Punjab Groundwater Extraction and Conservation Directions 2023
Notification - THE PUNJAB WATER RESOURCES (MANAGEMENT AND REGULATION) ACT, 2020
- Kind: Notification
- Under: THE PUNJAB WATER RESOURCES (MANAGEMENT AND REGULATION) ACT, 2020
Text of this notification
( 269 )
GOVERNMENT OF PUNJAB
PUNJAB WATER REGULATION AND DEVELOPMENT AUTHORITY
NOTIFICATION
The 27th January, 2023
No. 75340: PWRDA-PWRD0GENL/37/2021-PWRDA BR/418
Whereas, the Draft Directions, titled the ‘Punjab Guidelines for Ground Water
Extraction and Conservation 2020,’ issued by the Authority were published on the
websites www.irrigation.punjab.gov.in and www.punjab.gov.in and were thus made
available to the public on the said websites.
And whereas, a notice was issued in accordance with the provisions of the
sub-section 3 of Section 15 of the Punjab Water Resources (Management and
Regulation) Act, 2020 in the newspapers, namely The Tribune, Ajit and Jag Bani on
the 13th of November, 2020 inviting objections from all persons, likely to be affected,
by 18th of December, 2020.
And whereas, the objections received have been considered by the Authority.
And whereas, the Government has approved the Groundwater Charges
contained in these Directions under Section 17 (5) of the Punjab Water Resources
(Management and Regulation) Act, 2020.
Now, therefore, in exercise of powers conferred under Section 15 (2) of the
Punjab Water Resources (Management and Regulation) Act, 2020 and all other
powers enabling it in this behalf, the Punjab Water Regulation and Development
Authority hereby issues the following Directions:
http://www.irrigation.punjab.gov.in/
http://www.punjab.gov.in/
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
CHAPTER 1
1.1 SHORT TITLE, COMMENCEMENT AND EXTENT
A. These Directions may be called the "Punjab Groundwater Extraction and
Conservation Directions, 2023”.
B. These shall come into force from the first day of the month subsequent to
the publication of the Directions.
C. These shall extend to the whole of the State of Punjab.
1.2 DEFINITIONS
In these Directions, unless the context otherwise requires, -
a) 'Act' means the Punjab Water Resources (Management and Regulation)
Act, 2020;
b) 'Agriculture’ means agriculture and allied activities that are connected
with agriculture such as agro-forestry, animal husbandry, dairy, poultry, fisheries,
floriculture, nurseries, horticulture, poly-house and green-house cultivation, and
such other activities as may be notified or specified by the Government;
c) ‘Annexure’ means an Annexure appended to the Directions
d) 'Applicant' means a person who makes an application to the Authority
under the Directions;
e) ‘Directions’ means the Punjab Groundwater Extraction and
Conservation Directions, 2023;
f) 'Extraction' with respect to groundwater shall mean to include the
abstraction, drawing out, conveyance or transportation of groundwater through any
means or equipment from below the surface of the ground to the surface or further
to any place whether on the surface of the ground or otherwise, and shall include the
drawing out of groundwater from a natural spring or artesian well. Extraction shall
also include dewatering of sub-soil water that emerges onto the surface or onto dug
contours involved in mining and infrastructure projects etc. It is clarified that an
activity shall be considered to be Extraction even when it is not aided or supported
by an energy source.
g) ‘Extraction Structure’ means any structure which can be used in relation
to the extraction of groundwater by any method or technology, and known by any
nomenclature such as open well, dug well, bore well, dug-cum-bore well, tube well,
step well, filter point, collector well, artesian well, spring, infiltration gallery,
including any machinery, equipment and instruments used for the extraction of
groundwater, as well as any combination or variation of such structures;
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
h) ‘Groundwater Charges' means all such charges as fixed by the
Authority with the approval of the Government under Section 17(5) of the Act that
relate to the extraction of groundwater or any activity connected therewith. Such
Groundwater Charges, known by any nomenclature, shall include but shall not be
limited to the following:
I. ‘Groundwater Extraction Charges’ being the charges levied on
extraction of groundwater;
II. ‘Application Fee’ being a non-refundable amount to be paid
along with various applications to be filed under the Directions; and
III. ‘Non-Compliance Charges’ being the charges fixed for
contravention of the provisions of the Act, Rules, Regulations and the
Directions, which may be known by any nomenclature including
Groundwater Compensation Charges, other Non-Compliance Charges
etc.;
i) 'Security Deposit' means such non-interest bearing, refundable amount
as fixed by the Authority to be deposited with the Authority by the User;
j) 'Unit' means a premises, site or facility including a project, plant,
building, structure, mine, plot, layout, colony, complex, infrastructure, construction
site or land for which Permission is required or granted for the extraction of
groundwater under the Directions;
Explanation 1: An Existing Unit is a Unit which has been extracting
groundwater prior to the date of commencement of the Directions.
Explanation 2: A New Unit is a Unit which has not extracted groundwater
before the date of commencement of the Directions.
k) 'User' means a person who undertakes any activity related to
groundwater extraction or intends or seeks to undertake such activity, whether by
itself or through an agent;
Note: The words and phrases used in the Directions that have been defined in the
Act shall, unless the context requires otherwise, have the same meaning as defined
therein.
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
CHAPTER 2
GROUND WATER CONSERVATION
2.1 PROMOTION OF WATER CONSERVATION
A. The main objective of the Directions is to improve the water balance by
promoting and ensuring conservation of water by the Users. This objective
will be achieved by ensuring that all Users permitted to extract groundwater
shall pay volumetric Groundwater Extraction Charges and such charges shall
be utilised in part for conserving water. In addition, the Users shall have the
option of conserving water themselves with the approval of the Authority, and
such Users (who conserve water) shall be entitled to Water-Conservation
Credits as described in the Directions.
B. A User may opt to implement water conservation measures with the approval
of the Authority, either within the Unit or outside, whereupon such User shall
be provided Water-Conservation Credits which will entitle it for a rebate in
the Groundwater Extraction Charges.
C. A portion of the Groundwater Extraction Charges will be utilised by the
Authority for implementing Public Water Conservation Schemes through
Departments or Agencies of the Government or Entities. These water
conservation measures shall aim to improve the water balance by incentivizing
the conservation of water by Users.
2.2 PRIVATE WATER CONSERVATION SCHEMES PROPOSED AND
IMPLEMENTED BY USERS
A User may design and implement its own Private Water Conservation Scheme
to enable it to earn Water Conservation Credits. Any such Water Conservation
Scheme shall be submitted by the User along with all required information and
data for approval to the Authority. In case the Authority approves the Scheme
with such conditions as it deems fit, the User shall be eligible to earn Water
Conservation Credits by implementing the Scheme to the extent of the volume
of water that the User conserves in accordance with the parameters laid down
in the Scheme. Water-Conservation Credits will be credited to the User only
after inspection and/or verification of the Scheme as required by the Authority.
2.3 APPROVAL AND MONITORING OF PRIVATE WATER
CONSERVATION SCHEMES
A. The Authority shall scrutinise a private water conservation scheme submitted by
a User and shall endeavour to convey its decision within a period of three months
of the submission of the scheme complete in all respects. Incomplete submissions
shall be returned to the User upon scrutiny. In case any additional documents,
information, clarifications etc. are required the Authority shall communicate to
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
the User within two months of submission, in which case the time period of three
months for conveying a decision shall begin from the date that the User provides
a satisfactory response to the Authority.
B. A user will claim Water Conservation Credits only after approval of the Water
Conservation Scheme by the Authority.
C. Water Conservation Credits will be granted either from the date he has submitted
the proposal complete in all respects to the Authority or from the date it starts
conserving water whichever is later.
D. The Conservation Credits earned by a User will be allotted to the User once a year
and the time of such allotment shall depend on the nature of the conservation
measures in the Scheme, the date of commencement of the Scheme and other
relevant factors as may be determined by the Authority. After the Water
Conservation Credits are claimed by the unit each year and approved by the
Authority, the approved Water Conservation Credits will be credited over
subsequent billing cycles.
Provided that the Water Conservation Credits in any billing cycle to be
credited to the unit will not be more than the Groundwater Extraction Charges
payable in that Billing Cycle.
Provided further that the maximum limit of the Conservation Credits which
can be earned annually by a User shall be subject to the upper limit as mentioned
in Table 4.3 of the Directions.
E. The Authority may authorise a Person as a Conservation Appraiser to monitor,
appraise and evaluate the execution, implementation, operation and maintenance
etc. of any Water Conservation Schemes approved, to be approved or considered
by it, including the schemes of rain water harvesting and waste water treatment
and its use to reduce groundwater extraction. A User shall earn Water-
Conservation Credits only after the concerned Conservation Appraiser submits to
the Authority its assessment about the details of the volume of water conserved
by the User as per the conditions, standards and parameters laid down in the
Scheme and approved by the Authority. Till such assessment is approved by the
Authority or by the Conservation Appraiser (if so authorised), the User shall
continue to make payment of the entire Groundwater Extraction Charges at the
applicable rates without claiming any rebate for conservation.
Non-Compliance of conditions contained in the approval of the Scheme may
make the User liable for payment of Non-Compliance Charges.
