
302 (s4) fu{lqqT, frqi6 rrnd zozo
TABLE.A
(Apartments/Buildings Construction)
TABLE-B
(External Development)
Sr.
No
Particulars Rs. (in
Lakhs)
As on
{As per last
Certificatel
Rs. ( in
Lakhs)
From
Total (Rs.
in Lakhs)
As on
the date of
certificateTo
1 Total Estimated cost of the
buildings/ apartments/
drg"
2 Cost incurred based on
the Estimate cost )
3 Work done in Percentage
(a" Percentage of tJle
estimated cost )
4 Balance Cost to be
Incurred
(Based on Estimated Cost)
Sr.
No
Particulars Rs. ( in
LakhsI
As on
(As per last
Certificate)
Rs. ( in
Lakhs)
From
Total (Rs.
in Lakhs|
As on
the date of
certificateTo
1 Total Estimated cost of the
Internal and External
Development Works
including amenities and
Facilities in the layout
2 Cost incurred (based on
the Estimated cost )
3 Work done in Percentage
(as Percentage of the
estimated cost )
4 Balance Cost to be
Incurred
(Based on Estimated Cost)
, ftFriqi 6 nrd 2o2o 302 (ss)
Sr. No Particulars Rs. ( in
Lakhsf
As on
(As per l,ast
Certificatef
R.s. ( in
Lakhs!
From
Total [Rs. in
Lakhsf
As on
the date of
certificateTo
1 Total Estimated Cost,
lTable A(1)+Table B (1)l
2 Total Cost Incurred
tTable A(2)+Table B (2)l
3 Total Work done in
Percentage [as per Table
A{3) &TableB(3)l
4 The Balance cost to
Complete the Project
lTable A(4)+Table B (a)l
TABLE.C
(Overall Cost Incurred, Table-A + Table-Bl
Place:
Signature & Name of the Engineer
(License No.............)
Certificate No.
Sr. No Particulars Rs. { in
Lakhsf
As on
(As per last
Certificate)
Rs. ( in
Lakhs)
From
Total (Rs. in
LakhsI
As on
the date of
certificateTo
1
GUIDAI{CE NOTE:
(l) There should be proper agreement between the promoter and the
engineer for the supervision of the work.
(2) The complete details of quantity survey should be maintained and
verified by the engineer.
(3) Quantity survey should be done by office of Engineer.
(a) The estimated cost includes all labor, material, equipment and
machinery required to carry out entire work.
302 (s6) Bdsrr€ {qqd, frqi6 r rnd zozo
(5) The Engineer needs to find out the complete quantity of the material
received in the site and its utilization in the project.
(6) The rates of the material to work out the cost may be taken from the
purchase bills.
(7) The Engineer needs to get satisfied about the quantity of the material
and the labor cost incurred in the project.
(8) Engineer needs to keep all the working papers at the time of issue of this
certificate.
(9) The Engineer needs to visit the site, veriflr the records maintained at the
site or any other records which will satisfy for the use of material to the
project including the estimated quantity of the material which normally
goes in completing the work.
(10)The Engineer shall be held responsible and accountable for any wrong
information in the certificate. The Engineer shall be liable for any penal
action under Real Estate (Regulation and Development) Act, 2016
including recommendation to the Competent Authority to initiate
necessary disciplinary action including revocation of his/her
empanelment with the competent Authority for issue of wrong
certificate.
(ll)A11 components of work with specifications are indicative and not
exhaustive.
(I2)This certificate has to be issued on the letterhead of the Engineer,
affixing the stamp of the Engineer, along with Engineer's signature on
each page.
(13) The Engineers should have the qualification as prescribed in the Act.
s*sr€lTqqd, ftcifi oqrd zozo 302 ls7)
AI{NEXIIRE.6
CHARTERED ACCOUNTANT'S CERTIFICATE
(To be submitted at the time of Withdrawal from RERA Designated Account)
Name of the Promoter:
Name of the Project:
CGRERA Registration No.
A11 fi res 1n Rs.
(2)
Acquisition Cost of Land, lease Premium,
lease rent, interest cost incurred or
payable on Land Cost (including legal
Amount of Premium paid or payable to
obtain FAR, additional FAR, and any
other charges (including diversion
charges) to Competent Authority.
Amounts payable to State Government or
Competent Authority or any other
Statutory Authority of the State or
Central Government, towards stamp
duty, transfer charges, registration fees
etc; [if not included in (a) above]
Sub-Total of LAND COST
Development Cost/ Cost of
Construction:
Total Cost of Construction as
certified by Engineer (As per
Annexure-2) Certificate No:-
dated:_
(iil Actual Cost of construction
incurred as per the books of
accounts as verified by the CA
Note: (for adding to total cost of
construction incurred, Minimum of
(i) or (ii) is to be considered)
(iii) On-site expenditure for
development of entire project
excluding cost of construction as
per (iil
Previous and next
All provisions of The Chhattisgarh Real Estate Regulatatory Authority (General) Regulations, 2020
Questions people ask
Is regulation 30 of the Chhattisgarh Real Estate Regulatatory Authority (General) Regulations, 2020 still in force?
No repeal of the Chhattisgarh Real Estate Regulatatory Authority (General) Regulations, 2020 is recorded.