F. When a Water Conservation Scheme is implemented by a User outside its Unit
then such scheme may be implemented in any Assessment Area (Block) which
has the similar status (i.e. Orange, Yellow or Green) as the Assessment Area
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
(Block) where the Unit is located. In case, the User chooses to implement the
Scheme in another Assessment Area (Block) of different status then the User may
locate its water conservation scheme as follows: -
A Unit located in an Orange or Yellow status Assessment Area (Block) may
conserve water in any Assessment Area (Block) other than a Green status
Assessment Area (Block), and a Unit located in a Green status Assessment Area
(Block) may conserve water in any Assessment Area (Block) in the State.
Explanation 1: The water conservation rebate ceiling for a Unit shall be
determined by the location of the Unit and not by the location of the Water
Conservation Scheme.
Explanation 2: A contiguous Unit located in more than one Assessment
Area (Block) shall be treated as located entirely in that Block which has the
highest stage of groundwater development, and shall pay groundwater charges and
may also claim water conservation credits as per the rates and norms defined for
such Assessment Area (Block).
G. A User must obtain approval of the Authority for any water conservation scheme
that it intends to implement. A User that undertakes water conservation of its own
accord without obtaining the approval of the Authority will not be entitled for any
water conservation credits for such an activity.
2.4 PRIVATE WATER CONSERVATION SCHEMES PUBLISHED BY
AUTHORITY
The Authority may also publish Private Water Conservation Schemes from time to
time which may be implemented by a User or by a group of Users to avail Water-
Conservation Credits. A User seeking to implement such a Published Scheme shall
submit a specific proposal to the Authority with all required information and data.
Such User shall obtain approval of the scheme from the Authority and implement
the Scheme to the satisfaction of the Authority. Thereafter Water-Conservation
Credits will be credited to the User in accordance with the approval and the standards
and parameters of the Published Scheme.
2.5 PRIVATE WATER CONSERVATION SCHEMES IMPLEMENTED
COLLECTIVELY BY A GROUP OF USERS
A. Application may be submitted under Section 2.4 by a group comprising not less
than five Users, which may collectively implement water conservation schemes
outside their Units through an Association or a Special Purpose Vehicle (such
SPV being a society, firm, company or association of persons etc.) jointly funded
and managed by such group. In case of any change in members of the
SPV/Association, intimation regarding the same shall be given within 15 days of
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
the date of such change to the Authority and in case revised/new Permission is
required, the same shall be applied for.
B. Alternatively, such group of Users may outsource their Water Conservation
Schemes to a service provider or organisation of their choice to implement the
water conservation measures on their behalf.
C. Approval of such Collective Water Conservation Schemes shall be obtained from
the Authority, and the Authority shall be informed about the person(s) authorised
to report the volume of water conserved and the apportionment of such conserved
volume of water amongst the Units concerned.
D. The water conservation activities undertaken by such group of Users shall be
reported by a person duly authorised by such group to the Authority or to the
Conservation Appraiser designated by the Authority.
E. The water conservation credits shall be given to each User in the group as per
the apportionment approved by the Authority. The Authority shall not be liable
for any disagreements or disputes regarding the apportionment of water
conservation credits amongst the Users.
2.6 PUBLIC WATER CONSERVATION SCHEMES BY GOVERNMENT
OR ENTITY
A. A Department or an Agency of Government or an Entity may design and
implement a Public Water Conservation Scheme with the approval of the
Authority.
B. The Authority may direct a Department or Agency of the Government to
implement a Public Water Conservation Scheme.
C. Public Water Conservation Schemes prepared and to be implemented by the
Departments or an Agency of Government or an Entity with the approval of the
Authority may be funded by a User or a group of Users (as defined in 2.5 A) for
execution and periodic maintenance.
D. The Water Conservation Credits for such schemes as defined in Section 2.6 C
shall be given as per the procedures laid down in the Directions.
2.7 RAIN WATER HARVESTING
If a User intends to implement or has implemented a rainwater harvesting
scheme in a Unit, then such User may submit the requisite details of such rainwater
harvesting scheme to the Authority for its approval. In the event that the Authority
approves such rainwater harvesting scheme, the User shall be eligible for water-
conservation credits as per the conditions of the approval.
Note 1: A User shall ensure that it obtains prior approval of the Competent Authority
as required under the law for its Rain Water Harvesting Scheme.
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
2.8 REUSE OF TREATED WASTE WATER
A. A User shall be responsible for ensuring the treatment of waste water as per the
standards and requirements set by the concerned competent authority including
the State Pollution Control Board. In the event that such treatment facilities or
operations lead to the untreated or treated waste water (not complying with
irrigation quality or standards as defined by the concerned Competent Authority)
being collected in a water body or being used for irrigating a plantation, field or
ground, then such measures shall not be considered for the purposes of a water
conservation scheme by the Authority. Accordingly, a User shall not claim any
water conservation credits for undertaking such measures.
B. However, if as a result of implementing waste water treatment measures, the Unit
is able to ensure that all the waste water discharged by it meets the specifications
and standards set for irrigation-quality water (or higher standards such as
drinking-quality water) by the concerned competent authority, then if any such
treated waste water is reused for irrigation or other purposes conducive to the
conservation of water then, such volume of reused waste water may be
considered by the Authority for conservation credits, while approving such a
water conservation scheme submitted by such User.
C. Under special circumstances, a User who treats the waste water to standards
pertaining to discharge into inland surface water and releases such treated water
into a Surface water body, if so permitted by the competent Authority, may be
considered for being given partial water credits up to 50% of volume so treated
and discharged.
2.9 IMPACT ASSESSMENT STUDIES BY THE AUTHORITY
A. In order to ensure sustainable ground water management and for designing and
carrying out of effective Water Conservation Schemes, Impact Assessment
studies are required.
B. As the impact of groundwater withdrawal depends on the cumulative abstraction
by various users in surrounding areas, the Impact Assessment Studies of
individual units, may not reveal the impact of groundwater withdrawal on
hydrogeological conditions of the aquifers and may not yield actionable results
for preparation of accurate and beneficial Water Management Plans.
C. Therefore, the Authority shall carry out Impact Assessment Studies. Priority will
be given to study the over-exploited areas to get a meaningful picture of impact
on the hydrogeological regime.
2.10 WATER CONSERVATION MEASURES APPROVED BY CGWA
PRIOR TO THE DIRECTIONS
If a User has already implemented a water conservation scheme prior to the
commencement of the Directions with the approval of Central Ground Water
Authority (CGWA), and applies for approval of such water conservation scheme, the
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
Authority may while approving such scheme provide water conservation credits as
determined by the Authority to such User either from the date of commencement of
the Directions or such later date as determined by the Authority; provided that the
NOC given by CGWA to such User was valid on the date of submission of the
scheme to the Authority.
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
CHAPTER 3
PERMISSION FOR GROUNDWATER EXTRACTION
3.1 PERMISSION AND EXEMPTIONS
No User shall extract groundwater or conduct any activity connected therewith
without obtaining Permission of the Authority except for the following cases:
i. for Drinking and Domestic usage;
Explanation: A Unit shall be exempted under this clause only if the groundwater is
utilized exclusively for Drinking and Domestic use.
ii. for exclusive usage in Agriculture;
iii. for use in a place of worship;
iv. for a drinking and domestic Water Supply Scheme of Government;
v. for use by an Establishment of the Military or of the Central
Paramilitary Forces;
vi. an Urban Local Body, Panchayati Raj Institution, Cantonment Board,
Improvement Trust or Area Development Authority; and
vii. a Unit extracting not more than300 cubic metres of groundwater per
month.
3.2 APPLICATION FOR PERMISSION
An Application for Permission to extract groundwater shall be submitted to the
Authority in the required format within the time stipulated, complete in all aspects,
along with required documents, Application fees, Charges and Security Deposit etc.
For details see the Authority’s Website: www.pwrda.org.
3.3 TIME PERIOD FOR EXISTING UNITS TO APPLY FOR PERMISSION
A User with an existing Unit shall apply to the Authority for Permission within
the time period mentioned below from the date of commencement of the Directions.
Table 3.1: Time Period for existing Units to apply for Permission from
date of commencement of Directions
Volume of groundwater for which Permission
is sought
Time Period
1 >15,000 cubic metres per month Three Months
2 >1,500 to 15,000 cubic metres per month Six Months
3 >300 to 1,500 cubic metres per month Nine Months
http://www.pwrda.org/
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
3.4 TIME PERIOD FOR NEW UNITS TO APPLY FOR PERMISSION
No New Unit shall extract Groundwater without prior Permission of the Authority.
Provided that a New Unit may apply for permission within two months of
commencement of the Directions even though it may have started extraction of
groundwater prior to the date of application. Such User shall pay the groundwater
charges from the date of extraction of groundwater.
3.5 PROCESSING OF APPLICATIONS
A. On receipt of an application complete in all respects seeking Permission to
extract groundwater, the Authority may after examining the application and the
accompanying documents, and conducting on-site inspection if required, grant
Permission for extraction of groundwater subject to such conditions and
restrictions as it may impose.
B. It shall be the endeavour of the Authority that Users who are found to be eligible
for grant of Permission be granted the Permission within three months from the
date of receipt of an application complete in all respects.
C. In case the application is found to be incomplete, or in case any clarification,
information or document is required, then the Authority shall inform the
Applicant within a period of three months to complete the application or to
provide such clarification, information, document etc. as may be required.
D. The procedure for processing an application for Permission shall also apply to
applications for renewal, revocation, extension, amendment or modification of
Permission.
3.6 PERMISSION BY WATER TANKERS
A. No motor vehicle shall be used for conveyance or transportation of
groundwater through a water tanker (whether installed on the vehicle or towed
as a trailer etc.) with a carrying capacity in excess of 500 litres for any purpose
other than drinking and domestic or agricultural usage without Permission of
the Authority.
B. An application for Permission for operating an existing water tanker shall be
submitted to the Authority within six months from the date of commencement
of the Directions. If the Authority finds the application complete in all respects
and after having satisfied itself that the applicant has complied with all the
requirements of the Directions, the Authority shall grant the Permission,
subject to such conditions and restrictions that the Authority may impose.
C. Water Tankers owned and operated by a Department or Agency of the
Government of India (including the Military or Central para-military forces)
or of the Government of Punjab, or by an Urban Local Body, Panchayati Raj
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
Institution, Cantonment Board, Improvement Trust or Area Development
Authority shall not require Permission.
3.7 PERMISSION FOR A POWER-OPERATED DRILLING RIG
A. No power-operated drilling rig shall be operated for exploration of
groundwater or for establishing, modifying, augmenting or improving any
groundwater extraction structures in the state, without Permission of the
Authority.
B. An application for Permission to operate the power-operated drilling rig shall
be submitted in the required format within six months from the date of
commencement of the Directions. If the Authority finds the application
complete in all respects and after having satisfied itself that the applicant has
complied with all the requirements of the Directions, the Authority shall grant
the Permission, which will be valid for 3 years, subject to such conditions and
restrictions that the Authority may impose.
C. A person operating a power-operated drilling rig shall keep a record of the
borewells established, explored, excavated, modified, augmented or improved
any groundwater extraction structures, by it anywhere in the state and shall
communicate the same to the Officer as designated by the
Government/Deputy Commissioner. Every person operating a drilling rig
shall ensure that the instructions contained in the Order issued by Government
of Punjab by its Memo no. 4/19/2009 PJ2/1684-1710 dated 15.07.2010 in
pursuance of the Supreme Court order issued in CWP no. 36 of 2009
concerning the measures for prevention of fatal accidents of small children
falling into abandoned bore wells or tube wells are duly complied with.
D. The Department of Water Resources shall ensure that its instructions issued
vide Memo no. 4/19/2009 PJ2/1684-1710 dated 15.07.2010 pertaining to
prevention of fatal accidents of small children falling into abandoned bore
wells or tube wells are complied with by all concerned.
3.8 REFUSAL OF PERMISSION
The Authority may refuse Permission for groundwater extraction for any
reason to be recorded in writing including the following:
i. That a User has been fraudulent or has suppressed or mis-represented any
facts;
ii. That a User has failed to supply all the required information;
iii. That Permission Granted to a User will be against public policy or will not be
in accordance with the Objectives of the Act.
When Permission is refused, the reasons for such refusal shall be
communicated to the User.
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
3.9 VALIDITY OF PERMISSION
Permission shall, unless cancelled or revoked earlier, be valid for a period of
three years from the date on which it is granted.
3.10 AMENDMENT TO PERMISSION
A. The Authority may, for reasons to be recorded, amend the Permission
whether by varying, deleting or adding conditions of Permission, or by
amending the period of validity of the Permission, or by any other means,
after giving a notice of at least seven days to the affected person, affording
an opportunity to file objections.
B. A User may apply for amendment to an existing Permission. A User who
intends to extract groundwater higher than the permitted volume, shall apply
in advance for amendment of the Permission for increasing its volume of
extraction. Revised Permission may be granted in such a case for the
increased volume, on payment of application fees and increased security
deposit as applicable, and subject to amended conditions of Permission
including conditions pertaining to installing equipment and water meters etc.
as required.
C. A User with valid Permission for groundwater extraction shall not install any
additional Extraction Structure without the permission of the Authority.
D. If a User requires to make an alteration or modification to any Extraction
Structure, it shall intimate to the Authority in the required format within 30
days of starting the process of such alteration or modification:
Provided that if such activity is likely to result in an increase in
groundwater extraction beyond the volume permitted then the User shall
neither make any such alteration or modification nor extract any groundwater
in excess of the permitted volume without obtaining prior Permission of the
Authority.
3.11 RENEWAL OF PERMISSION
A. A User shall apply for renewal of Permission in the required format prior to
the expiry of Permission.
B. While renewing Permission, the Authority shall satisfy itself that conditions
of Permission have been complied with.
C. If the Authority does not communicate with the Applicant or User within a
period of three months from the date of receipt of the application for Renewal
of Permission complete in all respects, then the renewal will be deemed to
have been granted as applied for.
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
3.12 REVOCATION OF PERMISSION
The Authority may revoke a Permission on an application by the User in the required
format.
3.13 SUSPENSION OF PERMISSION
The Authority may, for reasons to be recorded suspend a Permission with
immediate effect, for a period not exceeding three months, if it has reason to believe
that the User has violated any condition of Permission, or has failed to comply with
any direction of the Authority.
Provided that within 7 working days of such order of suspension, the Authority
shall issue a Notice of 15 days to the User to show cause why the suspension order
may not be confirmed and the Permission may not be cancelled.
3.14 CANCELLATION OF PERMISSION
In the event that a User has obtained Permission by fraud or suppression or
mis-representation of facts, or fails to comply with any condition of the Permission
granted, or fails to comply with any direction of the Authority, then in addition to
any other action that the Authority may take in this regard as per law, the Permission
granted may be cancelled after issuing a notice of not less than fifteen days, affording
an opportunity of being heard to such User.
3.15 PERMISSION OBTAINED FROM CENTRAL GROUNDWATER
AUTHORITY
In case a User has obtained a No Objection Certificate (NOC) of the Central
Groundwater Authority (CGWA) prior to the date of commencement of the
Directions and such NOC has not expired on such date of commencement, then such
NOC shall be considered for the purpose of granting Permission by the Authority:
Provided that such User shall be bound by all the conditions of the Directions
and shall comply with the same from the date of commencement of the Directions.
3.16 OTHER REGULATORY CLEARANCES
The permission accorded by the Authority for extraction of groundwater is
limited to the purposes of the Act and it cannot be the basis of, or ground for, any
other regulatory clearance (known by any nomenclature including No Objection
Certificate, permission, sanction, authorisation, registration, certificate, etc.) that the
User may require under any law. Further, this permission is not a substitute for any
such regulatory clearance and it is entirely the responsibility of the User to obtain all
such clearances and to comply with the same at all times.
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
3.17 CONSTRUCTION OF GROUNDWATER EXTRACTION
STRUCTURE
After six months from the date of commencement of the Directions, no User shall
engage a power-operated drilling rig other than that permitted by the Authority for
exploration of groundwater or for establishing, modifying, augmenting or improving
any groundwater extraction structure.
3.18 SEALING OF ABANDONED OR DEFUNCT GROUNDWATER
EXTRACTION STRUCTURE
A. Every abandoned or defunct groundwater extraction structure shall be kept
sealed at all times.
B. A User shall ensure proper sealing with cement grouting of every abandoned
or defunct tube well, dug well or other extraction structure within seven days
of its abandonment or becoming defunct. The User shall submit a report
including photographs to this effect to the Authority within a further period of
seven days of having sealed the extraction structure.
3.19 GROUNDWATER QUALITY REPORT
Existing Units seeking Permission for extraction of a volume Groundwater (other
than Brackish/Saline water) more than 15,000 cubic metres per month shall submit
a Chemical Analysis Report of water of each extraction structure provided by a
NABL-accredited laboratory (as per IS-10500:2012) for the parameters as described
in the Application Form. This report should not be older than six months on the date
of Application. New Units granted permission to extract more than 15,000 cubic
metres per month of groundwater shall provide this report within 6 months of grant
of permission.
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
CHAPTER 4
GROUNDWATER CHARGES
4.1 GROUNDWATER CHARGES
A. A User not exempted under the Directions, shall pay Groundwater Charges as
applicable for the extraction of groundwater.
B. Groundwater Charges are exclusive of taxes.
C. The status (Green, Yellow, Orange) of Assessment Areas (Blocks) has been
defined keeping in view the status of groundwater development of each
Assessment Area (Block) as described in Annexure 1. Groundwater Charges
have been levied at different rates for different Assessment Areas (Blocks)
with a view to balance the demand for water on the one hand, and the
requirements of ecological sustainability on the other hand, so as to achieve
the overall objective of improving the water balance.
D. A user shall pay the Groundwater Charges applicable to the assessment area
(Block) in which the unit is located.
E. If a unit falls in more than one Assessment Area (Block), the Groundwater
Charges shall be calculated on the basis of the rates defined for the Assessment
Area (Block)with the highest stage of Groundwater Development; irrespective
of the location of extraction structures.
4.2 APPLICATION FEES FOR VARIOUS APPLICATIONS
An application under the Directions shall be made on payment of Application
Fees (non-refundable) as given in the Table below:
Table 4.1: Application Fees (in Rupees)
S.
N
o.
Nature of Application Groundwater Extraction by Unit
(cubic metres per month)
Upto1,500 > 1,500
to
15,000
>15,000
to 75,000
>
75,000
1 2 3 4 5 6
1 Permission, Renewal of Permission or
Amendment in volume of water extraction
1,000 2,500 10,000 50,00
0
2 Correction, Name Change in the Permission
granted
500
1,000
2,500 5,000
3 Revocation, Transfer or Amalgamation of
Permission
500 1,000 2,500 5,000
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
4 Registration of Extraction Structure, or
Modification thereof;
500 1,000 5,000 10,00
0
5 Permission for Drilling Rig, Renewal or
Amendment
10,000
6 Permission for Water Tanker, Renewal or
Amendment
2,500
Explanation 1: If a User seeks amendment of Permission for an increase in
the volume of groundwater extraction, then it shall pay the Application Fees
applicable to the total volume applied for.
Explanation 2: If a Drilling Rig or Water Tanker applies for any of the
services listed at serial numbers 2 or 3in the Table, it shall pay an amount
equivalent to the stipulated Application Fee for a volume of groundwater
extracted between 1,500 to 15,000 cubic metres per month as per column 4 of
the above table, for each such Rig or Tanker.
4.3 SECURITY DEPOSIT
A. The Security Deposit shall be equivalent to two months of Groundwater
Extraction Charges for the permitted volume.
Explanation: The Security Deposit will be calculated on the basis of the rate
of Groundwater Extraction Charges (exclusive of water conservation credits)
as applicable. The Security Deposit shall not be reduced in case the Unit is
eligible for any water conservation credits.
B. The Security Deposit may be refunded to the User after settling all accounts
in case the Permission is refused or revoked or cancelled by the Authority.
C. No interest shall accrue on the Security Deposit.
4.4 CHARGES ON GROUNDWATER LEVIED BY OTHER ENTITIES
Certain Entities in the State including Urban Local Bodies, Panchayati
Raj Institutions, Government Departments, Cantonment Boards, Urban
Development Authorities, Improvement Trusts and Water Users’
Associations may be levying a charge on groundwater extracted by users
whether known by any name such as a tax, tariff, rate, fee, or cess.
The Groundwater Charges contained in the Directions are in addition
to, and completely distinct and separate from, any such tax, tariff, rate, fee, or
cess levied by the concerned Entity under the applicable law. A User shall be
responsible for paying the Groundwater Charges under the Directions
irrespective of any such tax, tariff, rate, fee, or cess etc. levied or collected by
an Entity.
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
4.5 REBATE DUE TO COVID 19 EPIDEMIC
A rebate of 20% has been given on Groundwater Extraction Charges deposited
by the User under the Draft Guidelines 2020 till 31stJuly, 2021.Therefore the
Water Conservation Credits, if any, earned by such User till July 31st 2021
will also stand reduced by 20%.
4.6 CHARGES FOR GROUNDWATER EXTRACTION
A. Groundwater Extraction Charges shall be volumetric that is to say, they
shall be based on the volume of groundwater extracted. The volume of
groundwater extracted shall be measured as required by the Directions or
otherwise by the Authority.
B. Groundwater Extraction Charges will be levied for each Cubic Metre of
groundwater extracted by a Unit in a month as per the slabs shown in the Table
4.2 below:
Table 4.2: Groundwater Extraction Charges** (Gross)
Status of
Assessment Area*
Volume of Groundwater extracted (cubic metres per month)
Up to
300
> 300 up
to 1,500
> 1,500 up
to 15,000
> 15,000 up
to 75,000
Above
75,000
Charges in Rupees per cubic metre
GREEN 0 4 6 10 14
YELLOW 0 6 9 14 18
ORANGE 0 8 12 18 22
*Status of Assessment Area (Block) is described in Annexure 1.
** Charges exclude taxes
NOTE: It is clarified that these slab rates shall apply to all Units irrespective of the
volume of groundwater extracted by them. This is illustrated in the Example below.
Example: Calculation of monthly Ground Water Charges
Calculation of Ground water charges to be paid if a unit located in Orange Zone,
extracts 35,000 m3 of Ground Water in a month and does not undertake any water
conservation activity.
S
No.
Description
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
1 Volume of Water
Extracted in a month
35,000 m3
2 Assessment area Orange
3 Ground Water Charges
Payable without any
water conservation
Amount
(in Rs.)
i. Up to 300 m3
ii. >300-1500 m3 @ Rs. 8 x
1200
iii. >1500-15000m3@ Rs.12 x
13500
iv. >15000-35000 m3@ Rs.18 x
20000
Total
= 0
= 9,600
= 1,62,000
= 3,60,000
= 5,31,600
4.7 WATER CONSERVATION CREDITS
A Unit that extracts a volume of groundwater exceeding three hundred cubic
metres per month will be entitled for water conservation credits for the water
conserved by it under a scheme approved by the Authority. Each cubic metre
of water conserved will earn one Water Conservation Credit which will entitle
the Unit to a rebate of Rupees 2.50. However, this rebate will be available to
a Unit for each slab as depicted in Table 4.3 below. In case a Unit saves water
beyond this limit then no additional rebate shall accrue. The limit on the rebate
will vary according to the status of the Assessment Area (Block) in which a
Unit is located as described in Annexure 1. The upper limit for water
conservation up to which water conservation credits can be earned by a Unit
shall be as mentioned in Table 4.3 below.
Table 4.3: Water Conservation Limits for earning credits
Status of Assessment Area
Volume of Groundwater extracted (cubic
metres/Year)
>3600-
18000
>18000-
180000
>180000-
900000
>900000
% of groundwater to be conserved for maximum
rebate
Green 50% 100% 150% 200%
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
Yellow 100% 150% 200% 250%
Orange 150% 200% 250% 300%
Example: A Unit situated in Orange Zone extracting 25,000 cubic metres per month
(300,000 cubic metres per year) can earn maximum water conservation credits per
annum as follows:
No rebate for first 3,600 m3
For 3,600 to 18,000 cubic metres i.e.14400 m3 @ 150% = 21,600 cubic metres
For 18,000 to 1,80,000 cubic metres i.e.162000 m3 @ 200% = 3,24,000 cubic metres
For balance 1,20,000 cubic metres @ 250% = 3,00,000 cubic metres
Total Volume that can be conserved to avail maximum water conservation credits =
6,45,600 cubic metres.
Maximum Rebate is 645,600 x 2.50 = Rs 16,14,000 per annum
Note: No Water Conservation rebate will be available for Units extracting
groundwater up to 300 cubic metres in a month.
4.8 BILLING CYCLE AND PAYMENT SCHEDULE
A. Groundwater extraction charges shall be paid by the User on a self-assessment
basis in accordance with the self-recorded and reported water meter readings.
In addition, the Authority may verify the water meter readings either
periodically or at any time.
B. Groundwater extraction charges shall be paid on a monthly basis.
C. A User shall convey the water meter readings of the last working day of the
month to the Authority by the 10thday of the ensuing month and shall make
payment of the Charges by the20th day of the month.
Note: Water meter readings shall be conveyed by a User as per schedule even
if no groundwater extraction occurs in a billing cycle.
D. For the period from the date of commencement of the Directions up to date of
submitting the Permission application or up to the date of installation of
required water meters (whichever is later), an existing User shall pay
groundwater charges for the entire volume of groundwater for which
Permission is sought. In case the User is granted Permission for a different
volume of groundwater than applied for, then the difference in payment, if
any, will be paid by the User or adjusted in future bills as the case may be.
E. A User not applying within the stipulated time period, shall be liable to pay all
applicable Non-Compliance Charges
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
4.9 FAILURE TO PAY IN TIME
A. Failure to make any payment of Groundwater Charges in full and in time or
failure to convey Water Meter readings within the stipulated time period, by a
User shall be sufficient cause for the Authority to take action for default,
including but not limited to imposition and recovery of Non-Compliance
Charges as applicable.
B. Notwithstanding anything in the sub-paragraph above, if the User fails to
deposit the groundwater charges for three consecutive billing cycles, then the
Permission granted to the User maybe suspended in terms of the Directions.
4.10 CHARGES FOR GROUND WATER EXTRACTION WHICH
ENTAILS CONVEYANCE OR TRANSPORTATION THROUGH WATER
TANKERS
A. The following Groundwater Conveyance Charges shall be paid for
conveying, transporting, supplying or delivering groundwater for usage other
than drinking and domestic or agricultural or fire-fighting. These charges shall
be paid irrespective of the groundwater charges, if any, payable by the owner
or operator of the extraction structure.
Table 4.4 Ground Water Conveyance Charges
S.n
o
Category of Assessment Area
Rupees per cubic
metre
1 Orange 20
2 Yellow 16
3 Green 10
Note: The charges shall apply as per the location of groundwater
extraction structure.
B. Groundwater Conveyance Charges shall be payable from the
commencement of the Directions.
C. The Groundwater Conveyance Charges shall be calculated on the basis that
the water tanker carries its full capacity and makes twenty trips in a month as
per the following formula:
20 (Trips) x Capacity of Tanker in cubic metres x Rate given in Table 4.4
D. The monthly payment shall be made by the 10th day of the ensuing month.
4.11 EXTRACTION OF BRACKISH/SALINE GROUND WATER
A. Extraction of brackish/saline ground water in a pocket where the aquifers at all
levels up to 300 metres depth contain only brackish/saline ground water will
be permitted on payment of only 25% of the applicable Groundwater Charges.
No water conservation credits shall be available in such a case. A User seeking
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
Permission for extracting more than 1,500 cubic metres of brackish/saline
groundwater per month shall submit a hydro-geological report as per format
required by the Authority detailing the contours of the brackish/saline aquifer
and its potential, and an assessment of the risk of mixing of good quality water
due to extraction of brackish/saline water. Such hydro-geological report shall
cover a radius of 2 kilometres around the Unit. Further, the User shall obtain a
report of a NABL-accredited laboratory regarding the quality parameters of
groundwater extracted or to be extracted by the Unit and such test report will
be considered before deciding whether to grant Permission to a Unit to extract
groundwater in such an identified pocket.
B. A User which extracts saline/brackish water shall comply with all conditions
of environmental clearance (if applicable) as regards the extraction, treatment,
disposal and re-use of such water. In case the User is not required to obtain
environmental clearance then the Authority may impose such conditions as it
may deem fit for the treatment, disposal and re-use of such water.
4.12 DE-WATERING
A User that undertakes de-watering shall comply with all conditions of
environmental clearance (if applicable) as regards the treatment, disposal and re-use
of such water. In case the User is not required to obtain environmental clearance then
the Authority may impose such conditions as it may deem fit for the treatment,
disposal and re-use of such water.
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
CHAPTER 5
MONITORING OF GROUNDWATER EXTRACTION
5.1 METERING OF GROUNDWATER EXTRACTION
A. A User requiring Permission for groundwater extraction under the Directions
shall install volumetric water meters on each extraction structure. All water
meters shall conform to the technical specifications, performance parameters
and connectivity standards etc. as required by the Authority. It shall be the
responsibility of the User to ensure that each water meter including the
telemetry device (if required) is fully functional and in proper working order
at all times.
B. A User shall install a water meter at each extraction structure depending on
the volume of groundwater permitted to be extracted by the Unit as follows:
Table 5.1: Type of Water Meter
Permitted Volume of Groundwater
Extraction
Type of Water Meter
Up to 1,500 cubic metres per month
Mechanical meter or Digital flow
meter with or without telemetry
More than 1,500 cubic metres per
month
Digital Flow Water Meter with
Telemetry
Explanation: The type of water meter required to be installed will depend on
the total volume of groundwater extraction permitted to the Unit and not on
the volume extracted by each individual extraction structure. For example, if
a Unit has three tube wells and has obtained Permission to extract 3,000 cubic
metres of groundwater per month, then it shall install a digital water meter
with telemetry at each of the three tube wells irrespective of the fact that a
particular tube well may extract less than 1,500 cubic metres of groundwater
per month.
C. A User shall install the required water meters within three months of the date
of Permission. For the period (within the time limit of three months) that the
Unit extracts water without installing Water meters as required, it shall pay
groundwater extraction charges for the entire volume permitted.
D. In case more than one User obtains groundwater from an extraction structure
then only the User within whose Unit the extraction structure is installed, or
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
in case such structure is installed in a common area then the User who
operates and maintains such structure, shall be required to apply for
Permission and such User shall be exclusively and solely responsible for
paying the entire Extraction Charges and for complying with all conditions
of Permission.
5.2 MEASUREMENT OF GROUNDWATER LEVELS
A Unit permitted ground water extraction exceeding 15,000 cubic metres per
month shall monitor the groundwater level digitally through a piezometer. Only
one piezometer will be required for a Unit irrespective of the number of
extraction structures. The details of the piezometer shall be as follows:
a. If feasible, it should be located at a horizontal distance of at least 25
metres and a maximum of 75 metres from the nearest extraction structure.
b. Its diameter should range between 100 mm and 150 mm.
c. It should be at the same depth and also tap the same aquifer zones as the
pumping tube wells.
d. It shall be fitted with a digital water level recorder with telemetry as
required.
e. A display board in Punjabi and English showing the details of the
Piezometer shall be installed in the vicinity of the structure.
f. The Piezometer shall be installed within a period of three months from
the date of Permission. The telemetry system should also be functional within
this period. The piezometer and telemetry equipment shall conform to the
technical specifications, performance parameters and connectivity standards
etc. as required by the Authority
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
CHAPTER 6
NON-COMPLIANCE CHARGES
6.1 Failure by a User to comply with provisions of the Directions shall make it
liable to pay Non-Compliance Charges as described below without prejudice to any
other liability under the Act or the Directions.
6.2 GROUNDWATER COMPENSATION CHARGES
The Authority may impose Non-Compliance Charges called Groundwater
Compensation Charges (GCC) in addition to Other Non-Compliance Charges for the
following contraventions of the Directions:
i. Extraction of groundwater without applying for Permission in
accordance with the Directions within the stipulated time period;
ii. Extraction of groundwater after the Permission for groundwater
extraction has been refused, revoked or cancelled;
iii. Extraction of groundwater during the period when Permission for
groundwater extraction has been suspended;
iv. Extraction of groundwater after expiry of Permission.
Provided that a User who files an application for renewal prior to
expiry of Permission will not be required to pay Groundwater
Compensation Charges for the period from the date of expiry of
Permission to the date of renewal of the Permission. However, in
case such renewal of permission is refused and the User extracts
groundwater thereafter, it shall be liable to pay Groundwater
Compensation Charges from the date of refusal of renewal of
permission or date of expiry of permission, whichever is later.
v. If a User granted Permission to extract groundwater, extracts a
volume of groundwater in excess of the permitted volume for a
period of three consecutive billing cycles, without applying for
revised permission with an application complete in all respects
including required fees and deposits, it shall be liable to pay
Groundwater Compensation Charges for any such volume of water
that it extracts in excess of the permitted volume after the last date
of the third billing cycle.
vi. If groundwater is extracted by a User without installing a water
meter of the required specifications within the stipulated time
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
period, it shall be liable to pay Groundwater Compensation Charges
for the entire permitted volume of groundwater for the period of such
delay.
vii. If at any time a User has reason to believe that a water meter is
defective or is not recording the volume of groundwater extracted
correctly, it shall be the responsibility of the User to inform the
Authority within seven days. The user shall ensure that the defect
is rectified within one month of noticing such defect. In case the
User informs the Authority within the required seven days and also
rectifies the defect within one month, it shall be liable to pay only
the Groundwater Extraction Charges for the volume of groundwater
extracted during the period for which the water meter was not
working. This volume shall be assessed on the basis of groundwater
extraction of the last billing cycle. In case the User delays the
reporting of the defect or delays the rectifying the defect in the
water meter, then Non-Compliance Charges shall be levied for the
period of delay.
viii. In the cases referred in sub-para vi, vii, above, the volume of
groundwater extracted during this period shall be assessed by the
Authority in a manner that provides the User an opportunity for
presenting its case to the person conducting the assessment. The
Groundwater Compensation Charges on the groundwater extracted
during such period shall be charged on the entire volume of
extraction permitted. However, in case actual extraction is assessed
to be greater than the permitted volume in any of the last three
months for which undisputed meter readings are available, then the
Groundwater Compensation Charges will be calculated based on the
extraction during such month with the highest water extraction.
Note: The imposition of Groundwater Compensation Charges shall be without
prejudice to any other action that may be taken by the Authority under the Act or
Directions with respect to a User.
6.3 CALCULATION OF GROUNDWATER COMPENSATION
CHARGES
The Groundwater Compensation Charges (GCC) which may be imposed shall be
calculated slab wise on the daily volume of water extracted in contravention of the
Directions as per the Table 6.1 below for each day of contravention:
Table 6.1: Slab-Wise Groundwater Compensation Rates
Volume of Water Extracted (cubic metres/day)
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
S.
no.
Status of
assessment area
Upto10 >10-50 >50-500
>500-
2500
>2500
Compensation Rate in Rupees per cubic metre
1 GREEN 2 8 12 20 28
2 YELLOW 4 12 18 28 36
3 ORANGE 6 16 24 36 44
6.4 NON- COMPLIANCE OF REQUIRED SPECIFICATIONS
A. All machinery, equipment and instruments to be installed or used by a User
for any purpose connected with groundwater extraction or conservation,
including measurement and monitoring thereof, shall be in accordance with
the standards and specifications set by the Authority. The User shall be bound
to install all such equipment, instruments, machinery and structures as may be
required by the Authority for any purpose connected with the extraction or
conservation of groundwater.
B. In the event that a User fails to comply with such standards, specifications or
requirements or does not install the equipment within the time period required
then it shall liable to pay Groundwater Compensation Charges described in
this Chapter including Other Non-Compliance Charges.
6.5 OTHER NON-COMPLIANCE CHARGES
A. The following Non-Compliance Charges (other than Groundwater
Compensation Charges) for various contraventions of the Directions will be
imposed as given in the Table 6.2below. These charges are in addition to and
without prejudice to the Groundwater Compensation Charges that may be
levied.
Table 6.2: Other Non-Compliance Charges
S.
No.
Item Charges in Rs. #
Groundwater extracted by Unit
(cubic metres per month)
Up to
1,500
From
1,501 to
15,000
Above
15,000
1 Failure to install required water meter
in time; or failure to repair, rectify or
replace faulty water meter within one
10,000 20,000 50,000
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
month of its detection (for every
month or part thereof).
2 Non-disclosure, non-sealing or
unauthorised construction of
groundwater extraction or water
recharge (injection) structure at the
time of application or thereafter:
A. Each Functional Structure;
B. Each Defunct or Abandoned
Structure;
(For every month or part thereof).
25,000
10,000
50,000
20,000
2,00,000
1,00,000
3 Unauthorised use of abandoned or
non-functional extraction or recharge
(injection) structure for any purpose
including injection of any substance
into the ground (for every month or
part thereof).
25,000 50,000 2,00,000
4 Non-maintenance of water recharge
or conservation structures/measures
(as per water conservation scheme
approved for Unit)
(for every year or part thereof).
10,000 20,000 1,00,000
5 Non-submission of groundwater
extraction data in time; any other
violation pertaining to documentation
and reporting.
5,000 10,000 50,000
6 Non-Submission of Water Audit
Report in time (for every year or part
thereof).
Not
Applicable
25,000
1,00,000
7 Construction or excavation of
groundwater extraction or recharge
structure by engaging a Drilling Rig
not having valid Permission (per
structure).
5,000 10,000 50,000
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
8 Submission of false information or
undertaking or failure to comply with
undertaking (including undertaking
related to water meters and
piezometers) at the time of application
or thereafter.
10,000 20,000 1,00,000
9 Operation of water tanker without
valid Permission.
2,000
(for every month or part thereof)
10 Operation of drilling rig without valid
Permission.
10,000
(for every month or part thereof)
11
Delay in payment of any Groundwater
Charges
1.5% of overdue amount for every
month or part thereof; to be
compounded annually
# All Charges are exclusive of GST and other taxes.
Explanation: If an act or omission by a User amounts to contravention of
more than one of the conditions of the Directions, including conditions of
Permission, then such User shall be liable to pay each and every applicable
Non-Compliance Charge.
Example: Calculation of Groundwater Compensation Charges (GCC) and delay
payment charges
Calculation of Groundwater Compensation charges to be paid by an existing Unit
in Orange Zone, extracts 35,000 m3 of Ground Water in a month and does not
undertake any water conservation activity and applies to the Authority after 4
months 21 days from the date of commencement of Directions.
S
No.
Description Amount
1 Transition period (given
to apply to Authority)
3 months (refer table 3.1)
2 Assessment area Orange
3 Groundwater
Compensation Charges
to be paid for the period
51 days
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
4 Ground Water Charges
Payable without any
water conservation per
month
i. Up to 300 m3 =
0
ii. >300-1500 m3 @ Rs. 8 x 1200
= 9600
iii. >1500-15000m3@ Rs.12 x 13500 =
1,62,000
iv. >15000-35000 m3@ Rs.18 x 20000 =
3,60,000
Total Rs. 5,31,600
5 Per day consumption of
Unit
= 35,000/30 = 1,167 m3
6 GCC charges calculation
per day
i. Up to 10 m3@ 6 x 10 = 60
ii. >10-50 m3 @ Rs. 16 x 40 = 640
iii. >50-500m3@ Rs.24 x 450 = 10,800
iv. >500-1167 m3@ Rs.36 x 667 = 24,012
Total Rs. 35,512/-
7 Total GCC for 21 days = 35,512 x 51 Rs.
18,11,112/-
8 Delay of Payment of
three months
Groundwater Charges
(as per S.No. 11 of Table
6.2 above)
= 5,31,600 x 3 x (1.5 % x 2) Rs. 47,844/-
6.6 INSPECTION OF UNIT
A person authorised by the Authority may inspect a Unit at any time for
the purpose of checking, determining or monitoring the compliance of the
Directions. Such authorised person shall make a written note of inspection and
provide a copy of the Inspection Note, at the time of inspection or within such
period as required by the Authority, to the User.
Such authorised person may also inspect and obtain copies of any documents,
records, digital files, data in electronic format etc. required for the purpose of
checking or monitoring the compliance of the Directions, and it shall be the
responsibility of the User to provide all such documents, records, information
and files without delay.
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
CHAPTER 7
WATER AUDIT
7.1 Water audit is a systematic process of objectively obtaining a water
balance of the Unit by measuring flow of water from the source of water
withdrawal or treatment, through the distribution system, and into areas where
it is used, treated and finally discharged or re-used.
a. Objectives of Water Audit
Conducting a water audit involves calculating the existing water use and
water balance, and then identifying and prioritising the options for saving
water so as to achieve an improved water balance within a defined time
period.
A detailed description of the current and the achievable water balance is
an important deliverable of the Water Audit Report. This includes
assessing the water quantity and quality at various user points which are
mapped to assist in developing reduction, recycle and reuse
opportunities.
b. Activities during Water Audit
A preliminary water survey will be conducted to collect information
regarding the Unit’s activities, water consumption, water quality, water
treatment, water discharge and re-use pattern and water billing rates.
Secondary data will be collected from the industry or similar Units to
assess and evaluate good practices, feasible technologies and
economically viable options.
After the analysis of this secondary data a detailed water audit of the Unit
shall be conducted, including the following steps:
• On-site briefing and discussion with facility manager and
personnel;
• Analysis of water system and each water sub-system in the Unit;
• Preparation and Quantification of Baseline Water Map;
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
• Measurement of water flows and water quality using water meters
and other devices and water quality tests by NABL-accredited
laboratories for all relevant parameters;
• Identification and Quantification of water inefficiencies including
leakages;
• Quantification of loads and discharges;
• Quantification of variability in flows and in water quality
parameters;
• Targets and Strategies for improving water use productivity,
economising water use, improving water treatment and reuse;
• Prioritising options based on cost-benefit analysis and defining
time lines for actionable points.
c. The Water Audit Report should contain the following:
• Water consumption and wastewater generation pattern
• Specific water usage, quality, treatment and conservation issues
• Complete water balance of the Unit
• Water saving opportunities
• Comparison of the technologies and practices of the Unit with best
technology and best practices for water use of the industry
• Recommendations, short term and long term, for achieving
improved water balance, based on priorities determined through
cost-benefit analysis of options;
• Methods, costs, benefits and timelines for implementing the
recommendations
• Investments in new machinery, equipment, processes, skills, and
technologies required to achieve recommendations within agreed
time periods
• Detailed description and analysis including data, tables and
figures.
7.2 A Unit that has been granted permission to extract more than 3,000
cubic metres per month of groundwater shall be required to undertake a Water
Audit as per the following time schedule:
(1) A Unit permitted to extract between 3,000 cubic metres month and 15,000
cubic metres per month will submit a Water Audit Report once every five years
from the date of grant of permission.
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
(2) A Unit permitted to extract groundwater above 15,000 cubic metres per
month will submit a Water Audit Report once every three years from the date
of grant of permission. The Unit shall engage for this purpose any one of the
Water Auditors empanelled by the Authority.
7.3 The Water Auditor shall obtain the comments of the User as regards the contents
of the Report and in particular as regards implementing in a time-bound manner
the recommendations contained in the Report. The Water Auditor shall
specifically mention such of the recommendations that the User has agreed to
implement within a definite time period along with an action plan for the same.
7.4 The Report shall be submitted by the User to the Authority after it is completed
and signed by the Water Auditor. The Authority may monitor and review the
activities of the User for ensuring compliance with the agreed time-bound action
plan contained in the Report, and may issue directions in this regard to the User.
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
CHAPTER-8
AD-INTERIM PERMISSIONS
8.1. A User who had obtained granted ad-interim permission under the Draft
Guidelines shall apply for permission under the Directions within the time
period stipulated for existing Units.
8.2. A User who had obtained ad-interim permission under the Draft Guidelines
shall pay Groundwater Extraction charges from the date it had submitted its
application or from the date of extraction, whichever is later, as per the
charges in the Draft Guidelines, up to the commencement of the Directions
as the ad-interim permission will come to an end with the commencement of
the Directions.
8.3. Such User shall pay the groundwater charges contained in the Directions from
the date of commencement of the Directions.
8.4. The Security Deposit of such User will be re-calculated as per the Directions.
8.5. A User granted ad-interim Permission for a Unit which is now exempted from
paying Charges under the Directions (e.g. a Unit extracting up to 300 cubic
metres per month) may seek refund of the Security Deposit which may be
returned to the User after settling all accounts.
8.6. A User who has already paid the registration fee for extraction structures
while applying for ad-interim permission under the Draft Guidelines, shall
not be required to pay such fee again for the same structures while applying
under the Directions. However, no refund shall be applicable in case of any
difference in registration fees.
8.7. A User who has applied for ad-interim permission and has paid the
application fee for the same, shall be exempted from payment of application
fee for the same Unit under the Directions in case the volume of groundwater
extraction for which permission is sought does not fall in a higher slab.
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
CHAPTER-9
PETITIONS TO AUTHORITY AND REMOVAL OF DIFFICULTIES
9.1 PETITION BY AFFECTED PERSON
A person affected by an Order under the Directions may file a petition before
the Authority within 60 Days of such Order, in accordance with the provisions of the
Punjab Water Regulation and Development Authority (Conduct of Business)
Regulations, 2021.
9.2 REMOVAL OF DIFFICULTIES
If any difficulty arises in giving effect to any of the provisions of the Directions, the
Authority may by general or special order, do anything not being inconsistent with
the provisions of the Act which appears to it to be necessary or expedient for the
purpose of removing such difficulty.
9.3 INTERPRETATION AND REMOVAL OF DOUBTS
The Authority may, from time to time, issue such clarifications, explanations,
illustrations, examples and notes etc. as it may deem fit for the purpose of
interpreting any of the provisions contained in the Direction, and for the removal of
any doubts are regards the meaning, import and consequences of such provisions.
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
ANNEXURE 1
GROUND WATER RESOURCE ASSESSMENT
The Government of India and Government of Punjab have been jointly
assessing the groundwater status of Punjab periodically. The latest assessment of
Ground Water Resources of Punjab has been published in the Report “Ground Water
Resources of Punjab State (As on 31st March 2022) December 2022 by Ground
Water Management Circle, Water Resources Department, Punjab and the Central
Ground Water Board, North Western Region, Chandigarh. (hereinafter the Report).
As per the Report, the categorisation of assessment areas (blocks) is defined
by the Stage of Ground Water Extraction as given below:
Table A 1: Stage of Ground Water Extraction
Stage of Ground Water Extraction
(%)
Category
≤ 70 Safe
> 70and ≤ 90 Semi-Critical
> 90 and ≤ 100 Critical
> 100% Over-Exploited
The Stage of ground water extraction and categorisation of assessment areas
(blocks) in the Report is based only on the Dynamic Ground Water Resources. In
other words, the assessment in the Report does not consider the Static Ground Water
Resources or water resources contained in the deeper aquifers.
The abstract of Dynamic Ground Water Assessment for the year 2022 for Punjab is
given in the Report as follows:
Table A-2: Data on Dynamic Water Resources of Punjab, 2022
Groundwater Resource
Billion
Cubic
Metres
Millio
n
Acre
Feet
Net Annual Groundwater Availability 17.07 13.83
Existing Groundwater Draft for Irrigation 26.69 21.62
Existing Groundwater Draft for Domestic, and Industrial
Use 1.32 1.08
Existing Groundwater Draft for All Uses 28.01 22.70
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
Net Ground Water Availability for future Irrigation
Development in Safe, Semi-critical, Critical and potential
resource in water-logged areas
1.56 1.27
Average Stage of Groundwater Extraction of State (%) 164 %
The number of Assessment Areas (Blocks) falling in various categories in the year
2022 as per the Report is as follows:
TableA-3: Data on Number of Blocks in Various Categories
Total Blocks 153*
Over-Exploited Blocks 117*
Critical Blocks 04
Semi-Critical Blocks 15
Safe Blocks 17
*Includes 3 Urban areas- Amritsar City, Jalandhar city & Ludhiana city-
all 3 are in over-exploited category
In the Directions the categorisation of Assessment Areas (Blocks) contained
in the Report has been adopted. In addition, for better management and conservation
of groundwater resources the Assessment Areas (Blocks) have been assigned a
Status i.e., Orange, Yellow and Green. This Status has been considered while fixing
Groundwater Charges under the Directions for each Assessment Areas (Blocks). The
Status is based on the stage of groundwater extraction contained in the Report.
The Over-exploited Blocks/Assessment Areas with a stage of ground water
development of 200% or more have been designated as "ORANGE". These are 63
in number. These would need most immediate and urgent attention for management
and conservation of ground water.
The Over-exploited Blocks/Assessment Areas numbering 53, with a stage of
ground water development more than 100% and up to 199% have been designated
as "YELLOW". These need appropriate management and water conservation
measures on an urgent basis.
The 37 Blocks/Assessment Areas with a stage of ground water development
falling in the three categories of Critical, Semi-critical and Safe as per the Report
have been designated as “GREEN" and need appropriate water management
measures so that ground water conditions remain sustainable in the long run.
Consequently, the number of Assessment Areas (Blocks) in each Status is as
follows.
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
Table A-4: Number of Assessment Areas (Blocks) by Status
Category as per Report (2022) Status
Number of Assessment
Areas (Blocks)
Safe, Semi Critical, Critical Green 37
Over-exploited (up to 199%) Yellow 53
Over-exploited (200% and
above) Orange 63
Accordingly, the categorization of Assessment Areas (Blocks) contained in the 2022
Report titled “Ground Water Resources of Punjab State (As on 31st March 2022)” is
as follows:
Table A-5: Category and Corresponding Status of Assessment Areas (Blocks)
Sr.
No.
District
Assessment
Areas (Blocks)
Stage of
Ground Water
Extraction (%)
as on
31.03.2022
Category Status
1. AMRITSAR AJNALA 157 OVER-EXPLOITED YELLOW
2. AMRITSAR ATTARI 185 OVER-EXPLOITED YELLOW
3. AMRITSAR
AMRITSAR
CITY (URBAN)
324 OVER-EXPLOITED ORANGE
4. AMRITSAR CHOGAWAN 145 OVER-EXPLOITED YELLOW
5. AMRITSAR
HARSHA
CHINA
186 OVER-EXPLOITED YELLOW
6. AMRITSAR
JANDIALAGU
RU
238 OVER-EXPLOITED ORANGE
7. AMRITSAR MAJITHA 157 OVER-EXPLOITED YELLOW
8. AMRITSAR RAYYA 187 OVER-EXPLOITED YELLOW
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
9. AMRITSAR TARSIKA 202 OVER-EXPLOITED ORANGE
10. AMRITSAR VERKA 242 OVER-EXPLOITED ORANGE
11. BARNALA BARNALA 320 OVER-EXPLOITED ORANGE
12. BARNALA
MAHAL
KALAN
117 OVER-EXPLOITED YELLOW
13. BARNALA SEHNA 211 OVER-EXPLOITED ORANGE
14. BATHINDA BATHINDA 126 OVER-EXPLOITED YELLOW
15. BATHINDA
BHAGTA
BHAI KA
345 OVER-EXPLOITED ORANGE
16. BATHINDA
GONIANA
MANDI
219 OVER-EXPLOITED ORANGE
17. BATHINDA MAUR 179 OVER-EXPLOITED YELLOW
18. BATHINDA NATHANA 118 OVER-EXPLOITED YELLOW
19. BATHINDA PHUL 135 OVER-EXPLOITED YELLOW
20. BATHINDA RAMPURA 78 SEMI-CRITICAL GREEN
21. BATHINDA SANGAT 72 SEMI-CRITICAL GREEN
22. BATHINDA
TALWANDI
SABOO
75 SEMI-CRITICAL GREEN
23. FARIDKOT FARIDKOT 144 OVER-EXPLOITED YELLOW
24. FARIDKOT JAITON 188 OVER-EXPLOITED YELLOW
25. FARIDKOT KOT KAPURA 125 OVER-EXPLOITED YELLOW
26.
FATEHGARH
SAHIB
AMLOH 248 OVER-EXPLOITED ORANGE
27.
FATEHGARH
SAHIB
BASSI
PATHANA
248 OVER-EXPLOITED ORANGE
28.
FATEHGARH
SAHIB
KHAMANON 170 OVER-EXPLOITED YELLOW
29.
FATEHGARH
SAHIB
KHERA 198 OVER-EXPLOITED YELLOW
30.
FATEHGARH
SAHIB
SIRHIND 199 OVER-EXPLOITED YELLOW
31. FAZILKA ABOHAR 17 SAFE GREEN
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
32. FAZILKA
ARNIWALA
SHEIKH
SUBANPUR
81 SEMI-CRITICAL GREEN
33. FAZILKA FAZILKA 34 SAFE GREEN
34. FAZILKA JALALABAD 182 OVER-EXPLOITED YELLOW
35. FAZILKA
KHUYIAN
SARWAR
61 SAFE GREEN
36. FEROZPUR FEROZPUR 113 OVER-EXPLOITED YELLOW
37. FEROZPUR
GHALL
KHURD
139 OVER-EXPLOITED YELLOW
38. FEROZPUR
GURU HAR
SAHAI
103 OVER-EXPLOITED YELLOW
39. FEROZPUR MAKHU 99 CRITICAL GREEN
40. FEROZPUR MAMDOT 195 OVER-EXPLOITED YELLOW
41. FEROZPUR ZIRA 270 OVER-EXPLOITED ORANGE
42. GURDASPUR BATALA 167 OVER-EXPLOITED YELLOW
43. GURDASPUR
DERA BABA
NANAK
182 OVER-EXPLOITED YELLOW
44. GURDASPUR DHARIWAL 167 OVER-EXPLOITED YELLOW
45. GURDASPUR DINA NAGAR 86 SEMI-CRITICAL GREEN
46. GURDASPUR DORANGALA 87 SEMI-CRITICAL GREEN
47. GURDASPUR
FATEHGARH
CHURIAN
167 OVER-EXPLOITED YELLOW
48. GURDASPUR GURDASPUR 109 OVER-EXPLOITED YELLOW
49. GURDASPUR KAHNUWAN 134 OVER-EXPLOITED YELLOW
50. GURDASPUR KALANAUR 184 OVER-EXPLOITED YELLOW
51. GURDASPUR QADIAN 103 OVER-EXPLOITED YELLOW
52. GURDASPUR
SRI
HARGOBINDP
UR
98 CRITICAL GREEN
53. HOSHIARPUR BHUNGA 76 SEMI-CRITICAL GREEN
54. HOSHIARPUR DASUYA 143 OVER-EXPLOITED YELLOW
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
55. HOSHIARPUR
GARHSHANK
AR
178 OVER-EXPLOITED YELLOW
56. HOSHIARPUR HAZIPUR 64 SAFE GREEN
57. HOSHIARPUR
HOSHIARPUR-
I
166 OVER-EXPLOITED YELLOW
58. HOSHIARPUR
HOSHIARPUR-
II
81 SEMI-CRITICAL GREEN
59. HOSHIARPUR MAHILPUR 90 SEMI-CRITICAL GREEN
60. HOSHIARPUR MUKERIAN 90 SEMI-CRITICAL GREEN
61. HOSHIARPUR TALWARA 34 SAFE GREEN
62. HOSHIARPUR TANDA 158 OVER-EXPLOITED YELLOW
63. JALANDHAR ADAMPUR 213 OVER-EXPLOITED ORANGE
64. JALANDHAR BHOGPUR 203 OVER-EXPLOITED ORANGE
65. JALANDHAR
JALANDHAR
CITY (URBAN
305 OVER-EXPLOITED ORANGE
66. JALANDHAR
JALANDHAR-
EAST
400 OVER-EXPLOITED ORANGE
67. JALANDHAR
JALANDHAR-
WEST
243 OVER-EXPLOITED ORANGE
68. JALANDHAR LOHIAN 247 OVER-EXPLOITED ORANGE
69. JALANDHAR MEHATPUR 273 OVER-EXPLOITED ORANGE
70. JALANDHAR NAKODAR 313 OVER-EXPLOITED ORANGE
71. JALANDHAR NUR MAHAL 199 OVER-EXPLOITED YELLOW
72. JALANDHAR PHILLAUR 259 OVER-EXPLOITED ORANGE
73. JALANDHAR
RURKA
KALAN
241 OVER-EXPLOITED ORANGE
74. JALANDHAR SHAHKOT 344 OVER-EXPLOITED ORANGE
75. KAPURTHALA DHILWAN 177 OVER-EXPLOITED YELLOW
76. KAPURTHALA KAPURTHALA 286 OVER-EXPLOITED ORANGE
77. KAPURTHALA NADALA 189 OVER-EXPLOITED YELLOW
78. KAPURTHALA PHAGWARA 265 OVER-EXPLOITED ORANGE
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
79. KAPURTHALA
SULTANPUR
LODHI
249 OVER-EXPLOITED ORANGE
80. LUDHIANA DEHLON 237 OVER-EXPLOITED ORANGE
81. LUDHIANA DORAHA 142 OVER-EXPLOITED YELLOW
82. LUDHIANA JAGRAON 157 OVER-EXPLOITED YELLOW
83. LUDHIANA KHANNA 297 OVER-EXPLOITED ORANGE
84. LUDHIANA LUDHIANA-I 353 OVER-EXPLOITED ORANGE
85. LUDHIANA LUDHIANA-II 216 OVER-EXPLOITED ORANGE
86. LUDHIANA
LUDHIANA
CITY (URBAN)
426 OVER-EXPLOITED ORANGE
87. LUDHIANA
MACHHIWAR
A
153 OVER-EXPLOITED YELLOW
88. LUDHIANA MALOUD 199 OVER-EXPLOITED YELLOW
89. LUDHIANA PAKHOWAL 273 OVER-EXPLOITED ORANGE
90. LUDHIANA RAIKOT 282 OVER-EXPLOITED ORANGE
91. LUDHIANA SAMRALA 234 OVER-EXPLOITED ORANGE
92. LUDHIANA
SIDHWAN
BET
251 OVER-EXPLOITED ORANGE
93. LUDHIANA SUDHAR 237 OVER-EXPLOITED ORANGE
94. MALER KOTLA
MALER
KOTLA-I
308 OVER-EXPLOITED ORANGE
95. MALER KOTLA
MALER
KOTLA-II
298 OVER-EXPLOITED ORANGE
96. MANSA BHIKHI 215 OVER-EXPLOITED ORANGE
97. MANSA BUDHLADA 100 CRITICAL GREEN
98. MANSA JHUNIR 48 SAFE GREEN
99. MANSA MANSA 170 OVER-EXPLOITED YELLOW
100. MANSA
SARDULGAR
H
88 SEMI-CRITICAL GREEN
101. MOGA
BAGHA
PURANA
209 OVER-EXPLOITED ORANGE
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
102. MOGA
DHARAMKOT
(KOT ISA
KHAN)
159 OVER-EXPLOITED YELLOW
103. MOGA MOGA I 333 OVER-EXPLOITED ORANGE
104. MOGA MOGA II 344 OVER-EXPLOITED ORANGE
105. MOGA
NIHAL SINGH
WALA
331 OVER-EXPLOITED ORANGE
106. MUKTSAR
GIDDERBAHA
/ (KOT BHAI)
38 SAFE GREEN
107. MUKTSAR LAMBI 20 SAFE GREEN
108. MUKTSAR MALOUT 34 SAFE GREEN
109. MUKTSAR MUKTSAR 19 SAFE GREEN
110.
NAWAN
SHAHR
AUR 115 OVER-EXPLOITED YELLOW
111.
NAWAN
SHAHR
BALACHAUR 90 SEMI-CRITICAL GREEN
112.
NAWAN
SHAHR
BANGA 203 OVER-EXPLOITED ORANGE
113.
NAWAN
SHAHR
NAWAN
SHAHR
145 OVER-EXPLOITED YELLOW
114.
NAWAN
SHAHR
SAROYA 59 SAFE GREEN
115. PATHANKOT BAMYAL 82 SEMI-CRITICAL GREEN
116. PATHANKOT DHAR KALAN 27 SAFE GREEN
117. PATHANKOT GHAROTA 71 SEMI-CRITICAL GREEN
118. PATHANKOT
NAROT
JAIMAL
SINGH
77 SEMI-CRITICAL GREEN
119. PATHANKOT PATHANKOT 56 SAFE GREEN
120. PATHANKOT SUJANPUR 35 SAFE GREEN
121. PATIALA BHUNER HERI 282 OVER-EXPLOITED ORANGE
122. PATIALA GHANAUR 100 CRITICAL GREEN
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
123. PATIALA NABHA 214 OVER-EXPLOITED ORANGE
124. PATIALA PATIALA 196 OVER-EXPLOITED YELLOW
125. PATIALA PATRAN 286 OVER-EXPLOITED ORANGE
126. PATIALA RAJPURA 201 OVER-EXPLOITED ORANGE
127. PATIALA SAMANA 189 OVER-EXPLOITED YELLOW
128. PATIALA SANAUR 237 OVER-EXPLOITED ORANGE
129. PATIALA
SHAMBHU
KALAN
245 OVER-EXPLOITED ORANGE
130. ROPAR
ANANDPUR
SAHIB
76 SEMI-CRITICAL GREEN
131. ROPAR
CHAMKAUR
SAHIB
130 OVER-EXPLOITED YELLOW
132. ROPAR MORINDA 159 OVER-EXPLOITED YELLOW
133. ROPAR NURPUR BEDI 69 SAFE GREEN
134. ROPAR ROPAR 65 SAFE GREEN
135. S.A.S. NAGAR DERA BASSI 163 OVER-EXPLOITED YELLOW
136. S.A.S. NAGAR KHARAR 115 OVER-EXPLOITED YELLOW
137. S.A.S. NAGAR MAJRI 65 SAFE GREEN
138. SANGRUR ANDANA 251 OVER-EXPLOITED ORANGE
139. SANGRUR
BHAWANIGA
RH
348 OVER-EXPLOITED ORANGE
140. SANGRUR DHURI 344 OVER-EXPLOITED ORANGE
141. SANGRUR DIRBA 342 OVER-EXPLOITED ORANGE
142. SANGRUR
LEHRAGHAG
A
277 OVER-EXPLOITED ORANGE
143. SANGRUR SANGRUR 310 OVER-EXPLOITED ORANGE
144. SANGRUR SHERPUR 286 OVER-EXPLOITED ORANGE
145. SANGRUR SUNAM 341 OVER-EXPLOITED ORANGE
146. TARN TARAN BHIKHIWIND 219 OVER-EXPLOITED ORANGE
147. TARN TARAN CHOLA SAHIB 247 OVER-EXPLOITED ORANGE
PUNJAB GOVT. GAZ. (EXTRA), JANUARY 27, 2023 (MAGHA 7, 1944 SAKA)
148. TARN TARAN
GANDIWIND
TATLA
124 OVER-EXPLOITED YELLOW
149. TARN TARAN
KHADUR
SAHIB
223 OVER-EXPLOITED ORANGE
150. TARN TARAN
NAUSHEHRA
PANUAN
257 OVER-EXPLOITED ORANGE
151. TARN TARAN PATTI 236 OVER-EXPLOITED ORANGE
152. TARN TARAN TARN TARAN 241 OVER-EXPLOITED ORANGE
153. TARN TARAN VALTOHA 166 OVER-EXPLOITED YELLOW
Sd/-
(J.K JAIN)
Secretary
Chandigarh Punjab Water Regulation
The 27th January, 2023 and Development Authority
2753/1-2023/Pb. Govt. Press, S.A.S. Nagar
All of THE PUNJAB WATER RESOURCES (MANAGEMENT AND REGULATION) ACT, 2020